{{#Wiki_filter:SOUTHERN CALIFORNIA A. Edward Scherer Director Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company August 27, 2009 U. S. Nuclear Regulatory.Commission ATTN: Document Control Desk Washington, D.C. 20555  
{{#Wiki_filter:~I          SOUTHERN CALIFORNIA SOUTHERN CALIfORNIA                                                                A. Edward Scherer A. Edward   Scherer s:          EDISON                                                                            Director Nuclear Nuclear Regulatory Regulatory Affairs An EDISON INTERNATIONAL Company August 27,27, 2009 U.
U. S. Nuclear Nuclear Regulatory        ,Commission Regulatory.Commission Document ATTN: Document           Control Desk Washington, D.C. 20555 Washington,


==Subject:==
==Subject:==
Docket Nos. 50-361 and 50-362 Design Report for Structural Weld Overlays on Reactor Coolant System Hot Leg Dissimilar Metal Welds San Onofre Nuclear Generating Station, Units 2 and 3  
50-361 and 50-362 Docket Nos. 50-361             50-362 Report for Structural Design Report                               Overlays on Structural Weld Overlays Reactor Coolant System Hot Leg Dissimilar Metal Welds Reactor                                                        Welds San Onofre               Generating Station, Units 2 and 3 Nuclear Generating Onofre Nuclear


==References:==
==References:==
: 1) Letter from A. E. Scherer (SCE) to the U. S. Nuclear Regulatory Commission dated November 12, 2008;  
: 1) Letter from A. E. Scherer
 
==References:==
Scherer (SCE) to the U. U. S. Nuclear Nuclear Regulatory Commission dated November November      12, 2008; 200B; 


==Subject:==
==Subject:==
Docket Nos.50-361 and 50-362, Revision to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Units 2 and 3 (ADAMS Accession No. ML083220131)
Docket Docket Nos.
: 2) Letter from M. T. Markley (NRC) to R. T. Ridenoure (SCE), dated January 23, 2009,  
Revision to Third Ten-Year 50-361 and 50-362, Revision                             Inservice Ten-Year Inservice Inspection   (ISI) Interval Inspection (lSI)                                      ISI-3-28, Use of Interval Requests ISI-3-27 and ISI-3-2B, Overlay and Associated Structural Weld Overlay                                     Repair Associated Alternative Repair Techniques, San Onofre Techniques,          Onofre Nuclear     Generating Station, Units 2 Nuclear Generating ML083220131) and 33 (ADAMS Accession No. MLOB3220131)
: 2) Letter Letter from M.M. T. Markley     (NRC) to R. T. Ridenoure Markley (NRC)              Ridenoure (SCE), dated January 23, 2009,  


==Subject:==
==Subject:==
San Onofre Nuclear Generating Station, Units 2 and 3 -RE: Relief Requests ISI-3-27, Revision 1 and ISI-3-28, Revision 1, for the Application of Weld Overlay on Dissimilar and Similar Metal Welds (TAC Nos. ME0108 and ME0109)


==Dear Sir or Madam:==
January                                        Nuclear Generating
The Design Report for the Structural Weld Overlays for the San Onofre Units 2 and 3 Reactor Coolant System (RCS) Hot Leg Dissimilar Metal Welds is provided as an enclosure to this letter.
Southern California Edison (SCE) committed to provide this report by letter dated November 12, 2008 (Reference 1).Reference 1 requested a Revision to previously approved Third Ten-Year Inservice Inspection (ISI) Interval Relief Requests ISI-3-27 and ISI-3-28.
These relief requests supported implementation of Structural Weld Overlays on the Dissimilar Metal Welds in the San Onofre Units 2 and 3 RCS Hot Leg. During implementation of these weld overlays in the Unit 3 Cycle 15 Refueling outage, SCE discovered that the Unit 3 Hot Leg Surge Line included additional Code-allowed Weld buildup that had not been previously identified.
To resolve this, the design of the associated weld overlay was modified to increase the length of the overlay, thereby including an additional weld. The purpose of Revision 1 to ISI-3-27 and ISI-3-28 was to include this additional weld in the scope of the Relief Requests.P.O. Box 128 C 2 .San Clemente, CA 92674SOUTHERN CALIfORNIA s: EDISON A. Edward Scherer Director Nuclear Regulatory Affairs An EDISON INTERNATIONAL Company August 27, 2009 U. S. Nuclear Regulatory ,Commission ATTN: Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Docket Nos. 50-361 and 50-362 Design Report for Structural Weld Overlays on Reactor Coolant System Hot Leg Dissimilar Metal Welds San Onofre Nuclear Generating Station, Units 2 and 3
San Onofre Nuclear        Generating Station, Units 2 and 3 - RE: Relief Requests ISI-3-27, Revision 1 ISI-3-28, Revision 1, and ISI-3-2B,              1, for the Application of Weld Overlay Overlay on Dissimilar and Similar Metal Welds (TAC Nos. ME010B Dissimilar                                            ME0108 and ME0109)
ME0109)


==References:==
==Dear Sir or Madam:==
: 1) Letter from A. E. Scherer (SCE) to the U. S. Nuclear Regulatory Commission dated November 12, 200B;


==Subject:==
The Design Report for the Structural Weld Overlays for the San Onofre          Onofre Units 2 and 3 Reactor Coolant System  System (RCS) Hot Leg Dissimilar Metal Welds is provided as an enclosure to this letter. Southern California enclosure                                                                committed to provide this California Edison (SCE) committed                        this report by letter letter dated November November 12, 200B 2008 (Reference (Reference 1).
Docket Nos. 50-361 and 50-362, Revision to Third Ten-Year Inservice Inspection (lSI) Interval Requests ISI-3-27 and ISI-3-2B, Use of Structural Weld Overlay and Associated Alternative Repair Techniques, San Onofre Nuclear Generating Station, Units 2 and 3 (ADAMS Accession No. MLOB3220131)
Reference 1 requested Reference                                      previously approved requested a Revision to previously                          Ten-Year Inservice approved Third Ten-Year       Inservice (ISI) Interval Relief Requests Inspection (lSI)
: 2) Letter from M. T. Markley (NRC) to R. T. Ridenoure (SCE), dated January 23, 2009,  
Inspection                                          ISI-3-27 Requests ISI-3-27     and ISI-3-28.
ISI-3-2B. These    relief  requests supported                              Structural Weld Overlays on the Dissimilar Metal Welds in implementation of Structural supported implementation                                                                                    in the San Onofre Onofre    Units 2 and 3  RCS  Hot  Leg. During  implementation implementation    of  these    weld overlays overlays in the Unit 3 Cycle 15 Refueling                            discovered that the Unit 3 Hot Refueling outage, SCE discovered                            Hot Leg Surge Line includedincluded additional    Code-allowed Weld buildup that had not been additional Code-allowed associated weld overlay identified. To resolve this, the design of the associated previously identified.                                                                   overlay waswas including an additional weld. The length of the overlay, thereby including increase the length modified to increase                                                                                      The purpose of Revision 1 to ISI-3-27 and ISI-3-2B  ISI-3-28 was to include          additional weld in the include this additional                the scope scope of the Relief Requests.
P.O. Box 128 C    2                                                                                            .
Clemente, CA 92674 San Clemente,     92674


==Subject:==
Document Control Desk Document                                                          August 27, 27, 2009 Due to the emergent emergent nature of the overlay design modification, a complete complete revision to the weld overlay design design analysis was not available at the time of submittal of Reference 1. In Reference        In support      Reference 1, the ASME support of Reference          ASME Section Section III and Fatigue Crack Growth calculations were        reviewed were reviewed and compared compared against the geometry geometry of the modified weld overlay. It  It was conservatively conservatively concluded concluded that the previous analysis would remain valid for the modified modified geometry, and the modified weld overlay configuration configuration would be be acceptable acceptable for a minimum of one cycle.
San Onofre Nuclear Generating Station, Units 2 and 3 -RE: Relief Requests ISI-3-27, Revision 1 and ISI-3-2B, Revision 1, for the Application of Weld Overlay on Dissimilar and Similar Metal Welds (TAC Nos. ME010B and ME0109)
The final analysis analysis has now been completed and the summary summary is included included in the the enclosed Design Report. Table 5-1 of this report shows the actual actual limiting crack growth results for each of the nozzles repaired.
Revision Revision 1 to ISI-3-27 ISI-3-27 and ISI-3-28 ISI-3-28 was approved approved by the U.
U. S. Nuclear Regulatory Commission          Reference 2 (ADAMS Accession Commission by Reference                      Accession No. ML083640375)
ML083640375) for the duration of the third ten-year ten-year ISI lSI interval.
There are no new commitments commitments or required actions resulting from this letter.
If you have any questions If                  questions regarding this information, please feel free to contact Ms.
Linda T. Conklin at (949) 368-9443.
Sincerely, Enclosure Enclosure cc:      E. E. Collins, Regional Administrator, NRC Region IV    IV R. Hall, NRC NRC Project Manager, San OnofreOnofre Units 2 and 3 G. G. Warnick, NRC Senior ResidentResident Inspector, San Onofre Onofre Units 2 and 3


==Dear Sir or Madam:==
Enclosure Design Report for Structural Structural Weld Overlays Overlays San Onofre Nuclear Generating Generating Station Station Units 2 and 3 Reactor Reactor Coolant System System Hot Leg Dissimilar Metal Welds}}
The Design Report for the Structural Weld Overlays for the San Onofre Units 2 and 3 Reactor Coolant System (RCS) Hot Leg Dissimilar Metal Welds is provided as an enclosure to this letter. Southern California Edison (SCE) committed to provide this report by letter dated November 12, 200B (Reference 1). Reference 1 requested a Revision to previously approved Third Ten-Year Inservice Inspection (lSI) Interval Relief Requests ISI-3-27 and ISI-3-2B.
These relief requests supported implementation of Structural Weld Overlays on the Dissimilar Metal Welds in the San Onofre Units 2 and 3 RCS Hot Leg. During implementation of these weld overlays in the Unit 3 Cycle 15 Refueling outage, SCE discovered that the Unit 3 Hot Leg Surge Line included additional Code-allowed Weld buildup that had not been previously identified.
To resolve this, the design of the associated weld overlay was modified to increase the length of the overlay, thereby including an additional weld. The purpose of Revision 1 to ISI-3-27 and ISI-3-2B was to include this additional weld in the scope of the Relief Requests.
P.O. Box 128 San Clemente, CA 92674 Document Control Desk August 27, 2009 Due to the emergent nature of the overlay design modification, a complete revision to the weld overlay design analysis was not available at the time of submittal of Reference 1. In support of Reference 1, the ASME Section III and Fatigue Crack Growth calculations were reviewed and compared against the geometry of the modified weld overlay. It was conservatively concluded that the previous analysis would remain valid for the modified geometry, and the modified weld overlay configuration would be acceptable for a minimum of one cycle.The final analysis has now been completed and the summary is included in the enclosed Design Report. Table 5-1 of this report shows the actual limiting crack growth results for each of the nozzles repaired.Revision 1 to ISI-3-27 and ISI-3-28 was approved by the U. S. Nuclear Regulatory Commission by Reference 2 (ADAMS Accession No. ML083640375) for the duration of the third ten-year ISI interval.There are no new commitments or required actions resulting from this letter.If you have any questions regarding this information, please feel free to contact Ms.Linda T. Conklin at (949) 368-9443.Sincerely, Enclosure cc: E. E. Collins, Regional Administrator, NRC Region IVR. Hall, NRC Project Manager, San Onofre Units 2 and 3G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 Document Control Desk August 27, 2009 Due to the emergent nature of the overlay design modification, a complete revision to the weld overlay design analysis was not available at the time of submittal of Reference
: 1. In support of Reference 1, the ASME Section III and Fatigue Crack Growth calculations were reviewed and compared against the geometry of the modified weld overlay. It was conservatively concluded that the previous analysis would remain valid for the modified geometry, and the modified weld overlay configuration would be acceptable for a minimum of one cycle. The final analysis has now been completed and the summary is included in the enclosed Design Report. Table 5-1 of this report shows the actual limiting crack growth results for each of the nozzles repaired.
Revision 1 to ISI-3-27 and ISI-3-28 was approved by the U. S. Nuclear Regulatory Commission by Reference 2 (ADAMS Accession No. ML083640375) for the duration of the third ten-year lSI interval.
There are no new commitments or required actions resulting from this letter. If you have any questions regarding this information, please feel free to contact Ms. Linda T. Conklin at (949) 368-9443.
Enclosure cc: E. E. Collins, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3 Enclosure Design Report forStructural Weld Overlays San Onofre Nuclear Generating Station Units 2 and 3 Reactor Coolant System Hot Leg Dissimilar Metal Welds Enclosure Design Report for Structural Weld Overlays San Onofre Nuclear Generating Station Units 2 and 3 Reactor Coolant System Hot Leg Dissimilar Metal Welds}}

Latest revision as of 02:43, 14 November 2019

Transmittal of Design Report for Structural Weld Overlays on Reactor Coolant System Hot Leg Dissimilar Metal Welds
ML092440189
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/27/2009
From: Scherer A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML092440189 (3)


Text

~I SOUTHERN CALIFORNIA SOUTHERN CALIfORNIA A. Edward Scherer A. Edward Scherer s: EDISON Director Nuclear Nuclear Regulatory Regulatory Affairs An EDISON INTERNATIONAL Company August 27,27, 2009 U.

U. S. Nuclear Nuclear Regulatory ,Commission Regulatory.Commission Document ATTN: Document Control Desk Washington, D.C. 20555 Washington,

Subject:

50-361 and 50-362 Docket Nos. 50-361 50-362 Report for Structural Design Report Overlays on Structural Weld Overlays Reactor Coolant System Hot Leg Dissimilar Metal Welds Reactor Welds San Onofre Generating Station, Units 2 and 3 Nuclear Generating Onofre Nuclear

References:

1) Letter from A. E. Scherer

References:

Scherer (SCE) to the U. U. S. Nuclear Nuclear Regulatory Commission dated November November 12, 2008; 200B;

Subject:

Docket Docket Nos.

Revision to Third Ten-Year 50-361 and 50-362, Revision Inservice Ten-Year Inservice Inspection (ISI) Interval Inspection (lSI) ISI-3-28, Use of Interval Requests ISI-3-27 and ISI-3-2B, Overlay and Associated Structural Weld Overlay Repair Associated Alternative Repair Techniques, San Onofre Techniques, Onofre Nuclear Generating Station, Units 2 Nuclear Generating ML083220131) and 33 (ADAMS Accession No. MLOB3220131)

2) Letter Letter from M.M. T. Markley (NRC) to R. T. Ridenoure Markley (NRC) Ridenoure (SCE), dated January 23, 2009,

Subject:

January Nuclear Generating

Subject:

San Onofre Nuclear Generating Station, Units 2 and 3 - RE: Relief Requests ISI-3-27, Revision 1 ISI-3-28, Revision 1, and ISI-3-2B, 1, for the Application of Weld Overlay Overlay on Dissimilar and Similar Metal Welds (TAC Nos. ME010B Dissimilar ME0108 and ME0109)

ME0109)

Dear Sir or Madam:

The Design Report for the Structural Weld Overlays for the San Onofre Onofre Units 2 and 3 Reactor Coolant System System (RCS) Hot Leg Dissimilar Metal Welds is provided as an enclosure to this letter. Southern California enclosure committed to provide this California Edison (SCE) committed this report by letter letter dated November November 12, 200B 2008 (Reference (Reference 1).

Reference 1 requested Reference previously approved requested a Revision to previously Ten-Year Inservice approved Third Ten-Year Inservice (ISI) Interval Relief Requests Inspection (lSI)

Inspection ISI-3-27 Requests ISI-3-27 and ISI-3-28.

ISI-3-2B. These relief requests supported Structural Weld Overlays on the Dissimilar Metal Welds in implementation of Structural supported implementation in the San Onofre Onofre Units 2 and 3 RCS Hot Leg. During implementation implementation of these weld overlays overlays in the Unit 3 Cycle 15 Refueling discovered that the Unit 3 Hot Refueling outage, SCE discovered Hot Leg Surge Line includedincluded additional Code-allowed Weld buildup that had not been additional Code-allowed associated weld overlay identified. To resolve this, the design of the associated previously identified. overlay waswas including an additional weld. The length of the overlay, thereby including increase the length modified to increase The purpose of Revision 1 to ISI-3-27 and ISI-3-2B ISI-3-28 was to include additional weld in the include this additional the scope scope of the Relief Requests.

P.O. Box 128 C 2 .

Clemente, CA 92674 San Clemente, 92674

Document Control Desk Document August 27, 27, 2009 Due to the emergent emergent nature of the overlay design modification, a complete complete revision to the weld overlay design design analysis was not available at the time of submittal of Reference 1. In Reference In support Reference 1, the ASME support of Reference ASME Section Section III and Fatigue Crack Growth calculations were reviewed were reviewed and compared compared against the geometry geometry of the modified weld overlay. It It was conservatively conservatively concluded concluded that the previous analysis would remain valid for the modified modified geometry, and the modified weld overlay configuration configuration would be be acceptable acceptable for a minimum of one cycle.

The final analysis analysis has now been completed and the summary summary is included included in the the enclosed Design Report. Table 5-1 of this report shows the actual actual limiting crack growth results for each of the nozzles repaired.

Revision Revision 1 to ISI-3-27 ISI-3-27 and ISI-3-28 ISI-3-28 was approved approved by the U.

U. S. Nuclear Regulatory Commission Reference 2 (ADAMS Accession Commission by Reference Accession No. ML083640375)

ML083640375) for the duration of the third ten-year ten-year ISI lSI interval.

There are no new commitments commitments or required actions resulting from this letter.

If you have any questions If questions regarding this information, please feel free to contact Ms.

Linda T. Conklin at (949) 368-9443.

Sincerely, Enclosure Enclosure cc: E. E. Collins, Regional Administrator, NRC Region IV IV R. Hall, NRC NRC Project Manager, San OnofreOnofre Units 2 and 3 G. G. Warnick, NRC Senior ResidentResident Inspector, San Onofre Onofre Units 2 and 3

Enclosure Design Report for Structural Structural Weld Overlays Overlays San Onofre Nuclear Generating Generating Station Station Units 2 and 3 Reactor Reactor Coolant System System Hot Leg Dissimilar Metal Welds