ML110070530: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES N UCLEAR REGU LATORY COMMISSION | {{#Wiki_filter:UNITED STATES | ||
REGION I 475 ALLENDALE | N UCLEAR REGU LATORY COMMISSION | ||
REGION I | |||
Ianuary 6, 20IL EA-10-175 EA-10-227 Mr. David A. Heacock President | 475 ALLENDALE ROAD | ||
and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.Glen Allen, VA 23060-6711 | KlNG OF PRUSSlA. PA 19406-141s | ||
SUBJECT: MILLSTONE | Ianuary 6, 20IL | ||
POWER STATION RESPONSE TO NRC INSPECTION | EA-10-175 | ||
EA-10-227 | |||
1 008 AN D 05000 4231201 001 1 Dear Mr. Heacock: Thank you for your letters of December 6, 2010, (ML103410252 | Mr. David A. Heacock | ||
and ML103490464) | President and Chief Nuclear Officer | ||
Dominion Resources | |||
transmitted | 5000 Dominion Blvd. | ||
in our November 4 and November 5,2010, letters (M10103090613 | Glen Allen, VA 23060-6711 | ||
and M1103090062). | SUBJECT: MILLSTONE POWER STATION RESPONSE TO NRC INSPECTION REPORTS | ||
We will review the implementation | 05000336/20 1 008 AN D 05000 4231201 001 1 | ||
of your corrective | Dear Mr. Heacock: | ||
actions during a future inspection | Thank you for your letters of December 6, 2010, (ML103410252 and ML103490464) that | ||
to determine | provided your response to two notices of violation transmitted in our November 4 and | ||
that full compliance | November 5,2010, letters (M10103090613 and M1103090062). We will review the | ||
has been achieved and will be maintained. | implementation of your corrective actions during a future inspection to determine that full | ||
ln accordance | compliance has been achieved and will be maintained. | ||
with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available | ln accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the | ||
electronically | NRC's "Rules of Practice," a copy of this letter will be available electronically for public | ||
for public inspections | inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) | ||
in the NRC Public Document Room or from the Publicly Available | component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC | ||
Records (PARS)component | Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). | ||
of the NRC's document system (ADAMS). ADAMS is accessible | Sincerely, | ||
from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic | fuL | ||
Reading Room).Sincerely, fuL John F. Rogge, Chief Engineering | John F. Rogge, Chief | ||
Branch 3 Division of Reactor Safety cc: Distribution | Engineering Branch 3 | ||
via ListServ | Division of Reactor Safety | ||
EA-10-175 EA-10-227 Mr. David A. Heacock President | cc: Distribution via ListServ | ||
and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.Glen Allen, VA 23060-6711 | |||
SUBJECT: MILLSTONE | EA-10-175 | ||
POWER STATION RESPONSE TO NRC INSPECTION | EA-10-227 | ||
Mr. David A. Heacock | |||
1 008 AN D 05000 4231 201 001 1 Dear Mr. Heacock: Thank you for your letters of Decemb er 6, 2010, (ML1 03410252 and M1103490464) | President and Chief Nuclear Officer | ||
Dominion Resources | |||
transmitted | 5000 Dominion Blvd. | ||
in our November 4 and November 5,2010, letters (ML0103090613 | Glen Allen, VA 23060-6711 | ||
and M1103090062). | SUBJECT: MILLSTONE POWER STATION RESPONSE TO NRC INSPECTION REPORTS | ||
We will review the implementation | 05000336/20 1 008 AN D 05000 4231 201 001 1 | ||
of your corrective | Dear Mr. Heacock: | ||
actions during a future inspection | Thank you for your letters of Decemb er 6, 2010, (ML1 03410252 and M1103490464) that | ||
to determine | provided your response to two notices of violation transmitted in our November 4 and | ||
that full compliance | November 5,2010, letters (ML0103090613 and M1103090062). We will review the | ||
has been achieved and will be maintained. | implementation of your corrective actions during a future inspection to determine that full | ||
In accordance | compliance has been achieved and will be maintained. | ||
with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available | In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the | ||
electronically | NRC's "Rules of Practice," a copy of this letter will be available electronically for public | ||
for public inspections | inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) | ||
in the NRC Public Document Room or from the Publicly Available | component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC | ||
Records (PARS)component | Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). | ||
of the NRC's document system (ADAMS). ADAMS is accessible | Sincerely, | ||
from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic | /RA/ | ||
Reading Room).Sincerely,/RA/John F. Rogge, Chief Engineering | John F. Rogge, Chief | ||
Branch 3 Division of Reactor Safety cc: Distribution | Engineering Branch 3 | ||
via ListServ Distribution: | Division of Reactor Safety | ||
D. Roberts, DRS (RIDRSMAIL | cc: Distribution via ListServ | ||
S. Shaffer, DRP, SRI RESOURCE) | Distribution: | ||
J. KraftY, DRP, Rl P. Wilson, DRS (RIDRSMAlL | D. Roberts, DRS (RIDRSMAIL S. Shaffer, DRP, SRI | ||
RESOURCE) | RESOURCE) J. KraftY, DRP, Rl | ||
B. Haagensen, Rl J. Clifford, DRP A. DeFrancisco, ORA G. Dentel, DRP D. Holody, ORA D. Jackson, DRP G. Gulla, OE SUNSI Review Gomplete:jff- (Reviewer's | P. Wilson, DRS (RIDRSMAlL RESOURCE) B. Haagensen, Rl | ||
lnitials)Doc Name: o:\DRS\ENGINEERING | J. Clifford, DRP A. DeFrancisco, ORA | ||
BRANCH 3\SCHOLL\MILLSTONE | G. Dentel, DRP D. Holody, ORA | ||
D. Jackson, DRP G. Gulla, OE | |||
M1110070s30 | SUNSI Review Gomplete:jff- (Reviewer's lnitials) | ||
After declaring | Doc Name: o:\DRS\ENGINEERING BRANCH 3\SCHOLL\MILLSTONE NOV | ||
this document 'An Official Agency Record" it will be released to the Public.To receive a copiof this document, indicate in the box: "C"= Copy witrout attachmenVenclosure "E"=CoPy with attachmenVenclosure, "N"=No copy SFFICE RVDRS RI/DRS RI/ORA NAME LScholl/LLS* | A.KN.*LEDGEMENT'D..^ M1110070s30 | ||
JRoqqe /JFR*DHolodv/AED" FOR DATE 0110612011 | After declaring this document 'An Official Agency Record" it will be released to the Public. | ||
01106t2011 | To receive a copiof this document, indicate in the box: "C"= Copy witrout attachmenVenclosure "E"=CoPy with attachmenVenclosure, "N"=No copy | ||
SFFICE RVDRS RI/DRS RI/ORA | |||
NAME LScholl/LLS* JRoqqe /JFR* DHolodv/AED" FOR | |||
DATE 0110612011 01106t2011 01106111 | |||
OFFICIAL RECORD COPY | |||
}} | }} |
Latest revision as of 05:40, 13 November 2019
ML110070530 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 01/06/2011 |
From: | Rogge J Engineering Region 1 Branch 3 |
To: | Heacock D Dominion Resources |
References | |
EA-10-175, EA-10-227, FOIA/PA-2011-0115 IR-10-008, IR-10-011 | |
Download: ML110070530 (2) | |
See also: IR 05000336/2010008
Text
UNITED STATES
N UCLEAR REGU LATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KlNG OF PRUSSlA. PA 19406-141s
Ianuary 6, 20IL
EA-10-227
Mr. David A. Heacock
President and Chief Nuclear Officer
Dominion Resources
5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT: MILLSTONE POWER STATION RESPONSE TO NRC INSPECTION REPORTS
05000336/20 1 008 AN D 05000 4231201 001 1
Dear Mr. Heacock:
Thank you for your letters of December 6, 2010, (ML103410252 and ML103490464) that
provided your response to two notices of violation transmitted in our November 4 and
November 5,2010, letters (M10103090613 and M1103090062). We will review the
implementation of your corrective actions during a future inspection to determine that full
compliance has been achieved and will be maintained.
ln accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the
NRC's "Rules of Practice," a copy of this letter will be available electronically for public
inspections in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC
Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
fuL
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
cc: Distribution via ListServ
EA-10-227
Mr. David A. Heacock
President and Chief Nuclear Officer
Dominion Resources
5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT: MILLSTONE POWER STATION RESPONSE TO NRC INSPECTION REPORTS
05000336/20 1 008 AN D 05000 4231 201 001 1
Dear Mr. Heacock:
Thank you for your letters of Decemb er 6, 2010, (ML1 03410252 and M1103490464) that
provided your response to two notices of violation transmitted in our November 4 and
November 5,2010, letters (ML0103090613 and M1103090062). We will review the
implementation of your corrective actions during a future inspection to determine that full
compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the
NRC's "Rules of Practice," a copy of this letter will be available electronically for public
inspections in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC
Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
cc: Distribution via ListServ
Distribution:
D. Roberts, DRS (RIDRSMAIL S. Shaffer, DRP, SRI
RESOURCE) J. KraftY, DRP, Rl
P. Wilson, DRS (RIDRSMAlL RESOURCE) B. Haagensen, Rl
J. Clifford, DRP A. DeFrancisco, ORA
G. Dentel, DRP D. Holody, ORA
SUNSI Review Gomplete:jff- (Reviewer's lnitials)
Doc Name: o:\DRS\ENGINEERING BRANCH 3\SCHOLL\MILLSTONE NOV
A.KN.*LEDGEMENT'D..^ M1110070s30
After declaring this document 'An Official Agency Record" it will be released to the Public.
To receive a copiof this document, indicate in the box: "C"= Copy witrout attachmenVenclosure "E"=CoPy with attachmenVenclosure, "N"=No copy
SFFICE RVDRS RI/DRS RI/ORA
NAME LScholl/LLS* JRoqqe /JFR* DHolodv/AED" FOR
DATE 0110612011 01106t2011 01106111
OFFICIAL RECORD COPY