{{#Wiki_filter:Constellation CCN: 23-58                                                                                  10 CFR 72.212 July 7, 2023 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29
 
==Subject:==
Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks In accordance with 10 CFR 72.212(b)(2), the purpose of this letter is to register ISFSI casks that were recently placed into service. The following information is provided in accordance with 10 CFR 72.212(b)(2).
Licensee Name:                            Constellation Energy Generation, LLC Licensee Address:                        Peach Bottom Atomic Power Station 1848 Lay Road, Delta, PA 17314 Reactor License Numbers:                  (Renewed) DPR-44 and DPR-56 Reactor Docket Numbers:                  50-277 and 50-278 ISFSI Docket Number:                      72-29 Contact Person and
 
==Title:==
Amy Huber, Sr. Regulatory Engineer Cask/MPC ID#        Cask Model#              Cask Certificate#        In-Service Date    ISFSI Location 339/249          HI-STORM FW          1032, Amendment 1, Rev.1        06/09/2023              13 373/288          HI-STORM FW          1032, Amendment 1, Rev.1        06/16/2023              14 374/289          HI-STORM FW          1032, Amendment 1, Rev.1        06/22/2023              15 375/290          HI-STORM FW          1032, Amendment 1, Rev.1        06/29/2023              16 There are no commitments in this letter. If there are any questions, please contact Amy Huber at 717-456-3526.
1      fr  ,_,-
Ryan Stiltner Plant Manager and Acting Site Vice-President Peach Bottom Atomic Power Station cc:    NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station}}

Revision as of 09:24, 17 July 2023

Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks
ML23188A053
Person / Time
Site: Peach Bottom, 07201032  Constellation icon.png
Issue date: 07/07/2023
From: Stiltner R
Constellation Energy Generation
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
CCN: 23-58
Download: ML23188A053 (1)


Text

Constellation CCN: 23-58 10 CFR 72.212 July 7, 2023 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Subsequent Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277, 50-278, and 72-29

Subject:

Registration of Use of Independent Spent Fuel Storage Installation (ISFSI) Casks In accordance with 10 CFR 72.212(b)(2), the purpose of this letter is to register ISFSI casks that were recently placed into service. The following information is provided in accordance with 10 CFR 72.212(b)(2).

Licensee Name: Constellation Energy Generation, LLC Licensee Address: Peach Bottom Atomic Power Station 1848 Lay Road, Delta, PA 17314 Reactor License Numbers: (Renewed) DPR-44 and DPR-56 Reactor Docket Numbers: 50-277 and 50-278 ISFSI Docket Number: 72-29 Contact Person and

Title:

Amy Huber, Sr. Regulatory Engineer Cask/MPC ID# Cask Model# Cask Certificate# In-Service Date ISFSI Location 339/249 HI-STORM FW 1032, Amendment 1, Rev.1 06/09/2023 13 373/288 HI-STORM FW 1032, Amendment 1, Rev.1 06/16/2023 14 374/289 HI-STORM FW 1032, Amendment 1, Rev.1 06/22/2023 15 375/290 HI-STORM FW 1032, Amendment 1, Rev.1 06/29/2023 16 There are no commitments in this letter. If there are any questions, please contact Amy Huber at 717-456-3526.

1 fr ,_,-

Ryan Stiltner Plant Manager and Acting Site Vice-President Peach Bottom Atomic Power Station cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector - Peach Bottom Atomic Power Station