ML20080A165

From kanterella
Jump to navigation Jump to search
Amend to OL Application,Consisting of Amend 3 to FSAR, Correcting Errors in cross-references,typographical Errors, Incorrect Units of Measure,Table Column & Row Alignment
ML20080A165
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/27/1984
From: Foster D
GEORGIA POWER CO.
To: Harold Denton, Detin H
Office of Nuclear Reactor Regulation
Shared Package
ML20080A169 List:
References
GN306, NUDOCS 8402030400
Download: ML20080A165 (7)


Text

I Georg a Power Company

- 333 P1ecmont Avenue .

At!anta, Georgia 30338 Telephone 404 526-7726 -

Maihng Address. l Post Off.ce Box 4545 A!!anta. Georgia 30302 h Georgia Power D. O. Foster the southem electnc sys:em Vee Premdent and Genera! Manager Vogtte Project January 27, 1984 Mr. Harold R. Denton, Director Log: GN306 Office of Nuclear Reactor Regulation File: X7K00.02 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GII.E ELECTPIC GENERATING PLANT - UNITS 1 AND 2 APPLICATION FOR OPERATING LICENSES AMENDMENT NLHBER 3

Dear Mr. Denton:

Georgia Power Company, acting on its own behalf and.as agent.for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 3 to its Application for Operating Licenses for the Vogtle Electric Generating Plant - Units-1 and 2. Included in this transmittal are instructions for inserting this amendment.

This amendment consists of editorial changes to correct errors in cross-references, typographical errors, incorrect units of measure, table column

-and row alignment etc. More substantial revisions due to data corrections, design changes, or clarification of operator actions are tabulated in Attachment I to this letter. It is felt that these corrections'will aid in your review which is scheduled to commence on February 1, 1984.

In accordance with the requirements of 10 CFR 50.30(b) and (c), three ;(3) signed originals and sixty (60) copies of Amendment 3 are~' submitted for your use.

Yours truly, D. O. Fost r-DOF/KWK/sw Enclosures xc: List attached.

. S Y 8402030400 840127 PDR ADOCK 05000424 K. __ _ _ P _D R - ,.

Mr. Harolci R. Denton, Director Log: .GN306 January 27, 1984_ File: X7N00.02 Page 2

-xc: M. A. Miller R. A. Thomas D. E. Dutton J. A. Bailey O.'Batum l L. T. Gucwa i

. G. Bockhold, Jr.

G. F. Trowbridge, Esquire D. G. Eisenhut l

SWORN AND SUBSCRIBED BEFORE ME, THIS I[ DAY'0F =m, 1984 U 6 Nofary Public, Georgia State at Large Notary Puttic. Georgia. State at Larra My Comnission Expires March 21,1585

/

1 a

s

.l

AMENDMENT 3.

Tabulation of Revisions FSAR Section Reason for Revision ,

1.6 Add Table 1.6-3 for addition of AE Topical Reports.

1.7 Update revision numbers of listed drawings.

1.9 Addition of revision numbers of Regulatory Guides, editorial corrections.

1.9 ~ Invoking ' ANSI /ANS-3.3-1982 vice ANSI N18.7-1973 for RG 1.17.

2.2 Provide results of fire analysis. Q311.3.

2.3 Correct column headings in Table 2.3.5-11.

3.2 Renoval of requirement for qualification of safety injection system heat tracing.

3.2 Hisc. changes to project classification table.

3.8 Clarify description of electrical penetrations.

3.9 Implementation of' computer program ME-140 for analysis of. pipe supports.

3.9 B0P active valve update of Table 3.9.B.3-9.

4.2 Correct dimensional data of thimble plug assembly.

4.3 'JucLal power distribution is controlled by manual rather than automatic actions.

5.2 Correct description of RCS cold overpressure protection.

6.2 Revision of' hydrogen concentration calculations

~

to reflect no recombiner operation.

6.2 Containment cooler fans included in the' planned maintenance program.

l b.

FSAR Section Reason for Revision 6.3 Switch over time from cold to hot leg

-- recirculation changed to provide consistency in text.

6.4 Clarification of operator actions upon warning of smoke in the control room.

7.3 Revised to reflect conditions which will-t automatically or manually initiate control room ventilation isolation.

7.7 Revised to reflect results of control system interaction analysis.

8.2 Updated to reflect transmission line construction.

8.3 Additional diesel trips listed.

1 8.3 Revise to clarify system design with respect to i class 1E dc. power supply to inverters.

8.3 Revised to correct description of equipment subject to containment flooding.

1 9.1 Correct description of makeup water to spent

fuel pool.

9.1 Add description of monorail hoist in auxiliary

-building.

9.1 -Correct description of new and spent fuel storage facilities.

l 9.2 Revised to reflect deletion of condensate storage tank heaters.

9.2 Corrections to chilled water system FMEA due to internal design review.

. 9.3 Correctionofdescriptionofdiainpiping, i

9.3 . Corrected switch numbers in Table 9.3.3-3.

'9.3 Revised to reflect addition'of sump to i electric boiler building.

I' 9.4 Corrected airflow rate of containment-coolers

-in Table 9.4.6-1.

i-

-l

. .i s .. Sa-

'w

FSAR Section Reason for Revision 9.5 Corrections and clarifications to the diesel fuel oil _ storage:and transfer system.

9B Correct description of where PVC is used.

10.1 Corrected orientation of FW bypas check valves.

10.4 Corrected description of AFW system.

10.4 Corrected description of steam generator blowdown processing system.

11.5 Corrected description of radwaste building duct material and thickness.

12.3 Corrected valve thickness and civil terminology.

12.3 Revised to conform to system design.

13.1 Corrected titles of supervisory and management positions.

15.5 Clarify operator action upon receipt of a superious safety injection signal.

18.1 Revised to reflect electric aux board nameplate color change.

Q/R Sept. 6, 1983 Letter Revised response to Q 271.1 Q/R Sept. 6, 1983 Letter Revised response to Q 630.1 x

i

+ ~ _ _

r

, O Southern Company Services, Inc.

Date: January 27, 1984 Re: Vogtle Electric Generating Plant Final Safety Analysis Report O From: R. T. Oedamer Supervisor, Technical Writing Engineering Technical Services Department To: DENTON H ,

ROOM NRC 7928 NORFOLK A'BW 4

BETHESDAMD2f814 Attached are changes to be inserted in your copy of the subject manual. Please revise your manual according to the Revision Insertion instructions provided and destroy all supe <seded material. If the i attached package of change pages does not correspond to the insertion instructions provided, notify Trinket Shaw , ext.____6 R 17

} ( .

PLEASE SIGN BELOW AND RETURN THIS ENTIRE ACKNOWLEDGEMENT RECEIPT PAGE WITHIN 15 WORK DAYS FROM THE ABOVE DATE TO: l Supeivisor, Technical Writing  ;

Room 102, Metroplex IV i SCS Birmingham Manual Title vogtle Electric Generating Plant Final Safety Analysis Report Name Manual No. Rev. Date 1/27/84 l

O

. . ... m + in s c k _ . _ . , , -

i -

r - - t. -,._ ,,

.. ,. - i

, .. . .; - ..t.,

\

4i

. c. , , n e

Georaia Power

. G. O. Fostar w ,t', .. J -

-. s 4 January 27, 1984 Mr. Harold R. Denton, Director.

j O Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Log: GN306 File: X7N00.02 Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 t CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENET.ATING PLANT - UNITS 1 AND 2

APPLICATION FOR OPERATING LICENSES
j. AMENDMENT NUMBER 3

Dear Mr. Denton:

Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of. Georgia, and the City of Dalton, Georgia, hereby submits Amendment 3 to its Application for Operating

~

Licenses for the Vogtle Electric Generating Plant.- Units 1 and 2. Included j

in this transmittal are instructions for inserting this amendment.

This amendment consists of editorial changes to correct errors in cross references, typographical errors, incorrect' units'of measure, table column and row alignment, etc. More substantial revisions due to. data corrections, 4

design changes, or clarification of operator actions are tabulated in-Attachment I to this letter. It is felt that these corrections will. aid in your review which is scheduled to commence on February 1, 1984.

In accordance with the requirements of 10 CFR 50.30(b) and~(c), three (3)-

j -

signed originals and sixty (60) copies of Amendment'3 are submitted for.

your use.

Yours truly,

, , a

. 0. - Fosta[ s7 DOF/KWK/sw

. ( j- Enclosures ,

xc : List attached.

+

e 1

7 5

4

}

1 Mr. Harold R. Denton, Director Log: CN306 January 27, 1984 File: X7N00.02  ;

Page 2 l xc: M. A. Miller R. A. Thenas D. E. Dutton J. A. Bailey .

O. Batum  !

l L. T. Gucwa i G. Bockhold, Jr.

G. F. Trowbridge, Esquire D. G. Eisenhut SWORN AND SUBSCRIBED BEFORE ME, THIS M 7 - DAY OF A

  • M.' 1984 L./ d

,' U '/ M -

N<itary Public,' Georgia State at Large O

O l O O

l I

l

. . _. . . . . - . . . _ . . _ . _ . _ _ . . . . . . . . . _ _ . . , . . _ . _ . _ . , . . _ . _ . . , . - . .. , . _ _ , , _ . _ ._