Amend 2 to OL Applications,Consisting of Amend 2 to FSAR Re Changes to QA Program
ML20083C022
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/16/1983
From: Foster D
GEORGIA POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20083C024 List:
References
GN-291, NUDOCS 8312220062
Download: ML20083C022 (5)


Text

i l

Georgia Power Company 333 Piedmont Avenue Atlanta. Georgra 30308 Telephone 404 526-7726 Maihng Address Post Ofke Boa 4545 Atlanta. Georg;a 30302 h Georgia Power D. O. Foster the southern e:ncirc system Vice Pre 9 dent and General Manager Vogtle Protect December 16, 1983 l l

i Mr. Harold R. Denton, Director File: X7N00.02, X7BC35 Office of Nuclear Reactor Regulation Log: GN-291 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTIO1: PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 APPLICATION FOR OPERATING LICENSES AMENDMENT NUMBER 2

Dear Mr. Denton:

i Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 2 to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units 1 and 2. Included in this transmittal are instructions for inserting this amendment.

This amendment describes changes to the Quality Assurance Program during the design and construction phase. As can be seen from the amendment, the basic Quality Assurance Program has not been significantly changed. The changes are essentially administrative in nature in that certain program responsi-bilities have been transferred from Bechtel Power Corporation (BPC) to Georgia l Power Company (GPC) and Southern Company Services (SCS). Specifically, responsibility for procurement has been transferred from BPC to GPC and the administration of the Supplier Surveillance Program has been transferred from BPC to SCS. This will provide for closer GPC administrative controls of the procurement and supplier surveillance activities. The changes do not adversely affect the technical or quality controls or reduce the commit-ments of the Quality Assurance Program.

Presently, the Quality Assurance Program addressing the design and con-struction stage is documented in both the PSAR and the FSAR. This practice will cease with respect to the PSAR. Any future changes, should they be necessary, will be documented solely as an amendment to the FSAR.

In accordance with the requirements of 10 CFR 50.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 2 are submitted for your use.

8312220062 831216 k PDR ADOCK 05000424 K

l PDR

^

7 kf l

l Mr. Harold R. Denton, Director File: X7N00.02, X7BC35 l December 16, 1983 Log: GN-291

( Page 2 Should you have any questions on t.he enclosed submittals, do not hesitate to contact us.

Yours truly, 1

/

/ #

D. O. Foster DOF/KWK/bh Enclosure xc: M. A. Miller R. A. Thomas D. E. Dutton J. A. Bailey O. Batum L. T. Gucwa G. Bockhold, Jr.

G. F. Trowbridge, Esquire D. G. Eisenhut SWORN AND SUBSCRIBED BEFORE ME, THIS

/d DAY OF j , 1983 be W-Notary Public,' Georgia State at Large Notary Public, Georgia. State at targe My Commission Expires March 21,1985 l

l i

Southern Company Services, Inc.

Date: December 16, 1983 O Re: Vogtle Electric Generating Plant Final Safety Analysis Report From: R. T. Oedamer O Supervisor, Technical Writing Engineering Technical Services Department To:

Attached are changes to be inserted in your copy of the subject manual. Please revise your manual according to the Revision Insertion Instructions provided and destroy all superseded material. If the attached package of change pages does not correspond to the insertion instructions provided, notify Trinket Shaw , ext. 6837 ,

O PLEASE SIGN BELOW AND RETURN THIS ENTIRE ACKNOWLEDGEMENT RECElPT PAGE WITHIN 15 WORK DAYS FROM THE ABOVE DATE TO:

Supervisor, Technical Writing i Room 102, Metroplex IV j SCS Birmingham i

f Manual Title Vogtle Electric Generatino Plant Final Rafotv

, Analysis Report i

i Name Manual No. Rev. Date 12/16/83 '

i l lO i

lO i

, . .. .,, n. ,3 m c I

z.. .a~,,

o . . - ~

.. . . s, . -

.... .o .

o, m -

o4 e

t e ._,

(; eor;t;ia Potver

0. 0. Fostar <

. m ,n. ww

--t ?

lt.

\ .

December 16, 1983 Mr. Harold R. Denton, Director File: X7N00.02, X7BC35 Office of Nuclear Reactor Regulation Log: GN-291

- O- U.-S. Nuclear Regulatory Commission Washington, D.C. 20555 i NRC DOCKET NUMBERS 50-424 AND 50-425

-CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 i APPLICATION FOR OPERATING LICENSES

, AMENDMENT NUMBER 2

[ '

Dear Mr. Denton:

I

.- Georgia Power Company, acting on its own behalf and as agent for Oglethorpe s .

Power Corporation, Municipal Electric Authority of Georgia, and the City of

?- -

Dalton, Georgia, hereby submits Amendment 2 to its Application for Operating

Licenses for the Vogtle Electric Generating Plant - Units 1 and 2. Included in this transmittal are instructions for inserting this amendment.

I This amendment describes changes to the Quality Assurance Program during the design and construction phase. As can be seen from the amendment, the basic Quality Assurance Program has not been significantly changed. The changes l are essentially administrative in nature in that certain program responsi-bilities have been transferred from Bechtel Power Corporation (BPC) to Georgia l

Power Company (GPC) and Southern Company Services (SCS). Specifically,

j. responsibility for procurement has been transferred from BPC to GPC and the

'l administration of the Supplier Surveillance Program has been transferred from BPC to SCS. This will provide for closer GPC administrative controls

% of the procurement and supplier surveillance activities. The changes do

! not adversely affect the technical or quality controls or reduce the commit-ments of the Quality Assurance Program.

Presently, the Quality Assurance Program addressing the design and con-i struction stage is documented in both the PSAR and the FSAR. This practice

[ (/~') ./ will cease with respect to the PSAR. Any future changes, should they be necessary, will be documented solely as an amendment to the FSAR.

In accordance with the requirements of 10 CFR 50.30(b) and (c), three (3) signed originals and sixty (60) copies of Amendment 2 are submitted for l your use.

h

Mr. Ilarold R. Denton, Director File: X7N00.02, X7BC35 December 16, 1983 Log: GN-291 Page 2 Should you have any questions on the enclosed submittals, do not hesitate to contact us.

Yours truly D. O. Fosto DOF/lGiK/sw Enclosure xc: M. A. Miller R. A. Thomas D. E. Dutton J. A. Bailey O. Batum L. T. Gucwa G. Bockhold, Jr.

G. F. Trowbridge, Esquire D. G. Eisenhut SWORN AND SUBSCRIBED BEFORE ME, THIS O

'd - DAY OF M , 1983

, /

Notary Public, Ge'orgia State at Large

' is al b

- ,(e r , . n: . .

we

s'. to W .J ! Li .r rJ . J 9

O O

- _