Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant
ML20079B196
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/29/1994
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20079B199 List:
References
LCV-0063-A, LCV-63-A, TAC-M85700, TAC-M85701, NUDOCS 9501050312
Download: ML20079B196 (3)


Text

E

, Georg'a Power Company 40 inverr.ess Cen:er Parkway

. Post o'ftce Bos 1295 Birm:nyam. Alabama 35201 Teiephone 205 877-7122 m

C. K. McCoy Georgia Power

!!c saultern etatic systern December 29, 1994 LCV-0063-A Docket Nos. 50-424 50-425 TAC Nos. M85700 M85701 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT RESUBMITTAL OF REQUEST TO REVISE TECHNICAL SPECIFim \ TION ADDITION OF AUTOMATIC LOAD SEOUENCER Georgia Power Company (GPC) previously submitted a request to add the automatic load sequencer to the Vogtle Electric Generating Plant (VEGP) Technical Specifications (TS) by letters ELV-3945, dated January 22,1993, and LCV-0063, dated August 6,1993.

Because of subsequent issues raised and discussed with NRR during a meeting on February 2,1994, concerning the applicable TS sections affected by the automatic load sequencer during difTerent modes of plant operation, Georgia Power Company resubmits this request to revise the Technical Specifications. This resubmittal should replace and supersede all ponions of the previously submitted letters referenced above.

In accordance with the provisions of 10 CFR 50.90, Georgia Power Company hereby proposes to amend the Vogtle Electric Generating Plant Unit I and Unit 2 Technical Specifications, Appendix A to Operating Licenses NPF-68 and NPF-81.

Georgia Power Company requests approval of this amendment by April 1,1995.

9501050312 941229 PDR ADOCK 05000424 ii p PDR  ;

\

l t l

GeorgiaPbwerA U. S. Nuclear Regulatory Commission Page 2 of 3 The proposed change and the bases for the change are described in enclosure 1 to this letter. Enclosure 2 provides an evaluation pursuant to 10 CFR 50.92 showing that the  :

proposed changes do not involve significant hazards considerations. Instructions for l incorporation of the proposed changes into the Technical Specifications and a copy of the  !

changes are provided in enclosure 3.

In accordance with 10 CFR 50.91, the designated state official will be sent a copy of this letter and all enclosures.

t Mr. C. K. McCoy states that he is a vice president of Georgia Power Company and is authorized to execute this oath on behalf of Georgia power company and that, to the best of his knowledge and belief, the facts set fonh in this letter and enclosures are true.

GEORGIA POWER COMPANY [

By: ll C.'K. McCoy .

+

I Sworn to and subscribed before me thiday of MAA ,1994.

h,),k '

MYCOMMISSION EXPlRES Notary Public Old v <

/T l@ f CKM/AFS

Enclosures:

'l. Basis for Proposed Change  !

2. 10 CFR 50.92 Evaluation
3. Instructions for Incorporation and Revised Pages i xc: Distribution continued next page.

LCV-0063-A I

~ , , - - , - -

.. l

, 1 GeorgiaPower1 U. S. Nuclear Regulatory Commissicn Page 3 of 3 b

+

xc: Georgia Power Company Mr. J. B. Beasley, Jr.

Mr. M. Sheibani i NORMS  !

i U. S. Nuclear Regulatory Commission i Mr. S. D. Ebneter, Regional Administrator  ;

Mr. D. S. Hood, Licensing Project Manager, NRR l Mr. B. R. Bonser, Senior Resident Inspector, Vogtle  !

Slete of Georgi.a  !

Mr. J. D. Tanner, Commissioner, Dept. of Natural Resources  !

i

~h t

i i

l t

f i

LCV-0063-A

- , .-. _-.- - ._ -.