MONTHYEARML20087C2981995-08-0303 August 1995 Forwards Rev 0 to VEGP Unit 1 Pressure & Temperature Limits Rept Project stage: Other ML20087F3281995-08-0909 August 1995 Responds to RAI Re Proposed Conversion of Units 1 & 2 TS Based on NUREG-1431 Project stage: Other ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 Project stage: Request ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS Project stage: Request ML20097A3091996-01-30030 January 1996 Forwards Listed Changes to 950501 Proposed Conversion to Improved Ts,Based on NUREG-1431,in Response to NRC Comments Project stage: Other ML20100G0331996-02-19019 February 1996 Forwards marked-up TS Pages W/Comments Reflecting Results of Util Review of NRC Draft Safety Evaluation of Gpc Proposed Conversion of TS as Provided to Gpc by NRC 960117 & 0201 Ltrs Project stage: Draft Other ML20100M7231996-02-29029 February 1996 Requests That Listed SR Not Be Required Immediately Upon Implementation of Improved TS Project stage: Other ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 Project stage: Request ML20101D3161996-03-12012 March 1996 Informs That Changes to TS Would Convert Existing VEGP TS to Improved TS for Westinghouse Plants as Represented by NUREG-1431 Project stage: Other ML20111A5271996-05-0606 May 1996 Forwards marked-up Ts,Revising Proposed Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available,In Response to NRC RAI Project stage: Response to RAI ML20113A0221996-06-17017 June 1996 Forwards Proposed TS & Bases Reflecting Listed Submittals & Administrative Changes Based on NUREG-1431 Re Conversion of Existing TS to Improved TS Project stage: Other ML20117C3571996-08-23023 August 1996 Provides Statement of Conditions & Response to 960725 Telcon W/Sa Varga Re Request for Extended AOT for EDGs Project stage: Request ML20117N5811996-09-13013 September 1996 Requests to Pursue Proposed Extended DG AOT Apart from Conversion to Improved TS & Bases Project stage: Other ML20128H5621996-09-25025 September 1996 Safety Evaluation Supporting Amends 96 & 74 to Licenses NPF-68 & NPF-81,respectively Project stage: Request ML20133L3041997-01-10010 January 1997 Forwards Clean Typed Version of Affected Page from Table 3.3.1-1 as Stated in Amends 96 & 74 Project stage: Other ML20149M7131997-01-20020 January 1997 Requests That NRC Review Encl Comments Re Safety Evaluation Rept in Support of Amendments That Issued Improved TSs Project stage: Other 1996-03-12
[Table View] |
Text
'
Georg;a Power Company r T 40 inverness Center Parkway Post O'hce Box 1295 Birmingham. Alabama 3L201 Teiephone 205 877-7122 m
Georgia Power c.K.uccoy tre southem cutnc system c
Septemoer 22, 1995 LCV-0655 Docket Nos. 50-424 50-425 TAC-M92131 M92132 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT PROPOSED CONVERSION OF THE UNIT 1 AND UNIT 2 TECHNICAL SPECIFICATIONS 13ASED ON NUREG-1431 I3y letter dated May 1,1995, (LCV-0603) Georgia Power Company (GPC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications. The proposed amendment would, in part, convert the existing VEGP TS requirements to the format and content of NUREG-1431, the Westinghouse improved Standard Technical Specifications.
Subsequent to our May 1,1995, submittal, GPC identified additional changes that would render the proposed conversion closer to NUREG-1431. Specifically, GPC noted that with respect to unborated water source isolation valves, NUREG-1431 (LCO 3.9.2) simply specifies that each valve used to isolate unborated water sources shall be closed and secured in position. The equivalent existing VEGP TS requirements specify that valves 1208-U4-175,176,177, and 183 be closed and secured in position. GPC proposec to modify our submittal to more closely conform to NUREG-1431.
The enclosed changed pages contain the information necessary to modify our May 1,1995, submittal to reflect the subject change. Instructions are provided to facilitate insenion of the changed pages into the original submittal.
Sincerely, C. K. McCoy r,:-s
. s L U.t 9 1
9509260096 950922 O(
DR ADOCK 05000424 l
PDR I \\
, - * - 5 U. S. Nucliar Regulatory Commission -
LCV-0655-
- Page 2 CKM/NJS Enclosure xc:
Georuia Power Company -
Mr. J, B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Reuulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle i
9 The following page replaces the corresponding page behind the tab for Chapter 3.3, Volume 3.