Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID: L-2020-LLR-0134) | Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID: L-2020-LLR-0134) | ||
By letter dated October 1, 2020 (ADAMS Accession No. ML20280A232), Wolf Creek Nuclear Operating Corporation submitted a request for Wolf Creek Generating Station to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) | By {{letter dated|date=October 1, 2020|text=letter dated October 1, 2020}} (ADAMS Accession No. ML20280A232), Wolf Creek Nuclear Operating Corporation submitted a request for Wolf Creek Generating Station to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) | ||
Code, Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | Code, Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
Latest revision as of 22:05, 7 March 2021
ML20297A302 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 10/22/2020 |
From: | Samson Lee NRC/NRR/DORL/LPL4 |
To: | Joseph Turner Wolf Creek |
References | |
L-2020-LLR-0134 | |
Download: ML20297A302 (3) | |
Text
From: Lee, Samson Sent: Thursday, October 22, 2020 3:02 PM To: Joshua Turner
Subject:
Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI (EPID: L-2020-LLR-0134)
By letter dated October 1, 2020 (ADAMS Accession No. ML20280A232), Wolf Creek Nuclear Operating Corporation submitted a request for Wolf Creek Generating Station to use a specific provision of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV)
Code,Section XI, for Wolf Creek Generating Station (WCGS). Specifically, WCNOC requests approval to use IWA-4540(b) of 2017 Edition of the ASME B&PV Code. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to complete. The NRC staff expects to complete this review by November 12, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Samson Lee Wolf Creek Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168
Hearing Identifier: NRR_DRMA Email Number: 853 Mail Envelope Properties (DM8PR09MB6183BA8D7F60EDA23E351F3A9A1D0)
Subject:
Acceptance Review - Wolf Creek Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI (EPID: L-2020-LLR-0134)
Sent Date: 10/22/2020 3:02:15 PM Received Date: 10/22/2020 3:02:15 PM From: Lee, Samson Created By: Samson.Lee@nrc.gov Recipients: