ML17264A419: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 58: Line 58:
channel inoperable, SURVEILLANCE RE(jUIREHENTS SURVEILLANCE                                        FRE(UEHCY TSR    3.3.1.1        Perform  COT.                                            31  days TSR    3.3. 1.2      Perform  CHANNEL CALIBRATION.                            )8 months Ginna Station                                TRH  3.3-1                                  Revision  0
channel inoperable, SURVEILLANCE RE(jUIREHENTS SURVEILLANCE                                        FRE(UEHCY TSR    3.3.1.1        Perform  COT.                                            31  days TSR    3.3. 1.2      Perform  CHANNEL CALIBRATION.                            )8 months Ginna Station                                TRH  3.3-1                                  Revision  0


                                                              '
Circulating Water Flood Protection Instrumentation TR  3.3.2 3.3    INSTRUHENTATION 3.3.2    Circulating    Water Flood Protection Instrumentation TR  3.3.2            The Circulating Water Flood Protection instrumentation for
Circulating Water Flood Protection Instrumentation TR  3.3.2 3.3    INSTRUHENTATION 3.3.2    Circulating    Water Flood Protection Instrumentation TR  3.3.2            The Circulating Water Flood Protection instrumentation for
                       'each Function in Table TR 3.3.2- I shall he OPERABLE.
                       'each Function in Table TR 3.3.2- I shall he OPERABLE.
Line 94: Line 93:


V . e l
V . e l
  '


Refueling Manip    Lor Crane    interlocks TR  3.9.3
Refueling Manip    Lor Crane    interlocks TR  3.9.3

Latest revision as of 10:25, 4 February 2020

Rev 0 to Technical Requirements Manual (Trm).
ML17264A419
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/24/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-960224, NUDOCS 9604010159
Download: ML17264A419 (23)


Text

GINNA STATION TRIVl Revision 0 TECH ICAL REQUIR MENTS MANUAL (T )

R sponsible Manager Eff tive Oate N

/p ~

Controlled Copy Ho. ~ ~ /

96040101S9 960224 PDR ADOCK 05000244 P P DFt

List of Effective Pages (TAM)

Pa e Rev. Pa e Rev. Pa e Rev. Pa e Rev ~

TOC .Section 3.4 TRM 3.4-1 0 TRM 3.4-2 0 Section 1.0 TRM 3.4-3 0 TRM 3.4-4 0 TRH 1.0-1 TRH 3.4-5 '0 TRH 3.4-6 0 Section 2.0 TRM 3.4-7 0

,TRH 2.0-1 Section 3.5 Section 3.0 TRH 3.5-1 TRH 3.0-1 Section 3.6 Section 3. 1 TRH 3.6-1 ip TRH 3.1-1 Section 3.7 TRH 3.1-2 TRM 3.1-3 TRH 3.7-1 TRH 3.1-4 TRH 3.1-5 Section 3.8 TRM 3.1-6 TRM 3.1-7 TRH 3.8-1 0 TRH 3.1-8 TRH 3.8-'2 0 TRH 3.1-9 TRH 3.8-3 0-Section 3.2 Section 3.9 TRH 3.2-1 TRM 3.9-1 TRH 3.9-2 Section 3.3 TRM 3.9-3 TRH 3,9-4 TRH 3.3-1 TRH 3.3-P TRH 3.3-3 TRH 3.3-4 TRM 3.3-5 TRH 3.3-6 LEP-i

TABLE OF CONTENTS 1.0 USE ANO APPLICATION 1.0-1 2.0 SAFETY LIHITS (SLs) 2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY 3.0-1 3.0 SURVEILLANCE RE(UIREMENT (SR) APPLICABILITY 3.0-1 3.1 REACTIVITY CONTROL SYSTEMS . 3.1-1 3.1.1 Boron Injection System MODES 1, 2, 3, and 4 3.1-1 3.1.2 Boron Injection System HOOES 5 and 6 3.1-6 3.1.3 Rod Group Alignment Limits Safety Analyses Re-Evaluation 3.1-8 3.2 POWER OISIN'IBUT'ON LIHITS 3.2-1 3.3 INSTRUMENTATION 3.3-1 3.3,1 Control Room Emergency Air Treatment System (CREATS)

Instrumentation 3.3-1 3.3.2 Circulating Water Flood Protection Instrumentation . 3.3-3 3.3.3 Movable In-Core Instrumentation 3.3-6 3.4 REACTOR COOLANT SYSTEH (RCS) 3.4-1 3.4.1 Reactor Vessel Head Vents 3.4-1 3.4.2 RCS Chemistry 3.4-3 3.5 EMERGENCY CORE COOLING SYSTEHS (ECCS) 3.5-I 3.6 CONTAINMENT SYSTEHS 3.'6-1 3.7 PLANT SYSTEMS I ~ ~ 3.7-1 3.8 ELECTRICAL POWER SYSTEHS 3.8-1 3.8.1 Offsite Power Sources 3.8-1 3.8.2 Diesel Generator (OG) Load Sequencer . 3.8-2 3 9

~ REFUELING OPERATIONS ~ ~ ~ 3.9-1 3,9.1 Fuel Storage in Spent Fuel Pool (SFP) Region 2 ~ ~ ~ 3,9-1 3.9.2 Fuel Assembly Hovement in Auxiliary Building 3.9-2 3,9.3 Refueling Hanipulator Crane Interlocks , 3.9-4 M%%RtJKK JRR~S Ginna Station TRM Revision 0

3.0 LIHITIHG COHOITIONS FOR OPERATION (LCO) APPLICABILITY SURVE ILLAHCE REOUIREHEHT (SR) APPLICABILITY The Technical Requirements (TRs) in this manual follow the same LCO applicabi lities as the Improved Technical Specifications with the exception of LCO 3.0.6 which deals solely with ITS LCOs on support/supported system inoperabilities. The Technical Surveillance Requirements (TSRs) in this manual follow the same SR apiplicabilities as the Improved Technical Specifications.

The TRs in this manual also -follow the same organization as the Improved Technical Specifications (e.g., Reactivity Control System requirements are contained in TR Chapter 3,1).

Ginna Station TRH TRH 3.0-l" Revision 0

ACTIONS continued CONDITION REQUIRED ACTIONS COMPLETION TIHE D. Required Action and D. I Be in MODE 5, 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> associated Completion Time of Condition C not met.

E. Both boron injection E. I Enter LCO 3 '.3. Immediately subsystems inoperable.

Ginna Station TRH TRH 3.1-2 Revision 0

Boron injection System MODES 5 and 6 IR 3.1.2 3.1 REACTIVITY CONTROL SYSTEMS

3. 1,2 Boron Injection System MODES 5 and 6 TR 3.1.2 One boron injection subsystem shall be OPERABLE.

APPLICABILITY: MODES 5 and 6.

ACTIONS CONDITION RE(VIREO ACTIONS COMPLETION TIHE 0*4 A. Required boron A.l Suspend CORE Immedi a te1 y injection subsystem ALTERATIONS.

inoperable.

AND A.2 Suspend positive Immediately reactivity changes.

AND

~ * .o A.3 Initiate action to Immediately restore required boron injection subsystem to OPERABLE st'atus.

Ginna Station TRH TRM 3.1-6 Revision 0

~ I I II ~ I

C REATS Toxic Ga s Instrumentation lR 3.3.1 3.3 IHSTRUHEHTATION 3.3.1 Control Room Emergency Air Treatment System (CREATS) Toxic Gas Instrumentation TR 3.3.1 The CREATS actuation instrumentation for each toxic gas Function in Table TR 3.3. 1- 1 shall be OPERABLE.

APPLICABILITY: HOOES 1, 2, 3, 4, 5'and 6.

ACTIONS

-HOTE-CREATS air intake may be unisolated fnr up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per day for fresh air makeup to improve the working environment in the control room.

COHO I T ION, RE/VIREO ACTIONS COMPLETION TINE A. One or more toxic gas A.I Place CREATS in 1 hour functions with one HOOE F.

channel inoperable, SURVEILLANCE RE(jUIREHENTS SURVEILLANCE FRE(UEHCY TSR 3.3.1.1 Perform COT. 31 days TSR 3.3. 1.2 Perform CHANNEL CALIBRATION. )8 months Ginna Station TRH 3.3-1 Revision 0

Circulating Water Flood Protection Instrumentation TR 3.3.2 3.3 INSTRUHENTATION 3.3.2 Circulating Water Flood Protection Instrumentation TR 3.3.2 The Circulating Water Flood Protection instrumentation for

'each Function in Table TR 3.3.2- I shall he OPERABLE.

APPLICABILITY: HODES I and 2.

ACTIONS

-NOTE------

Separate Condition entry is allowed for each set.

CONDITION REQUIRED ACTION COHPLET ION T IHE A. One or more Functions Initiate action to Immediately with one required verify that affected channel in one or more function set is set(s) inoperable. OPERABLE.

B. One or more Functions B.I Restore set to 7 days with two or more OPERABLE status.

required channels per set inoperable.

C. One or more Functions C.I Restore at least one 24 hours wl th both sets set to OPERABLE inoperable. "

status.

D. Required Action and D.l Be in MODE 3. 6 hours Assn~i~ted Completion Time rut met.

Ginna Station TRH 3.3-3 Revision 0

t eactor Vessel fiead Vents TR 3.4.1 3.4 RfACTOR COOLANT SYSTEM (RCS) 3.4.1 Reactor Vessel Head Vents TR 3.4.1 Two reactor vessel head vent valves, in one vent flow path, shall be OPERABLE and closed.

APPL I CAB IL I TY: 'OOES 1, 2, and 3.

'CT IONS CONO I T ION REQUIRED ACTIONS COMPLETION TIHE A. One or more required -------------NOTE------------

reactor vessel head LCO 3.0.4 is not applicable.

vent valves inoperable.

Initiate action to Immediately OR close required vent valve(s).

One or more required reactor vessel head vent valves open.

A.2 Initiate action to Immediately remove motive power I'rom each required vent valve actuator.

AD 3 Restore required 30 days reactor vessel head vent valve(s) to OPfRABLE status.

B. Required Actions and B.l Be in HOOE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

B.2 Be in MOOE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Ginna Station TRH TRH 3.4-1 Revision 0

Reactor Vesse) >lead Vents TR 3.4.1 SURVEILLANCE REQUIREHENTS SURVEILLANCE FREQUENCY TSR 3.4. 1. 1 Verify the required reactor hea'd vent 18 months manual isolation valves are locked open.

TSR 3.4. 1.2 Verify flow through the required reactor 10 months vessel head vent path using either liquid or gas.

Ginna Station TRH TRH 3.4-2 Revision 0

3.7 PLANT SYSTEHS There are no technical requirements associated with this Chapter.

I I

Ginna Station ...TRH 3.7-1 Revision 0

V . e l

Refueling Manip Lor Crane interlocks TR 3.9.3

'l 3. 9 REFUELING OPERAl I ONS 3.9.3 Refueling Manipulator Crane Interlocks TR 3.9.3 The refueling manipulator crane interlocks shall be OPERABLE.

APPLICABILITY: During use nf the refueling manipulator crane with fuel in the vessel.

ACTIONS CONDITION REQUIRED ACTION COHPLETION TIHE A. Refuel ing manipul ator A.I Suspend use of Immedi ~ te 1 y crane interlocks refueling manipulator inoperable. --crane.

SURVEILLANCE RE(U I REMEN TS SURVEILLANCE FREQUENCY TSR 3.9,3.1 Veri fy the refuel ing manipulator crane Once prior to interlocks are OPERABLE. refueling operations 0 Ginna Station 3.9-:

TRH TRH Revision 0