DCL-23-118, License Renewal Application
From kanterella
(Redirected from ML23311A154)
Jump to navigation
Jump to search
Letter Sequence Other | |
---|---|
EPID:L-2024-CRS-0000, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule (Open) | |
Initiation
Administration Questions
Results
Other: DCL-23-118, License Renewal Application, ML24088A238, ML24136A162, ML24198A105, ML24205A066, ML24205A067, ML24235A203, ML24262A246, ML24281A106 | |
MONTHYEARDCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023
[Table View]Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule Project stage: Request ML23257A3022023-09-14014 September 2023 San Luis Obispo Mothers for Peace and Friends of the Earth Corrected Request for Hearing on NRC Staff Decision Effectively Amending Diablo Canyon 1 License, Request for Emergency Order Requiring Shutdown, and Errata Project stage: Request DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application Project stage: Other ML24065A4342024-03-0505 March 2024 Exhibit 2 to Hearing Request Project stage: Request ML24067A0662024-03-0707 March 2024 Petition by San Luis Obispo Mothers for Peace, Friends of the Earth and Environmental Working Group for Shutdown of Diablo Canyon Nuclear Power Plant Due to Unacceptable Risk of Seismic Core Damage Accident Project stage: Request ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 Project stage: Other ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment Project stage: Other ML24162A0792024-06-0707 June 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Supplemental Declaration 6-7-2024 - Project stage: Supplement ML24218A1642024-07-17017 July 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - 7-17-2024 Petitioner Public Meeting Transcript - Project stage: Meeting ML24198A1052024-07-17017 July 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petitioner Presentation 7-16-2024 - L-2024-CRS-0000 OEDO-24-00083 Project stage: Other ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 Project stage: Other ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - Project stage: Other ML24205A0672024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - FRN Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - (EPID L-2024-CRS-0000) - Federal Register Notice Project stage: Other ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - Project stage: Other ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 Project stage: Other ML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 Project stage: Supplement 2024-03-05 |
ML23311A154 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 11/07/2023 |
From: | Gerfen P Pacific Gas & Electric Co |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
DCL-23-118 | |
Download: ML23311A154 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter type:DCL
MONTHYEARDCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024
[Table view]Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System 2024-09-09 Category:License-Application for (Amend/Renewal/New) for DKT 30 MONTHYEARDCL-23-118, License Renewal Application2023-11-0707 November 2023
[Table view]License Renewal Application DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. 2023-11-07 Category:40 MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation L-21-010, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan DCL-21-026, Decommissioning Funding Report2021-03-31031 March 2021 Decommissioning Funding Report DCL-20-014, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 22020-03-30030 March 2020 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 2 ML19345D3452019-12-0404 December 2019 Site-Specific Decommissioning Cost Estimate DCL-19-055, Revised Enclosure for the Decommissioning Funding Report2019-07-0101 July 2019 Revised Enclosure for the Decommissioning Funding Report DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22017-03-31031 March 2017 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 22015-03-31031 March 2015 Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 DCL-13-033, Decommissioning Funding Report2013-04-0101 April 2013 Decommissioning Funding Report DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 20102011-03-31031 March 2011 Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010 DCL-11-039, Submittal of Decommissioning Funding Report2011-03-31031 March 2011 Submittal of Decommissioning Funding Report ML1109006722011-03-31031 March 2011 Decommissioning Funding Report for 2010 DCL-09-021, Submittal of Decommissioning Funding Report2009-03-31031 March 2009 Submittal of Decommissioning Funding Report DCL-07-028, Supplemental to Decommissioning Funding Report2007-06-13013 June 2007 Supplemental to Decommissioning Funding Report DCL-05-026, Decommissioning Funding Report2005-03-31031 March 2005 Decommissioning Funding Report DCL-03-035, Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 72003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 7 ML0309902892003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 1 - 4, Appendix C ML0509605442002-02-12012 February 2002 P01-1421-003, Rev. 0, Decommissioning Cost Study for Diablo Canyon Power Plant Units 1 and 2. 2024-08-28 Category:70 MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 DCL-22-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22022-03-30030 March 2022 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections2022-03-10010 March 2022 License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation L-21-010, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2021-12-14014 December 2021 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan DCL-21-026, Decommissioning Funding Report2021-03-31031 March 2021 Decommissioning Funding Report DCL-20-014, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 22020-03-30030 March 2020 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 & 2 ML19345D3452019-12-0404 December 2019 Site-Specific Decommissioning Cost Estimate DCL-19-055, Revised Enclosure for the Decommissioning Funding Report2019-07-0101 July 2019 Revised Enclosure for the Decommissioning Funding Report DCL-17-022, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22017-03-31031 March 2017 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-15-107, License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits.2015-09-16016 September 2015 License Amendment Request 15-07, Revision of Reactor Coolant System Minimum Flow Specified in Technical Specification 3.4.1. RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits. DCL-15-044, Decommissioning Funding Report for Diablo Canyon, Units 1 and 22015-03-31031 March 2015 Decommissioning Funding Report for Diablo Canyon, Units 1 and 2 DCL-13-033, Decommissioning Funding Report2013-04-0101 April 2013 Decommissioning Funding Report DCL-11-039, Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 20102011-03-31031 March 2011 Diablo Canyon Power Plant, Units 1 & 2, Decommissioning Funding Report for 2010 DCL-11-039, Submittal of Decommissioning Funding Report2011-03-31031 March 2011 Submittal of Decommissioning Funding Report ML1109006722011-03-31031 March 2011 Decommissioning Funding Report for 2010 DCL-09-021, Submittal of Decommissioning Funding Report2009-03-31031 March 2009 Submittal of Decommissioning Funding Report DCL-07-028, Supplemental to Decommissioning Funding Report2007-06-13013 June 2007 Supplemental to Decommissioning Funding Report DCL-05-026, Decommissioning Funding Report2005-03-31031 March 2005 Decommissioning Funding Report DCL-03-035, Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 72003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 4 - 7 ML0309902892003-03-27027 March 2003 Decommissioning Funding Reports for Diablo Canyon, Units 1 & 2 and Humboldt Bay, Unit 3, Enclosures 1 - 4, Appendix C ML0509605442002-02-12012 February 2002 P01-1421-003, Rev. 0, Decommissioning Cost Study for Diablo Canyon Power Plant Units 1 and 2. 2024-08-28 |