ML20095E858

From kanterella
Jump to navigation Jump to search
Amend to Application for Ols,Consisting of Amend 9 to FSAR
ML20095E858
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/17/1984
From: Foster D
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20095E863 List:
References
GN-399, NUDOCS 8408270052
Download: ML20095E858 (1)


Text

Georga Power Company 333 Piedmont Avenue

' Atlanta. Georgia 30308 Telephone 404 526 7726 Maang Address:

Post Office Box 4545 Atlanta, Georgia 30302 ~ L Georgia Power D. O. Foster the southern electoc system V+ce Presdent and General Manager -

Vogite Project August 17, 1984 Director of Nuclear Reactor Regulation File: X7N00.09 Attention: Ms. Elinor G. Adensam, Chief X7BC35 Licensing Branch #4 ,

Log: GN-399 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 9

Dear Mr. Denton:

Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 9 to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2.

This Amendment consists of revised pages for the Final Safety Analysis Report and provides responses to NRC questions transmitted in Ms. Adensam's letters dated May 31, June 13, and July 3, 1984. Also, instructions for inserting this material are included.

In accordance with the requirements of 10 CFR 50.30 (b) and (c), three (3) signed originals and sixty (60) copies of Amendment 9 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate to contact me.

gyo227 Ns3 Yourstruly[,

Yst. n.cx gooo424 . .

/

3A fVOD7 D. O. Fost r DOF/ JAB /sw Enclosures SWORN AND SUBSCRIBED BEFORE ME, THIS xc: M. A. Miller Idal., DAY OF 26usscoe, 1984.

R. A. Thomas ~#

\ l J. A. Bailey \

L. T. Gucwa ch M L. Fowler Not g Pu611c, Georgia State at Larg,e C. A. Stangler g Mpm - $1 r f f // ' #8 J. E. Joiner, Esquire G. F. Trowbridge, Esquire

?

. 98C' 7 8 C4l8f h 'IIIOdIIf 333 D'- F cntAve ne u Atlantn . Oecrgia .:0308 4 et ce M4 5M 7726 A Mmi.cc AjdtesS.

(V

) Post Cl' re Gex 4MS Atlanta Georg'a CC302

...., --~

b Ge,org, ia Power D. O. Foster the Soutrem eiecttC Sptem V ce or maert am1 General Manager vogue P e net August 17, 1984

)

Director of Nuclear Reactor Regulation File: X7N00.09 Attention: Ms. Elinor G. Adensam, Chief X7BC35; Q

D Licensing Branch #4 Division of Licensing Log: GN-399 .

U.S. Nuclear Regulatory Commission ,

Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 FSAR AMENDMENT NUMBER 9

Dear Mr. Denton:

Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of s Dalton, Georgia, hereby submits Amendment 9 to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2.

This Amendment consists of revised pages for the Final Safety Analysis Report and provides responses to NRC questions transmitted in Ms. Adensam's letters dated May 31, June 13, and July 3, 1984. Also, instructions for inserting this material are included.

In accordance with the requirements of 10 CFR 50.30 (b) and (c), three (3) signed originals and sixty (60) copies of Amendment 9 are submitted for your use.

Should you have any questions on the enclosed submittals, do not hesitate O to contact me.

Yours truly, D. O. Fost r DOF/ JAB /sw Enclosures SWORN AND SUBSCRIBED BEFORE ME, THIS xc: M. A. Miller [4al, DAY OF ZLascoe, 1984.

R. A. Thomas ~#

s J. A. Bailey i

L. T. Cucwa c4hM L. Fowler Not Pufflic, Georgia State at Large C. A. Stangler J. E. Joiner, Esquire M=&% hk r

  • UN-M8 G. F. Trowbridge, Esquire

, -.- . - - - -