ML20203A071: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_ - _                                        __          .        .            .  -      - - _ - . . -
wn*
I l
    . A                ..
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakor.ade Dr. East Welch. Minnesota 55089 l
I February 5,1999                                                    10CFR Part 50 Section 50.90 U S Nuclear Regulatory Commission
!        Attn: Document Control Desk Washington, DC 20555 l                              PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306                DPR-60
;                            License Amendment Request Dated February 5,1999 incorporation of Combustion Engineering Steam Generator Welded Tube Sleeve Topical Report Revision Attached is a request for a change to the Technical Specifications, Appendix A of the Operating Licenses, for the Prairie Island Nuclear Generating Plant (PINGP). This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.
l        This amendment request proposes a change to Technical Specification (TS) 4.12,
        " Steam Generator Tube Surveillance " to incorporate changes to the ABB Combustion Engineering (ABB CE) sleeve design assumptions and installation techniques. These changes to the sleeve design were developed by ABB CE.
The current PINGP Technical Specifications (TS) allow steam generator tubes with                                        !
eddy current indications requiring repair to be sleeved in accordance with ABB CE                                        I Report CEN-629-P Revision 2 and Addendum 1. By this amendment request, NSP wishes to obtain approval for repair of steam generator tubes using Revision 3 to Combustion Engineering Report CEN-629-P.                                                                                !
l ATTACHMENT CONTAINS PROPRIETARY INFORMATION TO BE                                .~              ,
WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE                                                  !
f, WITH 10 CFR PART 2, SECTION 2.790 Y[L
!            9902090278 990205 PDR l
i          P            ADOCK05000282ff PDR j                      >
l                            '
D 'l (( be l                                                v  l''+
t t
t                                                                                                                                1}}

Latest revision as of 08:30, 1 January 2021

Forwards Request for Amend to Licenses DPR-42 & DPR-60, Proposing Change to TS 4.12.Non-proprietary & Proprietary Versions of CEN-629, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves, Encl.Proprietary Encl Withheld
ML20203A071
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/05/1999
From: Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136E819 List:
References
NUDOCS 9902090278
Download: ML20203A071 (3)


Text

_ - _ __ . . . - - - _ - . . -

wn*

I l

. A ..

Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakor.ade Dr. East Welch. Minnesota 55089 l

I February 5,1999 10CFR Part 50 Section 50.90 U S Nuclear Regulatory Commission

! Attn: Document Control Desk Washington, DC 20555 l PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60

License Amendment Request Dated February 5,1999 incorporation of Combustion Engineering Steam Generator Welded Tube Sleeve Topical Report Revision Attached is a request for a change to the Technical Specifications, Appendix A of the Operating Licenses, for the Prairie Island Nuclear Generating Plant (PINGP). This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.

l This amendment request proposes a change to Technical Specification (TS) 4.12,

" Steam Generator Tube Surveillance " to incorporate changes to the ABB Combustion Engineering (ABB CE) sleeve design assumptions and installation techniques. These changes to the sleeve design were developed by ABB CE.

The current PINGP Technical Specifications (TS) allow steam generator tubes with  !

eddy current indications requiring repair to be sleeved in accordance with ABB CE I Report CEN-629-P Revision 2 and Addendum 1. By this amendment request, NSP wishes to obtain approval for repair of steam generator tubes using Revision 3 to Combustion Engineering Report CEN-629-P.  !

l ATTACHMENT CONTAINS PROPRIETARY INFORMATION TO BE .~ ,

WITHHELD FROM PUBLIC DISCLOSURE IN ACCORDANCE  !

f, WITH 10 CFR PART 2, SECTION 2.790 Y[L

! 9902090278 990205 PDR l

i P ADOCK05000282ff PDR j >

l '

D 'l (( be l v l+

t t

t 1