#REDIRECT [[RIS 2012-07, San Onofre, Units 2 and 3 - Response to Regulatory Issue Summary (RIS) 2012-07, Preparation and Scheduling of Operator Licensing Examinations.]]
{{Adams
| number = ML12188A011
| issue date = 07/02/2012
| title = San Onofre, Units 2 and 3 - Response to Regulatory Issue Summary (RIS) 2012-07, Preparation and Scheduling of Operator Licensing Examinations.
| author name = Bauder D R
| author affiliation = Southern California Edison Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000361, 05000362
| license number =
| contact person =
| case reference number = RIS-12-007
| document type = Letter
| page count = 2
| revision = 0
}}
See also: [[followed by::RIS 2012-07]]
 
=Text=
{{#Wiki_filter:SOUTHERN CALIFORNIAEDISON'An ED1SON INTERNA TIONALIE CompanyDouglas R. BauderSite Vice President & Station ManagerSan Onofre Nuclear Generating Station10 CFR 55.40July 2, 2012ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001Subject:Docket Nos. 50-361 and 50-362Response to Regulatory Issue Summary (RIS) 2012-07San Onofre Nuclear Generating Station, Units 2 and 3RIS 2012-07, "Preparation and Scheduling of Operator LicensingExaminations," dated June 8, 2012Reference:Gentlemen:This letter provides the Southern California Edison (SCE) response to U. S. NuclearRegulatory Commission Regulatory Issue Summary 2012-07, "Preparation andScheduling of Operator Licensing Examinations," dated June 8, 2012.The schedule shown on NRC Form 536, "Operator Licensing Examination Data," isenclosed and provides SCE's best estimate to meet our operator licensing needsthrough calendar year 2017.If you have any questions, please feel free to contact me or Mr. Ryan Treadway at(949) 368-9985.
 
Sincerely,
 
===Enclosure:===
As Statedcc: E. E. Collins, Regional Administrator, NRC Region IVMark S. Haire, Chief, Operations Branch, NRC Region IVR. Hall, NRC Project Manager, San Onofre Units 2 and 3G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3P.O. Box 128San Clemente, CA 92672(949) 368-9275 PAX 89275Fax: (949) 368-9881Doug.Bauder@sce.com/rAOD NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(9-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andEXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONSan Onofre Nuclear Generating Station, Units 2 and 3 Region IVA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2014 CY 2015 CY2016 CY 2017ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 0EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017NUMBER OF REACTOR 5 0 5 0OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 0 8 0NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 1 0 2 0NUMBER OF SENIOR REACTOROPERATORS -LIMITED 0 0 0 0PROPOSED DATESPRIMARY DATE 04/07/2014 0 08/01/2016 0ALTERNATE DATE 04/21/2014 0 08/22/2016 0C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULENRC FORM 536 (9-2011)
}}

Revision as of 04:44, 23 February 2018

San Onofre, Units 2 and 3 - Response to Regulatory Issue Summary (RIS) 2012-07, Preparation and Scheduling of Operator Licensing Examinations.
ML12188A011
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/02/2012
Revision: 0
From: Bauder D R
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-12-007
Download: ML12188A011 (2)


See also: RIS 2012-07

Text

SOUTHERN CALIFORNIAEDISON'An ED1SON INTERNA TIONALIE CompanyDouglas R. BauderSite Vice President & Station ManagerSan Onofre Nuclear Generating Station10 CFR 55.40July 2, 2012ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, D.C. 20555-0001Subject:Docket Nos. 50-361 and 50-362Response to Regulatory Issue Summary (RIS) 2012-07San Onofre Nuclear Generating Station, Units 2 and 3RIS 2012-07, "Preparation and Scheduling of Operator LicensingExaminations," dated June 8, 2012Reference:Gentlemen:This letter provides the Southern California Edison (SCE) response to U. S. NuclearRegulatory Commission Regulatory Issue Summary 2012-07, "Preparation andScheduling of Operator Licensing Examinations," dated June 8, 2012.The schedule shown on NRC Form 536, "Operator Licensing Examination Data," isenclosed and provides SCE's best estimate to meet our operator licensing needsthrough calendar year 2017.If you have any questions, please feel free to contact me or Mr. Ryan Treadway at(949) 368-9985.

Sincerely,

Enclosure:

As Statedcc: E. E. Collins, Regional Administrator, NRC Region IVMark S. Haire, Chief, Operations Branch, NRC Region IVR. Hall, NRC Project Manager, San Onofre Units 2 and 3G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3P.O. Box 128San Clemente, CA 92672(949) 368-9275 PAX 89275Fax: (949) 368-9881Doug.Bauder@sce.com/rAOD NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014(9-2011) Estimated burden per response to comply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operatorexaminations. Send comments regarding burden estimate to the Information Services BranchOPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information andEXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington,DC 20503. If a means used to impose an information collection does not display a currentlyvalid OMB control number, the NRC may not conduct or sponsor, and a person is not required torespond to, the information collection.FACILITY NRC REGIONSan Onofre Nuclear Generating Station, Units 2 and 3 Region IVA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2014 CY 2015 CY2016 CY 2017ESTIMATED NUMBER OFLICENSEE-PREPARED 1 0 1 0EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017NUMBER OF REACTOR 5 0 5 0OPERATORSNUMBER OF SENIOR REACTOROPERATORS -INSTANT 0 8 0NUMBER OF SENIOR REACTOROPERATORS -UPGRADE 1 0 2 0NUMBER OF SENIOR REACTOROPERATORS -LIMITED 0 0 0 0PROPOSED DATESPRIMARY DATE 04/07/2014 0 08/01/2016 0ALTERNATE DATE 04/21/2014 0 08/22/2016 0C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULENRC FORM 536 (9-2011)