MONTHYEARML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1162021-10-28028 October 2021 ES-301-3 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A3322021-10-28028 October 2021 Written Exam ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1352021-10-28028 October 2021 ES-401-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A2752021-10-28028 October 2021 ES-301-5 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21356B7322021-10-28028 October 2021 ES-201-1 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1262021-10-28028 October 2021 ES-301-6 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1732021-10-28028 October 2021 Proposed Sim JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A2452021-10-28028 October 2021 ES-301-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A3252021-10-28028 October 2021 Scenarios ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A2732021-10-28028 October 2021 ES-201-2 2023-08-09
[Table view] |
Text
ES-401 Written Examination Quality Checklist Date of Exam: ~/o/.to~xam Level: Rq0 SAO 0 Initial Item Description a b* c#
- 1. Questions and answers are technically accurate and applicab le to the facility. ~fit> he- ~
- 2. a. NRC K!As are referenced for all questions. fl~) ~
3.
- b. Facility learning objectives are referenced as available.
SAO questions are appropriate in accordance with Section D.2.d of ES-401 t-1/k *}Jij.l. I"\ A
- 4. The sampling process was random and systematic (If more than 4 RO or 2 SAO questions ~\{W were repeated from the last 2 NRC licensing exams, consult the NRR OL program office) .
- 5. Question duplication from the license screening/audit exam was controlled as indicated below (ch eck the item t~1at applies) and appears appropriate:
--~he audit exam was systematically and randomly developed; or
. ~* - the audit exam was completed before the license exam was started; or
___ the examinations were developed independently; or
..... the licensee certifies that there is no duplication; or
__ other (explain)
- 6. Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SAO-only question distribution(s) at right.
- 7. Between 50 and 60 percent of the questions on the RO Memory C/A exam are written at the comprehension/ analysis level; the SAO exam may exceed 60 percent if the randomly selected K!As support the higher cognitive levels; enter L(D 1 JJ;~
the actual RO I SAO question distribution(s) at right.
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
- 9. Question content conforms with specific KIA statem ents in the previously approved tJL*
I 11t) examination outline and is appropriate for tile tier to which they are assigned; ,. ;fit- (ZUW deviations are justified.
~~,,
- 10. Question psychometric quality and format meet the guidelines in ES Appendix B. f-t.- R\i.W 1 1. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.
tl<tf ~ ~\lW
, . ~rinted Name I Si~~~e /2 .
- a. Author 1:ofk{l.f f: PtTf~.f<>tv /'}':t./ fr;£~?'..-----
- b. Facility Review<lr (*) -;~,:! t.L~//.AJ 4i~~ --
c.
d.
NRC Chiei Examiner (#)
NRC Regional Supervisor
~1;:~~~~~~
Note:
- The facility reviewer's initial[;;i:n~~~~~re ~pplicable f~r NRC-develop~
not examinations.
- __lndef~:,'ndent NRC revi ,~wer initial items!:: Column "c"; chiHf exa miner concurrence required. = = = = = = = =-=-
ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: ~'11'~ Date of Exam:&ftft<>!.o/Exam Level: RoD SR0 [2g_
../
Initial Item Description a b. c~
- 1. Questions and answers are technically accurate and aQJJiicable to the facili~. ~ A<-
- 2. a.
b.
NRC KJAs are referenced for all questions.
Facility learning objectives are referenced as available. ~ ¥
- 3. SAO questions are appropriate in accordance with Section D.2.d of ES-401 ~ qt.-
- 4. The sampling process was random and systematic (If more than 4 RO or 2 SAO questions were repeated from the last 2 NRC licensing exams, consult the NRR OL_Qrogram office).
- 5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:
~t(e audit exam was systematically and randomly developed; or
_ the audit exam was completed before the license exam was started; or
_ the examinations were developed independently; or
~ 4l
_ the licensee certifies that there is no duplication; or
_ other (explain)
- 6. Bank use meets limits (no more than 75 percent Bank Modified New 1'1 1§61; 1l~ 11--
from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SAO-only II 1 7'f~ () ! CJ question distribution(s) a t right.
- 7. Between 50 and 60 percent of the questions on the RO Memory C/A
~1JP exam are written at the comprehension/ analysis level; the SAO exam may exceed 60 percent if the randomly qt.
selected KJAs support the higher cognitive levels; enter /I l~t/% It/ 1_56~
the actual RO I SAO question distribution(s) at right.
- 8. References/handouts provided do not give away answers or aid in the elimination of distractors.
tifiJ J1..
- 9. Question content conforms with specific KJA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; ~1P #'--
deviations are justified.
- 10. Question psychom etric quality and format meet the guidelines in ES Appendix B. 'efP ;j'-
11 . The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.
~t 4t..
- a. Author tZ P?; Name I Signature
\>ta-r r. ~as<>& /;?~
-,{ $..
~---
Date
~}!)1'/
- b. Facility Reviewer (*) ~ L~~ /~Z ,.rl A 'f(IJ/t1
- c. NRC Chief Examiner(#) ff4-JtV\D vn 1<6~ \J~1:b0I !D,, Ji.J{_,,~A ~ .f /1<r/f/t
)fu~. f".;, r~krrb'\ \X,#~~ ~
- d. NRC Regional Supervisor L~ V" ~
- f Note:
- The facility reviewer's initials/signature are not applicable for NRC-developed examinations.
- Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.