ML20098G380
| ML20098G380 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/27/1984 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20098G381 | List: |
| References | |
| GN-415, NUDOCS 8410040486 | |
| Download: ML20098G380 (3) | |
Text
,
' Georgia Power Company -
Route 2, Box 299A' Waynesboro Georgia 30830 Telephone 404 554-9961 Ext. 3360 404 724-8114, Ext. 3360 Georgia Power D. O. Fost.,
Vice President and Project the southern electnc sys:em General Manager Vogtie Prciect September 27, 1984 Director of Nuclear Reactor Regulation File: X7N00.10 Attention:
Ms. Elinor G.'Adensam, Chief X7BC35
-Licensing' Branch #4 Log:
GN-415 Division of Licensing-U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 ISAR AMENDMENT NUMBER 10
Dear Mr. Dentou:
Georgia Power Company, acting on its own behalf and as ager:t for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 10 to its Application for Operating Licenses-'for the Vogtle Electric Generating Plant - Units 1 and 2.
This Amendment (consists of revised pages for the Final Safety Analysis Report and provides responses to NRC questions transmitted in Ms. Adensam's f
letters of August 9 and August 14, 1984. Attachment I lists additional changes. These changes are a result of the NRC review process or were identified as "laters" in previous amendment submittals. Also, instructions for inserting this material are included.
In-accordance-with the requirements of 10 CFR 50.30 (b) and (c), three
~(3)- signed originals and sixty (60) copies of Amendment 10 are submitted for your use.
Should you have any questions on the enclosed submittals, do not hesitate to contact me.
Yourstruly,[
D. O. Fo'st s v DOF/ JAB /sw Enclosures xc: List attached.
SWORN AND SUBSCRIBED BEFORE S, THIS
/ M DAY OF [dm/w 1984.
$$A A$o$Po!
- Eg O accua 6 M A
K
--Notp/ PuSlic, Georgia State at Large L
'l i
j'e.
Director of Nuclear Reactor Regulation-File: X7N'00.10 -
i
~
' September 27, 1984 X7BC35
' Page ?
Log:
GN-415
- l xc:
'M.-~A. Miller R. A.' Thomas J.:A. Bailey L.'T.
Gucwa
-L. Fowler
- C. A. -Stangler J. E. Joiner, Esquire G.' F. Trowbridge, Esquire t
1e
.,a
REQUESTS FOR ADDITIONAL INFORMATION Question No.
Reason for Submittal or Change 210.11 6/13/84 Letter 252.2 9/17/84 NRC Teleconference 260.63 7/3/84 Letter 281.12' 9/11/84 NRC Teleconference 410.2 5/31/84 Letter 410.26 5/31/84 Letter 410.27-5/31/84 Letter 5/31/84 Letter 410.37 410.48 5/31/84 Letter 430.43 3/13/84 Letter 440.4 8/14/84 NRC Meeting
~440.6 8/14/84 NRC Meeting 440.10 8/14/84 NRC Meeting 440.11 8/14/84 NRC Meeting 440.18 8/14/84 NRC' Meeting 440.28 8/14/84 NRC Meeting 440.30 8/14/84 NRC Maeting 440.47 8/14/84 NRC Meeting 440.50 8/14/84 NRC Meeting 440.55 8/14/84 NRC Meeting 440.60 8/29/84 NRC Teleconference
.440.63 8/14/84 NRC Meeting 440.64 8/14/84 NRC Meeting 440.68 4/30/84 Letter 440.72 8/14/84 NRC Meeting 440.122 5/31/84 Letter 490.4 7/3/84 Letter 640.8 4/30/84 Letter 640.11 4/30/84 Letter 640.14 4/30/84 Letter 640.22 4/30/84 Letter 640.32 4/30/84 Letter 640.33 4/30/84 Letter
.