ML21237A495: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:From:           Nielsen, Adam To:             McNeil, Andrew Clair Cc:             Kellner, Bob
{{#Wiki_filter:From: Nielsen, Adam To: McNeil, Andrew Clair Cc: Kellner, Bob


==Subject:==
==Subject:==
October RP inspection document request Date:           Wednesday, August 25, 2021 1:43:00 PM Attachments:     SEQ_2021-04_RP_doc_request.pdf Our document request is attached. Please distribute it to the appropriate site people.
October RP inspection document request Date: Wednesday, August 25, 2021 1:43:00 PM Attachments: SEQ_2021-04_RP_doc_request.pdf
 
Our document request is attached. Please distribute it to the appropriate site people.
 
We would like the documents available to us by September 27th if possible. Please dont hesitate to call/email me if you have any questions.
We would like the documents available to us by September 27th if possible. Please dont hesitate to call/email me if you have any questions.
: Thanks, Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660
: Thanks, Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660


Sequoyah Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2021004 During the week of October 4 - 8, 2021, the NRC will perform a baseline Radiation Safety Inspection at the Browns Ferry Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, and 71151).
Sequoyah Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2021 004
 
During the week of October 4 - 8, 2021, the NRC will perform a baseline Radiation Safety Inspection at the Browns Ferry Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, and 71151).
 
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 27, 2021.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 27, 2021.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.


Document Request List Inspection Dates:                     October 4 - 8, 2021 Documents Due to Region II:           September 27, 2021 Inspection Procedures:                 IP 71124.01   Radiological Hazard Assessment and Exposure Controls IP 71124.02   Occupational ALARA Planning and Controls IP 71151       Performance Indicator Verification (Occupational Cornerstone Only)
PAPERWORK REDUCTION ACT STATEMENT
Lead Inspector:                       Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660 Adam.Nielsen@nrc.gov Note: The current version of these documents is expected unless specified otherwise.
 
This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150- 0008, 3150- 0011, 3150- 0014, 3150- 0044, and 3150- 0135.
 
PUBLIC PROTECTION NOTIFICATION
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
 
Document Request List
 
Inspection Dates: October 4 - 8, 2021
 
Documents Due to Region II: September 27, 2021
 
Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls IP 71151 Performance Indicator Verification (Occupational Cornerstone Only)
 
Lead Inspector: Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660 Adam.Nielsen@nrc.gov
 
Note: The current version of these documents is expected unless specified otherwise.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.
Miscellaneous
Miscellaneous
: 1. List of primary contacts for each inspection area w/phone numbers
: 1. List of primary contacts for each inspection area w/phone numbers
: 2. Corrective action program procedure(s) 71124.01 - Radiological Hazard Assessment and Exposure Controls
: 2. Corrective action program procedure(s)
 
71124.01 - Radiological Hazard Assessment and Exposure Controls
: 1. Timeline of major outage activities (e.g. Gantt chart or similar list)
: 1. Timeline of major outage activities (e.g. Gantt chart or similar list)
: 2. Procedures related to RP controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel movement, hot spots, etc.)
: 2. Procedures related to RP controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel movement, hot spots, etc.)
Line 41: Line 67:
: 5. List of all non-fuel items stored in spent fuel pool
: 5. List of all non-fuel items stored in spent fuel pool
: 6. Most recent self-assessment or audit covering RP controls
: 6. Most recent self-assessment or audit covering RP controls
: 7. List of CRs related to RP controls (e.g. radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since August 29, 2020.
: 7. List of CRs related to RP controls (e.g. radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since August 29, 20 20.
 
71124.02 - Occupational ALARA Planning and Controls
71124.02 - Occupational ALARA Planning and Controls
: 1. All procedures related to ALARA (e.g. temporary shielding, ALARA planning, source term reduction, etc.)
: 1. All procedures related to ALARA (e.g. temporary shielding, ALARA planning, source term reduction, etc.)
Line 49: Line 76:
: 5. Minutes from the last 4 Plant ALARA Committee Meetings
: 5. Minutes from the last 4 Plant ALARA Committee Meetings
: 6. Most recent self-assessment or audit of ALARA program.
: 6. Most recent self-assessment or audit of ALARA program.
: 7. List of CRs related to ALARA since December 1, 2018.
: 7. List of CRs related to ALARA since December 1, 201 8.
 
71151 - Performance Indicator Verification (Occupational Cornerstone Only)
71151 - Performance Indicator Verification (Occupational Cornerstone Only)
: 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable desktop guides.
: 1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable desktop guides.
: 2. List of electronic dosimeter alarms since August 29, 2020 (dose and dose rate)}}
: 2. List of electronic dosimeter alarms since August 29, 2020 (dose and dose rate)}}

Latest revision as of 23:40, 19 November 2024

Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04
ML21237A495
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/25/2021
From: Adam Nielsen
NRC/RGN-II
To: Mcneil A
Tennessee Valley Authority
References
Download: ML21237A495 (4)


Text

From: Nielsen, Adam To: McNeil, Andrew Clair Cc: Kellner, Bob

Subject:

October RP inspection document request Date: Wednesday, August 25, 2021 1:43:00 PM Attachments: SEQ_2021-04_RP_doc_request.pdf

Our document request is attached. Please distribute it to the appropriate site people.

We would like the documents available to us by September 27th if possible. Please dont hesitate to call/email me if you have any questions.

Thanks, Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660

Sequoyah Nuclear Plant Radiation Safety Baseline Inspection Initial Information Request Inspection Report: 2021 004

During the week of October 4 - 8, 2021, the NRC will perform a baseline Radiation Safety Inspection at the Browns Ferry Nuclear Plant (NRC Inspection Procedures 71124.01, 71124.02, and 71151).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we are requesting in advance documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than September 27, 2021.

If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen at 404-997-4660, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

PAPERWORK REDUCTION ACT STATEMENT

This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150- 0008, 3150- 0011, 3150- 0014, 3150- 0044, and 3150- 0135.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Document Request List

Inspection Dates: October 4 - 8, 2021

Documents Due to Region II: September 27, 2021

Inspection Procedures: IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls IP 71151 Performance Indicator Verification (Occupational Cornerstone Only)

Lead Inspector: Adam Nielsen Sr. Health Physicist US NRC Region II (404) 997-4660 Adam.Nielsen@nrc.gov

Note: The current version of these documents is expected unless specified otherwise.

Electronic media is preferred if readily available. Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies. Please organize the information as it is arranged below to the extent possible. Pay particular attention to the date ranges for the items requested as they may change from item to item. If there are questions regarding the documents requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector.

Miscellaneous

1. List of primary contacts for each inspection area w/phone numbers
2. Corrective action program procedure(s)

71124.01 - Radiological Hazard Assessment and Exposure Controls

1. Timeline of major outage activities (e.g. Gantt chart or similar list)
2. Procedures related to RP controls (e.g. Posting, labeling, surveys, RWPs, contamination control, HRA/LHRA/VHRA control, key control, control of divers, special controls during fuel movement, hot spots, etc.)
3. Procedures related to release of personnel and materials (e.g. release surveys, decontamination, guidance for alarm followup, etc.)
4. List of outage RWPs
5. List of all non-fuel items stored in spent fuel pool
6. Most recent self-assessment or audit covering RP controls
7. List of CRs related to RP controls (e.g. radworker error, RP technician error, posting issues, HRA/LHRA/VHRA issues, survey problems, etc.) issued since August 29, 20 20.

71124.02 - Occupational ALARA Planning and Controls

1. All procedures related to ALARA (e.g. temporary shielding, ALARA planning, source term reduction, etc.)
2. ALARA planning packages for the top 5 dose jobs for the upcoming refueling outage (including dose estimates, work hour estimates, special RP controls, and dose reduction initiatives)
3. ALARA trending point data for last two outages (last two for both units)
4. Source term reduction strategic plan, if available
5. Minutes from the last 4 Plant ALARA Committee Meetings
6. Most recent self-assessment or audit of ALARA program.
7. List of CRs related to ALARA since December 1, 201 8.

71151 - Performance Indicator Verification (Occupational Cornerstone Only)

1. Procedures for gathering and reporting NRC Performance Indicator (PI) data, including any applicable desktop guides.
2. List of electronic dosimeter alarms since August 29, 2020 (dose and dose rate)