ML13036A310: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project = TAC:MF0498
}}
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Chawla, MaheshSent:Thursday, January 31, 2013 1:24 PMTo:Alan I HassounCc:Grover, RavinderSubject:LIC-109 Acceptance for Fermi 2 LAR - Adoption of TSTF-423, Revision 1 - MF0498By letter dated January 11, 2013 (ADAMS Accession No. ML13014A125), Detroit Edison Co. submitted a license amendment request for Fermi 2 for Adoption of TSTF Traveler TSTF-423, Revision 1, "Technical Specifications End States, NEDC-32988-A. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-8371.
Hearing Identifier:  NRR_PMDA  Email Number:  604  Mail Envelope Properties  (Mahesh.Chawla@nrc.gov20130131132400) 
==Subject:==
LIC-109 Acceptance for Fermi 2 LAR - Adoption of TSTF-423, Revision 1 - MF0498  Sent Date:  1/31/2013 1:24:22 PM  Received Date:  1/31/2013 1:24:00 PM  From:    Chawla, Mahesh  Created By:  Mahesh.Chawla@nrc.gov  Recipients:    "Grover, Ravinder" <Ravinder.Grover@nrc.gov>  Tracking Status: None "Alan I Hassoun" <hassouna@dteenergy.com>  Tracking Status: None  Post Office:      Files    Size      Date & Time  MESSAGE    2229      1/31/2013 1:24:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:       
}}
}}

Revision as of 07:42, 28 March 2018

2013/01/31 NRR E-mail Capture - LIC-109 Acceptance for Fermi 2 LAR - Adoption of TSTF-423, Revision 1 - MF0498
ML13036A310
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/2013
From: Chawla M L
Division of Operating Reactor Licensing
To: Hassoun A I
Detroit Edison, Co
References
TAC MF0498
Download: ML13036A310 (2)


Text

1NRR-PMDAPEm ResourceFrom:Chawla, MaheshSent:Thursday, January 31, 2013 1:24 PMTo:Alan I HassounCc:Grover, RavinderSubject:LIC-109 Acceptance for Fermi 2 LAR - Adoption of TSTF-423, Revision 1 - MF0498By letter dated January 11, 2013 (ADAMS Accession No. ML13014A125), Detroit Edison Co. submitted a license amendment request for Fermi 2 for Adoption of TSTF Traveler TSTF-423, Revision 1, "Technical Specifications End States, NEDC-32988-A. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-8371.

Hearing Identifier: NRR_PMDA Email Number: 604 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20130131132400)

Subject:

LIC-109 Acceptance for Fermi 2 LAR - Adoption of TSTF-423, Revision 1 - MF0498 Sent Date: 1/31/2013 1:24:22 PM Received Date: 1/31/2013 1:24:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients: "Grover, Ravinder" <Ravinder.Grover@nrc.gov> Tracking Status: None "Alan I Hassoun" <hassouna@dteenergy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2229 1/31/2013 1:24:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: