ML24012A055: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:January 24, 2024 Julianne Polanco State Historic Preservation Officer California Office of Historic Preservation 1725 23rd Street, Suite 100 Sacramento, CA 95816 | ||
==SUBJECT:== | |||
REQUEST TO INITIATE SECTION 106 CONSULTATION AND SCOPING PROCESS FOR THE ENVIRONMENTAL REVIEW OF DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (DOCKET NUMBERS: 50-275 AND 50-323) | |||
==Dear Julianne Polanco:== | |||
The U.S. Nuclear Regulatory Commission (NRC) staff is conducting a review of the environmental effects of renewing the operating license for Diablo Canyon Nuclear Power Plant Units 1 and 2 (DCPP). DCPP is operated by Pacific Gas and Electric Company (PG&E), and is located in San Luis Obispo, California (see Enclosure 1). PG&E submitted an application for the renewal of DCPP operating licenses in a {{letter dated|date=November 7, 2023|text=letter dated November 7, 2023}}, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54. | |||
The Atomic Energy Act of 1954, as amended, authorizes the NRC to issue 40-year initial licenses, and upon application and approval, renew licenses for nuclear power reactors. The NRCs regulations limit these renewals to 20-year increments. Approval of a renewed license is based on the outcome of a safety and environmental review. The Atomic Energy Commission issued a construction permit for DCPP in 1968 and 1970 respectively, and the NRC issued operating licenses on November 2, 1984, and August 26, 1985, respectively. The requested renewal would extend the operating license expiration date for DCPP from November 2, 2024, and August 26, 2025, to November 2, 2044, and August 26, 2045, respectively. | |||
As part of the NRCs license renewal review for DCPP, a site-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, is prepared in accordance with 10 CFR 51, the NRCs environmental protection regulations. These regulations also implement Section 102(2) of the National Environmental Policy Act of 1969, as amended (NEPA). In accordance with Title 36 of the Code of Federal Regulations Section 800.8©, the NRC intends to comply with Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA), through the NEPA process. | |||
Accordingly, the NRC staff is inviting parties who may be interested in the proposed action to consult on this matter. | |||
In the context of NHPA, the NRC staff has determined that the area of potential effects (APE) for this license renewal is the area at the power plant site and its immediate environs that may be impacted by ongoing routine maintenance and operational activities during the license renewal term (see Enclosure 2). The APE may extend beyond the immediate DCPP environs if DCPP maintenance and operational activities affect offsite historic properties (see Enclosure 3). | |||
J. Polanco This determination is made irrespective of ownership or control of the lands of interest. The purpose of this letter is to perform scoping and initiate Section 106 consultation. | |||
Pursuant to 10 CFR 51.28 and 36 CFR 800.8(c)(iii), the NRC is ensuring that Indian Tribes who might attach religious and cultural significance to historic properties in the APE are afforded the opportunity to identify their concerns, provide advice on the identification and evaluation of historic properties, including those of traditional religious, and cultural importance, and, if necessary, participate in the resolution of any adverse effects to such properties. | |||
Please provide any comments that you may have on the scope of the environmental review within 30 days of the date of this letter. Written comments should be submitted by mail to: | |||
ATTN: Program Management, Announcements and Editing Staff Office of Administration Mail Stop: TWFN-7A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Electronic comments may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID: NRC-2023-0192. | |||
The NRC will hold a virtual public scoping meeting on February 1, 2024, and an in-person public scoping meeting on February 8, 2024, near the site. Details on the meetings can be found on the NRCs Public Meeting Schedule at: https://www.nrc.gov/pmns/mtg. | |||
The license renewal application is available through the web-based version of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at https://www.nrc.gov/reading-rm/adams.html. The license renewal application is listed under ADAMS Accession No. ML23311A154. When available, the NRC will publish a schedule for its review at: https://www.nrc.gov/reactors/operating/licensing/renewal/applications/diablo-canyon.html. The NRC will forward the Draft Supplemental Environmental Impact Statement to you for your review and comment when it is published. This draft supplement will include identification of historic properties, assessment of impacts, and a preliminary determination. | |||
J. Polanco If you have any questions concerning the NRCs license renewal review, please contact Kim Conway, at 301-415-1335 or via email at Kimberly.Conway@nrc.gov. | |||
Sincerely, Signed by Koenick, Stephen on 01/24/24 Stephen S. Koenick, Chief Environmental Project Management Branch 1 Division of Rulemaking, Environment and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos: 50-275 and 50-323 | |||
==Enclosures:== | |||
: 1. Area Map, 50-mile radius | |||
: 2. DCPP NPP, Unit 1 and 2 Area of Potential Effect | |||
: 3. Area Map, 6-mile radius cc: Listserv Michael McGuirt Supervisor, Archaeology and Environmental Compliance Unit California Office of Historic Preservation 1725 23rd Street, Suite 100 Sacramento, CA 95816 calshpo.ohp@parks.ca.gov https://ohp.parks.ca.gov/?page_id=30363#Submission | |||
J. Polanco | |||
==SUBJECT:== | |||
REQUEST TO INITIATE SECTION 106 CONSULTATION AND SCOPING PROCESS FOR THE ENVIRONMENTAL REVIEW OF DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 AND 2 LICENSE RENEWAL APPLICATION (DOCKET NUMBERS: 50-275 AND 50-323) | |||
DATED: | |||
January 24, 2024 DISTRIBUTION: | |||
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDnrlNlrp Resource RidsNrrPmDiabloCanyon Resource RidsRgn4MailCenter Resource BSmith, NRR SLee, NRR LGibson, NRR BHarris, NRR SGreen. NRR TKeene, OEDO SKoenick, NMSS ADAMS Package Accession No: ML24012A039; ML24012A055 (Letter)* via email OFFICE NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS NAME JTrefethen AWalker-Smith BGoldstein KConway SKoenick DATE 01/16/24 01/16/24 01/18/24 01/24/24 01/24/24 OFFICIAL RECORD COPY}} |
Revision as of 11:28, 16 February 2024
ML24012A055 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 01/24/2024 |
From: | Stephen Koenick NRC/NMSS/DREFS/ERMB |
To: | Polanco J State of CA, Office of Historic Preservation |
Shared Package | |
ML24012A039 | List: |
References | |
Download: ML24012A055 (4) | |
Text
January 24, 2024 Julianne Polanco State Historic Preservation Officer California Office of Historic Preservation 1725 23rd Street, Suite 100 Sacramento, CA 95816
SUBJECT:
REQUEST TO INITIATE SECTION 106 CONSULTATION AND SCOPING PROCESS FOR THE ENVIRONMENTAL REVIEW OF DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (DOCKET NUMBERS: 50-275 AND 50-323)
Dear Julianne Polanco:
The U.S. Nuclear Regulatory Commission (NRC) staff is conducting a review of the environmental effects of renewing the operating license for Diablo Canyon Nuclear Power Plant Units 1 and 2 (DCPP). DCPP is operated by Pacific Gas and Electric Company (PG&E), and is located in San Luis Obispo, California (see Enclosure 1). PG&E submitted an application for the renewal of DCPP operating licenses in a letter dated November 7, 2023, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54.
The Atomic Energy Act of 1954, as amended, authorizes the NRC to issue 40-year initial licenses, and upon application and approval, renew licenses for nuclear power reactors. The NRCs regulations limit these renewals to 20-year increments. Approval of a renewed license is based on the outcome of a safety and environmental review. The Atomic Energy Commission issued a construction permit for DCPP in 1968 and 1970 respectively, and the NRC issued operating licenses on November 2, 1984, and August 26, 1985, respectively. The requested renewal would extend the operating license expiration date for DCPP from November 2, 2024, and August 26, 2025, to November 2, 2044, and August 26, 2045, respectively.
As part of the NRCs license renewal review for DCPP, a site-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, is prepared in accordance with 10 CFR 51, the NRCs environmental protection regulations. These regulations also implement Section 102(2) of the National Environmental Policy Act of 1969, as amended (NEPA). In accordance with Title 36 of the Code of Federal Regulations Section 800.8©, the NRC intends to comply with Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA), through the NEPA process.
Accordingly, the NRC staff is inviting parties who may be interested in the proposed action to consult on this matter.
In the context of NHPA, the NRC staff has determined that the area of potential effects (APE) for this license renewal is the area at the power plant site and its immediate environs that may be impacted by ongoing routine maintenance and operational activities during the license renewal term (see Enclosure 2). The APE may extend beyond the immediate DCPP environs if DCPP maintenance and operational activities affect offsite historic properties (see Enclosure 3).
J. Polanco This determination is made irrespective of ownership or control of the lands of interest. The purpose of this letter is to perform scoping and initiate Section 106 consultation.
Pursuant to 10 CFR 51.28 and 36 CFR 800.8(c)(iii), the NRC is ensuring that Indian Tribes who might attach religious and cultural significance to historic properties in the APE are afforded the opportunity to identify their concerns, provide advice on the identification and evaluation of historic properties, including those of traditional religious, and cultural importance, and, if necessary, participate in the resolution of any adverse effects to such properties.
Please provide any comments that you may have on the scope of the environmental review within 30 days of the date of this letter. Written comments should be submitted by mail to:
ATTN: Program Management, Announcements and Editing Staff Office of Administration Mail Stop: TWFN-7A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Electronic comments may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID: NRC-2023-0192.
The NRC will hold a virtual public scoping meeting on February 1, 2024, and an in-person public scoping meeting on February 8, 2024, near the site. Details on the meetings can be found on the NRCs Public Meeting Schedule at: https://www.nrc.gov/pmns/mtg.
The license renewal application is available through the web-based version of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at https://www.nrc.gov/reading-rm/adams.html. The license renewal application is listed under ADAMS Accession No. ML23311A154. When available, the NRC will publish a schedule for its review at: https://www.nrc.gov/reactors/operating/licensing/renewal/applications/diablo-canyon.html. The NRC will forward the Draft Supplemental Environmental Impact Statement to you for your review and comment when it is published. This draft supplement will include identification of historic properties, assessment of impacts, and a preliminary determination.
J. Polanco If you have any questions concerning the NRCs license renewal review, please contact Kim Conway, at 301-415-1335 or via email at Kimberly.Conway@nrc.gov.
Sincerely, Signed by Koenick, Stephen on 01/24/24 Stephen S. Koenick, Chief Environmental Project Management Branch 1 Division of Rulemaking, Environment and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos: 50-275 and 50-323
Enclosures:
- 1. Area Map, 50-mile radius
- 3. Area Map, 6-mile radius cc: Listserv Michael McGuirt Supervisor, Archaeology and Environmental Compliance Unit California Office of Historic Preservation 1725 23rd Street, Suite 100 Sacramento, CA 95816 calshpo.ohp@parks.ca.gov https://ohp.parks.ca.gov/?page_id=30363#Submission
J. Polanco
SUBJECT:
REQUEST TO INITIATE SECTION 106 CONSULTATION AND SCOPING PROCESS FOR THE ENVIRONMENTAL REVIEW OF DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 AND 2 LICENSE RENEWAL APPLICATION (DOCKET NUMBERS: 50-275 AND 50-323)
DATED:
January 24, 2024 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrDnrlNlrp Resource RidsNrrPmDiabloCanyon Resource RidsRgn4MailCenter Resource BSmith, NRR SLee, NRR LGibson, NRR BHarris, NRR SGreen. NRR TKeene, OEDO SKoenick, NMSS ADAMS Package Accession No: ML24012A039; ML24012A055 (Letter)* via email OFFICE NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS NAME JTrefethen AWalker-Smith BGoldstein KConway SKoenick DATE 01/16/24 01/16/24 01/18/24 01/24/24 01/24/24 OFFICIAL RECORD COPY