ML083330173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:PVNGS 2008 License Examination Post-examination Assessment Written Examination Question Assessment 50% or more of the candidates answered these questions incorrectly.
{{#Wiki_filter:PVNGS 2008 License Examination Post-examination Assessment Written Examination Question Assessment 50% or more of the candidates answered these questions incorrectly.
Question #
Question #       Success Rate                         Description SRO Q-5             33%         Question asked which at EOP should be entered for the given conditions. Answer key and worksheet listed A (Reactor Trip) as the correct answer, after review it has been determined that B (LOAF) should be the correct answer.
Success Rate Description SRO Q-5 33% Question asked which at EOP should be entered for the given conditions. Answer key and worksheet listed "A" (Reactor Trip) as the correct answer, after review it has been determined that "B" (LOAF) should be the correct answer.  
Modified the question, worksheet and answer key to reflect this change.
This change has been submitted in the Post Exam submittal.
SRO Q-7            44%        Question asked for 2 preferred methods of contamination control during a SGTR/LOOP event. All candidates who missed the question chose distracter B which included increasing the cooldown rate to 100 degrees per hour. The SGTR procedure limits the CD rate to 30 degrees during a LOOP due to ensure asymmetric cooldown.
The question is valid as written.
SRO Q-13            44%        Question asked what signal would stop the SG overfill event and which EOP should be entered.
All picked correct signal MSIS but some chose Reactor Trip vs. Excessive Steam Demand. The excessive cooldown required ESD to be entered.
The question is valid as written.
SRO Q-21            33%        Question asked Operability status of ECCS (HPSI pumps) with the A DG OOS and a subsequent loss of the B HPSI pump room essential cooler.
The correct answer on the worksheets and answer key was both HPSI pumps Inoperable. All those who missed chose distracter C which stated that A HPSI was operable if the PBA-S03 was powered by offsite power, this can be considered correct since TS allows a 4 hour period before A HPSI must be declared Inoperable. A & C are both considered correct answers.
This change has been submitted in the Post Exam submittal.
1


Modified the question, worksheet and answer key
PVNGS 2008 License Examination Post-examination Assessment RO Q-34               32%         Question asked for the response of the Reactor Drain Tank as saturation conditions are reached in the Pressurizer when forming a bubble. The correct answer was smaller pressure increases accompanied by larger level increases, most examinees picked distracter D greater pressure increase accompanied by smaller level increases.
 
In review the question should have been worded more clearly.
to reflect this change.
The question is valid as written.
This change has been submitted in the Post
All examination questions missed by any candidate have been reviewed and there are no other issues identified with any other questions.
 
Written Exam Results SROs           SRO     RO     Combined Reactor Operators Sensitive Kharrl         76       90       86       Sensitive Information Huck                         86 Information Smith           80       95       91       Gallegos                     85 Martinez       92       93       92       Schingeck                   91 Piepiora       76       85       82       Bury                         83 Clark           84       93       90       Trejo                       97 Liston         76       86       83       Ploegman                     90 Whitson         84       90       88       Hopkins                     94 Schank         72       93       87       Rosenbaum                   86 Fouse           72       89       84       Ratliff                     86 Kura                         98 2}}
Exam submittal.
SRO Q-7 44% Question asked for 2 preferred methods of contamination control during a SGTR/LOOP event. All candidates who missed the question chose distracter "B" which included increasing the
 
cooldown rate to 100 degr ees per hour. The SGTR procedure limits the CD rate to 30 degrees during a LOOP due to ensure asymmetric cooldown. The question is valid as written.
SRO Q-13 44% Question asked what signal would stop the SG overfill event and which EOP should be entered.
All picked correct signal MSIS but some chose Reactor Trip vs. Excessive Steam Demand. The
 
excessive cooldown required ESD to be entered. The question is valid as written.
SRO Q-21 33% Question asked Operability status of ECCS (HPSI pumps) with the "A" DG OOS and a subsequent
 
loss of the "B" HPSI pump room essential cooler. The correct answer on the worksheets and answer
 
key was both HPSI pumps Inoperable. All those who missed chose distracter "C" which stated that "A" HPSI was operable if the PBA-S03 was
 
powered by offsite power, this can be considered
 
correct since TS allows a 4 hour period before A HPSI must be declared Inoperable. "A & C" are
 
both considered correct answers.
This change has been submitted in the Post
 
Exam submittal.
1 PVNGS 2008 License Examination Post-examination Assessment RO Q-34 32% Question asked for the response of the Reactor Drain Tank as saturation conditions are reached in the Pressurizer when forming a bubble. The correct answer was smaller pressure increases accompanied by larger level increases, most examinees picked distracter "D" greater pressure increase accompanied by smaller level increases.  
 
In review the question s hould have been worded more clearly. The question is valid as written.
All examination questions missed by any candida te have been reviewed and there are no  
 
other issues identified with any other questions.
Written Exam Results SROs SRO RO CombinedReactor Operators Kharrl 76 90 86 Huck 86 Smith 80 95 91 Gallegos 85 Martinez 92 93 92 Schingeck 91 Piepiora 76 85 82 Bury 83 Clark 84 93 90 Trejo 97 Liston 76 86 83 Ploegman 90 Whitson 84 90 88 Hopkins 94 Schank 72 93 87 Rosenbaum 86 Fouse 72 89 84 Ratliff 86     Kura 98     2}}

Latest revision as of 10:51, 14 November 2019

PV-2008-11-Post-Examination Comments and Analysis
ML083330173
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/21/2008
From: Bement R
Arizona Public Service Co
To: Collins E
Region 4 Administrator
References
102-05931-RSB/FJB
Download: ML083330173 (22)


Text

PVNGS 2008 License Examination Post-examination Assessment Written Examination Question Assessment 50% or more of the candidates answered these questions incorrectly.

Question # Success Rate Description SRO Q-5 33% Question asked which at EOP should be entered for the given conditions. Answer key and worksheet listed A (Reactor Trip) as the correct answer, after review it has been determined that B (LOAF) should be the correct answer.

Modified the question, worksheet and answer key to reflect this change.

This change has been submitted in the Post Exam submittal.

SRO Q-7 44% Question asked for 2 preferred methods of contamination control during a SGTR/LOOP event. All candidates who missed the question chose distracter B which included increasing the cooldown rate to 100 degrees per hour. The SGTR procedure limits the CD rate to 30 degrees during a LOOP due to ensure asymmetric cooldown.

The question is valid as written.

SRO Q-13 44% Question asked what signal would stop the SG overfill event and which EOP should be entered.

All picked correct signal MSIS but some chose Reactor Trip vs. Excessive Steam Demand. The excessive cooldown required ESD to be entered.

The question is valid as written.

SRO Q-21 33% Question asked Operability status of ECCS (HPSI pumps) with the A DG OOS and a subsequent loss of the B HPSI pump room essential cooler.

The correct answer on the worksheets and answer key was both HPSI pumps Inoperable. All those who missed chose distracter C which stated that A HPSI was operable if the PBA-S03 was powered by offsite power, this can be considered correct since TS allows a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> period before A HPSI must be declared Inoperable. A & C are both considered correct answers.

This change has been submitted in the Post Exam submittal.

1

PVNGS 2008 License Examination Post-examination Assessment RO Q-34 32% Question asked for the response of the Reactor Drain Tank as saturation conditions are reached in the Pressurizer when forming a bubble. The correct answer was smaller pressure increases accompanied by larger level increases, most examinees picked distracter D greater pressure increase accompanied by smaller level increases.

In review the question should have been worded more clearly.

The question is valid as written.

All examination questions missed by any candidate have been reviewed and there are no other issues identified with any other questions.

Written Exam Results SROs SRO RO Combined Reactor Operators Sensitive Kharrl 76 90 86 Sensitive Information Huck 86 Information Smith 80 95 91 Gallegos 85 Martinez 92 93 92 Schingeck 91 Piepiora 76 85 82 Bury 83 Clark 84 93 90 Trejo 97 Liston 76 86 83 Ploegman 90 Whitson 84 90 88 Hopkins 94 Schank 72 93 87 Rosenbaum 86 Fouse 72 89 84 Ratliff 86 Kura 98 2