{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713  April 14, 2015 MEETING SUMMARY  LICENSEE: FirstEnergy Nuclear Generation, LLC FACILITY: Beaver Valley Power Station, Units 1 and 2   
 
==SUBJECT:==
Annual Assessment Meeting Summary On April 9, 2015 from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2014. A notice of the open house was issued on March 24, 2015, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15082A385. ADAMS is accessible from the NRC Web page at:  http://www.nrc.gov/reading-rm/adams.html. The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2014, as documented in our Annual Assessment Letter dated March 4, 2015 (ADAMS Accession No. ML15062A379). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations. 
 
      /RA/      _______________________ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects 
 
ML15062A379). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations.          _____/RA/________________ Silas R. Kennedy, Chief Projects Branch 6  Division of Reactor Projects Distribution: S. Kennedy, DRP C. Bickett, DRP B. Bollinger, DRP    J. Krafty, DRP, SRI B. Reyes, DRP, RI P. Garrett, DRP, OA          DOC NAME:  G:\DRP\BRANCH6\Communications\Public Meetings\Annual Assessment Meetings\2015\BV\ BV Annual Assessment Meeting Summary 2015.docx    ADAMS Accession No.:  ML15104A665  SUNSI Review  Non-Sensitive  Sensitive  Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP    NAME CBickett/ CAB  SKennedy/ SRK    DATE 04/13/15 04/14/15}}

Revision as of 10:03, 14 June 2018

April 9, 2015 Summary of Annual Assessment Meeting with Beaver Valley Power Station, Units 1 and 2
ML15104A665
Person / Time
Site: Beaver Valley
Issue date: 04/14/2015
From: Kennedy S R
NRC/RGN-I/DRP/PB6
To:
KENNEDY, SR
Shared Package
ML15049A479 List:
References
Download: ML15104A665 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 14, 2015 MEETING SUMMARY LICENSEE: FirstEnergy Nuclear Generation, LLC FACILITY: Beaver Valley Power Station, Units 1 and 2

SUBJECT:

Annual Assessment Meeting Summary On April 9, 2015 from 5:00 p.m. to 6:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Shippingport Community and Municipal Building, in Shippingport, PA. The NRC conducted the open house to discuss its assessment of the safety performance at Beaver Valley Power Station, Units 1 and 2, for 2014. A notice of the open house was issued on March 24, 2015, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML15082A385. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC displayed poster boards and was available to discuss its assessment of the safety performance of the Beaver Valley Power Station for the period of January 1 through December 31, 2014, as documented in our Annual Assessment Letter dated March 4, 2015 (ADAMS Accession No. ML15062A379). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations.

/RA/ _______________________ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects

ML15062A379). The NRC poster boards included background information on the Reactor Oversight Process (ROP) and plant-specific performance. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Beaver Valley Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public attended the open house and were offered the opportunity to question the NRC regarding Beaver Valley's performance and the role of the agency in ensuring safe plant operations. _____/RA/________________ Silas R. Kennedy, Chief Projects Branch 6 Division of Reactor Projects Distribution: S. Kennedy, DRP C. Bickett, DRP B. Bollinger, DRP J. Krafty, DRP, SRI B. Reyes, DRP, RI P. Garrett, DRP, OA DOC NAME: G:\DRP\BRANCH6\Communications\Public Meetings\Annual Assessment Meetings\2015\BV\ BV Annual Assessment Meeting Summary 2015.docx ADAMS Accession No.: ML15104A665 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME CBickett/ CAB SKennedy/ SRK DATE 04/13/15 04/14/15