ML20136B644: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:--        _ _ _ _ _ _ _ _ _ _ _ _ _                          _ _ _ _ _ _ _ _ _ .              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
                                                                                                                                                                                        ~
BOSTON EDlSON CO:!PANY TELECOPY }!ESSAGE                                                                        ,
To. 215-337-5272
                                                                                                                                                                                          ^"U" ''            /
Datc/ Time:
Telephone Number To: Director, Region I                                                                                                                                    From: Pilgrim Nuclear Power Station l          Office of Inspection and Enforec=ent                                                                                                                        RFD #1 Rocky 11111 Road l          U. S. Nuclear Regulatory Commission                                                                                                                        Plymouth,11A                02360 631 Park Avenue King of Prussia, PA 19406
 
==Subject:==
PRO:IPT REPORTABLE dCCURRENCE Docket l'un.ber 50-293; License DPR-35                                                                                                s              .
                                        ' Assigned LER Number                        79-029/01X-0                                                                                        ,
Event
 
== Description:==
On June 12, 1979 while perfoming repcir's on the "A"                                                                                              Core Spray Systen minimum flow line, a degradation of primary contaic=ent integrity occurred.
This is a viola tiou of Tec'h. Spec. 3.7.A.2.                                                                                                                                                                      ,
Cause and Corrective Action: While investigating problems with the Core Spray Loop                                                                                                                                  "A" minicten flov line, the disc in the 6" check valve rc. quired repair and was removed and replaced, ' thus violating pricary containment integrity. This occurrence was identified during an unscheduled IE Inspection.
Facility Status:                                                                                                                                                      100        % Thermal I!W c) Routine Startup                                                                                                                                                g) Shutdown d) 1:outin: Shutdo.n                                                                                                                                              h) Refueling                      ,
o) Steady State                                  X                                                                                                                i) Other f) Load Changing                                                                        ,                                                                          j) !!ot Applicaple
: t. uritten follow-up report will be sent within tuo uccht.                                                                                                                                                                .
NRC person notified                                  !!r. R. Architect                                                                                      Prep'ared by          John M. Fulton 9v 11:11 (2) copies to:                                                                ,
                                                                                                                                                                                                  . :.J ,, , *, [3          \
Director
* Of fico of !an.igement Infortation and Progra: Control                                                                                                                                                                  .
U. S. :
va,.u..'ucle:e                          Regulatory
                                      ..tuu n.c. 20333 Commission                                                                                        -
3 7 9Mio o q71~:                                                          9              _    m      a
                                                                                                                                                                                                                      ,v. ,      -}}

Latest revision as of 05:10, 1 July 2020

RO 79-029/01X-0:on 790612,degradation of Primary Containment Integrity Occurred in Violation of Tech Specs 3.7.A.2.While Investigating,Disc in 6-inch Check Valve Was Removed, Violating Containment Integrity.Rept to Follow
ML20136B644
Person / Time
Site: Pilgrim
Issue date: 08/09/1979
From: Fulton J
BOSTON EDISON CO.
To:
References
NUDOCS 7909100072
Download: ML20136B644 (1)


Text

-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

BOSTON EDlSON CO:!PANY TELECOPY }!ESSAGE ,

To. 215-337-5272

^"U" /

Datc/ Time:

Telephone Number To: Director, Region I From: Pilgrim Nuclear Power Station l Office of Inspection and Enforec=ent RFD #1 Rocky 11111 Road l U. S. Nuclear Regulatory Commission Plymouth,11A 02360 631 Park Avenue King of Prussia, PA 19406

Subject:

PRO:IPT REPORTABLE dCCURRENCE Docket l'un.ber 50-293; License DPR-35 s .

' Assigned LER Number 79-029/01X-0 ,

Event

Description:

On June 12, 1979 while perfoming repcir's on the "A" Core Spray Systen minimum flow line, a degradation of primary contaic=ent integrity occurred.

This is a viola tiou of Tec'h. Spec. 3.7.A.2. ,

Cause and Corrective Action: While investigating problems with the Core Spray Loop "A" minicten flov line, the disc in the 6" check valve rc. quired repair and was removed and replaced, ' thus violating pricary containment integrity. This occurrence was identified during an unscheduled IE Inspection.

Facility Status: 100  % Thermal I!W c) Routine Startup g) Shutdown d) 1:outin: Shutdo.n h) Refueling ,

o) Steady State X i) Other f) Load Changing , j) !!ot Applicaple

t. uritten follow-up report will be sent within tuo uccht. .

NRC person notified  !!r. R. Architect Prep'ared by John M. Fulton 9v 11:11 (2) copies to: ,

. :.J ,, , *, [3 \

Director

  • Of fico of !an.igement Infortation and Progra: Control .

U. S. :

va,.u..'ucle:e Regulatory

..tuu n.c. 20333 Commission -

3 7 9Mio o q71~: 9 _ m a

,v. , -