ML12188A011

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary (RIS) 2012-07, Preparation and Scheduling of Operator Licensing Examinations.
ML12188A011
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/02/2012
From: Bauder D
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-12-007
Download: ML12188A011 (2)


Text

Douglas R. Bauder I* EDISON' SOUTHERN CALIFORNIA Site Vice President & Station Manager San Onofre Nuclear Generating Station An ED1SON INTERNA TIONALIE Company 10 CFR 55.40 July 2, 2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-361 and 50-362 Response to Regulatory Issue Summary (RIS) 2012-07 San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

RIS 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 Gentlemen:

This letter provides the Southern California Edison (SCE) response to U. S. Nuclear Regulatory Commission Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012.

The schedule shown on NRC Form 536, "Operator Licensing Examination Data," is enclosed and provides SCE's best estimate to meet our operator licensing needs through calendar year 2017.

If you have any questions, please feel free to contact me or Mr. Ryan Treadway at (949) 368-9985.

Sincerely,

Enclosure:

As Stated cc: E. E. Collins, Regional Administrator, NRC Region IV Mark S. Haire, Chief, Operations Branch, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92672 (949) 368-9275 PAX 89275 /rAOD Fax: (949) 368-9881 Doug.Bauder@sce.com

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION San Onofre Nuclear Generating Station, Units 2 and 3 Region IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 5 0 5 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 1 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/07/2014 0 08/01/2016 0 ALTERNATE DATE 04/21/2014 0 08/22/2016 0 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE NRC FORM 536 (9-2011)