RO 79-029/01X-0:on 790612,degradation of Primary Containment Integrity Occurred in Violation of Tech Specs 3.7.A.2.While Investigating,Disc in 6-inch Check Valve Was Removed, Violating Containment Integrity.Rept to Follow
ML20136B644
Person / Time
Site: Pilgrim
Issue date: 08/09/1979
From: Fulton J
BOSTON EDISON CO.
To:
References
NUDOCS 7909100072
Download: ML20136B644 (1)


Text

-- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

~

BOSTON EDlSON CO:!PANY TELECOPY }!ESSAGE ,

To. 215-337-5272

^"U" /

Datc/ Time:

Telephone Number To: Director, Region I From: Pilgrim Nuclear Power Station l Office of Inspection and Enforec=ent RFD #1 Rocky 11111 Road l U. S. Nuclear Regulatory Commission Plymouth,11A 02360 631 Park Avenue King of Prussia, PA 19406

Subject:

PRO:IPT REPORTABLE dCCURRENCE Docket l'un.ber 50-293; License DPR-35 s .

' Assigned LER Number 79-029/01X-0 ,

Event

Description:

On June 12, 1979 while perfoming repcir's on the "A" Core Spray Systen minimum flow line, a degradation of primary contaic=ent integrity occurred.

This is a viola tiou of Tec'h. Spec. 3.7.A.2. ,

Cause and Corrective Action: While investigating problems with the Core Spray Loop "A" minicten flov line, the disc in the 6" check valve rc. quired repair and was removed and replaced, ' thus violating pricary containment integrity. This occurrence was identified during an unscheduled IE Inspection.

Facility Status: 100  % Thermal I!W c) Routine Startup g) Shutdown d) 1:outin: Shutdo.n h) Refueling ,

o) Steady State X i) Other f) Load Changing , j) !!ot Applicaple

t. uritten follow-up report will be sent within tuo uccht. .

NRC person notified  !!r. R. Architect Prep'ared by John M. Fulton 9v 11:11 (2) copies to: ,