{{#Wiki_filter:Dominion | {{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com | ||
Energy Kewaunee, | NOV 0 7 2013 ATTN: Document Control Desk Serial No. 13-239 U. S. Nuclear Regulatory | ||
Inc. 4D | |||
WI | |||
www.dom.com | |||
NOV 0 7 | |||
Control Desk Serial No. 13- | |||
Commission | Commission | ||
LIC/RR/R0 | LIC/RR/R0 Washington, DC 20555-0001 | ||
Washington, | Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION | ||
DC 20555-0001 | REPORT 0500030512013504 -RESPONSE | ||
Docket No.: 50- | TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory | ||
ENERGY KEWAUNEE, | Commission (NRC) issued an inspection | ||
INC.KEWAUNEE | report for the Kewaunee Power Station (KPS) (Reference | ||
POWER | |||
REPORT 0500030512013504 | |||
-RESPONSE | |||
TO NRC | |||
Commission | |||
(NRC) issued an inspection | |||
report for the Kewaunee | |||
Power Station (KPS) (Reference | |||
1) indicating | 1) indicating | ||
a preliminary | a preliminary | ||
significance | significance | ||
determination | determination | ||
for a White finding. | for a White finding. On April 4, 2013, the NRC issued the final significance | ||
On April 4, 2013, the NRC issued | |||
determination | determination | ||
for a White finding and notice of violation | for a White finding and notice of violation (Reference | ||
(Reference | |||
2).The April 4, 2013 letter (Reference | 2).The April 4, 2013 letter (Reference | ||
2) also informed | 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting | ||
Dominion | |||
Energy Kewaunee, | |||
Inc.(DEK) the NRC would be conducting | |||
a supplemental | a supplemental | ||
inspection | inspection | ||
Line 59: | Line 41: | ||
for One or Two White Inputs in a Strategic | for One or Two White Inputs in a Strategic | ||
Performance | Performance | ||
Area," when NRC has been notified | Area," when NRC has been notified by DEK of its readiness | ||
by DEK of its readiness | |||
for the inspection. | for the inspection. | ||
On May 31, 2013, the NRC issued a letter describing | On May 31, 2013, the NRC issued a letter describing | ||
the termination | the termination | ||
of the | of the Reactor Oversight | ||
Process for KPS and commencement | Process for KPS and commencement | ||
of the Decommissioning | of the Decommissioning | ||
Power Reactor Inspection | |||
Program (Reference | Program (Reference | ||
3). In that letter the NRC states that it | 3). In that letter the NRC states that it will conduct the inspection | ||
for the Emergency | for the Emergency | ||
Preparedness | Preparedness | ||
Line 77: | Line 58: | ||
on Corrective | on Corrective | ||
Actions for Violations | Actions for Violations | ||
and Deviations," | and Deviations," to verify appropriate | ||
corrective | corrective | ||
actions are being implemented | actions are being implemented | ||
Line 86: | Line 66: | ||
the steps necessary | the steps necessary | ||
to assure that the cause evaluation | to assure that the cause evaluation | ||
and corrective | |||
actions are of sufficient | actions are of sufficient | ||
scope and breadth to address the identified | scope and breadth to address the identified | ||
performance | performance | ||
deficiencies. | deficiencies. | ||
DEK requests | DEK requests the NRC perform the inspection | ||
the NRC perform the inspection | |||
identified | identified | ||
in Reference | |||
3 starting | 3 starting on or after November 12, 2013.If you have questions | ||
on or after November | |||
12, 2013.If you have questions | |||
or require additional | or require additional | ||
information, | information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217. | ||
please feel free to contact Mr.Richard P. Repshas at 920-388-8217. | Very truly yours, Site Vi e resident, Kewaunee Power Station | ||
Very truly yours,Site Vi e resident, | Serial No. 13-239 Page 2 of 2 References: | ||
Kewaunee | 1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC | ||
Power Station | |||
Serial No. 13- | |||
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee | |||
Power Station-NRC | |||
Emergency | Emergency | ||
Preparedness | Preparedness | ||
Inspection | Inspection | ||
Report 05000305/2012503; | |||
Preliminary | Preliminary | ||
White Finding," | White Finding," dated January 24, 2013. (ADAMS Accession | ||
dated January 24, 2013. ( | |||
No. ML13024A422) | No. ML13024A422) | ||
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance | 2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance | ||
Determination | Determination | ||
of A White Finding With Proposed | of A White Finding With Proposed Followup and Notice of Violation; | ||
Followup | |||
and Notice of Violation; | |||
NRC Inspection | NRC Inspection | ||
Report No. 05000305/2013504; | Report No. 05000305/2013504; | ||
Kewaunee | Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession | ||
Power Station," | |||
No. ML13094A270) | No. ML13094A270) | ||
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination | 3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination | ||
Of Reactor Oversight | |||
Process For Kewaunee | Process For Kewaunee Power Station And Commencement | ||
Power Station And Commencement | Of Decommissioning | ||
Inspection | Inspection | ||
Program," | Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375) | ||
dated May 31, 2013. (ADAMS Accession | |||
No. ML13151A375) | |||
Commitments | Commitments | ||
made by this letter: | made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory | ||
Administrator, | |||
Region | |||
Commission | Commission | ||
2443 Warrenville | 2443 Warrenville | ||
Road Suite 210 Lisle, IL 60532-4352 | |||
Mr. K. D. | Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory | ||
Commission | Commission | ||
One White Flint North, Mail Stop 08-Dl | One White Flint North, Mail Stop 08-Dl 5 11555 Rockville | ||
Pike Rockville, MD 20852-2738 | |||
MD 20852-2738 | NRC Senior Resident Inspector Kewaunee Power Station | ||
NRC Senior Resident | |||
Inspector | |||
Kewaunee | |||
Power Station | |||
}} | }} |
Revision as of 19:36, 13 July 2018
ML13322A416 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 11/07/2013 |
From: | Jordan A J Dominion, Dominion Energy Kewaunee |
To: | Document Control Desk, NRC/RGN-III |
References | |
Download: ML13322A416 (2) | |
See also: IR 05000305/2013504
Text
Dominion Energy Kewaunee, Inc. 4D minion N490 Hwy 42, Kewaunee, WI 54216 Web Address: www.dom.com
NOV 0 7 2013 ATTN: Document Control Desk Serial No.13-239 U. S. Nuclear Regulatory
Commission
LIC/RR/R0 Washington, DC 20555-0001
Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATION INSPECTION
REPORT 0500030512013504 -RESPONSE
TO NRC REQUEST On January 24, 2013, the Nuclear Regulatory
Commission (NRC) issued an inspection
report for the Kewaunee Power Station (KPS) (Reference
1) indicating
a preliminary
significance
determination
for a White finding. On April 4, 2013, the NRC issued the final significance
determination
for a White finding and notice of violation (Reference
2).The April 4, 2013 letter (Reference
2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting
a supplemental
inspection
using Inspection
Procedure
95001, "Inspection
for One or Two White Inputs in a Strategic
Performance
Area," when NRC has been notified by DEK of its readiness
for the inspection.
On May 31, 2013, the NRC issued a letter describing
the termination
of the Reactor Oversight
Process for KPS and commencement
of the Decommissioning
Power Reactor Inspection
Program (Reference
3). In that letter the NRC states that it will conduct the inspection
for the Emergency
Preparedness
White finding using Inspection
Procedure
92702, "Follow-Up
on Corrective
Actions for Violations
and Deviations," to verify appropriate
corrective
actions are being implemented
instead of using Inspection
Procedure
95001.DEK has undertaken
the steps necessary
to assure that the cause evaluation
and corrective
actions are of sufficient
scope and breadth to address the identified
performance
deficiencies.
DEK requests the NRC perform the inspection
identified
in Reference
3 starting on or after November 12, 2013.If you have questions
or require additional
information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
Very truly yours, Site Vi e resident, Kewaunee Power Station
Serial No.13-239 Page 2 of 2 References:
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee Power Station-NRC
Emergency
Preparedness
Inspection
Report 05000305/2012503;
Preliminary
White Finding," dated January 24, 2013. (ADAMS Accession
No. ML13024A422)
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance
Determination
of A White Finding With Proposed Followup and Notice of Violation;
NRC Inspection
Report No. 05000305/2013504;
Kewaunee Power Station," dated April 4, 2013. (ADAMS Accession
No. ML13094A270)
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination
Of Reactor Oversight
Process For Kewaunee Power Station And Commencement
Of Decommissioning
Inspection
Program," dated May 31, 2013. (ADAMS Accession No. ML13151A375)
Commitments
made by this letter: NONE cc: Regional Administrator, Region III U. S. Nuclear Regulatory
Commission
2443 Warrenville
Road Suite 210 Lisle, IL 60532-4352
Mr. K. D. Feintuch Project Manager U.S. Nuclear Regulatory
Commission
One White Flint North, Mail Stop 08-Dl 5 11555 Rockville
Pike Rockville, MD 20852-2738
NRC Senior Resident Inspector Kewaunee Power Station