{{#Wiki_filter:CATEGORY1IACCESSION NBR-FACIL:50-315 AUTH;X'TAME
{{#Wiki_filter:CATEGORY 1 I ACCESSION NBR-FACIL:50-315 AUTH;X'TAME
'ENCHECK,M.W.
'ENCHECK,M.W.
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)9904290045 DOC.DATE:
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)9904290045 DOC.DATE: 99/04/16 NOTARIZED:
99/04/16NOTARIZED:
NO DOCKET Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTHOR AFFILIATION Indiana Michigan Power Co.RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
NODOCKETDonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315AUTHORAFFILIATION IndianaMichiganPowerCo.RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
ForwardsLER99-006-00, "FuelCraneLoadsLiftedOverSFPCouldImpackEnergiesGreaterThanTSLimits,"IAW10CFR50.73,Submittal wasdelayedtoallowforresolution ofquestions.
Forwards LER 99-006-00,"Fuel Crane Loads Lifted Over SFP Could Impack Energies Greater Than TS Limits," IAW 10CFR50.73,Submittal was delayed to allow for resolution of questions.
Commitment madebylicensee, listed.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidenRpt,etc.NOTES:RECIPIENT IDCODE/NAME LPD3-1PDINTERNAL:
Commitment made by licensee, listed.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden Rpt, etc.NOTES: RECIPIENT ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1, 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG,J FILE C NRR/DIPM/IQMB NRR/DSSA/SPLB RGN3 FILE 01 LMITCO MARSHALL NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1., 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB EXTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16 Indiana Michigan Power Company Cook Ntdoat Piattr One Cook Piata eridyttlt.
LSTLOBBYWARDNOACPOORE,W.NRCPDRCOPIESLTTRENCL1111111,111111111RECIPIENT IDCODE/NAME STANG,JFILECNRR/DIPM/IQMB NRR/DSSA/SPLB RGN3FILE01LMITCOMARSHALLNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL11111111111.,11111NOTETOALL"RIDS"RECIPIENTS:
Ml 491 06 616 465 5901 INDIANA NICHIGAM IaOMfKR April 16, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No.50-315 Document Control Manager: In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ort~Sstem, the fottowtng report is being submitted:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISORREDUCETHENUMBEROFCOPZESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTRDESK(DCD)ONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
LER 315/99-006-00,"Fuel Crane Loads Lifted Over Spent Fuel Pool Could Impart Impact Energies Greater than Technical Specification Limits" The following commitment has been identified in this submittal:
LTTR16ENCL16 IndianaMichiganPowerCompanyCookNtdoatPiattrOneCookPiataeridyttlt.
~The root cause investigation for this event has not been completed.
Ml491066164655901INDIANANICHIGAMIaOMfKRApril16,1999UnitedStatesNuclearRegulatory Commission DocumentControlDeskWashington, DC20555Operating LicenseDPR-58DocketNo.50-315DocumentControlManager:Inaccordance withthecriteriaestablished by10CFR50.73entitledLicenseeEventReort~Sstem,thefottowtng reportisbeingsubmitted:
Based on the results of this investigation, information regarding the safety signiTicance of this condition, including additional corrective and preventive actions, will be provided in an update to this LER upon completion of the investigation.
LER315/99-006-00, "FuelCraneLoadsLiftedOverSpentFuelPoolCouldImpartImpactEnergiesGreaterthanTechnical Specification Limits"Thefollowing commitment hasbeenidentified inthissubmittal:
This LER was originally due to be submitted on March 23, 1999.Due to uncertainty as to technical issues that directly affect the reportability of this event, submittal of the LER was delayed to.allow for resolution of questions.
~Therootcauseinvestigation forthiseventhasnotbeencompleted.
It is recognized that the submittal of this document exceeds the 30 day requirement of 10.CFR 50.73.A Condition Report has been written and entered into the corrective action program to address this issue.Sincerely, M.W.Rencheck Vice President-Nuclear Engineering
Basedontheresultsofthisinvestigation, information regarding thesafetysigniTicance ofthiscondition, including additional corrective andpreventive actions,willbeprovidedinanupdatetothisLERuponcompletion oftheinvestigation.
/mbd Attachment
ThisLERwasoriginally duetobesubmitted onMarch23,1999.Duetouncertainty astotechnical issuesthatdirectlyaffectthereportability ofthisevent,submittal oftheLERwasdelayedto.allowforresolution ofquestions.
'gi'gi04290045 9904ih PDR, ADQCK 050003i5 S PDR J.E.Dyer, Region III P.A.Barrett D.F.Kunsemiller R..Whale D.Hahn Records Center, INPO NRC Resident Inspector}}
Itisrecognized thatthesubmittal ofthisdocumentexceedsthe30dayrequirement of10.CFR50.73.ACondition Reporthasbeenwrittenandenteredintothecorrective actionprogramtoaddressthisissue.Sincerely, M.W.RencheckVicePresident
-NuclearEngineering
/mbdAttachment
'gi'gi04290045 9904ihPDR,ADQCK050003i5SPDR J.E.Dyer,RegionIIIP.A.BarrettD.F.Kunsemiller R..WhaleD.HahnRecordsCenter,INPONRCResidentInspector}}

Revision as of 08:22, 6 July 2018

Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
ML17325B556
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/16/1999
From: RENCHECK M W
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17325B557 List:
References
NUDOCS 9904290045
Download: ML17325B556 (3)


Text

CATEGORY 1 I ACCESSION NBR-FACIL:50-315 AUTH;X'TAME

'ENCHECK,M.W.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)9904290045 DOC.DATE: 99/04/16 NOTARIZED:

NO DOCKET Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTHOR AFFILIATION Indiana Michigan Power Co.RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards LER 99-006-00,"Fuel Crane Loads Lifted Over SFP Could Impack Energies Greater Than TS Limits," IAW 10CFR50.73,Submittal was delayed to allow for resolution of questions.

Commitment made by licensee, listed.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden Rpt, etc.NOTES: RECIPIENT ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POORE,W.NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1, 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG,J FILE C NRR/DIPM/IQMB NRR/DSSA/SPLB RGN3 FILE 01 LMITCO MARSHALL NOAC QUEENER,DS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1., 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16 Indiana Michigan Power Company Cook Ntdoat Piattr One Cook Piata eridyttlt.

Ml 491 06 616 465 5901 INDIANA NICHIGAM IaOMfKR April 16, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No.50-315 Document Control Manager: In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ort~Sstem, the fottowtng report is being submitted:

LER 315/99-006-00,"Fuel Crane Loads Lifted Over Spent Fuel Pool Could Impart Impact Energies Greater than Technical Specification Limits" The following commitment has been identified in this submittal:

~The root cause investigation for this event has not been completed.

Based on the results of this investigation, information regarding the safety signiTicance of this condition, including additional corrective and preventive actions, will be provided in an update to this LER upon completion of the investigation.

This LER was originally due to be submitted on March 23, 1999.Due to uncertainty as to technical issues that directly affect the reportability of this event, submittal of the LER was delayed to.allow for resolution of questions.

It is recognized that the submittal of this document exceeds the 30 day requirement of 10.CFR 50.73.A Condition Report has been written and entered into the corrective action program to address this issue.Sincerely, M.W.Rencheck Vice President-Nuclear Engineering

/mbd Attachment

'gi'gi04290045 9904ih PDR, ADQCK 050003i5 S PDR J.E.Dyer, Region III P.A.Barrett D.F.Kunsemiller R..Whale D.Hahn Records Center, INPO NRC Resident Inspector