{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
                              NUCLEAR REGULATORY COMMISSION
  August 7, 2014  
                                                REGION IV
                                          1600 E. LAMAR BLVD.
                                        ARLINGTON, TX 76011-4511
Mr. Mark E. Reddemann  
                                            August 7, 2014
Chief Executive Officer  
Mr. Mark E. Reddemann
Energy Northwest  
Chief Executive Officer
P. O. Box 968 (Mail Drop 1023)  
Energy Northwest
P. O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:        COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF
                CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT
                MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR
                INFORMATION
Dear Mr. Reddemann:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
modifications at your Columbia Generating Station from September 22-26, 2014, and
October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRCs
Region IV office for two weeks. The inspection will be conducted in accordance with NRC
Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and
Permanent Plant Modifications.
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for information. Please note that the
information is requested to be provided by September 15, 2014. Upon review of this
information, the inspectors will select additional information for review upon arrival onsite. It is
important that all of this information is up-to-date and complete in order to minimize the amount
of additional information requested during the preparation and/or the onsite portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Richard Garcia of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at
Jonathan.Braisted@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.


Richland, WA 99352-0968
M. Reddemann                                    -2-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Thomas R. Farnholtz, Chief
                                                  Engineering Branch 1
                                                  Division of Reactor Safety
Docket No.: 50-397
License No.: NPF-21
Enclosure:
Evaluations of Changes, Tests,
  and Experiments and Permanent Plant
Modifications Inspection Request for Information
Electronic Distribution to Columbia Generating Station


SUBJECT: COLUMBIA GENERATING STATION
                                      Request for Information
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT
  Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR
                                              Inspection
INFORMATION
                                  Columbia Generating Station
Dear Mr. Reddemann:
Inspection Report:              05000397/20140045
Inspection Dates:              September 22-26, 2014, and October 5-10, 2014
The purpose of this letter is to notify you that
Inspection Procedure:          IP 71111.17T, Evaluations of Changes, Tests, and Experiments
U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant
                                and Permanent Plant Modifications
modifications at your Columbia Generating Station from September 22-26, 2014, and October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and  
Lead Inspector:                Jonathan Braisted, Reactor Inspector
Permanent Plant Modifications.
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request
that you categorize the documents in your response with the numbered list below. The
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the onsite inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
    2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last
        triennial modification inspection that did not result in an evaluation.
    3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial
        modification inspection that did not result in an application for license amendment.
    4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial modification inspection.
    5. Procedure(s) for implementing permanent plant modifications.
    6. A list with descriptions of all permanent plant modifications since the last triennial
        modification inspection.
    7. A list with descriptions of all corrective action documents related to permanent plant
        modifications since the last triennial modification inspection.
    8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
    9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
                                                                                          Enclosure


    10. Current revisions of the Technical Specifications and Bases and the Updated Final
Experience has shown that this
        Safety Analysis Report.
inspection is resource intens
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
ive for both the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for information. Please note that the
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
information is requested to be provided by S
Note: For this inspection, permanent plant modifications include permanent plant changes,
eptember 15, 2014.  Upon review of this information, the inspectors will select additional information for review upon arrival onsite.  It is
design changes, set point changes, procedure changes, equivalency evaluations, suitability
important that all of this information is up-to-date and complete in order to minimize the amount of additional information requested during the preparation and/or the onsite portions of the inspection.  
analyses, calculations, and commercial grade dedications
Inspector Contact Information:
We have discussed the schedule for these inspection activities with your staff and understand
Jonathan Braisted                     Mahdi Hayes                    Nnaerika Okonkwo
that our regulatory contact for this inspection will be Richard Garcia of your licensing
Reactor Inspector                    Operations Engineer            Reactor Inspector
organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at Jonathan.Braisted@nrc.gov.
817-200-1194                         817-200-1508                  817-200-1114
Jonathan.Braisted@nrc.gov             Mahdi.Hayes@nrc.gov            Nnaerika.Okonkwo@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Jonathan Braisted
1600 East Lamar Blvd.
Arlington, TX 76011-4125
                                              -2-


This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Offi
ce of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number. 
M. Reddemann - 2 - 
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at 
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
Sincerely, 
/RA/
Thomas R. Farnholtz, Chief Engineering Branch 1


Division of Reactor Safety
  ML14219A751
   
  SUNSI Review      ADAMS:             Sensitive                Non-Publicly Available        Keyword
Docket No.: 50-397 License No.: NPF-21
  By: JDB             Yes No         Non-Sensitive             Publicly Available             NRC-002
OFFICE       RI:DRS/EB1         C:/DRP/PBD                                               C:DRS/EB1
Enclosure: 
NAME         JBraisted/tek     BHagar                                                   TFarnholtz
Evaluations of Changes, Tests, 
SIGNATURE /RA/                 /RA/                                                     /RA/
and Experiments and Permanent Plant 
DATE         8/6/14             8/6/14                                                   8/7/14
Modifications Inspection Request for Information
                                   
Electronic Distribution to Columbia Generating Station
Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014
 
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF
CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS
INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION
 
DISTRIBUTION:
  Enclosure
Regional Administrator (Marc.Dapas@nrc.gov)
Request for Information
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
Acting DRP Director (Troy.Pruett@nrc.gov)
Inspection Columbia Generating Station
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
 
DRS Director (Anton.Vegel@nrc.gov)
Inspection Report:  05000397/20140045
DRS Deputy Director (Jeff.Clark@nrc.gov)
 
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Inspection Dates:  September 22-26, 2014, and October 5-10, 2014
Resident Inspector (Dan.Bradley@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov)
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"
Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)
Lead Inspector:  Jonathan Braisted, Reactor Inspector
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
 
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Information Requested for the In-Office Preparation Week
Public Affairs Officer (Victor.Dricks@nrc.gov)
 
Public Affairs Officer (Lara.Uselding@nrc.gov)
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by September 15, 2014, to the attention of Jonathan Braisted.  We request
Project Manager (Andrea.George@nrc.gov)
that you categorize the documents in your response with the numbered list below.  The
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks.  We ask that the specific
RITS Coordinator (Marisa.Herrera@nrc.gov)
items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as possible.
ACES (R4Enforcement.Resource@nrc.gov)
 
Regional Counsel (Karla.Fuller@nrc.gov)
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
Technical Support Assistant (Loretta.Williams@nrc.gov)
2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation. 
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment. 
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 
5. Procedure(s) for implementing permanent plant modifications.
6. A list with descriptions of all permanent plant modifications since the last triennial modification inspection. 
7. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection. 
8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
 
  - 2 -  10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.
Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
 
Note:  For this inspection, permanent plant modifications include permanent plant changes,
design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications
Inspector Contact Information:
Jonathan Braisted  Mahdi Hayes    Nnaerika Okonkwo
Reactor Inspector  Operations Engineer  Reactor Inspector
817-200-1194    817-200-1508  817-200-1114
Jonathan.Braisted@nrc.gov  Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov
 
Mailing Address:
 
   
U.S. NRC, Region IV
Attn: Jonathan Braisted 1600 East Lamar Blvd. Arlington, TX  76011-4125
 
 
 
  ML14219A751
SUNSI Review By: JDB ADAMS:    Yes     No Sensitive    Non-Sensitive Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE RI:DRS/EB1 C:/DRP/PBD   C:DRS/EB1 NAME JBraisted/tek BHagar   TFarnholtz SIGNATURE /RA/ /RA/   /RA/ DATE 8/6/14 8/6/14   8/7/14
    Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014  
SUBJECT: COLUMBIA GENERATING STATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS  
INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION  
 
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Michael.Hay@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Jeremy.Groom@nrc.gov)  
Resident Inspector (Dan.Bradley@nrc.gov)  
Administrative Assistant (Douglas.Bodine@nrc.gov)  
 
Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)  
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Andrea.George@nrc.gov)  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
}}
}}

Latest revision as of 01:40, 4 November 2019

Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information
ML14219A751
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Reddemann M
Energy Northwest
References
IR-14-005
Download: ML14219A751 (6)


See also: IR 05000397/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

August 7, 2014

Mr. Mark E. Reddemann

Chief Executive Officer

Energy Northwest

P. O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF

CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT

MODIFICATIONS INSPECTION (05000397/2014005) AND REQUEST FOR

INFORMATION

Dear Mr. Reddemann:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Columbia Generating Station from September 22-26, 2014, and

October 5-10, 2014. The inspection will consist of three reactor inspectors from the NRCs

Region IV office for two weeks. The inspection will be conducted in accordance with NRC

Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and

Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for information. Please note that the

information is requested to be provided by September 15, 2014. Upon review of this

information, the inspectors will select additional information for review upon arrival onsite. It is

important that all of this information is up-to-date and complete in order to minimize the amount

of additional information requested during the preparation and/or the onsite portions of the

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Richard Garcia of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194, or by e-mail at

Jonathan.Braisted@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

M. Reddemann -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-397

License No.: NPF-21

Enclosure:

Evaluations of Changes, Tests,

and Experiments and Permanent Plant

Modifications Inspection Request for Information

Electronic Distribution to Columbia Generating Station

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection

Columbia Generating Station

Inspection Report: 05000397/20140045

Inspection Dates: September 22-26, 2014, and October 5-10, 2014

Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications

Lead Inspector: Jonathan Braisted, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by September 15, 2014, to the attention of Jonathan Braisted. We request

that you categorize the documents in your response with the numbered list below. The

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 50.59 screenings (or equivalent) performed since the last

triennial modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial

modification inspection that did not result in an application for license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial modification inspection.

5. Procedure(s) for implementing permanent plant modifications.

6. A list with descriptions of all permanent plant modifications since the last triennial

modification inspection.

7. A list with descriptions of all corrective action documents related to permanent plant

modifications since the last triennial modification inspection.

8. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

9. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

Enclosure

10. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations, suitability

analyses, calculations, and commercial grade dedications

Inspector Contact Information:

Jonathan Braisted Mahdi Hayes Nnaerika Okonkwo

Reactor Inspector Operations Engineer Reactor Inspector

817-200-1194 817-200-1508 817-200-1114

Jonathan.Braisted@nrc.gov Mahdi.Hayes@nrc.gov Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Jonathan Braisted

1600 East Lamar Blvd.

Arlington, TX 76011-4125

-2-

ML14219A751

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: JDB Yes No Non-Sensitive Publicly Available NRC-002

OFFICE RI:DRS/EB1 C:/DRP/PBD C:DRS/EB1

NAME JBraisted/tek BHagar TFarnholtz

SIGNATURE /RA/ /RA/ /RA/

DATE 8/6/14 8/6/14 8/7/14

Letter to Mark Reddemann from Thomas Farnholtz, dated August 7, 2014

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF EVALUATIONS OF

CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS

INSPECTION (05000397/2014005) AND REQUEST FOR INFORMATION

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Administrative Assistant (Douglas.Bodine@nrc.gov)

Acting Branch Chief, DRP/D (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)