| title = Forwards Rev 1 to Prairie Island Nuclear Generating Plan Station Blackout/Electrical Safeguards Upgrade Project.
| title = Forwards Rev 1 to Prairie Island Nuclear Generating Plan Station Blackout/Electrical Safeguards Upgrade Project
| author name = Parker T
| author name = Parker T
| author affiliation = NORTHERN STATES POWER CO.
| author affiliation = NORTHERN STATES POWER CO.

Revision as of 03:11, 16 April 2020

Forwards Rev 1 to Prairie Island Nuclear Generating Plan Station Blackout/Electrical Safeguards Upgrade Project
ML20086T557
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/23/1991
From: Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086T561 List:
References
TAC-M68588, TAC-M68599, NUDOCS 9201060328
Download: ML20086T557 (2)


Text

+

{

- a e Northern Stt,,es Power Cort pony

Pemirie hnd Nuclear Gnnefeting Plant 17t r Woonee D. East Wekh Mmesot4, %089 De c e n.be r 23, 1991 10 Cfy. Part 50 Section 50.63(c)(4)

U S Nuclear Pse g,ul a t o 4. y. Cummis s i r. n Attn: . Docussent Control Desk Vashington, DC 205$5

' PP,AIRIE 1511diD NUClJAR GENERATING PI ANT Docket Nos. 50-?R2 License Non. DPR 42 1 50 306 DPR-60 lltilfJLl!SERELMI _Ihe_Snih1Lhlfs.bnu.ufluultel f.nfmands

, 'Jerntdt fInlu t - Eevisinn LLTAC 12n.dfJ1HF._andt7dM11 Referenu s: (1) Letter from Thomas M Parker, Northern States Power Company to U S Nuclour Regulatory Commission dated November 27, 1990 titled:

  • Design Report for the Station Blackout / Electrical Saf eguards Upgrade h oject"

(?) letter from Thomas M Parker. Northern States Power Conpany, to U S Nuclear Reg;ulatory Connisulon dat ed October 29, 1991 titled: " Schedule for R. quired Hardware and Associated Procedure Changes to implonent the Requirernents of the SB0 Ruln" (3) Le t t er f roto David Musol f , Northern St at.eo Powe r Comrany, t o U S Nuclear Regulatory Commission dated April 13, 1989 titled. " Loss of All Alternating Current Power Information Required by 10 CPR Part 50, Section 50.63(c)(1)"

(4) Letter f rom Dominic C Dilanni, U S Nuclear Regulatory Commission, to ' thomas M Parker, Northern States Power Corapany , dated September 18, 1990 titled: S a f e ty Evaluation of the Prairic Island Nuclear Generating Plant Unit Nos. I and 2; Station Blackout Rule 10 CFR 50.63 (TAC Nos .l'{iB588 andfi[8589)

Oa Noveraber 27, 1990 we cuba.itted for URC Statf review our Design Report for the Station Blachout/ Electrical Safeguards Ur> grade Proj ect (Refertace 1).

This Design Report de tailed our comn:l tment ~ for design, procurement, ,

fabrication and construction rrlated tc. tte add; tion of two r,afeguards ettergency diesel generators, upgrade of the safeguards electrical d'istribution syntem and vpgrade of the fil21 cooling water pump to become a swing sa'eguards pump.

po1 x..on n i n, t9fN

,. 1) >

u,o-

"[UU i4 DOCK 050631.32 Pim lf I

USNRC De c enib e r 23, 1991

Page 2 of 2 Enclosed is Revision 1 of the project Design Report submitted for NRC Staff review. Revision 1 contains both revised and additional information necessary to bting the Design Report up to date.

This tevision includes the following information:

1. Responses and other pertinent information result.ing frotn NRC Staff requests for additional information have been included in Revision 1 as appropriate.
2. A re. vised overal. p ject schedule is provided in Section 7.0 of Revision 1 as committed by NSp (Reference 2).

Figures 2-1 and 2 2, existing and upgraded one line electrical diagrams of the Emergency AC Power Systein, have been revised to correct certain inadvertent errors in drafting, Note that the inaccurate diagrams were previously subtnitted to the NRC Staff (References 1 and 3) and subsequently reproduced by the NRC (Reference 4).

4 As a result of our recent project scheduie assesernent (Reference 2),

we have decided to install new solid state progracusable logic controller based load coauencers for Unit 1 as well as Unit 2.

In general, we believe the chaages and additions in Revision 1 will not require a significant NRC Sacff review effort. In fact, many of the changes reflected in Revision 1 result from previous discussione and correspondence with the NRC Staff.

Please contact us if you have any questions related to this Design Report revistun.

L

/

Immas M Parker Manager Nuclear Support Services c: Regional Administrator Region 111, NRC Senior Resident Inspector, NRC NRR Project Man.ager, FRC J E S11ber6 Attachnent: Der'.gn Report for the Station Blackout / Electrical Safeguards Upgrade Project, Eevision 1