ML20098G380

From kanterella
Jump to navigation Jump to search
Amend 10 to Application for Ols,Consisting of Amend 10 to Fsar,Providing Responses to NRC Questions in 840809-14 Ltrs
ML20098G380
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/27/1984
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20098G381 List:
References
GN-415, NUDOCS 8410040486
Download: ML20098G380 (3)


Text

,

' Georgia Power Company -

Route 2, Box 299A' Waynesboro Georgia 30830 Telephone 404 554-9961 Ext. 3360 404 724-8114, Ext. 3360 D. O. Fost., Georgia Power Vice President and Project the southern electnc sys:em General Manager Vogtie Prciect September 27, 1984

< Director of Nuclear Reactor Regulation File: X7N00.10 Attention: Ms. Elinor G.'Adensam, Chief X7BC35

-Licensing' Branch #4 Log: GN-415 Division of Licensing-U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 ISAR AMENDMENT NUMBER 10

Dear Mr. Dentou:

Georgia Power Company, acting on its own behalf and as ager:t for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 10 to its Application for Operating Licenses-'for the Vogtle Electric Generating Plant - Units 1 and 2.

This Amendment (consists of revised pages for the Final Safety Analysis Report andf provides responses to NRC questions transmitted in Ms. Adensam's letters of August 9 and August 14, 1984. Attachment I lists additional changes. These changes are a result of the NRC review process or were identified as "laters" in previous amendment submittals. Also, instructions for inserting this material are included.

In-accordance-with the requirements of 10 CFR 50.30 (b) and (c), three

~(3)- signed originals and sixty (60) copies of Amendment 10 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate to contact me.

Yourstruly,[

D. O. Fo'st s v DOF/ JAB /sw  ;

Enclosures xc: List attached. SWORN AND SUBSCRIBED BEFORE S , THIS

/ M DAY OF [dm/w 1984.

$$A A$o$Po!

K

  • Eg O accua 6 M A

--Notp/ PuSlic, Georgia State at Large L _'

'li j'e.

l

~

Director of Nuclear Reactor Regulation- File: X7N'00.10 - i

' September 27, 1984 X7BC35 I

' Page ? Log: GN-415 -l xc: 'M.-~A. Miller R. A.' Thomas J.:A. Bailey L.'T. Gucwa

-L. Fowler

C. A. -Stangler J. E. Joiner, Esquire G.' F. Trowbridge, Esquire t

.,a 1e

Attachment 1 REQUESTS FOR ADDITIONAL INFORMATION Question No. Reason for Submittal or Change 210.11 6/13/84 Letter 252.2 9/17/84 NRC Teleconference 260.63 7/3/84 Letter 281.12' 9/11/84 NRC Teleconference 410.2 5/31/84 Letter 410.26 5/31/84 Letter 410.27- 5/31/84 Letter 410.37 5/31/84 Letter 410.48 5/31/84 Letter 430.43 3/13/84 Letter 440.4 8/14/84 NRC Meeting

~440.6 8/14/84 NRC Meeting 440.10 8/14/84 NRC Meeting 440.11 8/14/84 NRC Meeting 440.18 8/14/84 NRC' Meeting 440.28 8/14/84 NRC Meeting 440.30 8/14/84 NRC Maeting 440.47 8/14/84 NRC Meeting 440.50 8/14/84 NRC Meeting 440.55 8/14/84 NRC Meeting 440.60 8/29/84 NRC Teleconference

.440.63 8/14/84 NRC Meeting 440.64 8/14/84 NRC Meeting 440.68 4/30/84 Letter 440.72 8/14/84 NRC Meeting 440.122 5/31/84 Letter 490.4 7/3/84 Letter 640.8 4/30/84 Letter

. 640.11 4/30/84 Letter 640.14 4/30/84 Letter 640.22 4/30/84 Letter 640.32 4/30/84 Letter 640.33 4/30/84 Letter

.