ML14247A248: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facility:  
{{#Wiki_filter:ES-301                                           Operating Test Quality Checklist                                     Form ES-301-3 Facility: &.JV"-                                                     Date of Examination:   "/t/~'1'Operating Tesfffu~~t:(b:¥~
&.JV"-Date of Examination:
0                                                                                                               Initials
Operating 0 Initials 1. General Criteria a b* c# a. The operating test conforms with the previously approved outline; changes are consistent with 5/1P J7c-sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: 1. General Criteria a     b*       c#
: b. There is no day-to-day repetition between this and other operating tests to be administered Jt-£\AW during this examination.
: a.           The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).
: c. The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) 1111' d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. rl:NJ Q1-e. It appears that the operating test will differentiate between competent and less-than-competent tfl:HJ 6t--applicants at the designated license level. 2. Walk-Through Criteria ------a. Each JPM includes the following, as applicable:
5/1P J7c-        ~~
* initial conditions . initiating cues
: b.           There is no day-to-day repetition between this and other operating tests to be administered during this examination.
* references and tools, including associated procedures t1fl
                                                                                                                        ~ Jt- £\AW
* reasonable and validated time limits (average time allowed for completion) and specific It-(MtJ designation if deemed to be time-critical by the facility licensee
: c.           The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.)     1111'   ~ ~~
* operationally important specific performance criteria that include: -detailed expected actions with exact criteria and nomenclature  
: d.           Overlap with the written examination and between different parts of the operating test is within acceptable limits.
-system response and other examiner cues -statements describing important observations to be made by the applicant  
rl:NJ Q1-       ~
-criteria for successful completion of the task -identification of critical steps and their associated performance standards  
: e.           It appears that the operating test will differentiate between competent and less-than-competent           tfl:HJ 6t--     ~w applicants at the designated license level.
-restrictions on the sequence of steps, if applicable
: 2. Walk-Through Criteria                                                 --     --       --
: b. Ensure that any changes from the previously approved systems and administrative walk-through  
: a.           Each JPM includes the following, as applicable:
'# outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.
              .
: 3. Simulator Criteria ------The associated simulator operating tests (scenario sets) have been reviewed in accordance with 124' Form ES-301-4 and a copy is attached.  
* initial conditions initiating cues
"" Printed Date a. Author VE"f"C2.Sc.N  
* references and tools, including associated procedures
'I/J7//Y J b. Facility Reviewer(*)
* reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee t1fl It-        (MtJ
S/Z(I'.N
* operationally important specific performance criteria that include:
: c. NRC Chief B<amloe' (#) lli.c"i4 j) M / J.'J)J;r..
                    - detailed expected actions with exact criteria and nomenclature
If* . , SJ d. NRC Supervisor  
                    - system response and other examiner cues
'/nt/{I)F/
                    -     statements describing important observations to be made by the applicant
ft. >r5/1Y J /, y v NOTE:
                    -     criteria for successful completion of the task
* The facility signature is not applicable for NRC-developed tests. # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.}}
                    -     identification of critical steps and their associated performance standards
                    -     restrictions on the sequence of steps, if applicable
: b.           Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified
                                                                                                                        '#      ~
                                                                                                                                        ~\,;)
on those forms and Form ES-201-2.
: 3. Simulator Criteria                                               --     --       --
The associated simulator operating tests (scenario sets) have been reviewed in accordance with 124'             ~~
Form ES-301-4 and a copy is attached.
Printed Nam~~ature              ~
                                                                                                                                ""
Date
: a. Author                         ~/3cfJqf VE"f"C2.Sc.N j[K".r&#xa3;;-~ ~...------ 'I/J7//Y                           J
: b. Facility Reviewer(*)             S/Z(I'.N   LE--*AJ/~                                                      r~Jr
: c. NRC Chief B<amloe' (#)          ~I) lli.c"i4 ~!,:fAy</~' j) M / J.'J)J;r.. ~;;;
: d. NRC Supervisor If*            .
                                        '/nt/{I)F/ ft. ~>r5/1Y   .~/:::..
                                                              /, y
                                                                                  ,
v
                                                                                      -~                        SJ J ~/.
NOTE:
* The facility signature is not applicable for NRC-developed tests.
              # Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.}}

Revision as of 01:44, 4 November 2019

2014 Byron Nuclear Station Initial License Examination Form ES-301-3
ML14247A248
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/13/2014
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14140A562 List:
References
Download: ML14247A248 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: &.JV"- Date of Examination: "/t/~'1'Operating Tesfffu~~t:(b:¥~

0 Initials

1. General Criteria a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g., 10 CFR 55.45, operational importance, safety function distribution).

5/1P J7c- ~~

b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.

~ Jt- £\AW

c. The operating test shall not duplicate items from the applicants' audit test(s). (see Section D.1.a.) 1111' ~ ~~
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.

rl:NJ Q1- ~

e. It appears that the operating test will differentiate between competent and less-than-competent tfl:HJ 6t-- ~w applicants at the designated license level.
2. Walk-Through Criteria -- -- --
a. Each JPM includes the following, as applicable:

.

  • initial conditions initiating cues
  • references and tools, including associated procedures
  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee t1fl It- (MtJ
  • operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified

'# ~

~\,;)

on those forms and Form ES-201-2.

3. Simulator Criteria -- -- --

The associated simulator operating tests (scenario sets) have been reviewed in accordance with 124' ~~

Form ES-301-4 and a copy is attached.

Printed Nam~~ature ~

""

Date

a. Author ~/3cfJqf VE"f"C2.Sc.N j[K".r£;-~ ~...------ 'I/J7//Y J
b. Facility Reviewer(*) S/Z(I'.N LE--*AJ/~ r~Jr
c. NRC Chief B<amloe' (#) ~I) lli.c"i4 ~!,:fAy</~' j) M / J.'J)J;r.. ~;;;
d. NRC Supervisor If* .

'/nt/{I)F/ ft. ~>r5/1Y .~/:::..

/, y

,

v

-~ SJ J ~/.

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.