ML20081M145: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20081M145
| number = ML20081M145
| issue date = 11/11/1983
| issue date = 11/11/1983
| title = Amend 1 to Application for Ol,Consisting of Revised Pages to Fsar.Rev Addresses Acceptance Review Questions Included in NRC 830906 Ltr
| title = Amend 1 to Application for Ol,Consisting of Revised Pages to Fsar.Rev Addresses Acceptance Review Questions Included in NRC
| author name = Foster D
| author name = Foster D
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = 1, NUDOCS 8311170115
| document report number = 1, NUDOCS 8311170115
| title reference date = 09-06-1983
| package number = ML20081M148
| package number = ML20081M148
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, OPERATING LICENSES-APPLICATION FOR & AMENDMENTS, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, OPERATING LICENSES-APPLICATION FOR & AMENDMENTS, TEXT-LICENSE APPLICATIONS & PERMITS
Line 25: Line 26:
==Dear Mr. Denton:==
==Dear Mr. Denton:==


Georgia Power Company, acting on its own behalf and'as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment i to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2. This Amendment consists of revised pages for the Final Safety. Analysis Report and provides responses to your acceptance review questions which were included in your September 6,1983 letter. Also, instructions for insert-ing this material are included.
Georgia Power Company, acting on its own behalf and'as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment i to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2. This Amendment consists of revised pages for the Final Safety. Analysis Report and provides responses to your acceptance review questions which were included in your {{letter dated|date=September 6, 1983|text=September 6,1983 letter}}. Also, instructions for insert-ing this material are included.
   - In' accordance with the requirements of 10 CFR 50.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 1 are submitted for your use.
   - In' accordance with the requirements of 10 CFR 50.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 1 are submitted for your use.
Should you have any questions on the enclosed submittals, do not hesitate to contact us.
Should you have any questions on the enclosed submittals, do not hesitate to contact us.

Latest revision as of 12:54, 26 September 2022

Amend 1 to Application for Ol,Consisting of Revised Pages to Fsar.Rev Addresses Acceptance Review Questions Included in NRC
ML20081M145
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/11/1983
From: Foster D
GEORGIA POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20081M148 List:
References
1, NUDOCS 8311170115
Download: ML20081M145 (2)


Text

.

Georgia Power Company 333 Piedmcel Avenue Atlanta,Gectgia 50308 Telephone 404 526-7726 Ma+ng Address-Port Office Box 4545 Attanta Georg:a 30302 h Georgia Power

- D. O. Foster the southern etecirc sprem Vice President and General Manager Vogt!c Protect November 11, 1983 Mr. Harold R. Denton, Director Log: GN-271 Office of Nuclear Reactor Regulation File: X7N00.0-01 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 APPLICATION FOR OPERATING LICENSES FSAR AMENDMENT NUMBER 1

Dear Mr. Denton:

Georgia Power Company, acting on its own behalf and'as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment i to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2. This Amendment consists of revised pages for the Final Safety. Analysis Report and provides responses to your acceptance review questions which were included in your September 6,1983 letter. Also, instructions for insert-ing this material are included.

- In' accordance with the requirements of 10 CFR 50.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 1 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate to contact us.

Yours truly,

/ _

D. O. Foster DOF/KWK/sw Enclosure xc: M. A. Miller L. T. Cucwa R. A. Thomas G. Bockhold, Jr.

D. E. Dutton G. F. Trowbridge, Esquire J. A. Bailey D. G. Eisenhut g O. Batum I B311170115 831111 9n gp PDR ADOCK 05000424 K PDR

r Mr. Harold R. Denton, Director Log: GN-271

, November 11,' 1983 File: X7N00.0-01

- Page 2

' SWORN AND SUBSCRIBED BEFORE ME,-THIS

// DAY OF. 4 N'N 1983 fj L k.

Notary 76blic, _ Georgia State at Large

~

f 3

4 L

i e

a l

L h'.

i.

I L.