ML20206K423: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:{                                             UNITE
{{#Wiki_filter:{
                                                          }TATES Y       f
}TATES Y
                                                                                            /
/
p    }
}
1                                  NUCLEAR REGUL.. JRY COMMISSION                y , .     /</ /
UNITE f
C31 A   AVENUI                             d KING OF PRUS$1A. PENNSYLVANI A 19406 L- 0meY Y JAN 2 81975 Boston Edison Company Attention:   Mr. M. J. Feldmann l
p y,.
Vice President and Director of
/</ /
    ;                        Operations and Engineering i         800 Boylston Street
1 NUCLEAR REGUL.. JRY COMMISSION C31 A AVENUI d
    ?
KING OF PRUS$1A. PENNSYLVANI A 19406 L- 0meY Y JAN 2 81975 Boston Edison Company l
Boston, Massachusetts       02199 Gentlemen:
Attention:
  ;          This letter refers to our telephone conversation of January 28, 1975,
Mr. M. J. Feldmann Vice President and Director of Operations and Engineering i
  @          between Mr. O'Reilly of this Office and you and Mr. Roach of your Staff,               ,
800 Boylston Street
fJ          concerning the operation of your Pilgrim Nuclear Power Plant.                           I h         It is our understanding that you are continuing to investigate the cause of gaseous radioactivity releases from your reactor building ventilation I         system vent that have exceeded limits contained in your Techni:a1 Speci-i         fications. We understand that the following conditions have been set on j         plant operation during your investigation:
?
: a. That reactor power will be limited to 30% of your authorized license limit.
Boston, Massachusetts 02199 Gentlemen:
: b. That you will control your releases from the reactor Luilding
This letter refers to our telephone conversation of January 28, 1975, between Mr. O'Reilly of this Office and you and Mr. Roach of your Staff, f
    }                     vent so as not to exceed 75% of your limiting condition for j                     operation.
concerning the operation of your Pilgrim Nuclear Power Plant.
yd j                c. That you will inform this Office, prior to returning the plant
I J
    ;                      to normal operation, with information suf ficient to show the bases for corrective action taken to preclude recurrence.
h It is our understanding that you are continuing to investigate the cause of gaseous radioactivity releases from your reactor building ventilation I
system vent that have exceeded limits contained in your Techni:a1 Speci-i fications. We understand that the following conditions have been set on j
plant operation during your investigation:
a.
That reactor power will be limited to 30% of your authorized license limit.
b.
That you will control your releases from the reactor Luilding
}
vent so as not to exceed 75% of your limiting condition for j
operation.
yd That you will inform this Office, prior to returning the plant j
c.
to normal operation, with information suf ficient to show the bases for corrective action taken to preclude recurrence.
If our understanding of your planned actions is not in accordance with this letter, please contact this Office immediately.
If our understanding of your planned actions is not in accordance with this letter, please contact this Office immediately.
Sincerely, l
Sincerely, l
w         0    '
0 w
j                                                     J.mes P. O'Reilly 1                                                     Di ,ctor i           Distribution Page 2 I
j J.mes P. O'Reilly 1
i        LUTro l
Di,ctor i
y          n%e j    6 MA 2
Distribution Page 2 Ii LUTro l
{    .#//6 19N
n%e y
  ',                            Se#63g9e6061a DURNSTEIB6-58         PDR B-7
6 MA j
2
.#//6 19N
{
Se#63g9e6061a DURNSTEIB6-58 PDR B-7


                                                                                                                                                                                                                              ~
ltCGlDh)U h
ltCGlDh)U                                                                                                                 h Gil h' ARK AVENUE 17416 KING Of" PitOSSI A. PENNSYLV ANI A                                                                                                                       ,.
~
JAN 2 81975 Boston Edison Company                                                                                                                                                                                   i Attention:             Mr.11. J . Feldmann Vice President and Director of Operations and Engineering 800 Boylston Street Boston, Massachusetts                                   02199 Gentlemen:
Gil h' ARK AVENUE 17416 KING Of" PitOSSI A. PENNSYLV ANI A JAN 2 81975 Boston Edison Company i
28, 1975, This letter refers to our telephone conversation of January                                                                   Roach of your Staff, between Mr. O'Reilly of this Of fice and you and Mr.
Attention:
Mr.11. J. Feldmann Vice President and Director of Operations and Engineering 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:
28, 1975, This letter refers to our telephone conversation of January Roach of your Staff, between Mr. O'Reilly of this Of fice and you and Mr.
concerning the operation of your Pilgrim Nuclear Power Plant.
concerning the operation of your Pilgrim Nuclear Power Plant.
It is our understanding that you are continuing to investigate the cause                                                                                                                               !
It is our understanding that you are continuing to investigate the cause of gaseous radicactivity releases from your reactor building ventilation that have exceeded limits contained in your Technical Speci-system vent k'c understand that the following conditions have been set on fications.
of gaseous radicactivity releases from your reactor building ventilation that have exceeded limits contained in your Technical Speci-understand that the following conditions have been set on system vent fications.
plant operation during your investigation:
k'c plant operation during your investigation:
That reactor power will be limited to 30% of your authorized a.
: a.        That reactor power will be limited to 30% of your authorized license limit.
license limit.
: b.        That you will control your releases f rom the reactor building vent so as not to exceed 75% of your limiting condition for operation.
That you will control your releases f rom the reactor building b.
: c.        That you will inform this Office, prior to returning the plant to normal operation, with information suf ficient to show the bases f or corrective action taken to preclude recurrence.
to exceed 75% of your limiting condition for vent so as not operation.
j If our understanding of your planned actions is not in accordance with                                                                                                                                  I this letter, please centact this Office ir.nediately.                                                                                                                                                   !
That you will inform this Office, prior to returning the plant c.
Sincerely, (V,v t .                 b4                                        ,
to normal operation, with information suf ficient to show the bases f or corrective action taken to preclude recurrence.
J.4nes P. O'Reilly Dir'ctor Distributio:t Page 2 j                                                   -
in accordance with j
If our understanding of your planned actions is not I
this letter, please centact this Office ir.nediately.
Sincerely, b4 (V,v t.
J.4nes P.
O'Reilly Dir'ctor Distributio:t Page 2 j
fotono,%
fotono,%
ta_                                                                                   .
ta_
    ~..-        --
~.. -
                              .-... ?.Q.y J. . .g. .. .. .. p....
.-... ?.Q.y J...g...
c                                                                                                                                . . . . . . . . . . . . . .                  ..,..
.... p....
                  ~~                                                                                                                   . . .g. .3. . ....
...g..3......
: f.                            .9. ."                      ...              I.h7 .     r              -
c
                $UkM44 >
~~
I
I.h7.
                                . Y.I.
. Y.I.
* Y. ,
* Y.,
                                                                        . .'. .k .0. . . . . . . . . _
..'..k.0......... _
                                                                                                                                                    . . . .                     7 t,
f.
(                                                                                                                                                                                                   - . . . . .
.9.."
l               .
7 r
                                                                                                                . . . . . . . . . . ....Y..      ...        . . . . . .          . . . . . . . . .
I t,
          >        DUt>     ..
(
Form AlC.lle (Hev. 9 53) AIO. CHO                                                                                                                                                                             f f
$UkM44 >
t I
l
t C -1                       l}}
..............Y..
DUt>
Form AlC.lle (Hev. 9 53) AIO. CHO f
ft I
t C -1 l}}

Latest revision as of 00:44, 7 December 2024

Lists Conditions Under Which Util Investigating Cause of Gaseous Radioactivity Releases from Reactor Bldg Ventilation Sys Vent Exceeding Tech Spec Limits,Per 750128 Telcon
ML20206K423
Person / Time
Site: Pilgrim, 05000000
Issue date: 01/28/1975
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feldmann M
BOSTON EDISON CO.
Shared Package
ML20204E974 List:
References
FOIA-86-58 NUDOCS 8606300089
Download: ML20206K423 (2)


Text

{

}TATES Y

/

}

UNITE f

p y,.

/</ /

1 NUCLEAR REGUL.. JRY COMMISSION C31 A AVENUI d

KING OF PRUS$1A. PENNSYLVANI A 19406 L- 0meY Y JAN 2 81975 Boston Edison Company l

Attention:

Mr. M. J. Feldmann Vice President and Director of Operations and Engineering i

800 Boylston Street

?

Boston, Massachusetts 02199 Gentlemen:

This letter refers to our telephone conversation of January 28, 1975, between Mr. O'Reilly of this Office and you and Mr. Roach of your Staff, f

concerning the operation of your Pilgrim Nuclear Power Plant.

I J

h It is our understanding that you are continuing to investigate the cause of gaseous radioactivity releases from your reactor building ventilation I

system vent that have exceeded limits contained in your Techni:a1 Speci-i fications. We understand that the following conditions have been set on j

plant operation during your investigation:

a.

That reactor power will be limited to 30% of your authorized license limit.

b.

That you will control your releases from the reactor Luilding

}

vent so as not to exceed 75% of your limiting condition for j

operation.

yd That you will inform this Office, prior to returning the plant j

c.

to normal operation, with information suf ficient to show the bases for corrective action taken to preclude recurrence.

If our understanding of your planned actions is not in accordance with this letter, please contact this Office immediately.

Sincerely, l

0 w

j J.mes P. O'Reilly 1

Di,ctor i

Distribution Page 2 Ii LUTro l

n%e y

6 MA j

2

.#//6 19N

{

Se#63g9e6061a DURNSTEIB6-58 PDR B-7

ltCGlDh)U h

~

Gil h' ARK AVENUE 17416 KING Of" PitOSSI A. PENNSYLV ANI A JAN 2 81975 Boston Edison Company i

Attention:

Mr.11. J. Feldmann Vice President and Director of Operations and Engineering 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:

28, 1975, This letter refers to our telephone conversation of January Roach of your Staff, between Mr. O'Reilly of this Of fice and you and Mr.

concerning the operation of your Pilgrim Nuclear Power Plant.

It is our understanding that you are continuing to investigate the cause of gaseous radicactivity releases from your reactor building ventilation that have exceeded limits contained in your Technical Speci-system vent k'c understand that the following conditions have been set on fications.

plant operation during your investigation:

That reactor power will be limited to 30% of your authorized a.

license limit.

That you will control your releases f rom the reactor building b.

to exceed 75% of your limiting condition for vent so as not operation.

That you will inform this Office, prior to returning the plant c.

to normal operation, with information suf ficient to show the bases f or corrective action taken to preclude recurrence.

in accordance with j

If our understanding of your planned actions is not I

this letter, please centact this Office ir.nediately.

Sincerely, b4 (V,v t.

J.4nes P.

O'Reilly Dir'ctor Distributio:t Page 2 j

fotono,%

ta_

~.. -

.-... ?.Q.y J...g...

.... p....

...g..3......

c

~~

I.h7.

. Y.I.

  • Y.,

..'..k.0......... _

f.

.9.."

7 r

I t,

(

$UkM44 >

l

..............Y..

DUt>

Form AlC.lle (Hev. 9 53) AIO. CHO f

ft I

t C -1 l