{{#Wiki_filter:IssueDate:07/13/2016 ASafetyRelatedPAGE79OF123
{{#Wiki_filter:Issue Date: 07/13/2016 A Safety RelatedPAGE79OF123
..-
..-
GrandGulfNuclearStationREFERENCE USE01-5-02-9 QUALITYRECORDRev:001Procedure ChanaeProcessAttachment 3,Procedure Editorial ChangeTraveler(PEC),',""*_,c
Grand Gulf Nuclear Station REFERENCE USE 01-5-02-9 QUALITY RECORDRev:001 Procedure Chanae Process Attachment 3, Procedure Editorial Change Traveler (PEC),',""*_,c" ,i"',, i v.'.'i PRGGN: 2 0 16S6 S-Procedure Number: I(),<-ot-Z3 Unit Number: I Current Revision: t{-Procedure Title: e.,"" t",..,----ITypeof[313_,_loc_
",i"',,iv.'.'iPRGGN:2016S6S-Procedure Number:I(),<-ot-Z3UnitNumber:ICurrentRevision:
0 OE1 OF1 Pen&Ink Editorial OA__I D--changeinfield Change: I Describe Editorial Correction:
t{-Procedure Title:e.,""t",..,----ITypeof[313_,_loc_
CI};;e"t+;tll"A; I.t-/I r", (;PI I tilt',,,,,,,,,,, J{t<"""r" , Initiator:
0OE1OF1Pen&InkEditorial OA__ID--changeinfieldChange:IDescribeEditorial Correction:
R.0:liV{)f,v ae<<;{Y-:=-:-=,.Date: 7-/3-/6 Print Name Signature'F""'/S,ECtjQN2
CI};;e"t+;tll"A; I.t-/Ir",(;PIItilt',,,,,,,,,,,
J{t<"""r",Initiator:
R.0:liV{)f,vae<<;{Y-:=-:-=,.Date:7-/3-/6PrintNameSignature
'F""'/S,ECtjQN2
....
....
....".'PlantManagement Staff:":S<1Pt'Date:
....".'Plant Management Staff: ":S<1Pt'Date:
PrintName
Print Name
*Signature indicates PEeisaccurate, consistent withPEetypesofPage2or3.Thisalso indicates approvalforimmediateuse(penandink changeinfield-Ff}isprovided.
*Signature indicates PEe is accurate, consistent with PEetypesofPage2or3.Thisalso indicates approval for immediateuse(penandink change in field-Ff}isprovided.
NOTE:14Working dayclockstartsuponPlant Management StaffApproval.
NOTE:14Working dayclockstartsuponPlant Management Staff Approval.>','
>','
;
;
..
..
,'-.<--.iT:::AssignedProcedure Writer.;<.Va..,NewRevision Number:5I'.,.",",i.,.',"'E<
,'-.<--.iT::: Assigned Procedure Writer.;<.Va..,NewRevision Number: 5 I'.,."," ,i.,.',"'E<:'*""".:':i
:'*""".:':i
.".,:',..;;;'.'(i,j',//{'"r i'i">:,?",.', i':".........'Review by:
.".,:',..;;;'.'(i,j',//{'"r i'i">:,?",.',i':".........
Date: 7j;o/Jh Print Name C Note:ThepersonperformingthePlantManagementSlaffApprovalmayalsobethesameperson performing theSupervIsorReview.TheInitiatorCANNOTbeeitherofthetwo.Page1 of3 CONTROLLED COPY_
'Reviewby:
AlA Safety RelatedPAGE80OF123 Grand Gulf Nuclear StationREFERENCEUSE 01-5-02-9QUALITYRECORD Rev: 001 Procedure Change Process Attachment 3, Procedure Editorial Change Traveler (PEC), Continued PEC Descri ption Type A.Correction of the following obvious editorial errors: 1.Punctuation, Capitalization or Misspelledwordsor obvious typographical errors 2.Redundantwordsor phrases 3.Omitted symbols 4.Misplaced decimals 5.Incorrectunitsof measure)6.Step/section/revision number discrepancies 7.Page number discrepancies 8.Cloning errors (Obvioussteporpartofastepcopied incorrectlyfroman opposite unit procedure).
Date:7j;o/JhPrintNameC Note:ThepersonperformingthePlantManagementSlaffApprovalmayalsobethesameperson performing theSupervIsorReview.TheInitiatorCANNOTbeeitherofthetwo.Page1of3CONTROLLED COPY_
AlASafetyRelatedPAGE80OF123 GrandGulfNuclearStationREFERENCEUSE 01-5-02-9QUALITYRECORD Rev:001Procedure ChangeProcessAttachment 3,Procedure Editorial ChangeTraveler(PEC),Continued PECDescriptionTypeA.Correction ofthefollowing obviouseditorial errors:1.Punctuation, Capitalization orMisspelledwordsorobvioustypographical errors2.Redundantwordsorphrases3.Omittedsymbols4.Misplaced decimals5.Incorrectunitsofmeasure)6.Step/section/revision numberdiscrepancies 7.Pagenumberdiscrepancies 8.Cloningerrors(Obvioussteporpartofastepcopied incorrectlyfromanoppositeunitprocedure).
9.Equipment positions, conditionsorsettingswhen incorrect.
9.Equipment positions, conditionsorsettingswhen incorrect.
10.Inadvertent deletionofinformationfromapreviously approvedversionofthedocument.
10.Inadvertent deletion of informationfroma previously approved versionofthe document.11.Steprefersusertoan incorrect Attachment or branchestoan incorrect step.12.Equipment locations or descriptions.
11.Steprefersusertoan incorrect Attachment orbranchestoanincorrect step.12.Equipment locations ordescriptions.
13.Corrections/enhancementstopage layoutsorword processing features.14.Incorrect pagination 15.Incorrect transitions 16.Digitaldata corruptionerrorscausedby software conversions.
13.Corrections/enhancementstopagelayoutsorwordprocessing features.
B.Minor non-technical changes that enhance understanding:
14.Incorrect pagination 15.Incorrect transitions 16.Digitaldata corruptionerrorscausedby softwareconversions.
1.Grammaticalerrorsand sentence structure.
B.Minornon-technical changesthatenhanceunderstanding:
2.Restoringoraddingsign-ofts, signaturelines,datelinesorplace keeping tools.3.Corrections to reference pages includingtheTitlePage, Summary of Revisions, and Table of Contents.4.Correction to Attachment identifiers for consistency throughout the document.5.Clarifyingoradding informationtoNotes, Warnings, Cautions,andStepswhenthey clearlydonot change the technical performance or intentofthestep.
1.Grammaticalerrorsand sentencestructure.
6.Convert Initial Conditionactionstepsthatwouldbemore appropriateasthefirst steps of a procedure into procedure steps.7.Indicating or modifyingtextatthe beginningofasectionto indicate the Technical ProcedureUsageLevel.
2.Restoringoraddingsign-ofts, signaturelines,datelinesorplace keepingtools.3.Corrections toreference pagesincludingtheTitlePage, SummaryofRevisions, andTableofContents.
8 Changes to component' verification practicestobe consistent with EN-HU-106, ProcedureandWork InstructionUseand Adherence.
4.Correction toAttachment identifiers forconsistency throughout thedocument.
'Page2of3 Safety RelatedPAGE81OF123 Grand Gulf Nuclear StationREFERENCEUSE 01-5-02-9 QUALITY RECORD Rev: 001 Procedure Change Process Attachment 3, Procedure Editorial Change Traveler (PEC), Continued PEC Description Type C.Updating existing information due to organizational or internal process changes: 1.AddressesandTelephoneNumbers.
5.ClarifyingoraddinginformationtoNotes,Warnings, Cautions,andStepswhenthey clearlydonotchangethetechnical performance orintentofthestep.
6.ConvertInitialConditionactionstepsthatwouldbemore appropriateasthefirst stepsofaprocedure intoprocedure steps.7.Indicating ormodifyingtextatthe beginningofasectionto indicatetheTechnical ProcedureUsageLevel.
8Changestocomponent' verification practicestobeconsistent withEN-HU-106, ProcedureandWorkInstructionUseandAdherence.
'Page2of3 SafetyRelatedPAGE81OF123 GrandGulfNuclearStationREFERENCEUSE 01-5-02-9 QUALITYRECORDRev:001Procedure ChangeProcessAttachment 3,Procedure Editorial ChangeTraveler(PEC),Continued PECDescription TypeC.Updatingexistinginformation duetoorganizational orinternalprocesschanges:1.AddressesandTelephoneNumbers.
2.Referencesincludingadditions,deletionsortitlechanges.
2.Referencesincludingadditions,deletionsortitlechanges.
3.Equipmentdescriptionsorlocationstobeconsistentwithapproveddrawings,documents,labels,orprocedurecontent.
3.Equipmentdescriptionsorlocationstobeconsistentwithapproveddrawings,documents,labels,orprocedurecontent.
Line 60: Line 49:
&CountyRegulations,NRC,EPA,OSHA,COMARCodesandStandards,ANSI,CorporateandStationpolicies,directivesand procedures.
&CountyRegulations,NRC,EPA,OSHA,COMARCodesandStandards,ANSI,CorporateandStationpolicies,directivesand procedures.
6.CorrectingTech Spec/FSAR/FSARfTRM/ODCMreferencenumbers.
6.CorrectingTech Spec/FSAR/FSARfTRM/ODCMreferencenumbers.
D.Minorcorrections dueto inalreadyexistingprocesses:
D.Minor corrections due to in already existing processes:
1.Identifyingpreviouslyincorporatedtextwithacommitmentorsimilarreference.
1.Identifyingpreviouslyincorporatedtextwithacommitmentorsimilarreference.
2.Wordprocessingofpreviouslyapprovedpenandinkchanges.
2.Wordprocessingofpreviouslyapprovedpenandinkchanges.
Line 67: Line 56:
.*approved(05RCapproval, Technical Review)'lnanotherprocedure:
.*approved(05RCapproval, Technical Review)'lnanotherprocedure:
.......-:.1.Differentproceduresperformingthesameactivitysuchasproceduresontheoppositeunitortrain.
.......-:.1.Differentproceduresperformingthesameactivitysuchasproceduresontheoppositeunitortrain.
F.Pen&Inkchangesperformed inthefield:-.1.Pen&InkchangesrequiresatleastonecriterionfromA,B,orCaboveandManagementStaffmembersignature.(Section 5.15ProcedureEditorialChange(PEC)Process).Page3of3 PLANTOPERATIONS MANUALVolume10Section01REFERENCEUSE EMERGENCYPLANPROCEDURE REENTRYSAFETYRELATEDPrepared:
F.Pen&Ink changes performed in the field:-.1.Pen&InkchangesrequiresatleastonecriterionfromA,B,orCaboveandManagementStaffmembersignature.(Section 5.15ProcedureEditorialChange(PEC)Process).Page3of3 PLANT OPERATIONS MANUAL Volume 10 Section 01REFERENCEUSE EMERGENCYPLANPROCEDURE REENTRY SAFETY RELATED Prepared: Reviewed: Technical Approved: Manager, Emergency Planning List of Effective Pages: Pages 1-7 List of TCNs Incorporated:
Reviewed:
10-S-01-23 Revision: 005 Date: Revision o 1 002 003 004 005 TCN None None None None None None J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry No.: 10-S-01-23 RPTS FORM EMERGENCY PLAN PROCEDURE Revision: 005 Page: i REQUIRED REVIEW PERFORMED 0 00.59 E v a.1 u a t..i (I n (Check: all t hat apply)(EN-L1-100)(EN-LI-lOl
Technical Approved:
)0 72 48 Evaluation 0 SO 54 Evaluation 1'ransmi t app l, i cabl r;,;Rev i ew F'G:r:m as (EN-LI-112) a separatere co r d along with 0 PP-.D Not Required (EN-LI-1OOor..01-S-02-3i procedure to Document.Control 0 Process App l i cab i LityExc Lude ci 0 Edi t.or i a I Change 0 lSI/1ST Implement.ation 0 TeNIn corpor at.i ori ell'Auto F,:::v 0 Other Process-Number:
Manager,Emergency PlanningListofEffective Pages:Pages1-7ListofTCNsIncorporated:
PADRev i ewer:/)f or FAD Not Required)S i o na t u re j Da t.';:\.Cross-Discipline review required?()Yes (Note affected Departments Below)I (X)No Preparer Initials>>>
10-S-01-23 Revision:
II Department Cross-Discipline Reviews Needed Signoff (signed, electronic, telcon)Does this directive contain Tech Spec Triggers?()YES (Xl NO REQUIREMENTS CROSS-REFERENCE LIST Requirement Implemented Name Tech GGNS GGNS GGNS GGNS Spec Emer Emer Emer Emer Plan Plan Plan Plan 6.4.1a,b, c 6.3.1 6.1.2a thru c 6.2.1*Covered by directive as a whole or by various paragraphs of the directive.
005Date:Revisiono1002003004005TCNNoneNoneNoneNoneNoneNoneJ:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONTitle:ReentryNo.:10-S-01-23 RPTSFORMEMERGENCY PLANPROCEDURE Revision:
NOTE The Equipment Database (ED8)Request statement is applicable only to Volume 06 and 07 maintenance directives.
005Page:iREQUIREDREVIEWPERFORMED 0
EDB Change Request generated and the backup documentation available for setpoint and/or calibration data only 0 Yes 0 N/A ED8CR#J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry Current Revision Statement Revision 005: No.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: ii*Correct title on top of pages i andii from Recovery to Reentry.This is an editorial change.J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry 1.0 PURPOSE AND DISCUSSIONNo.: 10-S-01-23 Revision: 005 Page: 1 1.1 Purpose To provide general guidance for the reentry phase of an emergency.
00.59Eva.1uat..i(In(Check:allthatapply)(EN-L1-100)
(EN-LI-lOl
)07248Evaluation 0SO54Evaluation 1'ransmitappl,icablr;,;ReviewF'G:r:mas(EN-LI-112) aseparaterecordalongwith0PP-.DNotRequired(EN-LI-1OOor..01-S-02-3i procedure toDocument.
Control0ProcessApplicabiLityExcLudeci0Edit.oriaIChange0lSI/1STImplement.ation 0TeNIncorporat.ioriell'AutoF,:::v0OtherProcess-Number:
PADReviewer:/)forFADNotRequired)
SionaturejDat.';:\.Cross-Discipline reviewrequired?
()Yes(NoteaffectedDepartments Below)I(X)NoPreparerInitials>>>
IIDepartment Cross-Discipline ReviewsNeededSignoff(signed,electronic, telcon)Doesthisdirective containTechSpecTriggers?()YES(XlNOREQUIREMENTS CROSS-REFERENCE LISTRequirement Implemented NameTechGGNSGGNSGGNSGGNSSpecEmerEmerEmerEmerPlanPlanPlanPlan6.4.1a,b,c6.3.16.1.2athruc6.2.1*Coveredbydirective asawholeorbyvariousparagraphs ofthedirective.
NOTETheEquipment Database(ED8)Requeststatement isapplicable onlytoVolume06and07maintenance directives.
EDBChangeRequestgenerated andthebackupdocumentation available forsetpointand/orcalibration dataonly0Yes0N/AED8CR#J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONTitle:ReentryCurrentRevisionStatement Revision005:No.:10-S-01-23 EMERGENCY PLANPROCEDURE Revision:
005Page:ii*CorrecttitleontopofpagesiandiifromRecoverytoReentry.Thisisaneditorial change.J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONEMERGENCY PLANPROCEDURE Title:Reentry1.0PURPOSEANDDISCUSSIONNo.:10-S-01-23 Revision:
005Page:11.1PurposeToprovidegeneralguidanceforthereentryphaseofanemergency.
1.2Discussion Theimmediate actionsinresponsetoanemergency atGGNSaredirectedtowardlimitingtheconsequences oftheincidentinamannerthataffordsthemaximumprotection toplantpersonnel andthegeneralpublic.2.0RESPONSIBILITIES 2.1Emerqency Director-Maintains overallresponsibility fortheoperation andcontroloftheplant.2.2Operations SupportCenterManager-Isresponsible forusingtheguidelines ofthisprocedure fortheorganization, controlandoperation ofReentryandRecoveryTeams.HereportsfindingstoEmergency PlantManager.2.3Radiological Coordinator
-IsassistedbytheRadChernCoordinator intheOSCandisresponsible forensuringReentryandRecoveryTeamsobserveapprovedHealthPhysicsprocedures andradiation exposurelimits.EnsuresthattheEmergency Directorisinformedofcurrentradiological conditions.
2.4RadChernCoordinator
-Isresponsible forproviding RPcoverageforreentryTeam(s).Heisresponsible fordirecting on-sitemonitoring, samplinganddecontamination.
Heprovidesradiological protection information forReentryTeam(s).HereportedallresultstotheOSCManager.2.5ReentryTeams-Performcomprehensive radiological surveysofpreviously evacuated plantareastoperformassessments ofdamagedplantequipment.
2.6RecoveryManager-Isresponsible forOverallrecoveryactivities andforimplementing 10-S-I-23, Reentry,asnecessary tosupportrecoveryoperations.
2.7RecoveryRadiological Manager-Isresponsible forhealthphysicsandradwasteactivities insupportoftherecoveryoperations.
AnyentrybackintoEPZevacuated areasofsitepersonnel iscoordinated viatheleadgovernment agenciesthatissuedanyprotective actions.TheRecoveryRadiological Manager(orRadiological Assessment Coordinator) willcoordinate licenseeresources returntothesiteviadialogueandcoordination withtheseleadgovernment agencies.
2.8Emergency PlantManager-HeshalldirecttheOSCManagertodevelopthoseplansasappropriate andtoimplement theformulated plans.


==3.0REFERENCES==
===1.2 Discussion===
The immediate actions in response to an emergency at GGNS are directed toward limiting the consequences of the incident in a manner that affords the maximum protection to plant personnel and the general public.2.0 RESPONSIBILITIES 2.1 Emerqency Director-Maintains overall responsibility for the operation and control of the plant.2.2 Operations Support Center Manager-Is responsible for using the guidelines of this procedure for the organization, control and operation of Reentry and Recovery Teams.He reports findings to Emergency Plant Manager.2.3 Radiological Coordinator
-Is assisted by the Rad Chern Coordinator in the OSC and is responsible for ensuring Reentry and Recovery Teams observe approved Health Physics procedures and radiation exposure limits.Ensures that the Emergency Director is informed of current radiological conditions.
2.4 Rad Chern Coordinator
-Is responsible for providing RP coverage for reentry Team(s).He is responsible for directing on-site monitoring, sampling and decontamination.
He provides radiological protection information for Reentry Team(s).He reported all results to the OSC Manager.2.5 Reentry Teams-Perform comprehensive radiological surveys of previously evacuated plant areas to perform assessments of damaged plant equipment.
2.6 Recovery Manager-Is responsible for Overall recovery activities and for implementing 10-S-I-23, Reentry, as necessary to support recovery operations.
2.7 Recovery Radiological Manager-Is responsible for health physics and radwaste activities in support of the recovery operations.
Any entry back into EPZ evacuated areas of site personnel is coordinated via the lead government agencies that issued any protective actions.The Recovery Radiological Manager (or Radiological Assessment Coordinator) will coordinate licensee resources return to the site via dialogue and coordination with these lead government agencies.2.8 Emergency Plant Manager-He shall direct the OSC Manager to develop those plans as appropriate and to implement the formulated plans.


3.1GGNSEmergency Plan3.2NUREG06543.3Emergency PlanProcedure, 10-S-1-29, Operation SupportCenterOperations 3.4Emergency PlanProcedure, 10-S-01-22, RecoveryJ:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRANDGOLFNUCLEARSTATIONEMERGENCY PLANPROCEDURE Title:ReentryNo.:10-S-01-23 Revision:
==3.0 REFERENCES==
005Page:23.5Administrative Procedure, 01-S-08-2, Exposureand'Contamination Control3.6Emergency PlanProcedure, 10-S-01-20, Administration ofPotassium Iodide3.7Radiation Protection Instruction, 08-S-02-22, Personnel Decontamination
 
3.1 GGNS Emergency Plan 3.2 NUREG 0654 3.3 Emergency Plan Procedure, 10-S-1-29, Operation Support Center Operations 3.4 Emergency Plan Procedure, 10-S-01-22, Recovery J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GOLF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: ReentryNo.: 10-S-01-23 Revision: 005 Page: 2 3.5 Administrative Procedure, 01-S-08-2, Exposure and'Contamination Control 3.6 Emergency Plan Procedure, 10-S-01-20, Administration of Potassium Iodide 3.7 Radiation Protection Instruction, 08-S-02-22, Personnel Decontamination


==4.0 ATTACHMENTS==
==4.0 ATTACHMENTS==
None5.0DEFINITIONS 5.1RecoveryActions-Thoseactionstakenaftertheemergency torestore-the planttopre-emergency conditions.
None5.0 DEFINITIONS 5.1 Recovery Actions-Those actions taken after the emergency to restore-the plant to pre-emergency conditions.
5.2ED-Emergency Director5.3OSC-Operations SupportCenter5.4EOF-Emergency Operations Facility5.5EPP-Emergency PlanProcedure 5.6TSC-Technical SupportCenter5.7EPM-Emergency PlantManager(TSC)5.9RC-Radiological Coordinator (TSC)5.10RCC-RadChernCoordinator (OSC)6.0DETAILS6.1GeneralRequirements 6.1.1Oncethecorrective andprotective actionshaveestablished aneffective controloverthesituation, theemergency responseactionsshiftintotherecoveryphaseduringwhichallactionsareplannedanddeliberate.
5.2ED-Emergency Director 5.3OSC-Operations Support Center 5.4EOF-Emergency Operations Facility 5.5EPP-Emergency Plan Procedure 5.6TSC-Technical Support Center 5.7 EPM-Emergency Plant Manager (TSC)5.9 RC-Radiological Coordinator (TSC)5.10 RCC-Rad Chern Coordinator (OSC)6.0 DETAILS 6.1 General Requirements 6.1.1 Once the corrective and protective actions have established an effective control over the situation, the emergency response actions shift into the recovery phase during which all actions are planned and deliberate.
a.Radiation protection administrative requirements andcontrolsshouldbeimplemented, including'normal radiation exposurelimits,RWPs,ALARAreviewsandradiological postingsperReference 3.5.b.Maintenance activities shouldbeperformed inaccordance withapprovedplantdirectives, including suchcontrolasMaintenance ActionItems,equipment tag-out,andreviewoftheplannerworkactivitybytheShiftManager.c.Operations activities shouldbeperformed inaccordance withapprovedplantdirectives.
a.Radiation protection administrative requirements and controls should be implemented, including'normal radiation exposure limits, RWPs, ALARA reviews and radiological postings per Reference 3.5.b.Maintenance activities should be performed in accordance with approved plant directives, including such control as Maintenance Action Items, equipment tag-out, and review of the planner work activity by the Shift Manager.c.Operations activities should be performed in accordance with approved plant directives.
J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0l33.DOC GRANDGULFNUCLEARSTATIONTitle:Reentry6.1.1(continued)
J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0l33.DOC GRAND GULF NUCLEAR STATION Title: Reentry 6.1.1 (continued)
No.:10-S-01-23 EMERGENCY PLANPROCEDURE Revision:
No.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: 3 NOTE 6.1.2 During initial response to an emergency a licensed Senior Reactor Operator may authorize the emergency suspension of some normal quality assurance procedures and administrative controls, license conditions, and Technical Specifications.
005Page:3NOTE6.1.2Duringinitialresponsetoanemergency alicensedSeniorReactorOperatormayauthorize theemergency suspension ofsomenormalqualityassurance procedures andadministrative
For plant recovery, this provision allowed per Reference 3.1, should not be authorized.
: controls, licenseconditions, andTechnical Specifications.
Depending on the nature and severity of the emergency, the recovery phase may be: a.Completed by the Emergency Organization prior to termination of the emergency classification.
Forplantrecovery, thisprovision allowedperReference 3.1,shouldnotbeauthorized.
b.Establish a Recovery Organization if the recovery operations will be complicated or will extend over a relatively long period of time.c.Not necessary NOTE This procedure addresses actions to be taken after a major event.Portions of this procedure may be applied to reentry operations for any declared emergency (Unusual Event, Alert, Site Area Emergency, or General Emergency).
Depending onthenatureandseverityoftheemergency, therecoveryphasemaybe:a.Completed bytheEmergency Organization priortotermination oftheemergency classification.
Personnel actions and responsibilities are dictated by procedure as each emergency facility is activated.
b.Establish aRecoveryOrganization iftherecoveryoperations willbecomplicated orwillextendoverarelatively longperiodoftime.c.Notnecessary NOTEThisprocedure addresses actionstobetakenafteramajorevent.Portionsofthisprocedure maybeappliedtoreentryoperations foranydeclaredemergency (UnusualEvent,Alert,SiteAreaEmergency, orGeneralEmergency).
6.2 Reentry Assessment 6.2.1 6.2.2 6.2.3 The initial reentry into the plant areas encompasses the following goals (in order of priority): a.Determination of the initial required recovery operations (application of clearance tags, etc.)b.Visual observation of hazards or potential hazards associated with the recovery operations c.Conduct comprehensive radiation surveillance of plant facilities and define radiological problem areas d.Isolate and post areas in the plant with radiological warning signs, and rope barriers, as appropriate.
Personnel actionsandresponsibilities aredictatedbyprocedure aseachemergency facilityisactivated.
Reentry to affected areas of the plant which have been evacuated is to be planned and deliberate.
6.2ReentryAssessment 6.2.16.2.26.2.3Theinitialreentryintotheplantareasencompasses thefollowing goals(inorderofpriority)
The reentry phase is not to be initiated until the initial corrective and protective actions have been taken to establish effective control over the emergency situation.
:a.Determination oftheinitialrequiredrecoveryoperations (application ofclearance tags,etc.)b.Visualobservation ofhazardsorpotential hazardsassociated withtherecoveryoperations c.Conductcomprehensive radiation surveillance ofplantfacilities anddefineradiological problemareasd.Isolateandpostareasintheplantwithradiological warningsigns,andropebarriers, asappropriate.
J:\ADM SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry No.: 10-S-01-23 Revision: 005 Page: 4 6.2.4 6.2.5 6.2.6 The OSC Manager must obtain the approval of the Emergency Plant Manager prior to sending the initial Reentry Team into the plant.Utilize all available data including area and process monitor readings, survey data, and personnel observations to determine:
Reentrytoaffectedareasoftheplantwhichhavebeenevacuated istobeplannedanddeliberate.
a.Which plant area(s)is affected.b.The conditions in the area, such as personnel hazards, temperature, toxic environment, and equipment condition.
Thereentryphaseisnottobeinitiated untiltheinitialcorrective andprotective actionshavebeentakentoestablish effective controlovertheemergency situation.
c.Whether or not there are personnel in the area(si who need assistance.
J:\ADMSRVS\TECH PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONEMERGENCY PLANPROCEDURE Title:ReentryNo.:10-S-01-23 Revision:
d.The time scheduled, based on necessity, for reentry to commence.Isolate and post areas determined to be unsafe or unnecessary to be reentered with appropriate warning signs and rope barriers.6.3 Reentry Preparation 6.3.1 The OSC Manager should assign appropriately trained personnel to each Reentry Team based upon the assigned tasks of the team: For example: a.An initial Reentry Team assigned to perform comprehensive radiological surveys of evacuated plant areas should be manned primarily by Health Physics qualified personnel.
005Page:46.2.46.2.56.2.6TheOSCManagermustobtaintheapprovaloftheEmergency PlantManagerpriortosendingtheinitialReentryTeamintotheplant.Utilizeallavailable dataincluding areaandprocessmonitorreadings, surveydata,andpersonnel observations todetermine:
This team should preplan the following activities:
a.Whichplantarea(s)isaffected.
(1)Areas to be surveyed (2)Anticipated radiation and contamination levels (3)Radiation survey equipment required (4)Shielding requirements and availability (5)Protective clothing and equipment required Access control procedures (7)Exposure control limits and personnel dosimetry required (8)Decontamination requirements (9)Communications J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: ReentryNo.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: 5 6.3.1 (continued) b.A Reentry Team assigned to perform assessments of damaged plant equipment should be manned by personnel from the following sections as appropriate:
b.Theconditions inthearea,suchaspersonnel hazards,temperature, toxicenvironment, andequipment condition.
(1)Operations (2)Engineering (3)Maintenance (4)Radiological Protection c.A Reentry Team may also be assigned to perform both radiological surveillance and damage assessment functions.
c.Whetherornottherearepersonnel inthearea(siwhoneedassistance.
6.3.2 6.3.3 6.3.4 The team members should complete an Emergency Exposure Authorization form in accordance with 01-S-08-2, Exposure and Contamination Control, if high radiation levels are expected.For safety purposes, ensure that each reentry team is composed of at least two individuals.
d.Thetimescheduled, basedonnecessity, forreentrytocommence.
Ensure that the OSC maintains a current status board on reentry team operations and that reentry personnel log out of the OSC prior to departing on assigned reentry activities.
Isolateandpostareasdetermined tobeunsafeorunnecessary tobereentered withappropriate warningsignsandropebarriers.
6.4 Reentry into Radiological Affected Areas 6.4.1 6.4.2 6.4.3 6.4.4 The Rad Chern Coordinator reviews the following prior to plant reentry a.Radiation surveillance data available from plant instrumentation and OSC Response Team survey information to determine plant areas potentially affected by abnormal levels of radiation or contamination b.Radiation exposures of personnel assigned to participate in reentry operations and to determine need for additional personnel.
6.3ReentryPreparation 6.3.1TheOSCManagershouldassignappropriately trainedpersonnel toeachReentryTeambasedupontheassignedtasksoftheteam:Forexample:a.AninitialReentryTeamassignedtoperformcomprehensive radiological surveysofevacuated plantareasshouldbemannedprimarily byHealthPhysicsqualified personnel.
c.Adequacy of available survey instrumentation and equipment (type, range, number, calibration, etc.).d.Reentry team checklist, procedures, radiation areas, exposure limits, communication, shielding requirements and areas to be surveyed.Personnel selected for reentry teams should report to the OSC for their briefing.Administer potassium iodine, as necessary, according to20, Administration of Potassium Iodide, if high levels of radioactive iodine are encountered.
Thisteamshouldpreplanthefollowing activities:
Direct reentry personnel to monitor radiation levels and take appropriate samples along reentry route.J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry No.: 10-S-Ol-23 Revision: 005 Page: 6 6.4.5 6.4.6 6.4.7 6.4.8 Ensure that the reentry team leader maintains continuous communications with OSC, if possible, or otherwise at predetermined intervals to report progress of the reentry and observed conditions.
(1)Areastobesurveyed(2)Anticipated radiation andcontamination levels(3)Radiation surveyequipment required(4)Shielding requirements andavailability (5)Protective clothingandequipment requiredAccesscontrolprocedures (7)Exposurecontrollimitsandpersonnel dosimetry required(8)Decontamination requirements (9)Communications J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONTitle:ReentryNo.:10-S-01-23 EMERGENCY PLANPROCEDURE Revision:
Coordinate the return of the reentry team to the control point.Debrief team member at theNotify the EPM/Recovery Manager of the status of the reentry team(s).Report the results and findings of the reentry the EPM/Recovery Manager.Determine the need for additional reentries and, if required, for the initiation of recovery operations in accordance with22, Recovery, if recovery operations are not already initiated.
005Page:56.3.1(continued) b.AReentryTeamassignedtoperformassessments ofdamagedplantequipment shouldbemannedbypersonnel fromthefollowing sectionsasappropriate:
6.5 Reentry into Environmentally or Structurally Affected Areas 6.5.1 When entering environmentally or structurally affected areas (i.e., steam leak, smoke, flooding, earthquake damage, toxic atmosphere, etc.), ensure that appropriate measures are taken for personnel safety, including the following:
(1)Operations (2)Engineering (3)Maintenance (4)Radiological Protection c.AReentryTeammayalsobeassignedtoperformbothradiological surveillance anddamageassessment functions.
a.Reduce the potential hazards to reentry personnel, if possible, by actions such as ventilation purge or the securing of systems.b.Outfit personnel with appropriate emergency equipment, such as self-contained breathing apparatus, steam suits, flashlights, tow lines, specials tools and communication devices as required.c.Test the equipment for operability prior to reentry.d.Direct reentry personnel to withdraw to a predetermined
6.3.26.3.36.3.4TheteammembersshouldcompleteanEmergency ExposureAuthorization forminaccordance with01-S-08-2, ExposureandContamination Control,ifhighradiation levelsareexpected.
'safe area'if severe unanticipated or unplanned conditions are encountered, pending further evaluation of the reentry effort.e.Ensure that the reentry team leader maintains continuous communications with the OSC, if possible, or otherwise at predetermined intervals to report progress of the reentry and observed conditions.
Forsafetypurposes, ensurethateachreentryteamiscomposedofatleasttwoindividuals.
f.Coordinate the return of the reentry team to the control point.g.Perform monitoring and decontamination in accordance with reference 3.7, if required.h.Debrief team members at the OSC using OSC Team Debriefing Form (EPP 29-13), or similar.If radiological hazards were present, the OSC Rad Chern Coordinator should also conduct a debriefing in accordance with OSC Team Debriefing Form (EPP 29-13).J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry EMERGENCY PLAN PROCEDURENo.: 10-8-01-23 Revision: 005 Page: 7 6.5.2 6.5.3 6.5.4 Notify the Emergency Plant Manager/Recovery Manager of the return of the Reentry team(s).Report the results and findings of the reentry team to the Emergency Plant Manager/Recovery Manager.Determine the need for additional reentries and for the initiation of recovery operations, if necessary.
EnsurethattheOSCmaintains acurrentstatusboardonreentryteamoperations andthatreentrypersonnel logoutoftheOSCpriortodeparting onassignedreentryactivities.
6.4ReentryintoRadiological AffectedAreas6.4.16.4.26.4.36.4.4TheRadChernCoordinator reviewsthefollowing priortoplantreentrya.Radiation surveillance dataavailable fromplantinstrumentation andOSCResponseTeamsurveyinformation todetermine plantareaspotentially affectedbyabnormallevelsofradiation orcontamination b.Radiation exposures ofpersonnel assignedtoparticipate inreentryoperations andtodetermine needforadditional personnel.
c.Adequacyofavailable surveyinstrumentation andequipment (type,range,number,calibration, etc.).d.Reentryteamchecklist, procedures, radiation areas,exposurelimits,communication, shielding requirements andareastobesurveyed.
Personnel selectedforreentryteamsshouldreporttotheOSCfortheirbriefing.
Administer potassium iodine,asnecessary, according to20,Administration ofPotassium Iodide,ifhighlevelsofradioactive iodineareencountered.
Directreentrypersonnel tomonitorradiation levelsandtakeappropriate samplesalongreentryroute.J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONEMERGENCY PLANPROCEDURE Title:ReentryNo.:10-S-Ol-23 Revision:
005Page:66.4.56.4.66.4.76.4.8Ensurethatthereentryteamleadermaintains continuous communications withOSC,ifpossible, orotherwise atpredetermined intervals toreportprogressofthereentryandobservedconditions.
Coordinate thereturnofthereentryteamtothecontrolpoint.DebriefteammemberattheNotifytheEPM/Recovery Managerofthestatusofthereentryteam(s).ReporttheresultsandfindingsofthereentrytheEPM/Recovery Manager.Determine theneedforadditional reentries and,ifrequired, fortheinitiation ofrecoveryoperations inaccordance with22,Recovery, ifrecoveryoperations arenotalreadyinitiated.
6.5ReentryintoEnvironmentally orStructurally AffectedAreas6.5.1Whenenteringenvironmentally orstructurally affectedareas(i.e.,steamleak,smoke,flooding, earthquake damage,toxicatmosphere, etc.),ensurethatappropriate measuresaretakenforpersonnel safety,including thefollowing:
a.Reducethepotential hazardstoreentrypersonnel, ifpossible, byactionssuchasventilation purgeorthesecuringofsystems.b.Outfitpersonnel withappropriate emergency equipment, suchasself-contained breathing apparatus, steamsuits,flashlights, towlines,specialstoolsandcommunication devicesasrequired.
c.Testtheequipment foroperability priortoreentry.d.Directreentrypersonnel towithdrawtoapredetermined
'safearea'ifsevereunanticipated orunplanned conditions areencountered, pendingfurtherevaluation ofthereentryeffort.e.Ensurethatthereentryteamleadermaintains continuous communications withtheOSC,ifpossible, orotherwise atpredetermined intervals toreportprogressofthereentryandobservedconditions.
f.Coordinate thereturnofthereentryteamtothecontrolpoint.g.Performmonitoring anddecontamination inaccordance withreference 3.7,ifrequired.
h.DebriefteammembersattheOSCusingOSCTeamDebriefing Form(EPP29-13),orsimilar.Ifradiological hazardswerepresent,theOSCRadChernCoordinator shouldalsoconductadebriefing inaccordance withOSCTeamDebriefing Form(EPP29-13).J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRANDGULFNUCLEARSTATIONTitle:ReentryEMERGENCY PLANPROCEDURENo.:10-8-01-23 Revision:
005Page:76.5.26.5.36.5.4NotifytheEmergency PlantManager/Recovery ManagerofthereturnoftheReentryteam(s).ReporttheresultsandfindingsofthereentryteamtotheEmergency PlantManager/Recovery Manager.Determine theneedforadditional reentries andfortheinitiation ofrecoveryoperations, ifnecessary.


==7.0 FINALCONDITIONS==
==7.0 FINALCONDITIONS==
7.1ReentryOperations havebeencompleted andallreentryteamsmembershavebeenaccounted for.7.2Debriefing ofreentryteamsmembershasbeencompleted anddocumented.
7.1 Reentry Operations have been completed and all reentry teams members have been accounted for.7.2 Debriefing of reentry teams members has been completed and documented.
7.3Formsandpaperwork generated bythisprocedure andemergencies arecollected bytheOSCManagerandforwarded totheManager,Emergency Planning.
7.3 Forms and paperwork generated by this procedure and emergencies are collected by the OSC Manager and forwarded to the Manager, Emergency Planning.J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC}}
J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC}}

Revision as of 07:46, 8 July 2018

Grand Gulf Nuclear Station - Emergency Plan Procedure - Reentry - Safety Related
ML16200A203
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 07/13/2016
From: VanDenAkker R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
10-8-01-23
Download: ML16200A203 (13)


Text

Issue Date: 07/13/2016 A Safety RelatedPAGE79OF123

..-

Grand Gulf Nuclear Station REFERENCE USE 01-5-02-9 QUALITY RECORDRev:001 Procedure Chanae Process Attachment 3, Procedure Editorial Change Traveler (PEC),',""*_,c" ,i"',, i v.'.'i PRGGN: 2 0 16S6 S-Procedure Number: I(),<-ot-Z3 Unit Number: I Current Revision: t{-Procedure Title: e.,"" t",..,----ITypeof[313_,_loc_

0 OE1 OF1 Pen&Ink Editorial OA__I D--changeinfield Change: I Describe Editorial Correction:

CI};;e"t+;tll"A; I.t-/I r", (;PI I tilt',,,,,,,,,,, J{t<"""r" , Initiator:

R.0:liV{)f,v ae<<;{Y-:=-:-=,.Date: 7-/3-/6 Print Name Signature'F""'/S,ECtjQN2

....

....".'Plant Management Staff: ":S<1Pt'Date:

Print Name

  • Signature indicates PEe is accurate, consistent with PEetypesofPage2or3.Thisalso indicates approval for immediateuse(penandink change in field-Ff}isprovided.

NOTE:14Working dayclockstartsuponPlant Management Staff Approval.>','

..

,'-.<--.iT::: Assigned Procedure Writer.;<.Va..,NewRevision Number: 5 I'.,."," ,i.,.',"'E<:'*""".:':i

.".,:',..;;;'.'(i,j',//{'"r i'i">:,?",.', i':".........'Review by:

Date: 7j;o/Jh Print Name C Note:ThepersonperformingthePlantManagementSlaffApprovalmayalsobethesameperson performing theSupervIsorReview.TheInitiatorCANNOTbeeitherofthetwo.Page1 of3 CONTROLLED COPY_

AlA Safety RelatedPAGE80OF123 Grand Gulf Nuclear StationREFERENCEUSE 01-5-02-9QUALITYRECORD Rev: 001 Procedure Change Process Attachment 3, Procedure Editorial Change Traveler (PEC), Continued PEC Descri ption Type A.Correction of the following obvious editorial errors: 1.Punctuation, Capitalization or Misspelledwordsor obvious typographical errors 2.Redundantwordsor phrases 3.Omitted symbols 4.Misplaced decimals 5.Incorrectunitsof measure)6.Step/section/revision number discrepancies 7.Page number discrepancies 8.Cloning errors (Obvioussteporpartofastepcopied incorrectlyfroman opposite unit procedure).

9.Equipment positions, conditionsorsettingswhen incorrect.

10.Inadvertent deletion of informationfroma previously approved versionofthe document.11.Steprefersusertoan incorrect Attachment or branchestoan incorrect step.12.Equipment locations or descriptions.

13.Corrections/enhancementstopage layoutsorword processing features.14.Incorrect pagination 15.Incorrect transitions 16.Digitaldata corruptionerrorscausedby software conversions.

B.Minor non-technical changes that enhance understanding:

1.Grammaticalerrorsand sentence structure.

2.Restoringoraddingsign-ofts, signaturelines,datelinesorplace keeping tools.3.Corrections to reference pages includingtheTitlePage, Summary of Revisions, and Table of Contents.4.Correction to Attachment identifiers for consistency throughout the document.5.Clarifyingoradding informationtoNotes, Warnings, Cautions,andStepswhenthey clearlydonot change the technical performance or intentofthestep.

6.Convert Initial Conditionactionstepsthatwouldbemore appropriateasthefirst steps of a procedure into procedure steps.7.Indicating or modifyingtextatthe beginningofasectionto indicate the Technical ProcedureUsageLevel.

8 Changes to component' verification practicestobe consistent with EN-HU-106, ProcedureandWork InstructionUseand Adherence.

'Page2of3 Safety RelatedPAGE81OF123 Grand Gulf Nuclear StationREFERENCEUSE 01-5-02-9 QUALITY RECORD Rev: 001 Procedure Change Process Attachment 3, Procedure Editorial Change Traveler (PEC), Continued PEC Description Type C.Updating existing information due to organizational or internal process changes: 1.AddressesandTelephoneNumbers.

2.Referencesincludingadditions,deletionsortitlechanges.

3.Equipmentdescriptionsorlocationstobeconsistentwithapproveddrawings,documents,labels,orprocedurecontent.

4.Updatingorganizationaltitlesprovidedthetitlechangedoesnotresultinachangeinjobfunctionsorresponsibilitiesreferencedintheprocedure.

5.Adding,deletingorcorrectingdocumentreferencenumbersortitles,suchas:

  • Federal,State

&CountyRegulations,NRC,EPA,OSHA,COMARCodesandStandards,ANSI,CorporateandStationpolicies,directivesand procedures.

6.CorrectingTech Spec/FSAR/FSARfTRM/ODCMreferencenumbers.

D.Minor corrections due to in already existing processes:

1.Identifyingpreviouslyincorporatedtextwithacommitmentorsimilarreference.

2.Wordprocessingofpreviouslyapprovedpenandinkchanges.

3.Providecommitmentsourceinformation(forexample,NRC,INPO).

E.Identical.changes*.pre"iouslyreVieV\fedand

.*approved(05RCapproval, Technical Review)'lnanotherprocedure:

.......-:.1.Differentproceduresperformingthesameactivitysuchasproceduresontheoppositeunitortrain.

F.Pen&Ink changes performed in the field:-.1.Pen&InkchangesrequiresatleastonecriterionfromA,B,orCaboveandManagementStaffmembersignature.(Section 5.15ProcedureEditorialChange(PEC)Process).Page3of3 PLANT OPERATIONS MANUAL Volume 10 Section 01REFERENCEUSE EMERGENCYPLANPROCEDURE REENTRY SAFETY RELATED Prepared: Reviewed: Technical Approved: Manager, Emergency Planning List of Effective Pages: Pages 1-7 List of TCNs Incorporated:

10-S-01-23 Revision: 005 Date: Revision o 1 002 003 004 005 TCN None None None None None None J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry No.: 10-S-01-23 RPTS FORM EMERGENCY PLAN PROCEDURE Revision: 005 Page: i REQUIRED REVIEW PERFORMED 0 00.59 E v a.1 u a t..i (I n (Check: all t hat apply)(EN-L1-100)(EN-LI-lOl

)0 72 48 Evaluation 0 SO 54 Evaluation 1'ransmi t app l, i cabl r;,;Rev i ew F'G:r:m as (EN-LI-112) a separatere co r d along with 0 PP-.D Not Required (EN-LI-1OOor..01-S-02-3i procedure to Document.Control 0 Process App l i cab i LityExc Lude ci 0 Edi t.or i a I Change 0 lSI/1ST Implement.ation 0 TeNIn corpor at.i ori ell'Auto F,:::v 0 Other Process-Number:

PADRev i ewer:/)f or FAD Not Required)S i o na t u re j Da t.';:\.Cross-Discipline review required?()Yes (Note affected Departments Below)I (X)No Preparer Initials>>>

II Department Cross-Discipline Reviews Needed Signoff (signed, electronic, telcon)Does this directive contain Tech Spec Triggers?()YES (Xl NO REQUIREMENTS CROSS-REFERENCE LIST Requirement Implemented Name Tech GGNS GGNS GGNS GGNS Spec Emer Emer Emer Emer Plan Plan Plan Plan 6.4.1a,b, c 6.3.1 6.1.2a thru c 6.2.1*Covered by directive as a whole or by various paragraphs of the directive.

NOTE The Equipment Database (ED8)Request statement is applicable only to Volume 06 and 07 maintenance directives.

EDB Change Request generated and the backup documentation available for setpoint and/or calibration data only 0 Yes 0 N/A ED8CR#J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry Current Revision Statement Revision 005: No.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: ii*Correct title on top of pages i andii from Recovery to Reentry.This is an editorial change.J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry 1.0 PURPOSE AND DISCUSSIONNo.: 10-S-01-23 Revision: 005 Page: 1 1.1 Purpose To provide general guidance for the reentry phase of an emergency.

1.2 Discussion

The immediate actions in response to an emergency at GGNS are directed toward limiting the consequences of the incident in a manner that affords the maximum protection to plant personnel and the general public.2.0 RESPONSIBILITIES 2.1 Emerqency Director-Maintains overall responsibility for the operation and control of the plant.2.2 Operations Support Center Manager-Is responsible for using the guidelines of this procedure for the organization, control and operation of Reentry and Recovery Teams.He reports findings to Emergency Plant Manager.2.3 Radiological Coordinator

-Is assisted by the Rad Chern Coordinator in the OSC and is responsible for ensuring Reentry and Recovery Teams observe approved Health Physics procedures and radiation exposure limits.Ensures that the Emergency Director is informed of current radiological conditions.

2.4 Rad Chern Coordinator

-Is responsible for providing RP coverage for reentry Team(s).He is responsible for directing on-site monitoring, sampling and decontamination.

He provides radiological protection information for Reentry Team(s).He reported all results to the OSC Manager.2.5 Reentry Teams-Perform comprehensive radiological surveys of previously evacuated plant areas to perform assessments of damaged plant equipment.

2.6 Recovery Manager-Is responsible for Overall recovery activities and for implementing 10-S-I-23, Reentry, as necessary to support recovery operations.

2.7 Recovery Radiological Manager-Is responsible for health physics and radwaste activities in support of the recovery operations.

Any entry back into EPZ evacuated areas of site personnel is coordinated via the lead government agencies that issued any protective actions.The Recovery Radiological Manager (or Radiological Assessment Coordinator) will coordinate licensee resources return to the site via dialogue and coordination with these lead government agencies.2.8 Emergency Plant Manager-He shall direct the OSC Manager to develop those plans as appropriate and to implement the formulated plans.

3.0 REFERENCES

3.1 GGNS Emergency Plan 3.2 NUREG 0654 3.3 Emergency Plan Procedure, 10-S-1-29, Operation Support Center Operations 3.4 Emergency Plan Procedure, 10-S-01-22, Recovery J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GOLF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: ReentryNo.: 10-S-01-23 Revision: 005 Page: 2 3.5 Administrative Procedure, 01-S-08-2, Exposure and'Contamination Control 3.6 Emergency Plan Procedure, 10-S-01-20, Administration of Potassium Iodide 3.7 Radiation Protection Instruction, 08-S-02-22, Personnel Decontamination

4.0 ATTACHMENTS

None5.0 DEFINITIONS 5.1 Recovery Actions-Those actions taken after the emergency to restore-the plant to pre-emergency conditions.

5.2ED-Emergency Director 5.3OSC-Operations Support Center 5.4EOF-Emergency Operations Facility 5.5EPP-Emergency Plan Procedure 5.6TSC-Technical Support Center 5.7 EPM-Emergency Plant Manager (TSC)5.9 RC-Radiological Coordinator (TSC)5.10 RCC-Rad Chern Coordinator (OSC)6.0 DETAILS 6.1 General Requirements 6.1.1 Once the corrective and protective actions have established an effective control over the situation, the emergency response actions shift into the recovery phase during which all actions are planned and deliberate.

a.Radiation protection administrative requirements and controls should be implemented, including'normal radiation exposure limits, RWPs, ALARA reviews and radiological postings per Reference 3.5.b.Maintenance activities should be performed in accordance with approved plant directives, including such control as Maintenance Action Items, equipment tag-out, and review of the planner work activity by the Shift Manager.c.Operations activities should be performed in accordance with approved plant directives.

J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0l33.DOC GRAND GULF NUCLEAR STATION Title: Reentry 6.1.1 (continued)

No.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: 3 NOTE 6.1.2 During initial response to an emergency a licensed Senior Reactor Operator may authorize the emergency suspension of some normal quality assurance procedures and administrative controls, license conditions, and Technical Specifications.

For plant recovery, this provision allowed per Reference 3.1, should not be authorized.

Depending on the nature and severity of the emergency, the recovery phase may be: a.Completed by the Emergency Organization prior to termination of the emergency classification.

b.Establish a Recovery Organization if the recovery operations will be complicated or will extend over a relatively long period of time.c.Not necessary NOTE This procedure addresses actions to be taken after a major event.Portions of this procedure may be applied to reentry operations for any declared emergency (Unusual Event, Alert, Site Area Emergency, or General Emergency).

Personnel actions and responsibilities are dictated by procedure as each emergency facility is activated.

6.2 Reentry Assessment 6.2.1 6.2.2 6.2.3 The initial reentry into the plant areas encompasses the following goals (in order of priority): a.Determination of the initial required recovery operations (application of clearance tags, etc.)b.Visual observation of hazards or potential hazards associated with the recovery operations c.Conduct comprehensive radiation surveillance of plant facilities and define radiological problem areas d.Isolate and post areas in the plant with radiological warning signs, and rope barriers, as appropriate.

Reentry to affected areas of the plant which have been evacuated is to be planned and deliberate.

The reentry phase is not to be initiated until the initial corrective and protective actions have been taken to establish effective control over the emergency situation.

J:\ADM SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry No.: 10-S-01-23 Revision: 005 Page: 4 6.2.4 6.2.5 6.2.6 The OSC Manager must obtain the approval of the Emergency Plant Manager prior to sending the initial Reentry Team into the plant.Utilize all available data including area and process monitor readings, survey data, and personnel observations to determine:

a.Which plant area(s)is affected.b.The conditions in the area, such as personnel hazards, temperature, toxic environment, and equipment condition.

c.Whether or not there are personnel in the area(si who need assistance.

d.The time scheduled, based on necessity, for reentry to commence.Isolate and post areas determined to be unsafe or unnecessary to be reentered with appropriate warning signs and rope barriers.6.3 Reentry Preparation 6.3.1 The OSC Manager should assign appropriately trained personnel to each Reentry Team based upon the assigned tasks of the team: For example: a.An initial Reentry Team assigned to perform comprehensive radiological surveys of evacuated plant areas should be manned primarily by Health Physics qualified personnel.

This team should preplan the following activities:

(1)Areas to be surveyed (2)Anticipated radiation and contamination levels (3)Radiation survey equipment required (4)Shielding requirements and availability (5)Protective clothing and equipment required Access control procedures (7)Exposure control limits and personnel dosimetry required (8)Decontamination requirements (9)Communications J:\ADM_SRVS\TECH_PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: ReentryNo.: 10-S-01-23 EMERGENCY PLAN PROCEDURE Revision: 005 Page: 5 6.3.1 (continued) b.A Reentry Team assigned to perform assessments of damaged plant equipment should be manned by personnel from the following sections as appropriate:

(1)Operations (2)Engineering (3)Maintenance (4)Radiological Protection c.A Reentry Team may also be assigned to perform both radiological surveillance and damage assessment functions.

6.3.2 6.3.3 6.3.4 The team members should complete an Emergency Exposure Authorization form in accordance with 01-S-08-2, Exposure and Contamination Control, if high radiation levels are expected.For safety purposes, ensure that each reentry team is composed of at least two individuals.

Ensure that the OSC maintains a current status board on reentry team operations and that reentry personnel log out of the OSC prior to departing on assigned reentry activities.

6.4 Reentry into Radiological Affected Areas 6.4.1 6.4.2 6.4.3 6.4.4 The Rad Chern Coordinator reviews the following prior to plant reentry a.Radiation surveillance data available from plant instrumentation and OSC Response Team survey information to determine plant areas potentially affected by abnormal levels of radiation or contamination b.Radiation exposures of personnel assigned to participate in reentry operations and to determine need for additional personnel.

c.Adequacy of available survey instrumentation and equipment (type, range, number, calibration, etc.).d.Reentry team checklist, procedures, radiation areas, exposure limits, communication, shielding requirements and areas to be surveyed.Personnel selected for reentry teams should report to the OSC for their briefing.Administer potassium iodine, as necessary, according to20, Administration of Potassium Iodide, if high levels of radioactive iodine are encountered.

Direct reentry personnel to monitor radiation levels and take appropriate samples along reentry route.J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE Title: Reentry No.: 10-S-Ol-23 Revision: 005 Page: 6 6.4.5 6.4.6 6.4.7 6.4.8 Ensure that the reentry team leader maintains continuous communications with OSC, if possible, or otherwise at predetermined intervals to report progress of the reentry and observed conditions.

Coordinate the return of the reentry team to the control point.Debrief team member at theNotify the EPM/Recovery Manager of the status of the reentry team(s).Report the results and findings of the reentry the EPM/Recovery Manager.Determine the need for additional reentries and, if required, for the initiation of recovery operations in accordance with22, Recovery, if recovery operations are not already initiated.

6.5 Reentry into Environmentally or Structurally Affected Areas 6.5.1 When entering environmentally or structurally affected areas (i.e., steam leak, smoke, flooding, earthquake damage, toxic atmosphere, etc.), ensure that appropriate measures are taken for personnel safety, including the following:

a.Reduce the potential hazards to reentry personnel, if possible, by actions such as ventilation purge or the securing of systems.b.Outfit personnel with appropriate emergency equipment, such as self-contained breathing apparatus, steam suits, flashlights, tow lines, specials tools and communication devices as required.c.Test the equipment for operability prior to reentry.d.Direct reentry personnel to withdraw to a predetermined

'safe area'if severe unanticipated or unplanned conditions are encountered, pending further evaluation of the reentry effort.e.Ensure that the reentry team leader maintains continuous communications with the OSC, if possible, or otherwise at predetermined intervals to report progress of the reentry and observed conditions.

f.Coordinate the return of the reentry team to the control point.g.Perform monitoring and decontamination in accordance with reference 3.7, if required.h.Debrief team members at the OSC using OSC Team Debriefing Form (EPP 29-13), or similar.If radiological hazards were present, the OSC Rad Chern Coordinator should also conduct a debriefing in accordance with OSC Team Debriefing Form (EPP 29-13).J:\ADM_SRVS\TECH PUB\REVISION\10\10S0133.DOC GRAND GULF NUCLEAR STATION Title: Reentry EMERGENCY PLAN PROCEDURENo.: 10-8-01-23 Revision: 005 Page: 7 6.5.2 6.5.3 6.5.4 Notify the Emergency Plant Manager/Recovery Manager of the return of the Reentry team(s).Report the results and findings of the reentry team to the Emergency Plant Manager/Recovery Manager.Determine the need for additional reentries and for the initiation of recovery operations, if necessary.

7.0 FINALCONDITIONS

7.1 Reentry Operations have been completed and all reentry teams members have been accounted for.7.2 Debriefing of reentry teams members has been completed and documented.

7.3 Forms and paperwork generated by this procedure and emergencies are collected by the OSC Manager and forwarded to the Manager, Emergency Planning.J:\ADM_SRVS\TECH PU8\REVISION\10\10S0133.DOC