ML18319A139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018
 
==Title:==
San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
General Details:
General Details:
Line 28: Line 31:
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including


U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018
 
==Title:==
San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
General Details:
General Details:
Line 44: Line 50:
Attachment 1
Attachment 1


October 29, 2018 Title:               San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location:            Webinar Category:            This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.
October 29, 2018
Purpose:             The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS.
 
==Title:==
San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location:            Webinar Category:            This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.
 
==Purpose:==
The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS.
The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.
The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.
Contact:             Eric Simpson 817-200-1553 eric.simpson@nrc.gov Participants:       NRC Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL                                          Meeting Number              Password Webinar:
 
==Contact:==
Eric Simpson 817-200-1553 eric.simpson@nrc.gov
 
==Participants:==
NRC Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL                                          Meeting Number              Password Webinar:
https://attendee.gotowebinar.                None                        N/A com/register/325663643729566723 Docket No:          05000206 05000361 05000362 07200041 Comments:            Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:
https://attendee.gotowebinar.                None                        N/A com/register/325663643729566723 Docket No:          05000206 05000361 05000362 07200041 Comments:            Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:
https://www.nrc.gov/reactors/operating/ops-experience/songs-spec-insp-activities-cask-loading-misalignment.html
https://www.nrc.gov/reactors/operating/ops-experience/songs-spec-insp-activities-cask-loading-misalignment.html

Revision as of 07:58, 30 November 2019

Public Meeting Summary, Special Inspection Webinar
ML18319A139
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/14/2018
From:
NRC Region 4
To:
References
Download: ML18319A139 (79)


Text

U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018

Title:

San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:

The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.

General Details:

  • Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
  • Over 300 individuals participated in the webinar for various amounts of time.
  • The meeting started at 2 pm CST and ended at approximately 5 pm CST.
  • Three staff members gave a formal presentation that lasted approximately 30 minutes; after the presentation, the NRC answered questions for approximately 2Y2 hours.
  • The public participants submitted approximately 500 questions before and during the webinar.
  • The webinar was recorded and will be placed on the NRC website for public review when it is available.
  • Answers to selected questions that were asked during the webinar will be placed on the NRC website.

Summary of Presentations:

Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including

U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018

Title:

San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:

The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.

General Details:

  • Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
  • Over 300 individuals participated in the webinar for various amounts of time.
  • The meeting started at 2 pm CST and ended at approximately 5 pm CST.
  • Three staff members gave a formal presentation that lasted approximately 30 minutes; after the presentation, the NRC answered questions for approximately 2Y2 hours.
  • The public participants submitted approximately 500 questions before and during the webinar.
  • The webinar was recorded and will be placed on the NRC website for public review when 'it is available.
  • Answers to selected questions that were asked during the webinar will be placed on the NRC website.

Summary of Presentations:

Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including

MEETING AGENDA ADAMS Accession ML18302A351 )

Attachment 1

October 29, 2018

Title:

San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location: Webinar Category: This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS.

The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.

Contact:

Eric Simpson 817-200-1553 eric.simpson@nrc.gov

Participants:

NRC Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL Meeting Number Password Webinar:

https://attendee.gotowebinar. None N/A com/register/325663643729566723 Docket No: 05000206 05000361 05000362 07200041 Comments: Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:

https://www.nrc.gov/reactors/operating/ops-experience/songs-spec-insp-activities-cask-loading-misalignment.html

PUBLIC MEETING AGENDA

San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar November 08, 2018, 02:00 PM to 05:00 PM Webinar Time Topic Speaker 2:00 PM - 5:00 PM Opening Remarks and Introductions Troy Pruett Troy Pruett 2:00 PM - 5:00 PM NRC Presentation Linda Howell Eric Simpson 2:00 PM - 5:00 PM Questions and Discussions All 5:00PM Closing Remarks Troy Pruett

The time of the meeting *is local to the jurisdiction where the meeting is being held.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

ADAMS Accession Number: ML18302A351 Distribution:

RidsOeManCenter Resource RldsNmssOd Resource RldsNmssOd Resource RldsSecyMallCenter Resource RldsOcaMellCenter Resource RldsOlgMallCenter Resource RidsEdoMailCenter Resource EOO_Menagers RldsOcfoMailCenter Resource RldsOiMallCenter Resource RidsRgn1MallCenter Resource RklsRgn3MallCenter Resource RldsOpaMail Resource Kriss.Kennedy@nrc.gov Scott.Morris@nre.gov Unda.Howell@nrc.gov Janine.Katanlc@nrc.gov l!ric.Simpson@nrc.gov Lee.Brookhart@nrc.gov RMdy.Erickacn@nn:.gov Jackie.Cook@mc.gov Chris.Smi1b@nrc.gov BiltMaier@:mrc.gov MichaelVasquez@mc.gov John.Knunu@nrc.gov Victor.Dricks@nrc.gov Emeslinl'.Clay@nrc.gov Janet.Staub@nn:.gov Dan.llCtBeruuder@nrc.gov Micbael.Bloodgood@nrc.gov Michael.Laylon@nn:.gov Aicla.Rivcra-Varona@nn:.gov Polricia.Silva@nre.gov Marlonc.Davis@nre.gov Micbele.Burgess@nrc.gov Christopher.Cook@nrc.gov Angel.Morcno@nrc.gov Jcany.Wcil@nn:.go,* David.Mclntyre@nrc.gov R4DNMS_FCDB Name JFKatanic VLDricks GMVasquez WAMaier TWPruett Office DNMS ORA ACES RSLO DNMS Date 10/24/2018 10/25/2018 10/25/2018 10/25/2018 10/29/2018 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20181145 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html

PRESENTATION SLIDES DISTRIBUTED PRIOR TO THE MEETING (ADAMS Accession ML18312A118)

Attachment 2

US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX

~~ US.NRC Logistics United States Nuclear Regulatory Con:unission Protecting People and tl,e Envlronnient

  • Webinar Format
  • Back-up Bridge Line (888) 469-1677, Passcode 2471451
  • Questions and Answers 2

{:r~ US.NRC NRC Staff United States Nuclear R.egulatoty Commission.

Protecting People and tl,e Environnient

  • Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
  • Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3
  • ~:~ US.NRC Webinar Agenda United States Nuclear Regulatory Commission Protecting People and the Environ,nent
  • Background
  • Canister Downloading Operations
  • Inspection Team Findings
  • Current Status
  • Summary
  • Questions & Answers 4

I

---+-

ti)

E 0 §, 0

~ ~ .2>

C:

c *; -0 .::::;

-== u,

-

Cf) z  :::>

1- Z C C1)

C :::> C C1)

LL Cf)

-

(.~ US.NRC Transnuclear NUHOMS United States Nuclear .Regulatory C.Ommission Protecting People and the Environment 6

  • e:~US.NRC Holtec UMAX United States Nuclear Regulatory Commission
  • -- ~*----

..

Protecting People and the Environment

...__

7

r. ~ US.NR C Vertically Ventilated Module (Vault) United States Nuclear Regulatory Commission

~~---- ...........................

Protecting People and the Environnient

-,., ... -~"'**-*---- ....... ---- ...-*

8

US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Spent Fuel Canister Holtec MPC Transfer Cask 1]

9

~U S.NRC Downloading: Shield Cone United States Nuclear Regulatory Commission Protecti,ig People and the Enviro11n1ent 10

  • t*~~ US.NRC Downloading: Transporter United States Nuclear Regulatory Com.mission Protecting People and the Environment 11

C)~ US.NRC Downloading: Vault Door United States Nuclear .R..egulatory Commission Protecling People and tlie E11vlronment 12

US.NRC United States Nuclear Regulatoty Commission Protecting People and the Environment; Downloading:

Alignment 13

,~[~;eus.NRC Vuited Sta.tea Nuclear Regulatory Commission Protecting People and the Environment Downloading:

Attaching Slings 14

~*1;: eUS.NRC United Statcs:Nucleu Regulatory Commission Protecting 'People and the En.v iron,nent Downloading:

Attaching Slings 15

~'[.:eUS.NRC United States Nuclear .R cplatoty Commission.

Protecting People and the Envlronrnent Downloading Preparations 16

US.NRC What Happened on August 3rd? United States Nuclear .R egulatoi;y Commission

-- ---------~--

Protecting People and tl,e Environment



  • ~ --  ;'

-t©J* *---t©J-M1©rt&t$J-e-m-e--i$la-&J$HDt-l  ! 't' 1 l I  !  !

  • I

-f$lfi-fl*~-m~-~-$--e-ffl-~-

R!sl ro R!sl cj5i [$HO R!sl o rq51 o R!sl* o KP1* cj5i I I l I I t I I I 17

(-:~ U S.NRC What Happened on August 3rd? United Sta1e& Nuclear Regulatory Commission Protecting People and the Environ,nent

~-* , ,,

  • o.

. -

., ..

. ,,, ~'"* sw1rc - ,

T

What Happened on August 3rd?

19

~~~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Commission Protecting People and the Environ,nent 20

1

~~~ US.NRC What Happened on August 3rd? *- ---* *-------*-*--*- _______

United States Nuclear .Regulatory Commission

  • ---- ..

Protecting People and the Environment

......,, __ ,.. ....

21

-~ US.NRC Post Event Actions United States Nuclear Regulatory Commission Protecting People and the Environment

  • Spent Fuel Handling Activities Suspended
  • NRC Inspection Activities
  • San Onofre Notification to NRC
  • Causal Evaluations
  • Corrective Actions 22

~U S.NRC Spent Fuel Handling Activities Suspended United States Nuclear Regulatory Commission

-- ----------

Protecting People and the Environment

  • MPC 29 lowered into vault
  • San Onofre suspends fuel loading

- Inside Transfer Cask

- Seismically Restrained in Fuel Building 23

,~~~ US.NRC NRC Inspection Activities United States Nuclear .Regulatory CommiSttion Protecting People and the Environnrent

  • August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
  • August 7th: San Onofre commits to NRC review before resuming operations
  • August 17th: NRC decides to conduct Special Inspection
  • September 10-14: NRC Special Inspection Team onsite
  • NRC to perform inspection prior to resumption of fuel loading 24

-.~US.NRC

____ _____

NRC Inspection Activities United

,.

States.......... ---- .~* ____

Nuclear .Regulatory

___ ..,

Protecting People and the Environment Commission

    • -**------*
  • 2 Preliminary Escalated Findings

- Failure to provide redundant drop protection

- Failure to report

- Procedures

- Corrective actions

- Training

  • Management Oversight Weaknesses 25

f~~~ US.NRC Causal Evaluations United States Nuclear Regulatory Commission

,----*------- - "'--*-- -

.Protecting People and the Environment

  • San Onofre Apparent Cause Evaluation
  • Holtec Root Cause Analysis
  • Common Cause Evaluation 26

c~ US.NRC Root Causes United States Nuclear Regulatoty Commission Protecting People and tl,e Environn,ent

  • San Onofre Management failed to provide

-Adequate procedures

- Adequate training to support procedure

-Adequate oversight 27

?US.NRC Corrective Actions Uni.ted States Nuclear Regulatory Commission

,.._,,.. ,,,.~-*-*-........... _-.....-- ...

Protecting People and the Environment

  • --- - --

. ..... -*.. ....... ,,,

  • Training Requirements
  • Procedure Enhancements
  • Equipment Enhancements
  • Oversight Improvements 28

~ US.NRC Event Significance United States Nuclear :Regulatory Commission Protecting People and the Environnient

  • No Actual Drop of Canister
  • No Radiological Release
  • Load Drop Analysis (if canister fell) 29

US.NRC Next Steps United States Nuclem: ltegulatoty Commission

.P rotecting People and the Environment

  • Issue NRC Inspection Report
  • NRC Inspection of Causal Analyses
  • N RC Inspection of Corrective Actions 30

~US.NRC Summary United States Nuclear Regulatory Commission Protecting People and the Environment

  • Could have been prevented
  • Weaknesses in management oversight
  • Multiple failed barriers
  • Increased NRC oversight 31

~~,~ U S.NRC Questions United States Nuclear .Regulatory Commission Protecting People and the Environment 32

PRESENTATION SLIDES AS PRESENTED DURING MEETING (ADAMS Accession ML18318A064)

Attachment 3

,~ us.NRc United States Nuclear Regulatoi:y Commission Protecting People and t.he Bn.,ironment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX

~-~ us.NRc Logistics United States Nuclear RegulatoQ' Com.mission Protecting People and the E1zvironment

  • Webinar Format
  • Back-up Bridge Line (888) 469-1677, Passcode 2471451
  • Questions and Answers 2

-,~us.NRC NRC Staff United States Nuclear Regulatory Commission


*------*------*

Protecting People and the Environment

  • Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
  • Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3

XU S.NRC Webinar Agenda United States Nuclear Regulatory Commission

-~.~~.- - *-.. - - -----*-A*-*U-*-------~---~--

Protecting People and the En.vironment

  • Background
  • Canister Downloading Operations
  • Inspection Team Findings
  • Current Status
  • Summary
  • Questions & Answers 4

'**-"?US.NRC ISFSI Layout United States Nuclear Regulatory Commission

  • ---- ---~ --------- *-* ~- ---- *- *-*----

Protecting People and the Environment

..

Design r-, ._n_r1f-i L \\i,. ......~r. .]]:

k~\\_f. . .

pr-::~i;i:.i-...

.

__,,. ~. =---- ~ -

_r

  • 1 ._ : "'k t-tl .~ --*: \\i ~- _

Holtec UMAX If r'II I

Design

-,-

I I

-

-i-~a----r- I 1 f*--- t 5

-'~US.NRC Transnuclear NUHOMS United States Nuclear Regulatory Com.mission

  • -*----

Protecting People and the Environment 6

<~ US.NRC Holtec UMAX United States Nuclear Regulatory Commission Protetting People and the Environment 7

/:::}:,e US.NRC Vertically Ventilated Module (Vault) United States Nuclear Regulatory Commission Protecting People and the Environment 8

~ US.NRC United States Nuclear Regulatory Commission Protecting People and the En.vironment Spent Fuel Canister Holtec MPC Transfer Cask 9

-~ r:e US.NR C Downloading: Shield Cone United States Nuclear Regulatory Commission


Protecting People and the Environment 10

t~~ US.NRC Downloading: Transporter Uniwd States Nuclear Regulatory C-ommission Protecting 'People and the EnFironment 11

':~-~ US.NRC Downloading: Vault Door United States Nuclear Regulatory Commission

- ----- -~ ~

- --~- *-- ----

Protecting People and the Environment 12

US.NRC United States Nuclear Regulatory Com.mission.

Protecting People and the Environment Down loading:

Alignment 13

'-.~ US.NRC United States Nuclear Regulatory Commission


--*-----**---------

Protecting People and the Environment Downloading:

Attaching Slings 14

c~ US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Downloading:

Attaching Slings 15

  • ~ ~ US.NRC United States :Nuclear B.cgulatory Commission

-- - --- --*

Protecting .P eople and the Environment Downloading Preparations 16

+-'

en

J C)
,

<(

C 0

I

-c Cl)

I C

Cl) c..

c..

ro I

(~~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Conu:nis:sion Protecting People and the Environment

, * - t' * ~~.,c , ', J '" ~ ... SVtlTCt, LF, ~ U< T cc1*s,\10 RIGHT UFj eoav c,,:.) eo::*.*s soo1,,r 011L Y ii ~ .

What Happened on August 3rd?

19

rus.NRc __ ____ _____ ______

What Happened on August 3rd? ...........----

United States

. . . ....... _,Nuclear

..

Protecting People and the Environment Regulatory

, ___

.,.. Com.mission

. ... ...

20

c--~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Commission Protecting People and the EnPironni.e nt 21

z~~ US.NRC Post Event Actions United States Nuclear Regulatory Commission

-*---,- ----.- ~-----~ ------- -----*

Protecting 'People and the Environnient

  • Spent Fuel Handling Activities Suspended
  • NRC Inspection Activities
  • San Onofre Notification to NRC
  • Causal Evaluations
  • Corrective Actions 22

._ z uS.NRC Spent Fuel Handling Activities Suspended United States Nuclear Regulatory Commission

--- --- -*---*-

  • Protecting People and the Environment
  • MPC 29 lowered into vault
  • San Onofre suspends fuel loading

- Inside Transfer Cask

- Seismically Restrained in Fuel Building 23

US.NRC NRC Inspection Activities United States Nuclear Regulatory Commission Protecting l'eople and the Environment

  • August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
  • August 7th: San Onofre commits to NRC review before resuming operations
  • August 17th: NRC decides to conduct Special Inspection
  • September 10-14: NRC Special Inspection Team onsite
  • NRC to perform inspection prior to resumption of fuel loading 24

~~ US.NRC NRC Inspection Activities United States Nu.clear Regulatory Commission

---*- -**~-----------*6___________ . ,.__,...

Protecting People and the EnPironment

  • 2 Preliminary Escalated Findings

- Failure to provide redundant drop protection

- Failure to report

- Procedures

- Corrective actions

- Training

  • Management Oversight Weaknesses j 25

e:~~ US.NRC Causal Evaluations United States Nuclear Regulatory Commission Protecting °People and the Environnrent

  • San Onofre Apparent Cause Evaluation
  • Holtec Root Cause Analysis
  • Comm,on Cause Evaluation 26

c~ US.NRC Root Causes United States Nuclear Regulatory Commission Protecting People and the Environnaent

  • San Onofre Management failed to provide

- Adequate procedures

- Adequate training to support procedure

- Adequate oversight 27

C~>~ US.NRC Corrective Actions United States Nuclear Regulatory Commission

-*---*----,-----,-.....-.... -~ --

...

Protecting People and the En.1*ironnient

  • Training Requirements
  • Procedure Enhancements
  • Equipment Enhancements
  • Oversight Improvements 28

US.NRC Event Significance United States Nuclear :Regulatory Commission Protecting People and the Environment

  • No Actual Drop of Canister
  • No Radiological Release
  • Load Drop Analysis (if canister fell) 29

c~ US.NRC Next Steps 'United States Nuclear Regulatory Commission

--- . -----. *--*----- *- *- -

Protecting People and the Environment

  • Issue NRC Inspection Report
  • NRC Inspection of Causal Analyses
  • NRC Inspection of Corrective Actions 30

~~ US.NRC Summary United States Nuclear Regulatory Conu:nissj.on Protecting People and the Environnient

  • Could have been prevented
  • Weaknesses in management oversight
  • Multiple failed barriers
  • Increased NRC oversight 31

i US.NRC Questions United States Nuclear Regulatory Commission Protecting People and the Environment 32

,~~ US.NRC Shims United States Nuclear Regulatory Commission Protecting People and the Environment 33

US.NRC Shims United States Nuclear Regulatory Commission Protecting People and the Environnaent Orig.inal Desian: Machined Slots Design Change: Standoffs Pins 34

<-"~ U S.NRC Radiation Levels on the ISFSI Pad United States Nuclear Regulatory Com.mission Protecting People and the Environment Survey Results found by the NRC:

N Lids: 0.015 - 0.018 mR/hr 6 Outlet Vents: 0.12 - 0.24 mR/hr Closure Lid ~ OUTLET AIR VENT INLET AIR 7 VENT 3

Canister #29 levels in Gamma Lid: 0.015 mR/hr TS limit on Lid = 0.4 mR/hr Outlet Vent: 0.12 mR/hr TS limit on Outlet Vent = 1.8 mR/hr 35

~~ US.NRC Aging Management Plan United States Nuclear Regulatory Com.mission Protecting People and the Environnrent

  • Tracks Degradation of Structures, Systems, and Components

- Concrete

- Steel

- Stainless Steel

- No breaches of the canisters have been identified

- No chloride induced stress corrosion cracking has been identified

-~ US.NRC Canister Drop analysis United States Nuclear Regulatory Commission Protecting People and the Environment

  • San Onofre provided preliminary analysis
  • Analysis under NRC review
  • San Onofre preliminary results: no loss of containment 37

~:~ US.NRC Unresolved Item United States Nuclear Regulatory Com.mission


---*-- --*--

Protecting People and the Environnaent

  • Last NRC Inspection report (2017-001) documented an Unresolved Item
  • Licensee has modified loading operations to address NRC concern 38
  • /~ * --us.NRC Seismic and Flooding United States Nuclear Regulatory Commission

--- --------*- ---*--

Protecting People and the Environni.e nt

  • Both ISFSI systems at San Onofre are evaluated for:

,,

- Design Base Earthquake

- Maximum flood height and flood velocity (Tsunami) 39