Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS
ML20094N382
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/20/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20094N384 List:
References
RTR-NUREG-1431 LCV-0670, LCV-670, TAC-M92131, TAC-M92132, NUDOCS 9511280024
Download: ML20094N382 (3)


Text

4:

Georgia Power Comoany

" 40 loverness Center Pathway

'd:

Post Office Box 1295 Ermingham, Alabama 35201 Telephone 205 877 7122

c. x. uccoy Georgia Power.

Vice President, Nuclea'

..Vogtle Propct the southem elecinc system November 20, 1995 LCV-0670 Docket Nos. 50-424 50-425 TAC- M92131 M92132 L U. S. Nuclear Regulatory Conunission ATrN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT PROPOSED CONVERSION OF THE UNIT 1 AND UNIT 2 TECHNICAL SPECIFICATIONS BASED ON NUREG-1431 By letter dated May 1,1995, (LCV-0603) Georgia Power Company (GPC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2 Technical Specifications. The ,

proposed amendment would, in part, convert the existing VEGP TS requirements to the format and content of NUREG-1431. *he Westinghouse Improved Standard Technical Specifications.

- Subsequent to our my 1,1995, submittal, GPC has identified additional changes that are required to maintain the VEGP current licensing basis. Specifically, GPC has identified the following items
1. Response time test surveillance requirements for the Control Room Emergency Filtration System radiogas monitors and for the Auxiliary Feedwater System response to a loss of voltage and degraded voltage condition on the Engineered Safety Features (ESF) 4.16 kV buses should be added to the VEGP Improved Technical Specifications (ITS). The need to add the response time surveillances to the VEGP ITS is a direct result of the requirement to separate the associated instrument functions from the current VEGP ESF Actuation System TS in order to conform with the format and presentation of the Improved Technical Specifications in NUREG-1431.

- 2. The NUREG-1431 ESF Actuation System surveillance requirement to perform a channel check on the Pressurizer Pressure P-11 interlock was found to be inconsistent with the current VEOP licensing basis and has been deleted.

t r

9511280024 951120 '00

, PDR ADOCK 05000424 #

2 E ~ ~ - - _. _ .RDB _._,_ Il

l s 1:

U. S. Nuclear Regulatory Commission ,

LCV-0670 -

Page 2 s

3. Additional clarification is required in the Basei of the Auxiliary Feedwater (AFW) '
System Technical Specification. Specifcally, Surveillance Requirement 3.7.5.1 of the

?

AFW Specification requires the addition of a bases statement to enhance understanding of

'the NUREG-1431 terminology and its specific application to VEGP.

4. The surveillance frequency of the Channel Operational Test for the Turbine Trip low fluid oil pressure was also found to need additional clarification in ord to conform'with the format and presentation of the Improved Technical Specification ; in NUREG-1431.

GPC proposes to revise the May 1,1995 submittal to incorporate the changes described above.

The enclosed pages contain the information necessary to modify our May 1,1995, submittal to  :

reflect the above revisions. Instructions are provided to facilitate insertion of the changed pages into the original submittal documentation.

Sincerely, C. K. McCoy ,

i CKM/NJS Enclosure xc: Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani

-NORMS U.' S. Nuclear Regulatory Commission .

Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident inspector, Vogtle 9

The following pages replace the corresponding pages behind the Enclosure I tab for Chapter 3.3, Volume 3.

i I

I I

l

)

l i

1