ML14248A514

From kanterella
Jump to navigation Jump to search
2014 Byron Nuclear Station Initial License Examination Proposed In-Plant JPMs
ML14248A514
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/13/2014
From: Walton R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14140A562 List:
References
Download: ML14248A514 (26)


Text

Exelon Nuclear Job Performance Measure Local Reset of FW Isolation Signal (_BFR-H.1)

JPM Number: IPi (N-43)

Revision Number: 5 Date: 9/22/2009 Revised By: Lynn Sanders 9/22/09 Instructor Date Validated By: Jeremy Blumenthal 4/8/2014 Operations Dept. Date Approved By: Brian Lewin 4/8/2014 Operations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure _BFR-H.1 Rev: 203 Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Lynn Sanders (Signature on file) 9/25/09 SME / Instructor Date Brian Clark(Signature on file) 9/25/09 SME / Instructor Date Robert Peterson 4/9/2014 SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Revision Record (Summary)

Revision 5 Applied new template TQ-JA-150-02 Rev.1 Verified/ updated KAs and TPOs to current revision Changed Non Licensed Operator to Equipment Operator Updated procedure references with no change to JPM required. Revalidated by Lynn Sanders and Gary Wolfe on 9/17/10.

Validated 9/19/11 by Lynn Sanders and Mike McCue.

Updated procedure references with no change to JPM required. Revalidated on 4/9/2014 by Robert Peterson SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. You are an extra NSO.
2. A steamline break inside containment is occurring.
3. A safety injection has occurred.
4. _BFR-H.1, Response to Loss of Secondary Heat Sink, is in progress at Step 7.e.

INITIATING CUE The Unit Supervisor directs you to pull Feedwater Isolation Auxiliary Relay fuses per Step 7.e RNO of _BFR-H.1.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps: 3 & 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer to _BFR-H.1, Response to ° OPEN _BFR-H.1 to Step Loss of Secondary Heat Sink. 7.e RNO CUE: Provide the trainee a copy of

_BFR-H.1.

EVALUATOR NOTE Candidate must obtain keys from WEC to open the cabinets. If candidate does not state they are getting the keys, ask the following question:

Question: Where will you obtain keys for the cabinets?

Answer: From the key cabinet in the WEC.

2. Go to AEER ° LOCATE the Auxiliary Electrical Equipment Room Note: 451 elevation, Auxiliary Building CAUTION The next two steps are to be simulated only. After the candidate locates the cabinet, show photos and ask the candidate to use the photos to point out their next actions.
  • 3. Pull Feedwater Isolation Aux. ° LOCATE _PA27J Relays fuses at _PA27J REMOVE:

Cue: Fuse 24 is removed

  • Fuse FU-24 Cue: Fuse 27 is removed
  • Fuse FU-27
  • 4. Pull Feedwater Isolation Aux. ° LOCATE _PA28J Relays fuses at _PA28J REMOVE:

Cue: Fuse 24 is removed

  • Fuse FU-24 Cue: Fuse 27 is removed
  • Fuse FU-27 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Comment ELEMENT STANDARD SAT UNSAT Number NOTE If the trainee elects to contact the MCR to verify FW ISOL ACTD relay lights NOT LIT, then provide the following:

Cue: The Unit Supervisor reports that the FW ISOL ACTD relay lights are NOT LIT.

Cue: This JPM is completed RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Reset of FW Isolation Signal (_BFR-H.1)

JPM Number: N043 Revision Number: 5 Task Number and

Title:

R-EF-003 RESET the Engineered Safety Features.

K/A Number and Importance: 059A4.11 3.1/3.3 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

_BFR-H.1, Response to Loss of Secondary Heat Sink (Rev. 203)

CRITICAL STEPS (*) 3 & 4 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS

1. You are an extra NSO.
2. A steamline break inside containment is occurring.
3. A safety injection has occurred.
4. _BFR-H.1, Response to Loss of Secondary Heat Sink, is in progress at Step 7.e.

INITIATING CUE The Unit Supervisor directs you to pull Feedwater Isolation Auxiliary Relay fuses per Step 7.e RNO of _BFR-H.1.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Local Load of EDG JPM Number: IPj (AP21)

Revision Number: 05 Date: 4/25/2014 Revised By: Robert Peterson 3/25/2014 Instructor Date Validated By: Jeremy Blumenthal 4/8/2014 Operations Dept. Date Approved By: Brian Lewin 4/8/2014 Operations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 10

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOA ELEC-3 Rev: 107 Procedure 1BOA ELEC-5 Rev: 106 Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

Robert Peterson 4/25/2014 SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 10

Revision Record (Summary)

1. Revision 00-03 previous revisions prior to new TQ procedure.
2. Revision 04 added notes, cautions, and updated for new TQ procedure.
3. Revision 05 Revised to a loss of offsite power and restoring power from 1A DG.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 10

INITIAL CONDITIONS

1. Unit 1 lost offsite power to Bus 141.
2. 1A DG started but ACB 1413 failed to automatically close.
3. The crosstie from Bus 241 is unavailable.
4. Bus 141 is required to be energized for a vital load.
5. The crew has implemented 1BOA ELEC-3, Loss of 4KV ESF Bus, and is currently at Attachment B, step 2.

INITIATING CUES

1. The Unit Supervisor has directed you to energize Bus 141 from the 1A DG, using 1BOA ELEC-3.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps: 14, 15 & 17 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 10

RECORD START TIME:

Comment SAT UNSAT Number ELEMENT STANDARD 1 Refer to 1BOA ELEC-3, Locate and open 1BOA ELEC- ___ ___ ___

Attachment B, step 2. 3.

CUE: Provide 1BOA ELEC-3, Attachment B.

2 Obtain Keys from Center Desk. Obtain U1 Pri-5 keys and B- ___ ___ ___

core masters from Center Desk.

CUE: You have the necessary keys.

3 Check DG 1A shutdown. Check RUNNING IDLE light ___ ___ ___

NOT LIT.

CUE: RUNNING IDLE light is LIT and you can hear the DG running.

CUE: There is an EO standing by in the 1A DG room with a radio.

4 Check lockout relays for ACBs. Lockout relays for ACBs 1412, ___ ___ ___

1413 and 1414 are NOT CUE: Lockout relays for Tripped.

ACBs 1412, 1413 and 1414 are NOT Tripped.

5 Check DG voltage. DG voltage is greater than 4000 ___ ___ ___

volts.

CUE: EO reports 1A DG voltage indicates 4150 volts on meter.

6 Request Unit 1 to verify position ACB 1413 control switch is in ___ ___ ___

of ACB 1413 control switch. After Trip.

CUE: NSO reports ACB 1413 control switch is in After Trip.

7 Check if Bus 141 is energized. RUNNING LOADED light is LIT. ___ ___ ___

CUE: EO reports the RUNNING LOADED light is NOT LIT.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 10

Comment SAT UNSAT Number ELEMENT STANDARD 8 Locally verify all breakers on All breakers are OPEN on Bus ___ ___ ___

Bus 141 are open. 141.

CUE: ALL breakers OPEN lights are LIT on Bus 141.

EVALUATOR NOTE:

Candidate may open the door to the spare breaker cubicle, but may NOT break the plane of the doorway.

DO NOT ALLOW THE CANDIDATE TO OPEN THE DOOR TO ACB 1412 or 1413.

EVALUATOR NOTE:

Candidate must identify proper High Voltage clothing to wear and describe where to get it:

If Candidate does not state they will don HVS gear, ask the following questions:

Question: What clothing will you wear for your next actions?

Answer: Oberon suit, flash hood, rubber gloves with leather gauntlets.

Question: Where will you obtain it?

Answer: They are kept in the 451 Operating Task Coordinators Room (aka The War Room) on the north side of the WEC.

9 Remove Close Circuit fuse for Std: Fuse FU-25 in Bus 141 ___ ___ ___

ACB 1412. Cubicle 16 is removed.

CUE: Open the door to the Candidate will point out the fuse spare cubicle and point out block in the upper right side of the location of fuse. the cubicle.

Close door to spare cubicle.

10 Refer to 1BOA ELEC-5, Locate and open 1BOA ELEC- ___ ___ ___

Attachment A. 5.

CUE: Provide 1BOA ELEC-5, Attachment A.

11 Check breaker racked in. Breaker is racked in. ___ ___ ___

CUE: Do not open ACB 1413 door. Breaker is all the way back in the cubicle.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 10

Comment SAT UNSAT Number ELEMENT STANDARD 12 Check relay targets NOT UP. Points out that relay targets are ___ ___ ___

NOT dropped on the relays on CUE: No relay target flag is ACB 1413 dropped.

13 Check Trip and Close circuit The Trip and Close fuse boxes ___ ___ ___

fuse boxes installed. are installed.

CUE: Trip and Close Fuse boxes are installed, EVALUATOR NOTE:

Alternate Path begins at this step.

IF spare breaker is in the room behind the switchgear, lift the FME cover and have candidate point out components on breaker. Replace FME cover after use.

IF spare breaker is NOT in the room, use provided photos.

  • 14 Check if closing springs are Operator points out that the ___ ___ ___

charged. spring charging indicator shows the closing spring is NOT BKR CUE: Indicator is as you charged.

see it. (Discharged)

PHOTO CUE: SHOW Photo that shows the closing spring is NOT CHARGED.

EVALUATOR NOTE:

The charging lever and the OPEN and CLOSE reach rods are in a locker on 426 outside the switchgear rooms. If candidate did not point them out on the way in, and does not state where they are, ask:

Question: Where are the charging lever and reach rod?

Answer: in a locker outside the switchgear room.

  • 15 Locally charge closing springs Operator uses the manual ___ ___ ___

with the charging lever. charging lever and points out CUE: Closing spring is the slot next to the spring charging indicator where the CHARGED.

lever is inserted and pumped until the indicator shows the closing spring is charged.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 10

Comment SAT UNSAT Number ELEMENT STANDARD 16 Verify C/S is in After Trip. Operator contacts the Unit NSO ___ ___ ___

and requests the C/S for ACB CUE: Unit 1 NSO reports ACB 1413 to be in After Trip.

1413 MCR C/S is in After Trip.

EVALUATOR NOTE:

If the candidate does not point out the CLOSE coil on the spare breaker or photo, ask:

Question: Where will you connect the reach rod?

Answer: Under the CLOSE coil on the breaker.

  • 17 Locally close the breaker with Operator uses the proper reach ___ ___ ___

the CLOSE Reach Rod. rod (labeled CLOSE) on the proper coil (labeled CLOSE) to BKR CUE: Metal arrow is pointing to CLOSED. close the breaker, and verifies the breaker position pin PHOTO CUE: SHOW Photo indicates breaker is CLOSED.

and state the arrow is pointing to CLOSED.

18 Contact the Unit 1 NSO and Operator contacts the unit to tell ___ ___ ___

inform him that ACB 1413 is them ACB 1413 IS CLOSED.

CLOSED.

CUE: Unit 1 NSO acknowledges ACB 1413 is closed.

CUE: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 10

JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO STA SRO Cert JPM

Title:

Local Load of EDG JPM Number: IPj (AP21) Revision Number: 05 Task Number and

Title:

AP-010 Locally operate a 4KV or 6.9KV breaker manually K/A Number and Importance: 062A2.11 Imp Factor: 3.7/4.1 Suggested Testing Environment: In-Plant or EM Lab Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No

References:

1BOA ELEC-3 Rev 106 1BOA ELEC-5 Rev 107 CRITICAL STEPS (*): 14, 15 & 17 Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 10

INITIAL CONDITIONS

1. Unit 1 lost offsite power to Bus 141.
2. 1A DG started but ACB 1413 failed to automatically close.
3. The crosstie from Bus 241 is unavailable.
4. Bus 141 is required to be energized for a vital load.
5. The crew has implemented 1BOA ELEC-3, Loss of 4KV ESF Bus, and is currently at Attachment B, step 2.

INITIATING CUES

1. The Unit Supervisor has directed you to energize Bus 141 from the 1A DG, using 1BOA ELEC-3.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 10

Exelon Nuclear Job Performance Measure Local Operation of PZR PORV Block Valve (1RY8000B failure)

JPM Number: IPk Revision Number: 4 Date: 7/13/2010 Revised By: Robert Peterson 7/13/2010 Instructor Date Validated By: Jeremy Blumenthal 4/8/2014 Operations Dept. Date Approved By: Brian Lewin 4/8/2014 Operations Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 8

IP k - rev 3 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.

See File Copy

2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure 1BOA Pri-5 Rev: 106 Procedure 2BOA Pri-5 Rev: 109 Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 8

IP k - rev 3 Revision Record (Summary)

Revision 3 Revised to current format Revision 4 Made Unit 1 specific.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 8

IP k - rev 3 INITIAL CONDITIONS

1. You are the Aux Building EO.
2. The Main Control Room has been declared uninhabitable due to smoke.
3. 1BOA PRI-5 has been entered and the RSP has been activated.

INITIATING CUES

1. PZR pressure is 2200# and lowering
2. The 1C and 1D RCPs are secured
3. The U-1 US directs you to locally close the U-1 PZR PORV Block valves per 1BOA PRI-5, step 15.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps: 2 & 4 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 8

IP k - rev 3 RECORD START TIME:

Comment ELEMENT STANDARD SAT UNSAT Number

1. Refer 1BOA PRI-5, step 15 o LOCATE and OPEN 1BOA ___ ___ ___

PRI-5 Note: Provide the examinee with a copy of 1BOA PRI-5, step 15. o Utilize plant knowledge, operator aid, or contact Cue (if asked): MCC locations are in WEC/MCR for MCC the units electrical penetration location.

area:

131X2B - AB 414, S-11 132X2 - AB 426, S-11 EVALUATOR NOTE:

Steps 2 and 3 may be done in either order, depending on which route the candidate uses to get to the MCC.

In JPM steps 2 & 3, read the Closing Cues in sequence

  • 2. Locally isolate 1RY455A At MCC 131X2B, cub A5: ___ ___ ___

Cue: The Local/Remote switch

  • Place LOCAL/REMOTE for 1RY8000A is to the LEFT switch to LOCAL.

(LOCAL)

  • CLOSE 1RY8000A Cue: Both lights are lit for 1RY8000A.

Cue: The RED light is lit for 1RY8000A.

NOTE Alternate path is initiated in the following step.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 8

IP k - rev 3 Comment ELEMENT STANDARD SAT UNSAT Number

3. Locally isolate 1RY456 At MCC 132X2, cub C4: ___ ___ ___

Cue: The Local/Remote switch

  • Place LOCAL/REMOTE for 1RY8000B is to the LEFT switch to LOCAL.

(LOCAL)

  • CLOSE 1RY8000B Cue: Both lights are lit for 1RY8000B.

Cue: Both lights are now out for 1RY8000B and the breaker has tripped.

Cue (if asked): The breaker will NOT reset.

  • 4. Remove Control Power fuses for At 1DC11J, REMOVE control ___ ___ ___

1RY456 power to fail close 1RY456:

Cue: Fuse 46 has been removed.

  • Remove FU-46 Cue: Fuse 47 has been removed.
  • Remove FU-47 Cue: (if asked) PZR Pressure is 2221 psig and rising slowly.

Cue: This JPM is completed.

RECORD STOP TIME:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 8

IP k - rev 3 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Local Operation of PZR PORV Block Valve (1RY8000B failure)

JPM Number: IP k (N-113a) Revision Number: 4 Task Number and

Title:

4D.OA-27 Respond to Control Room Evacuation.

K/A Number and Importance: 068AA1.28 3.8 / 4.0 Suggested Testing Environment: In Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

1BOA Pri-5, Rev 106, Control Room Inaccessibility CRITICAL STEPS (*) 2 & 4 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 30 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 8

IP k - rev 3 INITIAL CONDITIONS

1. You are the Aux Building EO.
2. The Main Control Room has been declared uninhabitable due to smoke.
3. _BOA PRI-5 has been entered and the RSP has been activated.

INITIATING CUES

1. PZR pressure is 2200# and lowering
2. The _C and _D RCPs are secured
3. The U-_ US directs you to locally close the U-_ PZR PORV Block valves per

_BOA PRI-5, step 15.

SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 8