ML20199F813: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Dave Morey               Southern Nuclear We he9 dent =             Operating Company -
{{#Wiki_filter:Dave Morey Southern Nuclear We he9 dent =
1, Fvley Project             PJ. Box 1295 Bkmingham. Nabama 35201 Tel 205 992.5131 November 19,1997 EM COMPANY Energy to Serve hur World" '
Operating Company -
Docket Nos.       50 348                                                         10 CFR 50.90 50-364 U.S. Nuclect Regulatory Commission NITN.: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Response to Request for Additional Information Related to Power Uprate Facility Operating Licenses pnd Technical Specifications ChanggEc_qtJgst Ladies and Gentlemen:
1, Fvley Project PJ. Box 1295 Bkmingham. Nabama 35201 Tel 205 992.5131 November 19,1997 EM COMPANY Energy to Serve hur World" '
Docket Nos.
50 348 10 CFR 50.90 50-364 U.S. Nuclect Regulatory Commission NITN.: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Response to Request for Additional Information Related to Power Uprate Facility Operating Licenses pnd Technical Specifications ChanggEc_qtJgst Ladies and Gentlemen:
Dy {{letter dated|date=February 14, 1997|text=letter dated February 14,1997}}, Southern Nuclear Ope:ating Company (SNC) proposed to amend the Facility Operating Licenses and Technical Specifications for Joseph M. Farley Nuclear Plant (FNP) Unit I and Unit 2 to allow operation at an increased reactor core power level of 2775 megawatts thermal (Mwt). NRC letters dated July 1,1997 and August 21,1997 requested SNC provide additional infonnation, and SNC responded by letters dated August 5,1997 and September 22,1997, respectively. On October 20,1997, SNC received a new Staff request (NRC {{letter dated|date=October 14, 1997|text=letter dated October 14,1997}}) for additional infonnation. This SNC letter provides the requested information.
Dy {{letter dated|date=February 14, 1997|text=letter dated February 14,1997}}, Southern Nuclear Ope:ating Company (SNC) proposed to amend the Facility Operating Licenses and Technical Specifications for Joseph M. Farley Nuclear Plant (FNP) Unit I and Unit 2 to allow operation at an increased reactor core power level of 2775 megawatts thermal (Mwt). NRC letters dated July 1,1997 and August 21,1997 requested SNC provide additional infonnation, and SNC responded by letters dated August 5,1997 and September 22,1997, respectively. On October 20,1997, SNC received a new Staff request (NRC {{letter dated|date=October 14, 1997|text=letter dated October 14,1997}}) for additional infonnation. This SNC letter provides the requested information.
Attachment I provides the SNC Responses to NRC Question Nos.1 - 11 and 13 - 33, and Attachment 11 provides the SNC Response to NRC Question No.12, Attachment 111 includes a copy of corrected page 4-12 of WCAP-14723,"Farley Nuclear Plant Units I and 2 Power Uprate Project NSSS Licensing Report," which is a non-proprietary Westinghouse report.                                   -
Attachment I provides the SNC Responses to NRC Question Nos.1 - 11 and 13 - 33, and 1 provides the SNC Response to NRC Question No.12, Attachment 111 includes a copy of corrected page 4-12 of WCAP-14723,"Farley Nuclear Plant Units I and 2 Power Uprate Project NSSS Licensing Report," which is a non-proprietary Westinghouse report.
Attachment 11 also includes NSD-sal ESI 97 646, "SNC Response to NRC RAI on BELOCA,"
I 1 also includes NSD-sal ESI 97 646, "SNC Response to NRC RAI on BELOCA,"
Proprietary Class 2; NSD-sal-97-647, "SNC Response to NRC RAI on BELOCA " Non-                               1
\\d' Proprietary Class 2; NSD-sal-97-647, "SNC Response to NRC RAI on BELOCA " Non-1 Proprietary Class 3; and Westinghouse authorization letter CAW-97-1188 with accompanying Ql affidavit, proprietary infomtation notice, and copyright notice. As NSD-SAI-ESI 97-646 contains
                                                                                                                        \d' I
[
Proprietary Class 3; and Westinghouse authorization letter CAW-97-1188 with accompanying                   Ql affidavit, proprietary infomtation notice, and copyright notice. As NSD-SAI-ESI 97-646 contains           [
infomiation proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and specifically
infomiation proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and specifically
        - addresses the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations. Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-97-1188 and be addressed to Nicholas J. Liparuto, Manager of Equipment Design and Regulatory Engineering, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230-hhge; LD C 40001 4pg i 9711250019 971119                                               ; gl gj7                g PDR     ADOCK 05000348 P                           PDR
- addresses the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations. Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-97-1188 and be addressed to Nicholas J. Liparuto, Manager of Equipment Design and Regulatory Engineering, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230-hhge; LD C 40001
; gl gj7 4pg i
g 9711250019 971119 PDR ADOCK 05000348 P
PDR


a l
a l
      ~
~
* I
I
          " S. Nuclear Regulatory Commission                                           Page 2 y
" S. Nuclear Regulatory Commission Page 2 y
          - If you have any questions, please advise ~.                                                      .
- If you have any questions, please advise ~.
.                                                                                                            t Respectfully submitted, 7
t Respectfully submitted, 7
SOUTHERN NUCLEAR OPERATING COMPANY -
SOUTHERN NUCLEAR OPERATING COMPANY -
h7 7//Wf Dave Morey
h7 7//Wf Dave Morey
          ^ Sworn to andsubscribedbejbre me this$ y of 6Nd'l997 AAAl           =
^ Sworn to andsubscribedbejbre me this$ y of 6Nd'l997 4tYn AAAl
4tYn        ~
=
                                  .Notar> T'Ebile My Commission Expires:                 k A d#/
~
ff MGE/ cit:pwrup25. doc .
.Notar> T'Ebile My Commission Expires:
Attachments cc:     Mr L. A. Reyes, Region 11 Administrator Mr, J. I, Zimmerman, NRR Project Manager                                                 ,
k A d#/
                  ' Mr, T M Ross, Plant Sr. Resident inspector s
ff MGE/ cit:pwrup25. doc.
5 L..                                           __}}
Attachments cc:
Mr L. A. Reyes, Region 11 Administrator Mr, J. I, Zimmerman, NRR Project Manager
' Mr, T M Ross, Plant Sr. Resident inspector s
5 L..
__}}

Latest revision as of 07:41, 10 December 2024

Forwards Nonproprietary & Proprietary Versions of SNC Response to NRC RAI on Beloca, in Response to RAI Re Power Uprate Facility OLs & TS Change Request.W/Responses to Questions 1-11 & 13-33,affidavit & Authorization Ltr
ML20199F813
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/19/1997
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19313D093 List:
References
NUDOCS 9711250019
Download: ML20199F813 (59)


Text

Dave Morey Southern Nuclear We he9 dent =

Operating Company -

1, Fvley Project PJ. Box 1295 Bkmingham. Nabama 35201 Tel 205 992.5131 November 19,1997 EM COMPANY Energy to Serve hur World" '

Docket Nos.

50 348 10 CFR 50.90 50-364 U.S. Nuclect Regulatory Commission NITN.: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant Response to Request for Additional Information Related to Power Uprate Facility Operating Licenses pnd Technical Specifications ChanggEc_qtJgst Ladies and Gentlemen:

Dy letter dated February 14,1997, Southern Nuclear Ope:ating Company (SNC) proposed to amend the Facility Operating Licenses and Technical Specifications for Joseph M. Farley Nuclear Plant (FNP) Unit I and Unit 2 to allow operation at an increased reactor core power level of 2775 megawatts thermal (Mwt). NRC letters dated July 1,1997 and August 21,1997 requested SNC provide additional infonnation, and SNC responded by letters dated August 5,1997 and September 22,1997, respectively. On October 20,1997, SNC received a new Staff request (NRC letter dated October 14,1997) for additional infonnation. This SNC letter provides the requested information.

Attachment I provides the SNC Responses to NRC Question Nos.1 - 11 and 13 - 33, and 1 provides the SNC Response to NRC Question No.12, Attachment 111 includes a copy of corrected page 4-12 of WCAP-14723,"Farley Nuclear Plant Units I and 2 Power Uprate Project NSSS Licensing Report," which is a non-proprietary Westinghouse report.

I 1 also includes NSD-sal ESI 97 646, "SNC Response to NRC RAI on BELOCA,"

\\d' Proprietary Class 2; NSD-sal-97-647, "SNC Response to NRC RAI on BELOCA " Non-1 Proprietary Class 3; and Westinghouse authorization letter CAW-97-1188 with accompanying Ql affidavit, proprietary infomtation notice, and copyright notice. As NSD-SAI-ESI 97-646 contains

[

infomiation proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and specifically

- addresses the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations. Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-97-1188 and be addressed to Nicholas J. Liparuto, Manager of Equipment Design and Regulatory Engineering, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230-hhge; LD C 40001

gl gj7 4pg i

g 9711250019 971119 PDR ADOCK 05000348 P

PDR

a l

~

I

" S. Nuclear Regulatory Commission Page 2 y

- If you have any questions, please advise ~.

t Respectfully submitted, 7

SOUTHERN NUCLEAR OPERATING COMPANY -

h7 7//Wf Dave Morey

^ Sworn to andsubscribedbejbre me this$ y of 6Nd'l997 4tYn AAAl

=

~

.Notar> T'Ebile My Commission Expires:

k A d#/

ff MGE/ cit:pwrup25. doc.

Attachments cc:

Mr L. A. Reyes, Region 11 Administrator Mr, J. I, Zimmerman, NRR Project Manager

' Mr, T M Ross, Plant Sr. Resident inspector s

5 L..

__