{{#Wiki_filter:Dominion Energy Kewaunee, Inc. 4D minionN490 Hwy 42, Kewaunee, WI 54216Web Address: www.dom.comNOV 0 7 2013ATTN: Document Control Desk Serial No. 13-239U. S. Nuclear Regulatory Commission LIC/RR/R0Washington, DC 20555-0001 Docket No.: 50-305License No.: DPR-43DOMINION ENERGY KEWAUNEE, INC.KEWAUNEE POWER STATIONINSPECTION REPORT 0500030512013504 -RESPONSE TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory Commission (NRC) issued an inspectionreport for the Kewaunee Power Station (KPS) (Reference 1) indicating a preliminarysignificance determination for a White finding. On April 4, 2013, the NRC issued thefinal significance determination for a White finding and notice of violation (Reference 2).The April 4, 2013 letter (Reference 2) also informed Dominion Energy Kewaunee, Inc.(DEK) the NRC would be conducting a supplemental inspection using InspectionProcedure 95001, "Inspection for One or Two White Inputs in a Strategic PerformanceArea," when NRC has been notified by DEK of its readiness for the inspection.On May 31, 2013, the NRC issued a letter describing the termination of the ReactorOversight Process for KPS and commencement of the Decommissioning PowerReactor Inspection Program (Reference 3). In that letter the NRC states that it willconduct the inspection for the Emergency Preparedness White finding using InspectionProcedure 92702, "Follow-Up on Corrective Actions for Violations and Deviations," toverify appropriate corrective actions are being implemented instead of using InspectionProcedure 95001.DEK has undertaken the steps necessary to assure that the cause evaluation andcorrective actions are of sufficient scope and breadth to address the identifiedperformance deficiencies. DEK requests the NRC perform the inspection identified inReference 3 starting on or after November 12, 2013.If you have questions or require additional information, please feel free to contact Mr.Richard P. Repshas at 920-388-8217.Very truly yours,Site Vi e resident, Kewaunee Power Station  
{{#Wiki_filter:Dominion  
Serial No. 13-239Page 2 of 2References:1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "KewauneePower Station-NRC Emergency Preparedness Inspection Report05000305/2012503; Preliminary White Finding," dated January 24, 2013. (ADAMSAccession No. ML13024A422)2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final SignificanceDetermination of A White Finding With Proposed Followup and Notice of Violation;NRC Inspection Report No. 05000305/2013504; Kewaunee Power Station," datedApril 4, 2013. (ADAMS Accession No. ML13094A270)3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination OfReactor Oversight Process For Kewaunee Power Station And Commencement OfDecommissioning Inspection Program," dated May 31, 2013. (ADAMS AccessionNo. ML13151A375)Commitments made by this letter: NONEcc: Regional Administrator, Region IIIU. S. Nuclear Regulatory Commission2443 Warrenville RoadSuite 210Lisle, IL 60532-4352Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Dl 511555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorKewaunee Power Station  
Energy Kewaunee,  
 
Inc. 4D minionN490 Hwy 42, Kewaunee,  
WI 54216Web Address:  
www.dom.com
NOV 0 7 2013ATTN: Document  
Control Desk Serial No. 13-239U. S. Nuclear Regulatory  
Commission  
LIC/RR/R0
Washington,  
DC 20555-0001  
Docket No.: 50-305License No.: DPR-43DOMINION  
ENERGY KEWAUNEE,  
INC.KEWAUNEE  
POWER STATIONINSPECTION  
REPORT 0500030512013504  
-RESPONSE  
TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory  
Commission  
(NRC) issued an inspection
report for the Kewaunee  
Power Station (KPS) (Reference  
1) indicating  
a preliminary
significance
determination  
for a White finding.  
On April 4, 2013, the NRC issued thefinal significance  
determination  
for a White finding and notice of violation  
(Reference  
2).The April 4, 2013 letter (Reference  
2) also informed  
Dominion  
Energy Kewaunee,  
Inc.(DEK) the NRC would be conducting  
a supplemental  
inspection  
using Inspection
Procedure
95001, "Inspection  
for One or Two White Inputs in a Strategic  
Performance
Area," when NRC has been notified  
by DEK of its readiness  
for the inspection.
On May 31, 2013, the NRC issued a letter describing  
the termination  
of the ReactorOversight  
Process for KPS and commencement  
of the Decommissioning  
PowerReactor Inspection  
Program (Reference  
3). In that letter the NRC states that it willconduct the inspection  
for the Emergency  
Preparedness  
White finding using Inspection
Procedure
92702, "Follow-Up  
on Corrective  
Actions for Violations  
and Deviations,"  
toverify appropriate  
corrective  
actions are being implemented  
instead of using Inspection
Procedure
95001.DEK has undertaken  
the steps necessary  
to assure that the cause evaluation  
andcorrective  
actions are of sufficient  
scope and breadth to address the identified
performance
deficiencies.  
DEK requests  
the NRC perform the inspection  
identified  
inReference  
3 starting  
on or after November  
12, 2013.If you have questions  
or require additional  
information,  
please feel free to contact Mr.Richard P. Repshas at 920-388-8217.
Very truly yours,Site Vi e resident,  
Kewaunee  
Power Station  
Serial No. 13-239Page 2 of 2References:
1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee
Power Station-NRC  
Emergency  
Preparedness  
Inspection  
Report05000305/2012503;  
Preliminary  
White Finding,"  
dated January 24, 2013. (ADAMSAccession  
No. ML13024A422)
2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance
Determination
of A White Finding With Proposed  
Followup  
and Notice of Violation;
NRC Inspection  
Report No. 05000305/2013504;  
Kewaunee  
Power Station,"  
datedApril 4, 2013. (ADAMS Accession  
No. ML13094A270)
3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination  
OfReactor Oversight  
Process For Kewaunee  
Power Station And Commencement  
OfDecommissioning  
Inspection  
Program,"  
dated May 31, 2013. (ADAMS Accession
No. ML13151A375)
Commitments  
made by this letter: NONEcc: Regional  
Administrator,  
Region IIIU. S. Nuclear Regulatory  
Commission
2443 Warrenville  
RoadSuite 210Lisle, IL 60532-4352
Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory  
Commission
One White Flint North, Mail Stop 08-Dl 511555 Rockville  
PikeRockville,  
MD 20852-2738
NRC Senior Resident  
Inspector
Kewaunee
Power Station
}}
}}

Revision as of 15:39, 3 July 2018

Kewaunne Power Station, Response to NRC Inspection Report 05000305-13-504 Request
ML13322A416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2013
From: Jordan A J
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, NRC/RGN-III
References
Download: ML13322A416 (2)


See also: IR 05000305/2013504

Text

Dominion

Energy Kewaunee,

Inc. 4D minionN490 Hwy 42, Kewaunee,

WI 54216Web Address:

www.dom.com

NOV 0 7 2013ATTN: Document

Control Desk Serial No. 13-239U. S. Nuclear Regulatory

Commission

LIC/RR/R0

Washington,

DC 20555-0001

Docket No.: 50-305License No.: DPR-43DOMINION

ENERGY KEWAUNEE,

INC.KEWAUNEE

POWER STATIONINSPECTION

REPORT 0500030512013504

-RESPONSE

TO NRC REQUESTOn January 24, 2013, the Nuclear Regulatory

Commission

(NRC) issued an inspection

report for the Kewaunee

Power Station (KPS) (Reference

1) indicating

a preliminary

significance

determination

for a White finding.

On April 4, 2013, the NRC issued thefinal significance

determination

for a White finding and notice of violation

(Reference

2).The April 4, 2013 letter (Reference

2) also informed

Dominion

Energy Kewaunee,

Inc.(DEK) the NRC would be conducting

a supplemental

inspection

using Inspection

Procedure

95001, "Inspection

for One or Two White Inputs in a Strategic

Performance

Area," when NRC has been notified

by DEK of its readiness

for the inspection.

On May 31, 2013, the NRC issued a letter describing

the termination

of the ReactorOversight

Process for KPS and commencement

of the Decommissioning

PowerReactor Inspection

Program (Reference

3). In that letter the NRC states that it willconduct the inspection

for the Emergency

Preparedness

White finding using Inspection

Procedure

92702, "Follow-Up

on Corrective

Actions for Violations

and Deviations,"

toverify appropriate

corrective

actions are being implemented

instead of using Inspection

Procedure

95001.DEK has undertaken

the steps necessary

to assure that the cause evaluation

andcorrective

actions are of sufficient

scope and breadth to address the identified

performance

deficiencies.

DEK requests

the NRC perform the inspection

identified

inReference

3 starting

on or after November

12, 2013.If you have questions

or require additional

information,

please feel free to contact Mr.Richard P. Repshas at 920-388-8217.

Very truly yours,Site Vi e resident,

Kewaunee

Power Station

Serial No. 13-239Page 2 of 2References:

1. Letter from Kenneth G. O'Brien (NRC) to David A. Heacock (DEK), "Kewaunee

Power Station-NRC

Emergency

Preparedness

Inspection

Report05000305/2012503;

Preliminary

White Finding,"

dated January 24, 2013. (ADAMSAccession

No. ML13024A422)

2. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Final Significance

Determination

of A White Finding With Proposed

Followup

and Notice of Violation;

NRC Inspection

Report No. 05000305/2013504;

Kewaunee

Power Station,"

datedApril 4, 2013. (ADAMS Accession

No. ML13094A270)

3. Letter from Charles A. Casto (NRC) to David A. Heacock (DEK), "Termination

OfReactor Oversight

Process For Kewaunee

Power Station And Commencement

OfDecommissioning

Inspection

Program,"

dated May 31, 2013. (ADAMS Accession

No. ML13151A375)

Commitments

made by this letter: NONEcc: Regional

Administrator,

Region IIIU. S. Nuclear Regulatory

Commission

2443 Warrenville

RoadSuite 210Lisle, IL 60532-4352

Mr. K. D. FeintuchProject ManagerU.S. Nuclear Regulatory

Commission

One White Flint North, Mail Stop 08-Dl 511555 Rockville

PikeRockville,

MD 20852-2738

NRC Senior Resident

Inspector

Kewaunee

Power Station