ML20196B069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ __________ _________
TABLE 3.3-8 (Continued) 1 ACTION STATEMENTS                                                                                        J 3kt.p or 3/x.b                                                                                                                    W ACTION 34 -                                                                                                                              With the number of OPERABLE channels less than the required num-ber of channels or the minimum channels OPERABLE requirement, restoro the inoperable channel (s) to OPERABLE status as per Actionnale-ee-b-as applicable if repair is feasible during plant operation. If repair is not feasible prepare and submit a                                                                                  l Special Report to the Commission, purs,uant to Specification 6.8.2 within 14 days that provides actions taken, cause of the in-                                                                                    i operability, and the plans and schedule for restoring the chan-nels to OPERABLE status. The provisions of Specification 3.0.4 are not applicable."
ACTION 35 - a. With the number of OPERABLE channels two less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUT 00WN within the next 12 hours,
: b. With the number of OPERABLE channels                                                    ce less than the Total Number of Channels requirement, reste                                        at least one inoperable channel to OPERABLE status within 7 c                                      ,, or be in at least HOT SI:UTDOWN within the next 12 hours.                                                                                                    .
: c. With the number of OPERABLE channels less than the Minimum Chan-nels Operable requirement, restore at least one inoperable chan-nel to OPERABLE status with 48 hours or be in HOT SHUTDOWN within the next 12 hours.                                                                                                                            ,
i
: d. The provisions of Specification 3.0.4 are not applicable.                                                                                                ;
ACTION 36 -                                                                                                                                  With the number of OPERABLE channels less than the r.inimum
)                                                                                                                                                                                                  channels OPERABLE requirements, comply with the provisions of                                                                                  ;
Specification 3.6.3. for an inoperable containment isolation                                                                                  '
val *<e.
i l
i e
                                                                                                                                                                                                                                                                                                                                                  )
2
;                                                    CAction Statement 34 applies to the first fuel cycle only.                                                                                                                                                                                      Action Statement 310.                  l 1
is applicable thereafter.
GS12060184 Gaggot hDR ADOCK 0500043 eDe                                                                                                                                .
]                                                    V0GTLE - UNIT 1                                                                                                                                                                  3/4 3-62 1
                                                                                                                                                                                                  -    . _ _      _ . _ _ _ _ _ _._              .~_,,,6 -- - - . - - - . - - - - - - - - - . - - - -- . - - - - - - - - - - - < - - -}}

Latest revision as of 10:28, 13 November 2020

Proposed Tech Specs 3/4 3-62,re-numbering Action 31 Refs to Action 31a or Action 31b
ML20196B069
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/01/1988
From:
GEORGIA POWER CO.
To:
Shared Package
ML20196B055 List:
References
NUDOCS 8812060184
Download: ML20196B069 (1)


Text

__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ __________ _________

TABLE 3.3-8 (Continued) 1 ACTION STATEMENTS J 3kt.p or 3/x.b W ACTION 34 - With the number of OPERABLE channels less than the required num-ber of channels or the minimum channels OPERABLE requirement, restoro the inoperable channel (s) to OPERABLE status as per Actionnale-ee-b-as applicable if repair is feasible during plant operation. If repair is not feasible prepare and submit a l Special Report to the Commission, purs,uant to Specification 6.8.2 within 14 days that provides actions taken, cause of the in- i operability, and the plans and schedule for restoring the chan-nels to OPERABLE status. The provisions of Specification 3.0.4 are not applicable."

ACTION 35 - a. With the number of OPERABLE channels two less than the Total Number of Channels requirements, restore the inoperable channel to OPERABLE status within 31 days, or be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,

b. With the number of OPERABLE channels ce less than the Total Number of Channels requirement, reste at least one inoperable channel to OPERABLE status within 7 c ,, or be in at least HOT SI:UTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. .
c. With the number of OPERABLE channels less than the Minimum Chan-nels Operable requirement, restore at least one inoperable chan-nel to OPERABLE status with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ,

i

d. The provisions of Specification 3.0.4 are not applicable.  ;

ACTION 36 - With the number of OPERABLE channels less than the r.inimum

) channels OPERABLE requirements, comply with the provisions of  ;

Specification 3.6.3. for an inoperable containment isolation '

val *<e.

i l

i e

)

2

CAction Statement 34 applies to the first fuel cycle only. Action Statement 310. l 1

is applicable thereafter.

GS12060184 Gaggot hDR ADOCK 0500043 eDe .

] V0GTLE - UNIT 1 3/4 3-62 1

- . _ _ _ . _ _ _ _ _ _._ .~_,,,6 -- - - . - - - . - - - - - - - - - . - - - -- . - - - - - - - - - - - < - - -