ML16237A081: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 August 24, 2016 Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, APYA290 Perry, OH 440810097 SUBJECT: PERRY NUCLEAR POWER PLANT NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000440/2016004 Dear Mr. Hamilton: On October 3, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your Perry Nuclear Power Plant. This inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than August 31, 2016. By September 7, 2016, the inspector will communicate the initial selected set of approximately 2 - 3 risk-significant heat exchangers. The second group is needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than September 17, 2016. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above as well as plant specific reference material. This information should be available onsite to the inspector on October 3, 2016.   It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection.
{{#Wiki_filter:UNITED STATES
D. Hamilton -2- The lead inspector for this inspection is Michael A. Jones. We understand that our licensing contact for this inspection is David Lockwood of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations of this letter, its enclosure, and your response (if any) will be available electronically for public component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Michael A. Jones, Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket No. 50440 License No. NPF58 Enclosure:  Triennial Heat Sink Performance Inspection   Document Request cc: Distribution via LISTSERV  
                              NUCLEAR REGULATORY COMMISSION
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure Inspection Report: 05000440/2016004 Inspection Dates: October 3 7, 2016 Inspection Procedure: IP 71111.07T Lead Inspector: Michael A. Jones Jr. 630-829-9745 Michael.Jones@nrc.gov I. Information Requested By August 31, 2016: 1. List of the Generic Letter (GL) 89-System Problems Affecting Safety- heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of Corrective Action Program (CAP) documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous three years or since the last CAP document list was sent to the U.S. Nuclear Regulatory Commission for the previous Heat Sink Performance Inspection. The list should include all CAP documents not on the last CAP document list. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers. 5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. 7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. II. Information Requested By September 19, 2016: 1. Copies of the GL 89-13 responses. 2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the GL 89-13 Heat Exchanger Program. 3. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g., the GL 89-13 Heat Exchanger Program description).  
                                                  REGION III
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 2 4. Copies of the selected CAP documents. 5. For the specific heat exchangers selected: a. Copies of the UFSAR sections applicable for each heat exchanger. b. Copy of system description and design basis document for the heat exchangers (as applicable). c. Provide a list of calculations (with a short description) which currently apply to each heat exchanger. i. establish the limiting design basis heat load required to be removed by each of these heat exchangers; ii. demonstrate the heat exchangers capacity to remove the limiting heat load; iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria); iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and v. evaluate excessive tube vibration in each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. e. Copy of the construction code, Design Specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the heat exchangers. f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers. g. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested. h. Copy of the document describing the inspection results of each heat exchanger. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.  6. For the Ultimate Heat Sink (UHS) and the safety-related service water system (or equivalent): a. Copies of the applicable UFSAR sections. b. Copy of system description and design basis document (as applicable).
                                      2443 WARRENVILLE RD. SUITE 210
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 3 c. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service water system. d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.   e. Copy of system description and design basis document (as applicable). f. Copy of the construction code and Design Specification. g. Copies of normal, abnormal, and emergency operating procedures associated with the UHS and safety-related service water systems including procedures for loss of these systems. h. Copies of corrective action documents associated with water hammer or hydraulic transients in the service water system since the last Heat Sink Inspection. i. If available, provide an electronic copy of piping and instrumentation diagrams for the service water system, including the intake structure. j. Provide a list of calculations (with a short description), which currently apply to UHS and safety-related service water system. k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety-related service water system and/or UHS. l. Provide a list of any design change (with a short description) performed on the UHS or safety-related service water system since the last Heat Sink Performance Inspection. m. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers. 7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related plant heat exchanger to be performed during the onsite portion of the inspection. III. Information Requested to be Available on First Day of Inspection, October 3, 2016: 1. For the specific heat exchangers selected. a. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria). b. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high-accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests. c. Information regarding any alarms which monitor on-line performance.
                                            LISLE, IL 60532-4352
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 4 d. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years. e. Copy of the design specification and heat exchanger data sheets for each heat exchanger. f. Copy of the vendor manuals including component drawings for each heat exchanger. g. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded. h. Copy of the calculations or documents which evaluate the potential for water hammer in each heat exchanger or associated piping. i. Copy of the calculations that evaluate excessive tube vibration in each heat exchanger and the documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation.   j. Copy of the periodic flow testing at or near maximum design flow. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.   k. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger. l. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger. m. Copies of the documents that verify the structural integrity of the heat exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and visual inspection results). n. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers.   2. For the review of the performance testing of the safety-related service water system (or equivalent) and the UHS: a. Copies of the last two performance tests, such as the American Society of Mechanical Engineers in-service test, for the pumps, valves, and, if applicable, the towers fans in the safety-related service water system. If the components are not performance tested, please provide documentation verifying performance by the methods actually used. b. Copies of the documents that demonstrate that flow balance testing was performed during the last 3 years. If the last flow test was performed longer than 3 years, then provide the last flow test. c. Copies of the documents that demonstrate that flow balance testing will continue to be periodically done in the future.
                                            August 24, 2016
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST 5 d. Copies of procedures used to monitor interface valves between the safety-related section of the service water system and the nonsafety-related section and the associated results. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.   e. Copies of the procedures that verify the performance of risk significant non-safety functions and the associated results. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection.   3. For the review associated with the system walkdown of the service water intake structure: a. Copies of corrective maintenance for the last 6 years associated with service water strainers, traveling screens and trash racks. b. Copies of the last two inspections and/or surveillances associated with service water strainers, traveling screens and trash racks. c. List of preventive maintenance, including frequency, associated with service water strainers, traveling screens and trash racks. d. Copies of abnormal procedures for the traveling screens and service water strainers. e. Copies of the last two inspections and/or surveillances documenting that component mounts have not excessively degraded (i.e., due to corrosion). For example, inspections for the mounts for the, service water pumps, service water strainers, traveling screens and trash racks. f. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the service water pump bay. g. Copies of surveillance procedures and testing results performed on the service water pump bay water level instruments. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. h. Copies of procedures associated with operating during adverse weather conditions (e.g., icing, high-temperatures, or low-level). i. Copy of the evaluation for the potential effects of low flow/level on underwater weir walls intended to limit silt or sand intake, if applicable. If the information requested above will not be available, please contact Michael Jones as soon as possible at 630-829-9745, or via e-mail Michael.Jones@nrc.gov.  
Mr. David Hamilton
  D. Hamilton -2- The lead inspector for this inspection is Michael A. Jones. We understand that our licensing contact for this inspection is David Lockwood of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations Inspectionof this letter, its enclosure, and your response (if any) will be available electronically for public able Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Michael A. Jones, Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket No. 50440 License No. NPF58 Enclosure:  Triennial Heat Sink Performance Inspection   Document Request cc: Distribution via LISTSERV DISTRIBUTION: Jeremy Bowen RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ADAMS Accession Number ML16237A081 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MJones:cl    DATE 08/24/16   OFFICIAL RECORD COPY
Site Vice President
FirstEnergy Nuclear Operating Company
Perry Nuclear Power Plant
P. O. Box 97, 10 Center Road, A-PY-A290
Perry, OH 44081-0097
SUBJECT: PERRY NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL
              HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;
              INSPECTION REPORT 05000440/2016004
Dear Mr. Hamilton:
On October 3, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
of the Triennial Heat Sink Performance Inspection at your Perry Nuclear Power Plant. This
inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
    The first group lists information necessary for our initial inspection scoping activities. This
    information should be available to the lead inspector no later than August 31, 2016. By
    September 7, 2016, the inspector will communicate the initial selected set of approximately
    2 - 3 risk-significant heat exchangers.
    The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the selected heat exchangers,
    should be available at the Regional Office no later than September 17, 2016. This
    information should be separated for each selected component, especially if provided
    electronically (e.g., folder with component name that includes calculations, condition
    reports, maintenance history, etc.). During the in-office preparation activities, the inspector
    may identify additional information needed to support the inspection.
    The last group includes the additional information above as well as plant specific reference
    material. This information should be available onsite to the inspector on October 3, 2016.
    It is also requested that corrective action documents and/or questions developed during the
    inspection be provided to the inspector as the documents are generated.
All requested documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during
the preparation week or during the onsite inspection.
 
D. Hamilton                                   -2-
The lead inspector for this inspection is Michael A. Jones. We understand that our licensing
contact for this inspection is David Lockwood of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA/
                                              Michael A. Jones, Reactor Engineer
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:
   Triennial Heat Sink Performance Inspection
    Document Request
cc: Distribution via LISTSERV
 
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report:             05000440/2016004
Inspection Dates:             October 3 - 7, 2016
Inspection Procedure:         IP 71111.07T, Heat Sink Performance
Lead Inspector:               Michael A. Jones Jr.
                              630-829-9745
                              Michael.Jones@nrc.gov
I.     Information Requested By August 31, 2016:
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
          Safety-Related Equipment, heat exchangers in order of risk significance.
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
          exchanger.
      3. List of Corrective Action Program (CAP) documents (with a short description)
          associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or
          heat exchanger testing, for the previous three years or since the last CAP document
          list was sent to the U.S. Nuclear Regulatory Commission for the previous Heat Sink
          Performance Inspection. The list should include all CAP documents not on the last
          CAP document list.
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
          GL 89-13 heat exchangers.
      6. List of engineering-related operator workarounds (with a short description)
          associated with GL 89-13 heat exchangers. The requested documents are to be for
          the time period from the onsite inspection period back to the documents that were
          provided in response to the previous Heat Sink Performance Inspection.
      7. List of permanent and temporary modifications (with a short description) associated
          with GL 89-13 heat exchangers. The requested documents are to be for the time
          period from the onsite inspection period back to the documents that were provided in
          response to the previous Heat Sink Performance Inspection.
II.   Information Requested By September 19, 2016:
      1. Copies of the GL 89-13 responses.
      2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the
          GL 89-13 Heat Exchanger Program.
      3. Copies of procedures developed to implement the recommendations of GL 89-13
          (e.g., the GL 89-13 Heat Exchanger Program description).
                                                                                      Enclosure
 
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
4. Copies of the selected CAP documents.
5. For the specific heat exchangers selected:
    a. Copies of the UFSAR sections applicable for each heat exchanger.
    b. Copy of system description and design basis document for the heat exchangers
        (as applicable).
    c. Provide a list of calculations (with a short description) which currently apply to
        each heat exchanger.
            i. establish the limiting design basis heat load required to be removed by
              each of these heat exchangers;
          ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
          iii. correlate surveillance testing and/or inspection results from these heat
              exchangers with design basis heat removal capability (e.g., basis for
              surveillance test and/or inspection acceptance criteria);
          iv. evaluate the potential for water hammer in each heat exchanger or
              associated piping; and
          v. evaluate excessive tube vibration in each heat exchanger.
    d. Copy of any operability determinations or other documentation of degradation
        associated with the heat exchangers or the systems that support the operation
        for the selected heat exchangers.
    e. Copy of the construction code, Design Specification, heat exchanger data
        sheets, and vendor documents including component drawings applicable for the
        heat exchangers.
    f. Copies of normal, abnormal, and emergency operating procedures associated
        with the selected heat exchangers.
    g. Copies of the two most recent completed tests and evaluation data confirming
        thermal performance for those heat exchangers which are performance tested.
    h. Copy of the document describing the inspection results of each heat exchanger.
        The requested documents are to be for the time period from the onsite inspection
        period back to the documents that were provided in response to the previous
        Heat Sink Performance Inspection.
  6. For the Ultimate Heat Sink (UHS) and the safety-related service water system
    (or equivalent):
    a. Copies of the applicable UFSAR sections.
    b. Copy of system description and design basis document (as applicable).
                                            2
 
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
          c. Copy of any operability determinations or other documentation of degradation
              associated with the UHS and the safety-related service water system.
          d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
              states the maximum cooling water system inlet temperature limit that still allows
              full licensed power operation of the nuclear reactor.
          e. Copy of system description and design basis document (as applicable).
          f. Copy of the construction code and Design Specification.
          g. Copies of normal, abnormal, and emergency operating procedures associated
              with the UHS and safety-related service water systems including procedures for
              loss of these systems.
          h. Copies of corrective action documents associated with water hammer or
              hydraulic transients in the service water system since the last Heat Sink
              Inspection.
          i. If available, provide an electronic copy of piping and instrumentation diagrams for
              the service water system, including the intake structure.
          j. Provide a list of calculations (with a short description), which currently apply to
              UHS and safety-related service water system.
          k. Provide a list of instruments (with a short description) associated with automatic
              or alarm functions for the safety-related service water system and/or UHS.
          l. Provide a list of any design change (with a short description) performed on the
              UHS or safety-related service water system since the last Heat Sink Performance
              Inspection.
          m. Copy of the calculation which establishes the limiting (maximum) design basis
              heat load which is required to be removed by each of these heat exchangers.
      7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related
          plant heat exchanger to be performed during the onsite portion of the inspection.
III. Information Requested to be Available on First Day of Inspection, October 3, 2016:
      1. For the specific heat exchangers selected.
          a. Copy of the calculation which correlates surveillance testing results from these
              heat exchangers with design basis heat removal capability (e.g., basis for
              surveillance test acceptance criteria).
          b. Documentation and procedures that identify the types, accuracy, and location of
              any special instrumentation used for the two most recently completed thermal
              performance tests for the heat exchangers (e.g., high-accuracy ultrasonic flow
              instruments or temperature instruments). Include calibration records for the
              instruments used during these tests.
          c. Information regarding any alarms which monitor on-line performance.
                                                  3
 
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
    d. The cleaning and inspection maintenance schedule for each heat exchanger for
        the next 5 years.
    e. Copy of the design specification and heat exchanger data sheets for each heat
        exchanger.
    f. Copy of the vendor manuals including component drawings for each heat
        exchanger.
    g. Copy of the operating procedure that ensures that the maximum cooling water
        system inlet temperature limit is not exceeded.
    h. Copy of the calculations or documents which evaluate the potential for water
        hammer in each heat exchanger or associated piping.
    i. Copy of the calculations that evaluate excessive tube vibration in each heat
        exchanger and the documents that describe the controls that prevent heat
        exchanger degradation due to excessive flow induced vibration during operation.
    j. Copy of the periodic flow testing at or near maximum design flow. The requested
        documents are to be for the time period from the onsite inspection period back to
        the documents that were provided in response to the previous Heat Sink
        Performance Inspection.
    k. Copy of the document which identifies the current number of tubes in service for
        each heat exchanger and the supporting calculation which establishes the
        maximum number of tubes which can be plugged in each heat exchanger.
    l. Copy of the document establishing the repair criteria (plugging limit) for degraded
        tubes which are identified in each heat exchanger.
    m. Copies of the documents that verify the structural integrity of the heat exchanger
        (e.g. eddy current summary sheets, ultrasonic testing results, and visual
        inspection results).
    n. Copies of those documents that describe the methods taken to control water
        chemistry in the heat exchangers.
2. For the review of the performance testing of the safety-related service water system
    (or equivalent) and the UHS:
    a. Copies of the last two performance tests, such as the American Society of
        Mechanical Engineers in-service test, for the pumps, valves, and, if applicable,
        the towers fans in the safety-related service water system. If the components are
        not performance tested, please provide documentation verifying performance by
        the methods actually used.
    b. Copies of the documents that demonstrate that flow balance testing was
        performed during the last 3 years. If the last flow test was performed longer
        than 3 years, then provide the last flow test.
    c. Copies of the documents that demonstrate that flow balance testing will continue
        to be periodically done in the future.
                                          4
 
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
            d. Copies of procedures used to monitor interface valves between the safety-related
                section of the service water system and the nonsafety-related section and the
                associated results. The requested documents are to be for the time period from
                the onsite inspection period back to the documents that were provided in
                response to the previous Heat Sink Performance Inspection.
            e. Copies of the procedures that verify the performance of risk significant non-safety
                functions and the associated results. The requested documents are to be for the
                time period from the onsite inspection period back to the documents that were
                provided in response to the previous Heat Sink Performance Inspection.
        3. For the review associated with the system walkdown of the service water intake
            structure:
            a. Copies of corrective maintenance for the last 6 years associated with service
                water strainers, traveling screens and trash racks.
            b. Copies of the last two inspections and/or surveillances associated with service
                water strainers, traveling screens and trash racks.
            c. List of preventive maintenance, including frequency, associated with service
                water strainers, traveling screens and trash racks.
            d. Copies of abnormal procedures for the traveling screens and service water
                strainers.
            e. Copies of the last two inspections and/or surveillances documenting that
                component mounts have not excessively degraded (i.e., due to corrosion). For
                example, inspections for the mounts for the, service water pumps, service water
                strainers, traveling screens and trash racks.
            f. Copies of the documents associated with the monitoring, trending, and
                remediation of silt accumulation at the service water pump bay.
            g. Copies of surveillance procedures and testing results performed on the service
                water pump bay water level instruments. The requested documents are to be for
                the time period from the onsite inspection period back to the documents that
                were provided in response to the previous Heat Sink Performance Inspection.
            h. Copies of procedures associated with operating during adverse weather
                conditions (e.g., icing, high-temperatures, or low-level).
            i. Copy of the evaluation for the potential effects of low flow/level on underwater
                weir walls intended to limit silt or sand intake, if applicable.
If the information requested above will not be available, please contact Michael Jones as soon
as possible at 630-829-9745, or via e-mail Michael.Jones@nrc.gov.
                                                      5
 
D. Hamilton                                                               -2-
The lead inspector for this inspection is Michael A. Jones. We understand that our licensing
contact for this inspection is David Lockwood of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA/
                                                                          Michael A. Jones, Reactor Engineer
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:
   Triennial Heat Sink Performance Inspection
    Document Request
cc: Distribution via LISTSERV
DISTRIBUTION:
Jeremy Bowen                                               Cynthia Pederson                              Carole Ariano
RidsNrrPMPerry Resource                                     Darrell Roberts                                Linda Linn
RidsNrrDorlLpl3-2 Resource                                 Richard Skokowski                              DRPIII
RidsNrrDirsIrib Resource                                   Allan Barker                                   DRSIII
ADAMS Accession Number ML16237A081
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                                 RIII                           RIII                               RIII
  NAME               MJones:cl
   DATE               08/24/16
                                                          OFFICIAL RECORD COPY
}}
}}

Latest revision as of 14:50, 30 October 2019

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000440/2016004
ML16237A081
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/24/2016
From: Michael Jones
NRC/RGN-III/DRS/EB2
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2016004
Download: ML16237A081 (8)


See also: IR 05000440/2016004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

August 24, 2016

Mr. David Hamilton

Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

P. O. Box 97, 10 Center Road, A-PY-A290

Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000440/2016004

Dear Mr. Hamilton:

On October 3, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your Perry Nuclear Power Plant. This

inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than August 31, 2016. By

September 7, 2016, the inspector will communicate the initial selected set of approximately

2 - 3 risk-significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than September 17, 2016. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the inspector

may identify additional information needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available onsite to the inspector on October 3, 2016.

It is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the onsite inspection.

D. Hamilton -2-

The lead inspector for this inspection is Michael A. Jones. We understand that our licensing

contact for this inspection is David Lockwood of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Michael A. Jones, Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000440/2016004

Inspection Dates: October 3 - 7, 2016

Inspection Procedure: IP 71111.07T, Heat Sink Performance

Lead Inspector: Michael A. Jones Jr.

630-829-9745

Michael.Jones@nrc.gov

I. Information Requested By August 31, 2016:

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program (CAP) documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or

heat exchanger testing, for the previous three years or since the last CAP document

list was sent to the U.S. Nuclear Regulatory Commission for the previous Heat Sink

Performance Inspection. The list should include all CAP documents not on the last

CAP document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous Heat Sink Performance Inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous Heat Sink Performance Inspection.

II. Information Requested By September 19, 2016:

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the

GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

4. Copies of the selected CAP documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for the

heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

g. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

h. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

Heat Sink Performance Inspection.

6. For the Ultimate Heat Sink (UHS) and the safety-related service water system

(or equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and Design Specification.

g. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

h. Copies of corrective action documents associated with water hammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

i. If available, provide an electronic copy of piping and instrumentation diagrams for

the service water system, including the intake structure.

j. Provide a list of calculations (with a short description), which currently apply to

UHS and safety-related service water system.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service water system and/or UHS.

l. Provide a list of any design change (with a short description) performed on the

UHS or safety-related service water system since the last Heat Sink Performance

Inspection.

m. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related

plant heat exchanger to be performed during the onsite portion of the inspection.

III. Information Requested to be Available on First Day of Inspection, October 3, 2016:

1. For the specific heat exchangers selected.

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria).

b. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high-accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

c. Information regarding any alarms which monitor on-line performance.

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

d. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

e. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

f. Copy of the vendor manuals including component drawings for each heat

exchanger.

g. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

h. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

i. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

j. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous Heat Sink

Performance Inspection.

k. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

l. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

m. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g. eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

n. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the performance testing of the safety-related service water system

(or equivalent) and the UHS:

a. Copies of the last two performance tests, such as the American Society of

Mechanical Engineers in-service test, for the pumps, valves, and, if applicable,

the towers fans in the safety-related service water system. If the components are

not performance tested, please provide documentation verifying performance by

the methods actually used.

b. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed longer

than 3 years, then provide the last flow test.

c. Copies of the documents that demonstrate that flow balance testing will continue

to be periodically done in the future.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

d. Copies of procedures used to monitor interface valves between the safety-related

section of the service water system and the nonsafety-related section and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous Heat Sink Performance Inspection.

e. Copies of the procedures that verify the performance of risk significant non-safety

functions and the associated results. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous Heat Sink Performance Inspection.

3. For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances associated with service

water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion). For

example, inspections for the mounts for the, service water pumps, service water

strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

g. Copies of surveillance procedures and testing results performed on the service

water pump bay water level instruments. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous Heat Sink Performance Inspection.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g., icing, high-temperatures, or low-level).

i. Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

If the information requested above will not be available, please contact Michael Jones as soon

as possible at 630-829-9745, or via e-mail Michael.Jones@nrc.gov.

5

D. Hamilton -2-

The lead inspector for this inspection is Michael A. Jones. We understand that our licensing

contact for this inspection is David Lockwood of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9745, or via e-mail at Michael.Jones@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Michael A. Jones, Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

DISTRIBUTION:

Jeremy Bowen Cynthia Pederson Carole Ariano

RidsNrrPMPerry Resource Darrell Roberts Linda Linn

RidsNrrDorlLpl3-2 Resource Richard Skokowski DRPIII

RidsNrrDirsIrib Resource Allan Barker DRSIII

ADAMS Accession Number ML16237A081

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME MJones:cl

DATE 08/24/16

OFFICIAL RECORD COPY