ML13336A403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Catawba Nuclear Station JPM A Sep. 2013 NRC Exam PAGE 1 OF 14  
{{#Wiki_filter:Catawba Nuclear Station JPM A Sep. 2013 NRC Exam JPM A PAGE 1 OF 14


JPM A
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam EVALUATION SHEET Task:                Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path:      Yes -
Facility JPM #:      NC-046 Safety Function:    4P      Title:      Reactor Coolant System K/A          002 A2.04      Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s):  4.3 / 4.6      CFR:      41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform              X      Simulate


Catawba Nuclear Station JPM A Sep. 2013 NRC Exam PAGE 2 OF 14  EVALUATION SHEET Task: Establish NC system Bleed and Feed per EP/1/A/5000/FR
==References:==
-H.1  Alternate Path:
EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 41 Task Standard:       Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time: 10 minutes                             Time Critical:         Yes         No     X
Yes -  Facility JPM #:
===========================================================================
NC-046  Safety Function:
Applicant:                                                                     Time Start: __________
4P Title: Reactor Coolant System K/A  002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Loss of heat sinks Rating(s):
NAME___________________________ Docket #_______________ Time Finish: __________
4.3 / 4.6 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:
Performance Rating:                                                           Performance Time _____
Preferred Evaluation  Method:
SAT ____ UNSAT ____
Simulator X In-Plant  Perform X Simulate  References
Examiner: _____________________________                 _____________________________/________
: EP/1/A/5000/FR
NAME                                       SIGNATURE                 DATE
-H.1 (Response to Loss of Secondary Heat Sink) rev. 41   Task Standard:
===========================================================================
Aligns S/I feed path using NI and NV pumps and opens 1NC
COMMENTS PAGE 2 OF 14
-32B and 1NC
 
-34A PZR PORVs to establish NC system bleed path Validation Time:
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
10 minutes Time Critical:
Yes No X ===========================================================================
Applicant:
Time Start:   ______
____ NAME___________________________
Docket #_______________
Time Finish: ________
__    Performance Rating:
SAT ____ UNSAT
____ Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM A Sep. 2013 NRC Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC #169.
#169. 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event XMT-NV011 FNV_6080 BORON INJ FLOW TO DCS/MCB/OAC (NVAA6080) 0    MAL-CA003A CAPT SA2 FAILS TO START Active     MAL-CA003B CAPT SA5 FAILS TO START Active     MAL-CA004A FAILURE OF CA PUMP A TO START Both    MAL-CA004B FAILURE OF CA PUMP B TO START Both    MAL-NI001B NI PUMP B FAILURE Auto     OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off    MAL-ISE002B (AUTO SI TRN B FAILS TO ACTUATE) Active REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM A Sep. 2013 NRC Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event XMT-NV011 FNV_6080 BORON INJ FLOW 0
TO DCS/MCB/OAC (NVAA6080)
MAL-CA003A CAPT SA2 FAILS TO START           Active MAL-CA003B CAPT SA5 FAILS TO START           Active MAL-CA004A FAILURE OF CA PUMP A TO Both START MAL-CA004B FAILURE OF CA PUMP B TO Both START MAL-NI001B NI PUMP B FAILURE                 Auto OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B MAL-ISE002B (AUTO SI TRN B FAILS TO Active ACTUATE)
PAGE 3 OF 14
 
REV. 0                                                                   PAGE 4 0F 14 Catawba Nuclear Station JPM A Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function.
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
Attempts to restart the Main CF pumps have been unsuccessful.
* The CA system will not function.
EP/1/A/5000/FR
* Attempts to restart the Main CF pumps have been unsuccessful.
-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
-0.1 (Reactor Trip Response).
* Bleed and Feed initiation criteria have been met.
Bleed and Feed initiation criteria ha ve been met. INITIATING CUES:
INITIATING CUES:
The CRS instructs you to initiate NC system bleed and feed per steps 19
* The CRS instructs you to initiate NC system bleed and feed per steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
-24 of EP/1/A/5000/FR
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 27-35.
-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
PAGE 4 OF 14
EXAMINER NOTE
 
: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                              SAT/UNSAT START TIME: _______
-H.1 pages 27
STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.                          ___ SAT STANDARD:                                                            ___ UNSAT Applicant acknowledges this step.
-35.
COMMENTS:
STEP 2 20. Ensure all NC pumps - OFF.                                ___ SAT STANDARD:                                                            ___UNSAT Applicant ensures the NC pumps are off.
COMMENTS:
PAGE 5 0F 14
 
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 3 21. Initiate S/I.                                                      CRITICAL STEP STANDARD:
___ SAT Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION              ___ UNSAT ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.
This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.
COMMENTS:
STEP 4 22. Verify NC System feed path as follows:                              ___ SAT
: a. Verify the following pumps - ON:                            ___ UNSAT
* At least one NV pump
* At least one NI pump.
STANDARD:
Applicant determines that at least one NV pump and one NI pump are running.
EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.
COMMENTS:
PAGE 6 0F 14


Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                                   SAT/UNSAT STEP 5   22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
STEP 1:  19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed.
___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.
STANDARD: Applicant acknowledges this step.
COMMENTS:
COMMENTS:       ___ SAT
STEP 6 22 b. RNO Perform the following:
___ UNSAT     STEP 2  20. Ensure all NC pumps
___ SAT
- OFF. STANDARD:   Applicant ensures the NC pumps are off.
: 1) Ensure the following pumps - ON:
___ UNSAT
* NV Pumps
* NI Pumps.
STANDARD:
Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.
COMMENTS:
COMMENTS:
___ SAT    ___UNSAT 
PAGE 7 0F 14


Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14  STEP 3  21. Initiate S/I.
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:                                     ___ SAT a) Ensure the following valves - OPEN:            ___ UNSAT
STANDARD:  Applicant depresses the red train 'A' and 'B' "SAFETY INJECTION INITIATE" pushbuttons and verifies the red "SAFETY INJECTION ACTUATED" status light is lit on 1SI
* 1NV-252A (NV Pumps Suct From FWST)
-13 or "ECCS TRN A
* 1NV-253B (NV Pumps Suct From FWST).
" yellow reset light is dark on 1MC
STANDARD:
-11. This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.
COMMENTS:    CRITICAL STEP  ___ SAT  ___ UNSAT STEP 4  22. Verify NC System feed path as follows:
: a. Verify the following pumps
- ON:  At least one NV pump At least one NI pump.
STANDARD:  Applicant determines that at least one NV pump and one NI pump are running. EXAMINER NOTE:
Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.
COMMENTS:       ___ SAT   ___ UNSAT Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 7 0F 14  STEP 5    22 b. Verify "NV S/I FLOW" - INDICATING FLOW.
STANDARD: Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC
-3 indicates 0 GPM and transitions to the RNO.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT      STEP 22 b. RNO Perform the following:
STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:
: 1) Ensure the following pumps
___ SAT
- ON:  NV Pumps  NI Pumps. STANDARD: Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps. COMMENTS:       ___ SAT  ___ UNSAT 
* 1NV-188A (VCT Otlt Isol)
___ UNSAT
* 1NV-189B (VCT Otlt Isol).
STANDARD:
Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark COMMENTS:
PAGE 8 0F 14


Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following:
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN:
a) Ensure the following valves  
___ SAT
- OPEN:   1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST).
* 1NI-9A (NV Pmp C/L Inj Isol)
STANDARD:  Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV
___ UNSAT
-253B. COMMENTS:        ___ SAT  ___ UNSAT STEP 8  22 b. RNO 2) b) Ensure the following valves
* 1NI-10B (NV Pmp C/L Inj Isol).
- CLOSED:  1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol)
STANDARD:
. STANDARD:  Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV
Applicant determines the red OPEN light is lit and green CLSD light is dark on 1NI-9A. Applicant determines that the red OPEN light is dark for 1NI-10B, and depresses the red OPEN pushbutton and verifies the red OPEN light is lit and the green CLSD light is dark.
-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark COMMENTS:        ___ SAT   ___ UNSAT Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 14  STEP 9  22 b. RNO 2) c) Ensure the following valves
COMMENTS:
- OPEN:  1NI-9A (NV Pmp C/L Inj Isol) 1NI-10B (NV Pmp C/L Inj Isol).
STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN:                       ___ SAT
STANDARD: Applicant determines the red OPEN light is lit and green CLSD light is dark on 1NI
* 1NI-103A (NI Pump 1A Suct)                   ___ UNSAT
-9A. Applicant determines that the red OPEN light is dark for 1NI-10B, and depresses the red OPEN pushbutton and verifies the red OPEN light is lit and the green CLSD light is dark
* 1NI-118A (NI Pump 1A C-Leg Inj Isol)
. COMMENTS:       ___ SAT  ___ UNSAT    STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves  
* 1NI-162A (NI To C-Legs Inj Hdr Isol)
- OPEN:   1NI-103A (NI Pump 1A Suct) 1NI-118A (NI Pump 1A C
* 1NI-100B (NI Pmps Suct From FWST).
-Leg Inj Isol)   1NI-162A (NI To C
STANDARD:
-Legs Inj Hdr Isol)   1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant determines that the red OPEN lights are lit and green CLSD lights are dark on valves 1NI
Applicant determines that the red OPEN lights are lit and green CLSD lights are dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.
-103A, 1NI-118A, 1NI-162A, and 1NI
COMMENTS:
-100B. COMMENTS:
PAGE 9 0F 14


___ SAT   ___ UNSAT
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                                  SAT/UNSAT STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN:                            ___ SAT
* 1NI-135B (NI Pump 1B Suct)                        ___ UNSAT
* 1NI-150B (NI Pump 1B C-Leg Inj Isol)
* 1NI-162A (NI To C-Legs Inj Hdr Isol)
* 1NI-100B (NI Pmps Suct From FWST).
STANDARD:
Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.
COMMENTS:
STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following:                                    ___ SAT STANDARD:                                                                  ___ UNSAT Applicant determines that a feed path does exist and this step is N/A.
COMMENTS:
PAGE 10 0F 14


Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14  STEP 11  22 b. RNO 4)  IF NI Pump 1B is in service, THEN ensure the following valves
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 13 23. Establish NC System bleed path as follows:
- OPEN:  1NI-135B (NI Pump 1B Suct) 1NI-150B (NI Pump 1B C
___ SAT
-Leg Inj Isol) 1NI-162A (NI To C
: a. Ensure all Pzr PORV isolation valves - OPEN.
-Legs Inj Hdr Isol) 1NI-100B (NI Pmps Suct From FWST).
___ UNSAT STANDARD:
STANDARD:  Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI
Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.
-135B, 1NI-150B, 1NI-162A, and 1NI
COMMENTS:
-100B. COMMENTS:        ___ SAT  ___ UNSAT STEP 12  22 b. RNO 5)  IF no feed path can be aligned, THEN perform the following:
STEP 14 23 b. Select "OPEN" on the following PZR PORVs:                   CRITICAL STEP
STANDARD:  Applicant determines that a feed path does exist and this step is N/A.
* 1NC-34A (PZR PORV)
COMMENTS:        ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 11 0F 14  STEP 13   23. Establish NC System bleed path as follows: a. Ensure all Pzr PORV isolation valves  
___ SAT
- OPEN. STANDARD: Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC
* 1NC-32B (PZR PORV).
-31B, 1NC-35B, and 1NC
___ UNSAT STANDARD:
-33A. COMMENTS:       ___ SAT  ___ UNSAT STEP 14   23   b. Select "OPEN" on the following PZR PORVs:   1NC-34A (PZR PORV) 1NC-32B (PZR PORV).
Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.
STANDARD: Applicant rotates switches for 1NC
-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.
This step is critical because it establishes an NC system Bleed path.
This step is critical because it establishes an NC system Bleed path.
COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14  STEP 15   23   c. Align N 2 to Pzr PORVs by opening the following valves:
COMMENTS:
1NI-438A (Emer N2 From CLA A To 1NC
PAGE 11 0F 14
-34A)   1NI-439B (Emer N2 From CLA B To 1NC
 
-32B). STANDARD: Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:
-438A and 1NI
___ SAT
-439B. COMMENTS:       ___ SAT  ___ UNSAT STEP 16   23   d. Verify power to all Pzr PORV isolation valves  
* 1NI-438A (Emer N2 From CLA A To 1NC-34A)
- AVAILABLE.
___ UNSAT
STANDARD: Applicant verifies indicating lights lit on 1NC
* 1NI-439B (Emer N2 From CLA B To 1NC-32B).
-31B, 1NC-35B, and 1NC
STANDARD:
-33A. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14  STEP 17   24. Verify the following valves  
Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.
- OPEN:   1NC-31B (PZR PORV Isol) 1NC-32B (PZR PORV) 1NC-33A (PZR PORV Isol) 1NC-34A (PZR PORV).
COMMENTS:
STANDARD: Applicant verifies lights on 1NC
STEP 16 23 d. Verify power to all Pzr PORV isolation valves -
-31B, 1NC-3 2B, 1NC-33A and 1NC-34A indicate OPEN
AVAILABLE.                                           ___ SAT STANDARD:                                                               ___ UNSAT Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.
. COMMENTS:   END OF TASK
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 12 0F 14
 
Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 17 24. Verify the following valves - OPEN:
* 1NC-31B (PZR PORV Isol)                             ___ SAT
* 1NC-32B (PZR PORV)                               ___ UNSAT
* 1NC-33A (PZR PORV Isol)
* 1NC-34A (PZR PORV).
STANDARD:
Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 13 0F 14


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) Catawba Nuclear Station 2013 NRC Exam JPM A  READ TO APPLICANT DIRECTION TO APPLICANT:
READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps. The CA system will not function.
* A reactor trip has occurred on Unit 1 due to a loss of both Main Feedwater pumps.
Attempts to restart the Main CF pumps have been unsuccessful.
* The CA system will not function.
EP/1/A/5000/FR
* Attempts to restart the Main CF pumps have been unsuccessful.
-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a "RED PATH" for the Heat Sink critical safety function while performing EP/1/A/5000/ES
* EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
-0.1 (Reactor Trip Response).
* Bleed and Feed initiation criteria have been met.
Bleed and Feed initiation criteria have been met.
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to initiate NC system bleed and feed per steps 19-24 of EP/1/A/5000/FR
* The CRS instructs you to initiate NC system bleed and feed per steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.
Catawba Nuclear Station 2013 NRC Exam JPM A


Catawba Nuclear Station JPM B Sep. 2013 NRC Exam PAGE 1 OF 19  
Catawba Nuclear Station JPM B Sep. 2013 NRC Exam JPM B PAGE 1 OF 19


JPM B         
Catawba Nuclear Station JPM B Sep. 2013 NRC Exam EVALUATION SHEET Task:                Restore Power to 1ETA from Offsite per EP/1/A/5000/ECA 0.0 Enclosure 7.
Alternate Path:      Yes Facility JPM #:      EP-010 Safety Function:    6       Title:      Electrical K/A          062 A4.01      Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
Rating(s):  3.3 / 3.1      CFR:      41.7 / 45.5 / to 45.8 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform            X      Simulate


Catawba Nuclear Station JPM B Sep. 2013 NRC Exam PAGE 2 OF 19 EVALUATION SHEET Task: Restore Power to 1ETA from Offsite per EP/1/A/5000/ECA 0.0 Enclosure
==References:==
: 7. Alternate Path:
EP/1/A/5000/ECA-0.0 (Loss OF All AC Power), Encl. 7, rev. 047 Task Standard:       Restore normal offsite Power to 1ETA from the switchyard.
Yes  Facility JPM
Validation Time: 15 minutes                             Time Critical:       Yes         No       X
#: EP-010  Safety Function:
===========================================================================
6 Title: Electrical K/A  062 A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
Applicant:                                                                   Time Start: __________
Rating(s):
NAME___________________________ Docket #_______________ Time Finish: __________
3.3 / 3.1 CFR: 41.7 / 45.5 / to 45.8 Preferred Evaluation Location:  Preferred Evaluation  Method:
Performance Rating:                                                         Performance Time _____
Simulator X In-Plant  Perform X Simulate  References
SAT ____ UNSAT ____
: EP/1/A/5000/ECA
Examiner: _____________________________                 _____________________________/________
-0.0 (Loss OF All AC Power), Encl. 7, rev. 04 7  Task Standard:
NAME                                     SIGNATURE                   DATE
Restore normal offsite Power to 1ETA from the switchyard.
===========================================================================
Validation Time: 15 minutes Time Critical:
COMMENTS PAGE 2 OF 19
Yes No X ===========================================================================
 
Applicant:
Catawba Nuclear Station JPM B Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Time Start:   ______
____ NAME___________________________
Docket #_______________
Time Finish: ________
__    Performance Rating:
SAT ____ UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM B Sep. 2013 NRC Exam PAGE 3 OF 19  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC  
: 2. Reset to IC #170
#170 3. Enter the password. 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 3. Enter the password.
-up window.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event MAL-DG001A (DG 1A FAILS TO START)
Instructor Action               Final   Delay Ramp Delete In Event MAL-DG001A (DG 1A FAILS TO START)             Active MAL-DG001B (DG 1B FAILS TO START)             Active MAL-EQB003A (LOSS OF D/G 1A Active SEQUENCER CTRL PWR)
Active     MAL-DG001B (DG 1B FAILS TO START)
MAL-EQB003B (LOSS OF D/G 1B Acitve SEQUENCER CTRL PWR)
Active     MAL-EQB003A (LOSS OF D/G 1A SEQUENCER CTRL PWR)
LOA-EP067 (600V LC ELXA BKR ELXA-4B)         Closed     10                   2 LOA-EP069 (600V LC ELXC BKR ELXC-4B)         Closed     20                   2 OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B Open switchyard PCBs Ensure load shed is complete.
Active    MAL-EQB003B (LOSS OF D/G 1B SEQUENCER CTRL PWR)
PAGE 3 OF 19
Acitve    LOA-EP067 (600V LC ELXA BKR ELXA
-4B) Closed 10   2 LOA-EP06 9 (600V LC ELXC BKR ELXC
-4B) Closed 20   2 OVR-ISE043 SAFETY INJECTION INITIATE PB TRN B Off    Open switchyard PCBs Ensure load shed is complete.


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 4 OF 19  READ TO APPLICANT DIRECTION TO APPLICANT:
Catawba Nuclear Station 2013 NRC Exam JPM B READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:   Unit One has experienced a Loss of All AC power.
INITIAL CONDITIONS:
It is desired to restore normal power to 1ETA from offsite through 1ATC.
* Unit One has experienced a Loss of All AC power.
The TCC has verified adequate switchyard voltage and grid reliability.
* It is desired to restore normal power to 1ETA from offsite through 1ATC.
 
* The TCC has verified adequate switchyard voltage and grid reliability.
The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.
* The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.
INITIATING CUES:
INITIATING CUES:
You have been directed to align Normal power to 1ETA by completing Enclosure 7 [Aligning Normal Power to 1ETA (1ATC)] of EP/1/A/5000/ECA
You have been directed to align Normal power to 1ETA by completing Enclosure 7 [Aligning Normal Power to 1ETA (1ATC)] of EP/1/A/5000/ECA-0.0, (Loss of All AC Power).
-0.0, (Loss of All AC Power). EXAMINER NOTE
EXAMINER NOTE: After reading initiating cue, provide the applicant with a copy of EP/1/A/5000/ECA-0.0 Enclosure 7, [Aligning Normal Power to 1ETA (1ATC)].
:   After reading initiating cue, provide the applicant with a copy of EP/1/A/5000/ECA
-0.0 Enclosure 7, [Aligning Normal Power to 1ETA (1ATC)].
 
.
.
Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 5 OF 19 START TIME: _______
PAGE 4 OF 19
STEP 1:  1. Verify the following 1ETA lockout relays
- RESET:    86N (1ETA 03 Cubicle) 86B (1ETA 03 Cubicle) 86S (1ETA 04 Cubicle) 86D (1ETA 19 Cubicle).
STANDARD:  Applicant determines that the lockout relays are reset based on the initiating cue or by asking. Examiner Cue
: If asked , 1ETA lockout relays are reset.
COMMENTS: 


Catawba Nuclear Station 2013 NRC Exam JPM B START TIME: _______
STEP 1: 1. Verify the following 1ETA lockout relays - RESET:
___ SAT
___ SAT
___ UNSAT STEP 2   2. IF AT ANY TIME it becomes apparent this enclosure will not be successful, THEN perform the following:
* 86N (1ETA 03 Cubicle)
: a. Notify Control Room Supervisor of status. b. RETURN TO Section C. (Operator Actions), Step 18.
___ UNSAT
STANDARD:   Applicant acknowledges the step COMMENTS:
* 86B (1ETA 03 Cubicle)
 
* 86S (1ETA 04 Cubicle)
___ SAT
* 86D (1ETA 19 Cubicle).
___UNSAT 
STANDARD:
Applicant determines that the lockout relays are reset based on the initiating cue or by asking.
Examiner Cue: If asked, 1ETA lockout relays are reset.
COMMENTS:
STEP 2 2. IF AT ANY TIME it becomes apparent this enclosure will       ___ SAT not be successful, THEN perform the following:
___UNSAT
: a. Notify Control Room Supervisor of status.
: b. RETURN TO Section C. (Operator Actions), Step 18.
STANDARD:
Applicant acknowledges the step COMMENTS:
PAGE 5 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 6 OF 19  STEP 3   3. IF 1ATC energized, THEN GO TO Step 15. STANDARD: Applicant determines that 1ATC is not energized.
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 3 3. IF 1ATC energized, THEN GO TO Step 15.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1ATC is not energized.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4   4. IF 6.9 KV buss 1TA energized, THEN GO TO Step 14. STANDARD: Applicant determines that 1TA is not energized.
STEP 4 4. IF 6.9 KV buss 1TA energized, THEN GO TO Step 14. ___ SAT STANDARD:                                                     ___ UNSAT Applicant determines that 1TA is not energized.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 5   5. IF transformer 1T2A energized, THEN GO TO Step 13. STANDARD: Applicant determines that 1T2A is not energized.
STEP 5   5. IF transformer 1T2A energized, THEN GO TO Step 13.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1T2A is not energized.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 6 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 7 OF 19  STEP 6   6. Notify Transmission Control Center (TCC), using one of the following methods, to coordinate attempts to restore power:   Outside line:
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 6 6. Notify Transmission Control Center (TCC), using one of the following methods, to coordinate attempts to restore     ___ SAT power:
704-382-9404   704-382-9411   704-382-4413   704-382-9403   704-399-9744 .       Two-way radio.
___ UNSAT
STANDARD: Applicant notifies the TCC using any of the listed methods Examiner Cue: Repeat back information provided by applicant. COMMENTS:       ___ SAT  ___ UNSAT STEP 7   7. Notify TCC to verify adequate switchyard voltage and grid reliability.
* Outside line:
STANDARD: Applicant determines adequate switchyard voltage and grid reliability based on the initiating cue or by contacting the TCC.
* 704-382-9404
Examiner Cue
* 704-382-9411
: If asked , The TCC has verified adequate switchyard voltage and grid reliability COMMENTS:
* 704-382-4413
___ SAT  ___ UNSAT 
* 704-382-9403
* 704-399-9744
.
* Two-way radio.
STANDARD:
Applicant notifies the TCC using any of the listed methods Examiner Cue: Repeat back information provided by applicant.
COMMENTS:
STEP 7 7. Notify TCC to verify adequate switchyard voltage and grid reliability.                                                 ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines adequate switchyard voltage and grid reliability based on the initiating cue or by contacting the TCC.
Examiner Cue: If asked, The TCC has verified adequate switchyard voltage and grid reliability COMMENTS:
PAGE 7 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 8 OF 19  STEP 8   8. Ensure both main transformer MODs  
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 8 8. Ensure both main transformer MODs - CLOSED.
- CLOSED. STANDARD: Applicant determines that both main transformer MODs are closed COMMENTS:       ___ SAT  ___ UNSAT STEP 9   9. Verify both turbine generator breakers  
___ SAT STANDARD:
- OPEN. STANDARD: Applicant determines both generator breakers are open COMMENTS:
___ UNSAT Applicant determines that both main transformer MODs are closed COMMENTS:
___ SAT  ___ UNSAT 
STEP 9 9. Verify both turbine generator breakers - OPEN.
___ SAT STANDARD:
___ UNSAT Applicant determines both generator breakers are open COMMENTS:
PAGE 8 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 9 OF 19  STEP 10 10. Prepare the 6.9 KV busses for power restoration as follows: a. Dispatch operator to ensure breakers for all de
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 10 10. Prepare the 6.9 KV busses for power restoration as follows:                                                     ___ SAT
-energized motor loads on following 6.9 KV busses  
: a. Dispatch operator to ensure breakers for all de-energized ___ UNSAT motor loads on following 6.9 KV busses - OPEN:
- OPEN:   1TA   1TB   1TC   1TD. STANDARD: Applicant dispatches operator to open all de
* 1TA
-energized motor loads on all 6.9 KV busses
* 1TB
. Examiner Cue: Operators have been dispatched.
* 1TC
* 1TD.
STANDARD:
Applicant dispatches operator to open all de-energized motor loads on all 6.9 KV busses.
Examiner Cue: Operators have been dispatched.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 11 10 b. Place switches for the following pumps in the "OFF" position:   All de-energized hotwell pumps All de-energized condensate booster pumps.
STEP 11 10 b. Place switches for the following pumps in the "OFF"           CRITICAL position:                                                   STEP
STANDARD: Applicant places the switches for the hotwell and booster pumps to OFF
* All de-energized hotwell pumps                         ___ SAT
 
* All de-energized condensate booster pumps.             ___ UNSAT STANDARD:
This step is critical to prevent overloading the busses when they are  
Applicant places the switches for the hotwell and booster pumps to OFF This step is critical to prevent overloading the busses when they are re-energized.
 
re-energized.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 9 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 10 OF 19  STEP 12   10 c. Depress the OFF pushbutton for all de-energized KR pumps. STANDARD: Applicant depresses the OFF pushbutton for the de
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 12 10 c. Depress the OFF pushbutton for all de-energized KR         CRITICAL pumps.                                                   STEP STANDARD:                                                               ___ SAT Applicant depresses the OFF pushbutton for the de-energized KR       ___ UNSAT pumps.
-energized KR pumps. Examiner Cue
Examiner Cue: If asked, 2SLXC is energized.
: If asked , "2SLXC is energized."
Examiner Note: Only the A and C KR pump OFF pushbuttons should be depressed. The B KR pump is powered from unit 2 and should be left running to supply unit 2 loads.
Examiner Note: Only the 'A' and 'C' KR pump OFF pushbuttons should be depressed. The 'B' KR pump is powered from unit 2 and should be left running to supply unit 2 loads.
This step is critical to prevent overloading the busses when they are re-energized.
This step is critical to prevent overloading the busses when they are re-energized.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 13   11. Do not continue in this procedure until all de-energized 6.9 KV motor load breakers are open.
STEP 13 11. Do not continue in this procedure until all de-energized 6.9 KV motor load breakers are open.                     ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines from the initiating cue, or by asking, that the procedure may continue.
STANDARD: Applicant determines from the initiating cue, or by asking, that the procedure may continue.
Examiner Cue: If asked, NEO reports that all de-energized 6.9 KV motor load breakers are open.
Examiner Cue
: If asked, NEO reports that all de
-energized 6.9 KV motor load breakers are open.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 10 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 11 OF 19 NOTE     Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re
Catawba Nuclear Station 2013 NRC Exam JPM B NOTE   Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing the main transformer.                                             ___ SAT STEP 14 12. Energize 6.9 KV busses as follows:                             ___ UNSAT
-energizing the main transformer.
: a. Announce "Energizing Unit 1 main power. All personnel stand clear."
STEP 14   12. Energize 6.9 KV busses as follows:
STANDARD:
: a. Announce "Energizing Unit 1 main power. All personnel stand clear." STANDARD: Applicant makes announcement using plant page COMMENTS:       ___ SAT  ___ UNSAT STEP 15   12 b. Verify the following unit tie PCBs  
Applicant makes announcement using plant page COMMENTS:
- CLOSED:   PCB 15   PCB 18. STANDARD: Applicant determines that the PCBs are open and proceeds to the RNO. COMMENTS:
STEP 15 12 b. Verify the following unit tie PCBs - CLOSED:
___ SAT  ___ UNSAT 
___ SAT
* PCB 15
___ UNSAT
* PCB 18.
STANDARD:
Applicant determines that the PCBs are open and proceeds to the RNO.
COMMENTS:
PAGE 11 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 12 OF 19  STEP 16   12 b. RNO b. Perform the following:
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 16 12 b. RNO b. Perform the following:
: 1) IF unit tie PCB(s) disconnects  
___ SAT
- OPEN, THEN return PCB(s) to operation. REFER TO OP/0/A/6350/010 (Operation of Station Breakers and Disconnects).
: 1) IF unit tie PCB(s) disconnects - OPEN, THEN return PCB(s) to operation. REFER TO       ___ UNSAT OP/0/A/6350/010 (Operation of Station Breakers and Disconnects).
STANDARD: Applicant determines that the step does not apply.
STANDARD:
Examiner Cue
Applicant determines that the step does not apply.
: If asked , "PCB disconnects are closed."
Examiner Cue: If asked, PCB disconnects are closed.
COMMENTS:       ___ SAT  ___ UNSAT    STEP 17   12 b. RNO b. 2) WHEN unit tie PCB(s) returned to operation, THEN CLOSE the following unit tie PCBs:
COMMENTS:
PCB 15   PCB 18. STANDARD: Applicant closes PCBs 15 and 18
STEP 17 12 b. RNO b. 2) WHEN unit tie PCB(s) returned to operation,     CRITICAL THEN CLOSE the following unit tie PCBs:       STEP
* PCB 15                                 ___ SAT
* PCB 18.                                 ___ UNSAT STANDARD:
Applicant closes PCBs 15 and 18 This step is critical to supply power from Offsite.
COMMENTS:
PAGE 12 OF 19


This step is critical to supply power from Offsite.
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 18 12 b. RNO b. 3) IF PCB(s) will not close, THEN notify TCC to close affected PCB(s).                          ___ SAT STANDARD:                                                                  ___ UNSAT Applicant determines that the step does not apply.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
STEP 19 13. Verify 1TA - ENERGIZED.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1TA is not energized and proceeds to the RNO.
COMMENTS:
STEP 20 13 RNO Perform the following:
___ SAT
: a. IF not previously performed, THEN dispatch operator to ensure breakers for all motor loads on 6.9 KV buss ___ UNSAT 1TA - OPEN:
STANDARD:
Applicant determines that the step does not apply.
COMMENTS:
PAGE 13 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 13 OF 19  STEP 18  12 b. RNO b. 3) IF PCB(s) will not close, THEN notify TCC to close affected PCB(s).
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 21 13 RNO b. Ensure switches for the following pumps in the "OFF" position:                              ___ SAT
STANDARD: Applicant determines that the step does not apply.
                        *  "HTWL PUMP 1A"                            ___ UNSAT
COMMENTS:       ___ SAT  ___ UNSAT STEP 19  13. Verify 1TA  
                        *  "CM BSTR PUMP 1A" STANDARD:
- ENERGIZED.
Applicant ensures the switches for the pumps in the OFF position.
STANDARD: Applicant determines that 1TA is not energized and proceeds to the RNO. COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 20  13 RNO Perform the following:
STEP 22 13 RNO c. Place "7KV BUS 1TA MODE SEL" switch in "MAN A      CRITICAL
: a. IF not previously performed, THEN dispatch operator to ensure breakers for all motor loads on 6.9 KV buss 1TA - OPEN: STANDARD: Applicant determines that the step does not apply.
                      & TIE".                                         STEP STANDARD:                                                           ___ SAT Applicant places the 7KV BUS 1TA MODE SEL switch to MAN A &    ___ UNSAT TIE This step is critical to operate the required breakers.
COMMENTS:
STEP 23 13 RNO d. CLOSE "7KV 1TA FDR FRM 1T2A".                     CRITICAL STEP STANDARD:
___ SAT Applicant depresses the red CLOSE pushbutton for 7KV 1TA FDR FRM 1T2A                                                        ___ UNSAT This step is critical to energize 1TA.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 14 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 14 OF 19  STEP 21  13 RNO b. Ensure switches for the following pumps in the "OFF" position:
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 24 13 RNO e. IF "7KV 1TA FDR FRM 1T2A" fails to close, THEN dispatch operator to close 1TA-05 (Normal A      ___ SAT Incoming Feeder From XFMR 1T2A). REFER TO Enclosure 30 (Local Operation of 6900V Bus       ___ UNSAT Breakers).
    "HTWL PUMP 1A"    "CM BSTR PUMP 1A" STANDARD:  Applicant ensures the switches for the pumps in the OFF position.
STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 22  13 RNO c. Place "7KV BUS 1TA MODE SEL" switch in "MAN A & TIE". STANDARD: Applicant places the "7KV BUS 1TA MODE SEL" switch to "MAN A & TIE" This step is critical to operate the required breakers.
Applicant determines that the step does not apply.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT STEP 23  13 RNO d. CLOSE "7KV 1TA FDR FRM 1T2A".
STEP 25 14. Verify 1ATC - ENERGIZED.
STANDARD: Applicant depresses the red CLOSE pushbutton for "7KV 1TA FDR FRM 1T2A" This step is critical to energize 1TA.
___ SAT STANDARD:
___ UNSAT Applicant verifies that 1ATC is energized COMMENTS:
STEP 26 15. Verify 1ETA-03 (Normal Incoming Feeder From Xfmr 1ATC) - RACKED IN.                                         ___ SAT STANDARD:                                                               ___ UNSAT Applicant verifies that 1ETA-03 is racked in using status lights, the OPEN light lit on the ETA NORM FDR FRM ATC switch, or the cue.
Examiner Cue: If asked, 1ETA-03 is racked in.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 15 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 15 OF 19  STEP 24  13 RNO e. IF "7KV 1TA FDR FRM 1T2A" fails to close, THEN dispatch operator to close 1TA-05 (Normal A Incoming Feeder From XFMR 1T2A). REFER TO Enclosure 30 (Local Operation of 6900V Bus Breakers).
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 27 16. Do not continue in this enclosure until:
STANDARD:  Applicant determines that the step does not apply. COMMENTS:       ___ SAT   ___ UNSAT STEP 25  14. Verify 1ATC  
___ SAT
- ENERGIZED.
* 4KV XFMR 1ATC - ENERGIZED
STANDARD:  Applicant verifies that 1ATC is energized COMMENTS:
___ UNSAT
___ SAT  ___ UNSAT STEP 26  15. Verify 1ETA
* 1ETA-03 (Normal Incoming Feeder From Xfmr 1ATC) -
-03 (Normal Incoming Feeder From Xfmr 1ATC) - RACKED IN.
RACKED IN.
STANDARD: Applicant verifies that 1ETA
* Load shed of 1ETA - COMPLETE
-03 is racked in using status lights, the OPEN light lit on the ETA NORM FDR FRM ATC switch, or the cue.
* The following 1ETA lockout relays - RESET:
Examiner Cue
* 86N (1ETA 03 Cubicle)
:  If asked, 1ETA-03 is racked in.
* 86B (1ETA 03 Cubicle)
* 86S (1ETA 04 Cubicle)
* 86D (1ETA 19 Cubicle).
STANDARD:
Applicant determines that all conditions are met and continues.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 16 OF 19
 
Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 16 OF 19 STEP 27  16. Do not continue in this enclosure until:
4KV XFMR 1ATC
- ENERGIZED  1ETA-03 (Normal Incoming Feeder From Xfmr 1ATC)
- RACKED IN.
Load shed of 1ETA
- COMPLETE    The following 1ETA lockout relays
- RESET:    86N (1ETA 03 Cubicle) 86B (1ETA 03 Cubicle)    86S (1ETA 04 Cubicle) 86D (1ETA 19 Cubicle).
STANDARD:  Applicant determines that all conditions are met and continues.
COMMENTS:        ___ SAT  ___ UNSAT 


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 17 OF 19  STEP 28   17. Energize 1ETA as follows:
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 28 17. Energize 1ETA as follows:                             CRITICAL STEP
: a. CLOSE "ETA NORM FDR FRM ATC". STANDARD: Applicant depresses the CLOSE pushbutton for "ETA NORM FDR FRM ATC". This step is critical to energize 1ETA.
: a. CLOSE "ETA NORM FDR FRM ATC".
___ SAT STANDARD:
___ UNSAT Applicant depresses the CLOSE pushbutton for ETA NORM FDR FRM ATC.
This step is critical to energize 1ETA.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 2 9  17 b. Verify 1ETA  
STEP 29 17 b. Verify 1ETA - ENERGIZED.
- ENERGIZED.
___ SAT STANDARD:
STANDARD: Applicant verifies that 1ETA is energized.
___ UNSAT Applicant verifies that 1ETA is energized.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 17 OF 19


Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 18 OF 19  STEP 30   18. Notify dispatched operator to close the following load center normal incoming breakers from 1ETA:
Catawba Nuclear Station 2013 NRC Exam JPM B STEP 30 18. Notify dispatched operator to close the following load     CRITICAL center normal incoming breakers from 1ETA:                 STEP
1ELXA-4B (Normal Incoming Breaker Fed From Xfmr 1ETXA) (AB
* 1ELXA-4B (Normal Incoming Breaker Fed From Xfmr       ___ SAT 1ETXA) (AB-577, AA-47, Rm 496)
-577, AA-47, Rm 496)   1ELXC-4B (Normal Incoming Breaker Fed From Xfmr 1ETXC) (AB
___ UNSAT
-577, AA-46, Rm 496)
* 1ELXC-4B (Normal Incoming Breaker Fed From Xfmr 1ETXC) (AB-577, AA-46, Rm 496)
STANDARD: Applicant notifies dispatched operator to close 1ELXA
STANDARD:
-4B and 1ELXC
Applicant notifies dispatched operator to close 1ELXA-4B and 1ELXC-4B.
-4B. Examiner Note: Insert Trigger 2 Examiner Cue:   Operator reports that 1ELXA
Examiner Note: Insert Trigger 2 Examiner Cue: Operator reports that 1ELXA-4B and 1ELXC-4B are closed.
-4B and 1ELXC-4B are closed.
This step is critical to energize the A train Essential Load Centers.
This step is critical to energize the 'A' train Essential Load Centers.
COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 31  19. GO TO Section C. (Operator Actions), Step 38. STANDARD:  Applicant reads the step.
Examiner Cue:  The CRS will go to section C, step 38.
COMMENTS:
COMMENTS:
END OF TASK
STEP 31 19. GO TO Section C. (Operator Actions), Step 38.
___ SAT   ___ UNSAT STOP TIME _______
___ SAT STANDARD:
___ UNSAT Applicant reads the step.
Examiner Cue: The CRS will go to section C, step 38.
COMMENTS:
END OF TASK STOP TIME _______
PAGE 18 OF 19


APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba Nuclear Station 2013 NRC Exam JPM B PAGE 19 OF 19  DIRECTION TO APPLICANT:
Catawba Nuclear Station 2013 NRC Exam JPM B DIRECTION TO APPLICANT:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit One has experienced a Loss of All AC power.
* Unit One has experienced a Loss of All AC power.
It is desired to restore normal power to 1ETA from offsite through 1ATC.
* It is desired to restore normal power to 1ETA from offsite through 1ATC.
The TCC has verified adequate switchyard voltage and grid reliability.
* The TCC has verified adequate switchyard voltage and grid reliability.
* The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.
INITIATING CUES:
You have been directed to align Normal power to 1ETA by completing  [Aligning Normal Power to 1ETA (1ATC)] of EP/1/A/5000/ECA-0.0, (Loss of All AC Power).
PAGE 19 OF 19


The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam JPM C PAGE 1 OF 9
INITIATING CUES:


You have been directed to align Normal power to 1ETA by completing Enclosure 7 [Aligning Normal Power to 1ETA (1ATC
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam EVALUATION SHEET Task:                Emergency Borate the Reactor Coolant System Alternate Path:      Yes Facility JPM #:      NV-017 Safety Function:    1       Title:      Reactivity Control K/A          004 A2.14      Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s):  3.8 / 3.9     CFR:      41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location:                          Preferred Evaluation Method:
)] of EP/1/A/5000/ECA
Simulator      X      In-Plant                        Perform              X      Simulate
-0.0, (Loss of All AC Power)
.
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam PAGE 1 OF 9  


JPM C      
==References:==
EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATW) rev. 021 Task Standard:      One NV pump running with its suction aligned to the FWST and isolated from the VCT.
Validation Time: 5 minutes                              Time Critical:          Yes        No     X
===========================================================================
Applicant:                                                                      Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 9


Catawba Nuclear Station JPM C Sep. 2013 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task: Emergency Borate the Reactor Coolant System Alternate Path:
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Yes  Facility JPM #:
: 1.     ENSURE NRC Examination Security has been established.
NV-017  Safety Function: 1 Title: Reactivity Control K/A  00 4 A 2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Emergency Boration Rating(s):
: 2.     Reset to IC #171
3.8 / 3.9 CFR: 41.5 / 43/5 / 45/3 / 45/5  Preferred Evaluation Location:
: 3.     Enter the password.
Preferred Evaluation  Method:
: 4.     Select Yes on the INITIAL CONDITION RESET pop-up window.
Simulator X In-Plant  Perform X Simulate  References
: 5.     Ensure simulator setup per table below.
: EP/1/A/5000/FR
: 6.     Place simulator in RUN and acknowledge any alarms.
-S.1 (Nuclear Power Generation/ATW) rev. 021  Task Standard:
: 7.     ENSURE Extra Operator is present in the simulator.
One NV pump running with its suction aligned to the FWST and isolated from the VCT. Validation Time:
: 8.     Place simulator in FREEZE until Examiner cue is given.
5 minutes  Time Critical:
Instructor Action               Final   Delay Ramp   Delete In Event MAL-IPX003A MAL-IPX003B VLV-NV043F                                       0 MAL-MT-007 Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.
Yes  No X ===========================================================================
PAGE 3 OF 9
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM C Sep. 2013 NRC Exam PAGE 3 OF 9  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
#171 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
. Instructor Action Final Delay Ramp Delete In Event MAL-IPX0 0 3A      MAL-IPX0 0 3B      VLV-NV043F 0     MAL-MT-007                                           Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.


REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM C Sep. 2013 NRC Exam PAGE 4 OF 9  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
REV. 0                                                                   PAGE 4 0F 9 Catawba Nuclear Station JPM C Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A valid reactor trip signal has been received
* A valid reactor trip signal has been received.
. The reactor will NOT trip automatically or manually
* The reactor will NOT trip automatically or manually.
. A Red Path for Subcriticality is in effect
* A Red Path for Subcriticality is in effect.
. The OATC is inserting rods manually
* The OATC is inserting rods manually.
. INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.
-S.1, (Nuclear Power Generation/ATWS), step 4. EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.
:   After reading cue, provide the applicant with a copy of EP/1/A/5000/FR
PAGE 4 OF 9
-S.1 pages 3-5.
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 9   START TIME: _______
STEP 1:  4. Initiate emergency boration of NC System as follows:
: a. Ensure at least one NV pump
- ON. STANDARD:  Applicant verifies red "ON" light lit for "NV PMP 1A" or "1B" (1MC
-10). COMMENTS: 


Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD                                SAT/UNSAT START TIME: _______
STEP 1: 4. Initiate emergency boration of NC System as follows:
___ SAT
___ SAT
___ UNSAT STEP 2   4. b. OPEN 1NV
: a. Ensure at least one NV pump - ON.
-236B (Boric Acid To NV Pumps Suct).
___ UNSAT STANDARD:
STANDARD:   Applicant depresses the red "OPEN" pushbutton for 1NV
Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).
-236B and verifies the red "OPEN" light remains dark and the green "CLSD" light remains lit on 1M C-10. 1NV-236B remains closed.
COMMENTS:
STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).
___ SAT STANDARD:
___UNSAT Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.
COMMENTS:
STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.                                            ___ SAT STANDARD:                                                                ___ UNSAT Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.
COMMENTS:
PAGE 5 0F 9
 
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD                        SAT/UNSAT STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR      ___ SAT EQUAL TO 30 GPM.
___ UNSAT STANDARD:
Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
COMMENTS:
COMMENTS:
STEP 5    4. d. RNO d. Align NV pump suction to FWST as follows:    CRITICAL STEP
: 1) OPEN the following valves:
___ SAT
___ SAT
___UNSAT STEP 3  4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION.
* 1NV-252A (NV Pumps Suct From FWST)
STANDARD: Applicant rotates the switches for "B/A XFER PMP 1A" and "B/A XFER PMP 1B" to the "ON" position.
___ UNSAT
COMMENTS:
* 1NV-253B (NV Pumps Suct From FWST).
STANDARD:
Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps as long as one of the valves is opened.
COMMENTS:
PAGE 6 0F 9


___ SAT  ___ UNSAT 
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 6 4. d. RNO d. 2) CLOSE the following valves:                           CRITICAL STEP
 
* 1NV-188A (VCT Otlt Isol)
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9    STEP 4  4. d. Verify emergency boration flow
___ SAT
- GREATER THAN OR EQUAL TO 30 GPM.
* 1NV-189B (VCT Otlt Isol).
STANDARD:  Applicant verifies "EMER BORATE FLOW" (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.
___ UNSAT STANDARD:
COMMENTS:        ___ SAT  ___ UNSAT STEP 5    4. d. RNO d. Align NV pump suction to FWST as follows:  1) OPEN the following valves:
Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.
1NV-252A (NV Pumps Suct From FWST)   1NV-253B (NV Pumps Suct From FWST). STANDARD: Applicant depresses the red OPEN pushbuttons for 1NV
This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps as long as one of the valves is closed.
-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps as long as one of the valves is open ed. COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
STEP 7 4. e. Verify the following charging line isolation valves - OPEN:
___ SAT
* 1NV-312A (Chrg Line Cont Isol) follows:
___ UNSAT
* 1NV-314B (Chrg Line Cont Isol).
STANDARD:
Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.
COMMENTS:
PAGE 7 0F 9


Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9  STEP 4. d. RNO d. 2) CLOSE the following valves:
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.
1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol).
___ SAT STANDARD:
STANDARD: Applicant depresses the green CLSD pushbutton fo r 1NV-188A and 1NV-189B. This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps as long as one of the valves is closed.
___ UNSAT Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 7  4. e. Verify the following charging line isolation valves
END OF TASK STOP TIME ________
- OPEN:  1NV-312A (Chrg Line Cont Isol) follows:
PAGE 8 0F 9
1NV-314B (Chrg Line Cont Isol).
STANDARD:  Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV
-314B. COMMENTS:
___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 9   STEP 8  4. f. Verify Pzr pressure
- LESS THAN 2335 PSIG.
STANDARD:  Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC
-10)  COMMENTS:  END OF TASK
___ SAT  ___ UNSAT 


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba Nuclear Station 2013 NRC Exam JPM C   DIRECTION TO APPLICANT:
Catawba Nuclear Station 2013 NRC Exam JPM C DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A valid reactor trip signal has been received
* A valid reactor trip signal has been received.
. The reactor will NOT trip automatically or manually
* The reactor will NOT trip automatically or manually.
. A Red Path for Subcriticality is in effect
* A Red Path for Subcriticality is in effect.
. The OATC is inserting rods manually
* The OATC is inserting rods manually.
. INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR
The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.
-S.1, (Nuclear Power Generation/ATWS), step 4.
 
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam PAGE 1 OF 10  
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam JPM D PAGE 1 OF 10
 
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam EVALUATION SHEET Task:                Secure 1A ND Pump per EP/1/A/5000/E-0 step 17.
Alternate Path:      Yes Facility JPM #:      New Safety Function:    3        Title:      Reactor Pressure Control K/A          006 A2.02      Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flow path.
Rating(s):  3.9 / 4.3      CFR:      41.5 / 45.5 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform              X      Simulate


JPM D      
==References:==
EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) rev. 041 Task Standard:      Secure the 1A ND Pump Validation Time: 5 minutes                              Time Critical:          Yes        No     X
===========================================================================
Applicant:                                                                      Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 10


Catawba Nuclear Station JPM D Sep. 2013 NRC Exam PAGE 2 OF 10 EVALUATION SHEET Task: Secure 1A ND Pump per EP/1/A/5000/E
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
-0 step 17. Alternate Path:
Yes  Facility JPM #:
New  Safety Function: 3 Title: Reactor Pressure Control K/A  006 A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flow path.
Rating(s):
3.9 / 4.3 CFR: 41.5 / 4 5.5    Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: EP/1/A/5000/E
-0 (Reactor Trip or Safety Injection) rev. 04 1  Task Standard:
Secure the 1A ND Pump Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM D Sep. 2013 NRC Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC #172
#172 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event VLV-ND004F (ND25A NDPMP A MINFLOW VALVE FAIL TO POSITION) 0    MAL-NC013B (NC COLD LEG D LEAK) 1.55 REV. 0 PAGE 4  0F 10 Catawba Nuclear Station JPM D Sep. 2013 NRC Exam PAGE 4 OF 10   READ TO APPLICANT  DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned
Instructor Action               Final   Delay Ramp Delete In Event VLV-ND004F (ND25A NDPMP A MINFLOW 0
 
VALVE FAIL TO POSITION)
task. To indicate that you have completed your assigned task return the handout sheet I provided you.
MAL-NC013B (NC COLD LEG D LEAK)               1.55 PAGE 3 OF 10


REV. 0                                                                  PAGE 4 0F 10 Catawba Nuclear Station JPM D Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Unit 1 safety injection has occurred due to a loss of coolant accident.
* A Unit 1 safety injection has occurred due to a loss of coolant accident.
EP/1/A/5000/E
* EP/1/A/5000/E-0, (Reactor Trip or Safety Injection) has been entered.
-0, (Reactor Trip or Safety Injection) has been entered.
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to perform step 17 of E-0. EXAMINER NOTE
The CRS has directed you to perform step 17 of E-0.
:   After reading cue, provide the applicant with a copy of EP/1/A/5000/
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/E-0 pages 10-12.
E-0 pages 10
PAGE 4 OF 10
-12.
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 10   START TIME: _______
STEP 1:  17. Verify proper S/I flow as follows:
: a. "NV S/I FLOW" - INDICATING FLOW.
STANDARD:  Applicant verifies flow on 1NVP6080 (NV S/I FLOW) on 1MC
-5. COMMENTS: 


Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD                          SAT/UNSAT START TIME: _______
STEP 1: 17. Verify proper S/I flow as follows:
___ SAT
___ SAT
___ UNSAT STEP 2   17. b. NC pressure  
: a. "NV S/I FLOW" - INDICATING FLOW.
- LESS THAN 1620 PSIG.
___ UNSAT STANDARD:
STANDARD:   Applicant verifies NC pressure is less than 1620 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG W/R PRESS) on 1MC
Applicant verifies flow on 1NVP6080 (NV S/I FLOW) on 1MC-5.
-5, or the plasma displays on 1MC
COMMENTS:
-1, or the OAC.
STEP 2   17. b. NC pressure - LESS THAN 1620 PSIG.                   ___ SAT STANDARD:                                                           ___UNSAT Applicant verifies NC pressure is less than 1620 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG W/R PRESS) on 1MC-5, or the plasma displays on 1MC-1, or the OAC.
COMMENTS:
COMMENTS:
 
STEP 3 17. c. NI pumps - INDICATING FLOW.
___ SAT    ___UNSAT STEP 3   17. c. NI pumps  
___ SAT STANDARD:
- INDICATING FLOW.
___ UNSAT Applicant verifies flow on 1NIP5450 (1A DISCH FLOW) and 1NIP5120 (1B DISCH FLOW) on 1MC-11.
STANDARD: Applicant verifies flow on 1NIP5450 (1A DISCH FLOW) and 1NIP5120 (1B DISCH FLOW) on 1MC
COMMENTS:
-11. COMMENTS:
PAGE 5 0F 10
 
___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10  STEP 4   17. d. NC pressure  
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 4 17. d. NC pressure - LESS THAN 285 PSIG.                         CRITICAL STEP STANDARD:
- LESS THAN 285 PSIG.
___ SAT Applicant verifies NC pressure is greater than 285 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG               ___ UNSAT W/R PRESS) on 1MC-5, or the plasma displays on 1MC-1, or the OAC, and transitions to the RNO column.
STANDARD: Applicant verifies NC pressure is greater than 285 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG W/R PRESS) on 1MC
-5, or the plasma displays on 1MC
-1, or the OAC , and transitions to the RNO column.
This step is critical to ensure the correct procedure flowpath (RNO) is recognized and implemented for task completion.
This step is critical to ensure the correct procedure flowpath (RNO) is recognized and implemented for task completion.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 5    17.d. RNO d. Perform the following:
STEP 5    17.d. RNO d. Perform the following:
: 1) Ensure ND pump miniflow valve on operating ND pump(s)  
___ SAT
- OPEN. STANDARD: Applicant determines that 1ND
: 1) Ensure ND pump miniflow valve on operating ND pump(s) - OPEN.                         ___ UNSAT STANDARD:
-25A (ND PUMP 1A MINIFLOW) is not open and attempts to open 1ND
Applicant determines that 1ND-25A (ND PUMP 1A MINIFLOW) is not open and attempts to open 1ND-25A by depressing the red OPEN pushbutton.
-25A by depressing the red OPEN pushbutton.
EXAMINER NOTE: 1ND-25A will not open.
EXAMINER NOTE
: 1ND-25A will not open.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 6 0F 10


Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10  STEP 6   17.d. RNO d. 2) IF the ND pump miniflow valve(s) cannot be opened, THEN perform the following for affected train(s): a) Reset ECCS.
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 6 17.d. RNO d. 2) IF the ND pump miniflow valve(s) cannot be           CRITICAL opened, THEN perform the following for affected   STEP train(s):
STANDARD: Applicant depresses the yellow RESET pushbutton for ECCS TRN A on 1MC-11 and verifies the yellow RESET light is lit.
___ SAT a) Reset ECCS.
___ UNSAT STANDARD:
Applicant depresses the yellow RESET pushbutton for ECCS TRN A on 1MC-11 and verifies the yellow RESET light is lit.
This step is critical to allow the 1A D/G Load Sequencer to be reset.
This step is critical to allow the 1A D/G Load Sequencer to be reset.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 7   17.d. RNO d. 2) b) Reset D/G load sequencer.
STEP 7 17.d. RNO d. 2) b) Reset D/G load sequencer.                         CRITICAL STEP STANDARD:
STANDARD: Applicant depresses the yellow RESET pushbutton for D/G 1A LOAD SEQ RESET on 1MC
___ SAT Applicant depresses the yellow RESET pushbutton for D/G 1A LOAD SEQ RESET on 1MC-11 and verifies the yellow RESET light is lit.         ___ UNSAT This step is critical to gain control of the 1A ND Pump.
-11 and verifies the yellow RESET light is lit.
COMMENTS:
PAGE 7 0F 10


This step is critical to gain control of the 1A ND Pump.
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD                          SAT/UNSAT STEP 8 17.d. RNO d. 2) c) Stop ND pump.                              CRITICAL STEP STANDARD:
___ SAT Applicant depresses the green OFF pushbutton for ND PUMP 1A on 1MC-11 and verifies ND PUMP 1A is off.                          ___ UNSAT This step is critical to stop the 1A ND Pump from deadheading and subsequent overheating.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT 
STEP 9 17.d. RNO d. 2) d) IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.           ___ SAT STANDARD:                                                           ___ UNSAT Applicant acknowledges the step.
 
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 8 0F 10  STEP 8  17.d. RNO d. 2) c) Stop ND pump.
STANDARD: Applicant depresses the green OFF pushbutton for ND PUMP 1A on 1MC-11 and verifies ND PUMP 1A is off.
This step is critical to stop the 1A ND Pump from deadheading and subsequent overheating.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 9  17.d. RNO d. 2) d) IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on.
STEP 10 17.d. RNO d. 2) e) IF AT ANY TIME NC pressure decreases to less than 285 PSIG in an uncontrolled  ___ SAT manner, THEN restart the ND pump.
STANDARD: Applicant acknowledges the step.
___ UNSAT STANDARD:
Applicant acknowledges the step.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 10 17.d. RNO d. 2) e) IF AT ANY TIME NC pressure decreases to less than 285 PSIG in an uncontrolled manner, THEN restart the ND pump. STANDARD:  Applicant acknowledges the step.
PAGE 8 0F 10
COMMENTS: 


___ SAT   ___ UNSAT
Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 11 17. d. RNO d. 3) Observe note prior to Step 18 and GO TO Step
: 18.                                          ___ SAT STANDARD:                                                            ___ UNSAT Applicant acknowledges the step and goes to step 18.
Examiner Cue: The CRS will continue to read the steps of E-0.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 9 0F 10


Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 10  STEP 11 17. d. RNO d. 3) Observe note prior to Step 18 and GO TO Step 18. STANDARD:  Applicant acknowledges the step and goes to step 18.
Examiner Cue
:  The CRS will continue to read the steps of E-0. COMMENTS:
END OF TASK
___ SAT  ___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba Nuclear Station 2013 NRC Exam JPM D   DIRECTION TO APPLICANT:
Catawba Nuclear Station 2013 NRC Exam JPM D DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A Unit 1 safety injection has occurred due to a loss of coolant accident.
* A Unit 1 safety injection has occurred due to a loss of coolant accident.
EP/1/A/5000/E
* EP/1/A/5000/E-0, (Reactor Trip or Safety Injection) has been entered.
-0, (Reactor Trip or Safety Injection) has been entered.
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to perform step 17 of E-0.


The CRS has directed you to perform step 17 of E
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam JPM E PAGE 1 OF 11
-0.


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam PAGE 1 OF 11       
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam EVALUATION SHEET Task:                Increase Pressure in the 1A Cold Leg Accumulator Alternate Path:      No Facility JPM #:      CLA-109 Safety Function:    2        Title:      Reactor Coolant System Inventory Control K/A          006 A1.03      Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration).
Rating(s):  3.5 / 3.7      CFR:      41.5 / 45.5 Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform            X      Simulate


JPM E     
==References:==
OP/1/A/6200/009 (Cold Leg Accumulator Operation) Enclosure 4.6 rev.075 OP/1/A/6100/010J, (Annunciator Response for 1AD-9, E/1) rev. 068 Task Standard:      Cold Leg Accumulator 1A is pressurized with nitrogen to clear annunciator 1AD-9, E/1.
Validation Time: 5 minutes                            Time Critical:        Yes        No     X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                          Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 11


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam PAGE 2 OF 11 EVALUATION SHEET Task: Increase Pressure in the 1 A Cold Leg Accumulator Alternate Path:
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No  Facility JPM #:
CLA-109  Safety Function:
2 Title: Reactor Coolant System Inventory Control K/A  006 A1.0 3 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including:  Accumulator pressure (level, boron concentration).
Rating(s):
3.5 / 3.7 CFR: 41.5 / 45.5  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: OP/1/A/6200/009 (Cold Leg Accumulator Operation) Enclosure 4.6 rev.075 OP/1/A/6100/010J, (Annunciator Response for 1AD
-9, E/1) rev. 068  Task Standard:
Cold Leg Accumulator 1A is pressurized with nitrogen to clear annunciator 1AD-9, E/1. Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM E Sep. 2013 NRC Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC #173
#173 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event REV. 0 PAGE 4 0F 11 Catawba Nuclear Station JPM E Sep. 2013 NRC Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event PAGE 3 OF 11
 
REV. 0                                                                   PAGE 4 0F 11 Catawba Nuclear Station JPM E Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power. Cold Leg Accumulator 1A nitrogen overpressure has decreased
* Unit 1 is at 100% power.
. Annunciator 1AD
* Cold Leg Accumulator 1A nitrogen overpressure has decreased.
-9, E/1 ACCUM TANK A HI/LO PRESS is lit.
* Annunciator 1AD-9, E/1 ACCUM TANK A HI/LO PRESS is lit.
INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD
* The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD-9, E/1.
-9, E/1. Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
* Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
Peer Check has been waived.
* Peer Check has been waived.
EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6200/009 Enclosure 4.6.
:   After reading cue, provide the applicant with a copy of OP/1/A/6200/009 Enclosure 4.
PAGE 4 OF 11
: 6.
 
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  START TIME: _______
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT START TIME: _______
STEP 1:   3.1 Open 1NI
STEP 1: 3.1 Open 1NI-47A (C-Leg Accum N2 Sup Cont Isol).               CRITICAL STEP STANDARD:
-47A (C-Leg Accum N 2 Sup Cont Isol).
___ SAT Applicant depresses the red OPEN pushbutton for 1NI-47A
STANDARD: Applicant depresses the red OPEN pushbutton for 1NI
___ UNSAT This step is critical to align nitrogen to the Cold Leg Accumulators.
-47A This step is critical to align nitrogen to the Cold Leg Accumulators.
COMMENTS:
COMMENTS:
CRITICAL STEP  ___ SAT
CRITICAL STEP 2 3.2 Position 1CB-1 (located behind control panel 1MC6, BB-56)     STEP to "ON".
___ UNSAT STEP 2   3.2 Position 1CB
___ SAT STANDARD:
-1 (located behind control panel 1MC6, BB
___UNSAT Applicant places the breaker for 1CB-1 in the ON position.
-56) to "ON". STANDARD: Applicant places the breaker for 1CB
-1 in the "ON" position.
 
This step is critical to align power to the switches for the Cold Leg Accumulator nitrogen supply isolations.
This step is critical to align power to the switches for the Cold Leg Accumulator nitrogen supply isolations.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT
PAGE 5 0F 11
___UNSAT 
 
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 11 NOTE:    If N 2 inlet temperature decreases to 65°F, accumulator N 2 supply isolation valves will auto close. There is no alarm associated with this condition. When N 2 inlet temperature increased above 66°F, this condition will auto clear.
CAUTION:    Pressurization shall be performed on only one accumulator at a time.
STEP 3  3.3 Open the corresponding valve to increase pressure in the desired accumulator:
1NI-50 (C-Leg Accum A N 2 Supply Isol) 1NI-61 (C-Leg Accum B N 2 Supply Isol) 1NI-72 (C-Leg Accum C N 2 Supply Isol) 1NI-84 (C-Leg Accum D N 2 Supply Isol)
STANDARD:  Applicant depresses the red OPEN pushbutton for 1NI
-50 and verifies that 1A Cold Leg Accumulator pressure is increasing (1NIP5040 or 1NIP5050 on 1MC
-11, or the using the OAC).


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                                  SAT/UNSAT NOTE:      If N2 inlet temperature decreases to 65°F, accumulator N2 supply isolation valves will auto close. There is no alarm associated with  CRITICAL this condition. When N2 inlet temperature increased above 66°F,        STEP this condition will auto clear.
___ SAT CAUTION:        Pressurization shall be performed on only one accumulator at a time.                                                    ___ UNSAT STEP 3 3.3 Open the corresponding valve to increase pressure in the desired accumulator:
* 1NI-50 (C-Leg Accum A N2 Supply Isol)
* 1NI-61 (C-Leg Accum B N2 Supply Isol)
* 1NI-72 (C-Leg Accum C N2 Supply Isol)
* 1NI-84 (C-Leg Accum D N2 Supply Isol)
STANDARD:
Applicant depresses the red OPEN pushbutton for 1NI-50 and verifies that 1A Cold Leg Accumulator pressure is increasing (1NIP5040 or 1NIP5050 on 1MC-11, or the using the OAC).
This step is critical to align nitrogen to the 1A Cold Leg Accumulator.
This step is critical to align nitrogen to the 1A Cold Leg Accumulator.
COMMENTS:
COMMENTS:
CRITICAL STEP
PAGE 6 0F 11
___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11    STEP 4   3.4 IF the accumulator N 2 supply isolation valve frequently auto closes, ensure the following:
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 4 3.4 IF the accumulator N2 supply isolation valve frequently auto ___ SAT closes, ensure the following:
SMXB-F05E (Safety Injection Accumulator Nitrogen Heater) (AB
___ UNSAT
-560, HH-52) is energized.
* SMXB-F05E (Safety Injection Accumulator Nitrogen Heater) (AB-560, HH-52) is energized.
The thermostat is set at 75°F.
* The thermostat is set at 75°F.
STANDARD: If 1NI-50 cycles closed and reopens, applicant dispatches an NEO to check the power supply and thermostat setting.
STANDARD:
EXAMINER NOTE:
If 1NI-50 cycles closed and reopens, applicant dispatches an NEO to check the power supply and thermostat setting.
If applicant dispatches an operator to check the power supply and thermostat setting, repeat back only what is said.
EXAMINER NOTE: If applicant dispatches an operator to check the power supply and thermostat setting, repeat back only what is said.
EXAMINER NOTE:
EXAMINER NOTE: Cold Leg Accumulator pressure cannot be increased unless steps 1, 2, and 3 are successfully completed.
Cold Leg Accumulator pressure cannot be increased unless steps 1, 2, and 3 are successfully completed.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 7 0F 11


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11  STEP 5    3.5 WHEN the accumulator is at the desired pressure, close the appropriate valve as follows:
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 5    3.5 WHEN the accumulator is at the desired pressure, close the   CRITICAL appropriate valve as follows:                                 STEP 3.5.1 Depress the "CLS" pushbutton for the appropriate     ___ SAT valve:
3.5.1 Depress the "CLS" pushbutton for the appropriate valve:   1NI-50 (C-Leg Accum A N 2 Supply Isol) 1NI-61 (C-Leg Accum B N 2 Supply Isol) 1NI-72 (C-Leg Accum C N 2 Supply Isol) 1NI-84 (C-Leg Accum D N 2 Supply Isol)
___ UNSAT
STANDARD: Applicant determines that Cold Leg Accumulator 1A pressure has been restored to within limits by verifying 1AD
* 1NI-50 (C-Leg Accum A N2 Supply Isol)
-9, E/1 clears and depresses the green CLOSE pushbutton for 1NI
* 1NI-61 (C-Leg Accum B N2 Supply Isol)
-50.
* 1NI-72 (C-Leg Accum C N2 Supply Isol)
This step is critical to terminate the pressure increase and prevent overpressurizing the 1A Cold Leg Accumulator. COMMENTS:
* 1NI-84 (C-Leg Accum D N2 Supply Isol)
CRITICAL STEP    ___ SAT  ___ UNSAT 
STANDARD:
Applicant determines that Cold Leg Accumulator 1A pressure has been restored to within limits by verifying 1AD-9, E/1 clears and depresses the green CLOSE pushbutton for 1NI-50.
This step is critical to terminate the pressure increase and prevent overpressurizing the 1A Cold Leg Accumulator.
COMMENTS:
PAGE 8 0F 11


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11  STEP 6   3.5.2 Verify the appropriate valve is closed:
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                                   SAT/UNSAT STEP 6 3.5.2 Verify the appropriate valve is closed:
1NI-50 (C-Leg Accum A N 2 Supply Isol) 1NI-61 (C-Leg Accum B N 2 Supply Isol) 1NI-72 (C-Leg Accum C N 2 Supply Isol) 1NI-84 (C-Leg Accum D N 2 Supply Isol)
___ SAT
STANDARD: Applicant verifies that the green CSLD light is lit and the red OPEN light is dark for 1NI
* 1NI-50 (C-Leg Accum A N2 Supply Isol)
-50. COMMENTS:       ___ SAT  ___ UNSAT STEP 7   3.6 IF necessary, repeat Steps 3.3 through 3.5 to increase pressure in additional accumulators.
___ UNSAT
STANDARD: Applicant determines that the step does not apply.
* 1NI-61 (C-Leg Accum B N2 Supply Isol)
* 1NI-72 (C-Leg Accum C N2 Supply Isol)
* 1NI-84 (C-Leg Accum D N2 Supply Isol)
STANDARD:
Applicant verifies that the green CSLD light is lit and the red OPEN light is dark for 1NI-50.
COMMENTS:
STEP 7 3.6 IF necessary, repeat Steps 3.3 through 3.5 to increase pressure in additional accumulators.                     ___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that the step does not apply.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 9 0F 11


Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11  STEP 8   3.7 Position 1CB
Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 8 3.7 Position 1CB-1 (located behind control panel 1MC6, BB-56) to "OFF".                                               ___ SAT STANDARD:                                                           ___ UNSAT Applicant places the breaker for 1CB-1 in the OFF position.
-1 (located behind control panel 1MC6, BB
COMMENTS:
-56) to "OFF". STANDARD: Applicant places the breaker for 1CB-1 in the "OFF" position.
STEP 9 3.8 Close 1NI-47A (C-Leg Accum N2 Sup Cont Isol).
COMMENTS:       ___ SAT  ___ UNSAT STEP 9   3.8 Close 1NI
___ SAT STANDARD:
-47A (C-Leg Accum N 2 Sup Cont Isol).
___ UNSAT Applicant depresses the green CLOSE pushbutton for 1NI-47A.
STANDARD: Applicant depresses the green CLOSE pushbutton for 1NI
COMMENTS:
-47A. COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11


END OF TASK
___ SAT  ___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
Catawba Nuclear Station 2013 NRC Exam JPM E   DIRECTION TO APPLICANT:
Catawba Nuclear Station 2013 NRC Exam JPM E DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power. Cold Leg Accumulator 1A nitrogen overpressure has decreased Annunciator 1AD-9, E/1 ACCUM TANK A HI/LO PRESS is lit.
* Unit 1 is at 100% power.
* Cold Leg Accumulator 1A nitrogen overpressure has decreased
* Annunciator 1AD-9, E/1 ACCUM TANK A HI/LO PRESS is lit.
INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD
* The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD-9, E/1.
-9, E/1. Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
* Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
Peer Check has been waived.
* Peer Check has been waived.


Catawba Nuclear Station JPM F Sep. 2013 NRC Exam PAGE 1 OF 12  
Catawba Nuclear Station JPM F Sep. 2013 NRC Exam JPM F PAGE 1 OF 12


JPM F     
Catawba Nuclear Station JPM F Sep. 2013 NRC Exam EVALUATION SHEET Task:                Shift Operating RC Pumps Alternate Path:      Yes Facility JPM #:      RC-001 Safety Function:      8      Title:      Plant Service Systems K/A      075 A2.02        Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps Rating(s):    2.5 /2.7      CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator        X     In-Plant                        Perform              X      Simulate


Catawba Nuclear Station JPM F Sep. 2013 NRC Exam PAGE 2 OF 12 EVALUATION SHEET Task: Shift Operating RC Pumps Alternate Path:
==References:==
Yes  Facility JPM #:
OP/1/B/6400/001A (Condenser Circulating Water) Enclosure 4.7 rev.071 Task Standard:       1A and 1D RC pumps are in service and 1RC-22 is closed.
RC-001  Safety Function:
Validation Time: 20 minutes                             Time Critical:           Yes         No     X
8 Title: Plant Service Systems K/A  075 A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
===========================================================================
Loss of circulating water pumps Rating(s):
Applicant:                                                                     Time Start: __________
2.5 /2.7 CFR: 41.5 / 4 3.5 / 45.3 / 45.13  Preferred Evaluation Location:
NAME___________________________ Docket #_______________ Time Finish: __________
Preferred Evaluation  Method:
Performance Rating:                                                             Performance Time _____
Simulator X In-Plant  Perform X Simulate  References
SAT ____ UNSAT ____
: OP/1/B/6400/001A (Condenser Circulating Water) Enclosure 4.7 rev.071 Task Standard:
Examiner: _____________________________                 _____________________________/________
1A and 1D RC pumps are in service and 1RC
NAME                                       SIGNATURE                 DATE
-22 is closed.
===========================================================================
Validation Time:
COMMENTS PAGE 2 OF 12
20 minutes Time Critical:
 
Yes No X ===========================================================================
Catawba Nuclear Station JPM F Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
Applicant:
: 1.     ENSURE NRC Examination Security has been established.
Time Start:   ______
: 2.     Reset to IC #174
____ NAME___________________________
: 3.     Enter the password.
Docket #_______________
: 4.     Select Yes on the INITIAL CONDITION RESET pop-up window.
Time Finish: ________
: 5.     Ensure simulator setup per table below.
__    Performance Rating:
: 6.     Place simulator in RUN and acknowledge any alarms.
SAT ____ UNSAT ____
: 7.     ENSURE Extra Operator is present in the simulator.
Performance Time ___
: 8.     Place simulator in FREEZE until Examiner cue is given.
__    Examiner: _____________________________
Instructor Action                         Delay Ramp Delete Event Final In x13i159n (1C RC Pump ON pushbutton) 600 XMT-RC063                                       235 SEC RACK    360 LOA-RC066 (x13i159n)
_____________________________/________
OUT   SEC 15 VLV-RC011F (x13i159n)                             0 SEC Do not go to RUN until the student is ready to proceed.
NAME SIGNATURE DATE ===========================================================================
PAGE 3 OF 12
COMMENTS Catawba Nuclear Station JPM F Sep. 2013 NRC Exam PAGE 3 OF 12  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
#174 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
. Instructor Action Final Delay Ramp Delete In Event x13i159n (1C RC Pump ON pushbutton)
XMT-RC063 235 600 SEC   LOA-RC066 (x13i159n)
RACK OUT 360 SEC   VLV-RC011F (x13i159n) 0 15 SEC                                             Do not go to RUN until the student is ready to proceed.


REV. 0 PAGE 4 0F 12 Catawba Nuclear Station JPM F Sep. 2013 NRC Exam PAGE 4 OF 12  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
REV. 0                                                                   PAGE 4 0F 12 Catawba Nuclear Station JPM F Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 50% power following repair of a condenser tube leak.
* Unit 1 is at 50% power following repair of a condenser tube leak.
 
* The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
* 1C RC Pump is NOT rotating in the reverse direction.
1C RC Pump is NOT rotating in the reverse direction.
* The NLO is standing by to check 1C RC pump after it starts.
 
The NLO is standing by to check 1C RC pump after it starts.
INITIATING CUES:
INITIATING CUES:
Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
* Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
Initial Conditions are complete.
* Initial Conditions are complete.
EXAMINER NOTE
EXAMINER NOTE:         After reading Initiating Cue, provide applicant with a copy of OP/1/B/6400/001A Enclosure 4.7 with the initial conditions signed off.
:   After reading Initiating Cue, provide applicant with a copy of OP/1/B/6400/001A Enclosure 4.7 with the initial conditions signed off.
PAGE 4 OF 12


Catawba Nuclear Station 2013 NRC Exam JPM F   START TIME: _______
Catawba Nuclear Station 2013 NRC Exam JPM F START TIME: _______
STEP 1:   3.1 Start the desired RC Pump as follows:
STEP 1: 3.1 Start the desired RC Pump as follows:
3.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction.
___ SAT 3.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction.                                 ___ UNSAT STANDARD:
STANDARD:   Applicant verifies that the pump is not rotating in the reverse direction per the initiating cue.
Applicant verifies that the pump is not rotating in the reverse direction per the initiating cue.
COMMENTS:
COMMENTS:
 
STEP 2   3.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM"               ___ SAT position.
___ SAT
___UNSAT STANDARD:
___ UNSAT STEP 2   3.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM" position. STANDARD:   Applicant ensures the "RCP DISCH VALVE MODE SEL" switch is in the 'NORM" position COMMENTS:
Applicant ensures the RCP DISCH VALVE MODE SEL switch is in the NORM position COMMENTS:
 
___ SAT    ___UNSAT 
 
Catawba Nuclear Station 2013 NRC Exam JPM F    STEP 3          3.1.3  IF starting a third RC pump, perform the following:
3.1.3.1 Indicate below which cooling tower inlet isolation is closed:
1RC-25 (Cool Twr 1A Inlet Isol) 1RC-27 (Cool Twr 1C Inlet Isol)
STANDARD:  Applicant determines that 1RC-25 is closed.
COMMENTS:      ___ SAT  ___ UNSAT STEP 4                    3.1.3.2 Ensure all three cooling tower inlet isolation valves are open:      1RC-25 (Cool Twr 1A Inlet Isol) 1RC-26 (Cool Twr 1B Inlet Isol 1RC-27 (Cool Twr 1C Inlet Isol)
STANDARD:  Applicant opens 1RC-25 by depressing the red "OPE N" pushbutton and verifies the red "OPEN" light illuminates.


Catawba Nuclear Station 2013 NRC Exam JPM F STEP 3        3.1.3 IF starting a third RC pump, perform the following:
___ SAT 3.1.3.1 Indicate below which cooling tower inlet isolation is closed:                          ___ UNSAT 1RC-25 (Cool Twr 1A Inlet Isol) 1RC-27 (Cool Twr 1C Inlet Isol)
STANDARD:
Applicant determines that 1RC-25 is closed.
COMMENTS:
STEP 4              3.1.3.2 Ensure all three cooling tower inlet isolation  ___ SAT valves are open:
___ UNSAT 1RC-25 (Cool Twr 1A Inlet Isol) 1RC-26 (Cool Twr 1B Inlet Isol 1RC-27 (Cool Twr 1C Inlet Isol)
STANDARD:
Applicant opens 1RC-25 by depressing the red OPEN pushbutton and verifies the red OPEN light illuminates.
Examiner Note: This is a large valve and takes ~ 3.5 minutes to stroke.
Examiner Note: This is a large valve and takes ~ 3.5 minutes to stroke.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 


Catawba Nuclear Station 2013 NRC Exam JPM F   STEP 5         3.1.4 Start the desired RC pump STANDARD: Applicant starts the 1C RC pump
Catawba Nuclear Station 2013 NRC Exam JPM F STEP 5       3.1.4 Start the desired RC pump
, per the initiating cue, by depressing the red "ON" pushbutton.
___ SAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 6         3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)
___ UNSAT Applicant starts the 1C RC pump, per the initiating cue, by depressing the red ON pushbutton.
STANDARD: Applicant determines that valve 1RC
COMMENTS:
-23 (RC Pump 1C Disch Isol) begins to open and then recloses and the 1C RC pump trips.
STEP 6       3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)       ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that valve 1RC-23 (RC Pump 1C Disch Isol) begins to open and then recloses and the 1C RC pump trips.
Examiner Cue: When notified that the 1C RC pump discharge valve did NOT open, provide the following cue: "Start the 1D RC pump and secure the 1B RC pump per OP/1/B/6400/001A, Enclosure 4.7."
Examiner Cue: When notified that the 1C RC pump discharge valve did NOT open, provide the following cue: Start the 1D RC pump and secure the 1B RC pump per OP/1/B/6400/001A, Enclosure 4.7.
Examiner Note: If asked by the applicant to verify that the 1D RC pump is not rotating in the reverse direction, or to checkout the 1D RC pump prior to start, provide the following cue: "1D RC pump is not rotating in the reverse direction and all local parameters are normal.COMMENTS:
Examiner Note: If asked by the applicant to verify that the 1D RC pump is not rotating in the reverse direction, or to checkout the 1D RC pump prior to start, provide the following cue: 1D RC pump is not rotating in the reverse direction and all local parameters are normal.
___ SAT  ___ UNSAT 
COMMENTS:


Catawba Nuclear Station 2013 NRC Exam JPM F   STEP 7         3.1.4 Start the desired RC pump STANDARD: Applicant starts the 1D RC pump by depressing the red "ON" pushbutton.
Catawba Nuclear Station 2013 NRC Exam JPM F STEP 7       3.1.4 Start the desired RC pump                           CRITICAL STEP STANDARD:
This step is critical in order to start a pump to be able to secure the 1B RC pump.
___ SAT Applicant starts the 1D RC pump by depressing the red ON pushbutton.                                                           ___ UNSAT This step is critical in order to start a pump to be able to secure the 1B RC pump.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 8         3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.) STANDARD: Applicant determines that 1RC
STEP 8       3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)       ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that 1RC-24 (RC Pump 1D Disch Isol) fully opens.
-24 (RC Pump 1D Disch Isol) fully opens.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
Catawba Nuclear Station 2013 NRC Exam JPM F    STEP 9  3.2 Stop the desired RC pump as follows:
3.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the next hour.
STANDARD:  Applicant dispatches an operator to monitor for cooling tower overflow.
This step is critical to ensure EPA guidelines are not being violated
. Examiner Cue:
  "This is Rob, I will monitor Unit 1 Cooling Tower levels"  COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 10      3.2.2 Close the discharge valve of the pump to be stopped:
1RC-21 (RC Pump 1A Disch Isol)  1RC-22 (RC Pump 1B Disch Isol)  1RC-23 (RC Pump 1C Disch Isol)  1RC-24 (RC Pump 1D Disch Isol)
STANDARD:  Applicant depresses the green "CLOSE" pushbutton for 1RC
-22 (RC Pump 1B Disch Isol) and verifies the green "CLSD" light illuminates.


Catawba Nuclear Station 2013 NRC Exam JPM F STEP 9 3.2 Stop the desired RC pump as follows:                              CRITICAL STEP 3.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the ___ SAT next hour.
___ UNSAT STANDARD:
Applicant dispatches an operator to monitor for cooling tower overflow.
This step is critical to ensure EPA guidelines are not being violated.
Examiner Cue:      This is Rob, I will monitor Unit 1 Cooling Tower levels COMMENTS:
STEP 10      3.2.2 Close the discharge valve of the pump to be stopped:      CRITICAL STEP 1RC-21 (RC Pump 1A Disch Isol) 1RC-22 (RC Pump 1B Disch Isol)                        ___ SAT 1RC-23 (RC Pump 1C Disch Isol) 1RC-24 (RC Pump 1D Disch Isol)                        ___ UNSAT STANDARD:
Applicant depresses the green CLOSE pushbutton for 1RC-22 (RC Pump 1B Disch Isol) and verifies the green CLSD light illuminates.
This step is critical to shut down the 1B RC pump.
This step is critical to shut down the 1B RC pump.
Examiner Note: This valve may take 1 minute to close.
Examiner Note: The 1B RC pump may trip before it can be manually secured.
COMMENTS:


Examiner Note:
Catawba Nuclear Station 2013 NRC Exam JPM F STEP 11       3.2.3 Ensure that the pump stops when the valve closes.
This valve may take 1 minute to close.
___ SAT STANDARD:
 
___ UNSAT Applicant verifies that the 1B RC pump green OFF light is illuminated.
Examiner Note:
COMMENTS:
The 1B RC pump may trip before it can be manually secured. COMMENTS:
STEP 12 3.3 IF Step 3.1.3.1 indicates a cooling tower inlet isolation was   CRITICAL initially closed, close that cooling tower inlet isolation. STEP 1RC-25 (Cool Twr 1A Inlet Isol)                       ___ SAT 1RC-27 (Cool Twr 1C Inlet Isol)
CRITICAL STEP    ___ SAT  ___ UNSAT 
STANDARD:                                                                   ___ UNSAT Applicant determines that 1RC-25 was originally closed and depresses the green CLOSE pushbutton and verifies the green CLSD light illuminates.
 
This step is critical to comply with required cooling tower configurations.
Catawba Nuclear Station 2013 NRC Exam JPM F     STEP 11       3.2.3 Ensure that the pump stops when the valve closes. STANDARD: Applicant verifies that the 1B RC pump green "OFF" light is illuminated.
COMMENTS:
COMMENTS:       ___ SAT  ___ UNSAT STEP 12   3.3 IF Step 3.1.3.1 indicates a cooling tower inlet isolation was initially closed, close that cooling tower inlet isolation.
1RC-25 (Cool Twr 1A Inlet Isol) 1RC-27 (Cool Twr 1C Inlet Isol)
STANDARD: Applicant determines that 1RC
-25 was originally closed and depresses the green "CLOSE" pushbutton and verifies the green "CLSD" light illuminates.


This step is critical to comply with required cooling tower configurations.
Catawba Nuclear Station 2013 NRC Exam JPM F STEP 13 3.4 Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the following ___ SAT cooling tower configuration limits:
___ UNSAT STANDARD:
Applicant determines the cooling towers are aligned properly. (See highlighted line.)
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
END OF TASK STOP TIME ________


Catawba Nuclear Station 2013 NRC Exam JPM F   STEP 13  3.4  Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the following cooling tower configuration limits:
Catawba Nuclear Station 2013 NRC Exam JPM F APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
STANDARD:  Applicant determines the cooling towers are aligned properly.  (See highlighted line.)
COMMENTS:  END OF TASK
___ SAT  ___ UNSAT STOP TIME ________
Catawba Nuclear Station 2013 NRC Exam JPM F  APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 50% power following repair of a condenser tube leak.
* Unit 1 is at 50% power following repair of a condenser tube leak.
* The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
* 1C RC Pump is NOT rotating in the reverse direction.
* The NLO is standing by to check 1C RC pump after it starts.
INITIATING CUES:
* Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
* Initial Conditions are complete.
 
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam JPM G PAGE 1 OF 18


The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam EVALUATION SHEET Task:                Align the NS System for Cold Leg Recirculation Alternate Path:      No Facility JPM #:      NS-101 (Significantly Modified)
1C RC Pump is NOT rotating in the reverse direction
Safety Function:    5        Title:      Containment Integrity K/A          026 A4.01      Ability to manually operate and/or monitor in the control room: CSS controls Rating(s):  4.5 / 4.3      CFR:       41.7 / 45.5 to 45.8 Preferred Evaluation Location:                        Preferred Evaluation Method:
.
Simulator      X      In-Plant                        Perform            X      Simulate
The NLO is standing by to check 1C RC pump after it starts.
INITIATING CUES:
Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
Initial Conditions are complete.


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam PAGE 1 OF 18        
==References:==
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) Enclosure 2. Rev.029 Task Standard:      Aligns NS to Cold Leg Recirculation with 1A NS Pump running and proper RN flow to the 1A NS Heat Exchanger.
Validation Time: 10 minutes                            Time Critical:        Yes        No    X
===========================================================================
Applicant:                                                                  Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                          Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 18


JPM G    
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1.      ENSURE NRC Examination Security has been established.
: 2.      Reset to IC #175
: 3.      Enter the password.
: 4.      Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5.      Ensure simulator setup per table below.
: 6.      Place simulator in RUN and acknowledge any alarms.
: 7.      ENSURE Extra Operator is present in the simulator.
: 8.      Place simulator in FREEZE until Examiner cue is given.
Instructor Action                Final  Delay Ramp Delete In Event x01o063g (Reactor Trip breaker A OPEN Light)
MAL-SM007A (x01o063g)                        4.24e+5 MAL-NC013D                                    27.5 OVR-VV013C (x01o063g)                          ON OVR-VV019D (x01o063g)                          ON OVR-VV022D (x01o063g)                          ON PAGE 3 OF 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam PAGE 2 OF 18 EVALUATION SHEET Task: Align the NS System for Cold Leg Recirculation Alternate Path:
REV. 0                                                                   PAGE 4 0F 18 Catawba Nuclear Station JPM G Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
No  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
NS-101 (Significantly Modified)
Safety Function:
5 Title: Containment Integrity K/A  0 26 A4.01 Ability to manually operate and/or monitor in the control room:  CSS controls  Rating(s):
4.5 / 4.3 CFR: 41.7 / 4 5.5 to 45.8  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: EP/1/A/5000/ES
-1.3 (Transfer to Cold Leg Recirculation) Enclosure 2.
Rev.029  Task Standard:
Aligns NS to Cold Leg Recirculation with 1A NS Pump running and proper RN flow to the 1A NS Heat Exchanger.
Validation Time:
10 minutes Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM G Sep. 2013 NRC Exam PAGE 3 OF 18  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
#175 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
. Instructor Action Final Delay Ramp Delete In Event x01o063g (Reactor Trip breaker A OPEN Light)      MAL-SM007A (x01o063g) 4.24e+5    MAL-NC013D 27.5    OVR-VV013C (x01o063g)
ON    OVR-VV019D (x01o063g)
ON    OVR-VV022D (x01o063g)
ON REV. 0 PAGE 4 0F 18 Catawba Nuclear Station JPM G Sep. 2013 NRC Exam PAGE 4 OF 18  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1.
* A LOCA has occurred on Unit 1.
EP/1/A/5000/ES
* EP/1/A/5000/ES-1.3, (Transfer to Cold Leg Recirculation) has been implemented.
-1.3, (Transfer to Cold Leg Recirculation) has been implemented.
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES
The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES-1.3.
-1.3. EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 Enclosure 2.
:   After reading cue, provide the applicant with a copy of EP/1/A/5000/
PAGE 4 OF 18
ES-1.3 Enclosure 2
.
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 18   START TIME: _______
STEP 1:  1. Verify both NS pumps
- OFF. STANDARD:  Applicant verifies both NS pumps are off
. COMMENTS: 


___ SAT
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                              SAT/UNSAT START TIME: _______
___ UNSAT STEP 2   2. CLOSE the following valves:
STEP 1: 1. Verify both NS pumps - OFF.
1NS-20A (NS Pump 1A Suct From FWST)   1NS-3B (NS Pump 1B Suct From FWST).
___ SAT STANDARD:
STANDARD:   Applicant depresses the green CLOSE pushbuttons for 1 NS-20A and 1NS-3B.
___ UNSAT Applicant verifies both NS pumps are off .
This step is critical to satisfy the interlocks to open 1NS
COMMENTS:
-18A and 1NS
CRITICAL STEP 2 2. CLOSE the following valves:                                       STEP
-1B respectively.
* 1NS-20A (NS Pump 1A Suct From FWST)                       ___ SAT
* 1NS-3B (NS Pump 1B Suct From FWST).                       ___UNSAT STANDARD:
Applicant depresses the green CLOSE pushbuttons for 1NS-20A and 1NS-3B.
This step is critical to satisfy the interlocks to open 1NS-18A and 1NS-1B respectively.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT    ___UNSAT 
PAGE 5 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 18  STEP 3   3. Verify containment pressure  
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                                   SAT/UNSAT STEP 3 3. Verify containment pressure - GREATER THAN 3 PSIG
- GREATER THAN 3 PSIG STANDARD: Applicant verifies containment pressure is greater than 3 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC
___ SAT STANDARD:
-11 or on the OAC or on any chart recorder containing containment pressure.
___ UNSAT Applicant verifies containment pressure is greater than 3 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC-11 or on the OAC or on any chart recorder containing containment pressure.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4   4. Verify at least one of the following annunciators  
STEP 4 4. Verify at least one of the following annunciators - LIT:           ___ SAT
- LIT:   1AD-20, B/3 "CONT. SUMP LEVEL >3.3 ft"   OR   1AD-21, B/3 "CONT. SUMP LEVEL >3.3 ft".
* 1AD-20, B/3 "CONT. SUMP LEVEL >3.3 ft"                       ___ UNSAT OR
STANDARD: Applicant verifies that at least 1AD
* 1AD-21, B/3 "CONT. SUMP LEVEL >3.3 ft".
-20, B/3 or 1AD
STANDARD:
-21, B/3 is lit on 1MC
Applicant verifies that at least 1AD-20, B/3 or 1AD-21, B/3 is lit on 1MC-7 COMMENTS:
-7 COMMENTS:
PAGE 6 0F 18
___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 18  STEP 5   5. Align NS Train 1A to containment sump as follows:
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                       SAT/UNSAT STEP 5   5. Align NS Train 1A to containment sump as follows:
: a. Verify NS Pump 1A  
___ SAT
- AVAILABLE TO RUN.
: a. Verify NS Pump 1A - AVAILABLE TO RUN.
STANDARD: Applicant verifies that NS Pump 1A is available to run.
___ UNSAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 6   5. b. Verify 1NI
Applicant verifies that NS Pump 1A is available to run.
-185A (ND Pump 1A Cont Sump Suct)  
COMMENTS:
- OPEN. STANDARD: Applicant verifies that 1NI
STEP 6 5. b. Verify 1NI-185A (ND Pump 1A Cont Sump Suct) - OPEN.
-185A is open.
___ SAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 7   5. c. Verify NS Pump 1B  
___ UNSAT Applicant verifies that 1NI-185A is open.
- OFF STANDARD: Applicant verifies that NS Pump 1B is off.
COMMENTS:
STEP 7 5. c. Verify NS Pump 1B - OFF
___ SAT STANDARD:
___ UNSAT Applicant verifies that NS Pump 1B is off.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 7 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 18  STEP 8   5. d. OPEN 1NS-29A (NS Spray Hdr 1A Cont Isol).
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 8 5. d. OPEN 1NS-29A (NS Spray Hdr 1A Cont Isol).             CRITICAL STEP STANDARD:
STANDARD: Applicant depresses the red OPEN pushbutton for 1NS
___ SAT Applicant depresses the red OPEN pushbutton for 1NS-29A on 1MC-
-29A on 1MC
: 11.                                                            ___ UNSAT This step is critical to align Containment Spray to the associated spray nozzles.
-11. This step is critical to align Containment Spray to the associated spray nozzles.
COMMENTS:
STEP 9 5. e. OPEN 1NS-32A (NS Spray Hdr 1A Cont Isol).              CRITICAL STEP STANDARD:
___ SAT Applicant depresses the red OPEN pushbutton for 1NS-32A on 1MC-
: 11.                                                             ___ UNSAT This step is critical to align Containment Spray to the associated spray nozzles.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 9  5. e. OPEN 1NS
STEP 10 5. f. Verify 1NS-20A (NS Pump 1A Suct From FWST) -
-32A (NS Spray Hdr 1A Cont Isol).
CLOSED.                                             ___ SAT STANDARD:                                                         ___ UNSAT Applicant verifies that 1NS-20A is closed.
STANDARD: Applicant depresses the red OPEN pushbutton for 1NS
-32A on 1MC
-11.
This step is critical to align Containment Spray to the associated spray nozzles.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 10  5. f. Verify 1NS
PAGE 8 0F 18
-20A (NS Pump 1A Suct From FWST)
- CLOSED. STANDARD:  Applicant verifies that 1NS
-20A is closed.
COMMENTS: 


___ SAT   ___ UNSAT
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                        SAT/UNSAT STEP 11 5. g. OPEN 1NS-18A (NS Pmp A Suct From Cont Sump).          CRITICAL STEP STANDARD:
___ SAT Applicant depresses the red OPEN pushbutton for 1NS-18A on 1MC-
: 11.                                                            ___ UNSAT This step is critical to align a suction source for NS Pump 1A.
COMMENTS:
STEP 12 5. h. Verify the following valves - OPEN:
___ SAT
* 1NS-29A (NS Spray Hdr 1A Cont Isol)
___ UNSAT
* 1NS-32A (NS Spray Hdr 1A Cont Isol)
* 1NS-18A (NS Pmp A Suct From Cont Sump).
STANDARD:
Applicant verifies that 1NS-29A, 1NS-32A and 1NS-18A are open.
COMMENTS:
PAGE 9 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 18  STEP 11  5. g. OPEN 1NS
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 13 5. i. Verify containment pressure - GREATER THAN 1 PSIG.
-18A (NS Pmp A Suct From Cont Sump).
___ SAT STANDARD:
STANDARD: Applicant depresses the red OPEN pushbutton for 1NS
___ UNSAT Applicant verifies containment pressure is greater than 1 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC-11 or on the OAC or on any chart recorder containing containment pressure.
-18A on 1MC
-11. This step is critical to align a suction source for NS Pump 1A.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 12  5. h. Verify the following valves
STEP 14 5. j. Start NS Pump 1A.                                       CRITICAL STEP STANDARD:
- OPEN:    1NS-29A (NS Spray Hdr 1A Cont Isol) 1NS-32A (NS Spray Hdr 1A Cont Isol) 1NS-18A (NS Pmp A Suct From Cont Sump).
___ SAT Applicant depresses the red ON pushbutton for NS PMP 1A
STANDARD: Applicant verifies that 1NS
___ UNSAT This step is critical to provide containment spray to the spray nozzles.
-29A, 1NS-32A and 1NS
-18A are open.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 10 0F 18
 
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 18   STEP 13  5. i. Verify containment pressure
- GREATER THAN 1 PSIG.
STANDARD:  Applicant verifies containment pressure is greater than 1 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC
-11 or on the OAC or on any chart recorder containing containment pressure.
COMMENTS:        ___ SAT  ___ UNSAT STEP 14  5. j. Start NS Pump 1A.
STANDARD:  Applicant depresses the red ON pushbutton for NS PMP 1A This step is critical to provide containment spray to the spray nozzles. COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 18  CAUTION   Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes.
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                       SAT/UNSAT CAUTION Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes.
STEP 15   5. k. Align RN to NS Hx 1A as follows:
___ SAT STEP 15 5. k. Align RN to NS Hx 1A as follows:
___ UNSAT
: 1) Verify at least one of the following:
: 1) Verify at least one of the following:
All Unit 1 and Unit 2 RN pumps  
* All Unit 1 and Unit 2 RN pumps - ON.
- ON. OR   RN System  
OR
- ALIGNED FOR SINGLE SUPPLY HEADER OPERATION STANDARD: Applicant verifies that all Unit 1 and Unit 2 RN pumps are on COMMENTS:       ___ SAT  ___ UNSAT STEP 16   5. k. 2) OPEN 1RN
* RN System - ALIGNED FOR SINGLE SUPPLY HEADER OPERATION STANDARD:
-144A (NS Hx 1A Inlet Isol). STANDARD: Applicant depresses the red OPEN pushbutton for 1RN
Applicant verifies that all Unit 1 and Unit 2 RN pumps are on COMMENTS:
-144A on 1MC
STEP 16 5. k. 2) OPEN 1RN-144A (NS Hx 1A Inlet Isol).               CRITICAL STEP STANDARD:
-11.
___ SAT Applicant depresses the red OPEN pushbutton for 1RN-144A on 1MC-
This step is critical to supply cooling water to the 1A NS heat exchanger.
: 11.                                                             ___ UNSAT This step is critical to supply cooling water to the 1A NS heat exchanger.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 11 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 18  STEP 17   5. k. 3) WHEN 1RN-144A begins to open, THEN OPEN 1RN-148A (NS Hx 1A Otlt Isol). STANDARD: Applicant depresses the red OPEN pushbutton for 1RN
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 17 5. k. 3) WHEN 1RN-144A begins to open, THEN OPEN 1RN-           CRITICAL 148A (NS Hx 1A Otlt Isol).                             STEP STANDARD:                                                               ___ SAT Applicant depresses the red OPEN pushbutton for 1RN-148A on 1MC-     ___ UNSAT 11 when they verify that 1RN-144A is opening.
-148A on 1MC
-11 when the y verify that 1RN
-144A is opening.
This step is critical to cool the containment spray water supplied to the spray nozzles.
This step is critical to cool the containment spray water supplied to the spray nozzles.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 1 8  6. Align NS Train 1B to containment sump as follows:
STEP 18 6. Align NS Train 1B to containment sump as follows:
: a. Verify 1NI
___ SAT
-184B (ND Pump 1B Cont Sump Suct)  
: a. Verify 1NI-184B (ND Pump 1B Cont Sump Suct) - OPEN.
- OPEN. STANDARD: Applicant verifies that 1NI-184B is open.
___ UNSAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT    STEP 1 9  6. b. Verify NS Pump 1A  
Applicant verifies that 1NI-184B is open.
- OFF STANDARD: Applicant verifies that NS Pump 1A is on and transitions to the RNO.
COMMENTS:
STEP 19 6. b. Verify NS Pump 1A - OFF
___ SAT STANDARD:
___ UNSAT Applicant verifies that NS Pump 1A is on and transitions to the RNO.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 12 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 18  STEP 20   6. b. RNO b. IF NS Pump 1A is running AND RN established to NS Hx 1A, THEN perform the following:
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 20 6. b. RNO b. IF NS Pump 1A is running AND RN established to NS Hx 1A, THEN perform the following:     ___ SAT
: 1) Ensure 1NS
: 1) Ensure 1NS-3B (NS Pump 1B Suct From     ___ UNSAT FWST) - CLOSED.
-3B (NS Pump 1B Suct From FWST) - CLOSED. STANDARD: Applicant verifies that 1NS
STANDARD:
-3B is closed.
Applicant verifies that 1NS-3B is closed.
Examiner Note:
Examiner Note: 1NS-3B was closed in a previous step.
1NS-3B was closed in a previous step.
COMMENTS:
COMMENTS:       ___ SAT  ___ UNSAT STEP 21   6. b. RNO b. 2) Ensure 1NS-1B (NS Pmp B Suct From Cont Sump) - OPEN. STANDARD: Applicant depresses the red OPEN pushbutton for 1NS
STEP 21 6. b. RNO b. 2) Ensure 1NS-1B (NS Pmp B Suct From Cont Sump) - OPEN.                           ___ SAT STANDARD:                                                           ___ UNSAT Applicant depresses the red OPEN pushbutton for 1NS-1B on 1MC-11.
-1B on 1MC-11. COMMENTS:        ___ SAT  ___ UNSAT    STEP 22  6. b. RNO b. 3) GO TO Step 7. STANDARD:  Applicant proceeds to step 7.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT
STEP 22 6. b. RNO b. 3) GO TO Step 7.
___ SAT STANDARD:
___ UNSAT Applicant proceeds to step 7.
COMMENTS:
PAGE 13 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 18  STEP 23   7. Verify proper NS alignment as follows:
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 23 7. Verify proper NS alignment as follows:
: a. Verify1NS
___ SAT
-18A (NS Pmp A Suct From Cont Sump)  
: a. Verify1NS-18A (NS Pmp A Suct From Cont Sump) -
- OPEN: STANDARD: Applicant verifies that 1NS-18A is open.
OPEN:                                             ___ UNSAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 24   7. b. Verify1NS
Applicant verifies that 1NS-18A is open.
-1B (NS Pmp B Suct From Cont Sump)  
COMMENTS:
- OPEN: STANDARD: Applicant verifies that 1NS-1B is open.
STEP 24 7. b. Verify1NS-1B (NS Pmp B Suct From Cont Sump) - OPEN:
___ SAT STANDARD:
___ UNSAT Applicant verifies that 1NS-1B is open.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 2 5  7. c. Verify NS Pump 1A  
STEP 25 7. c. Verify NS Pump 1A - ON.
- ON. STANDARD: Applicant verifies that NS Pump 1A is on.
___ SAT STANDARD:
___ UNSAT Applicant verifies that NS Pump 1A is on.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 14 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 18  STEP 2 6  7. d. Verify NS Pump 1B  
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 26 7. d. Verify NS Pump 1B - ON.
- ON. STANDARD: Applicant verifies that NS Pump 1B is off and transitions to the RNO.
___ SAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 2 7  7. d. RNO d. Ensure the following valves - CLOSED:   1NS-15B (NS Spray Hdr 1B Cont Isol) 1NS-12B (NS Spray Hdr 1B Cont Isol).
___ UNSAT Applicant verifies that NS Pump 1B is off and transitions to the RNO.
STANDARD: Applicant verifies that 1NS-12B and 1NS
COMMENTS:
-15B are closed.
STEP 27 7. d. RNO d. Ensure the following valves - CLOSED:
___ SAT
* 1NS-15B (NS Spray Hdr 1B Cont Isol)
___ UNSAT
* 1NS-12B (NS Spray Hdr 1B Cont Isol).
STANDARD:
Applicant verifies that 1NS-12B and 1NS-15B are closed.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 2 8  8. IF AT ANY TIME NS flow is lost OR RN flow is lost to operating NS Hx, THEN start other NS pump as follows:
STEP 28 8. IF AT ANY TIME NS flow is lost OR RN flow is lost to operating NS Hx, THEN start other NS pump as follows:       ___ SAT STANDARD:                                                               ___ UNSAT Applicant acknowledges step and continues.
STANDARD: Applicant acknowledges step and continues.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 15 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 16 0F 18  STEP 2 9  9. Verify adequate RN heat sink as follows:
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                                 SAT/UNSAT STEP 29 9. Verify adequate RN heat sink as follows:
RN System  
___ SAT
- SUCTION ALIGNED TO LAKE WYLIE RN essential header temperatures at one of the following locations  
* RN System - SUCTION ALIGNED TO LAKE WYLIE
- LESS THAN OR EQUAL TO 93°F
___ UNSAT
. 1MC-9 OR   RO Logbook.
* RN essential header temperatures at one of the following locations - LESS THAN OR EQUAL TO 93°F.
STANDARD: Applicant verifies that RN is aligned to Lake Wylie and that RN essential header temperature is  
* 1MC-9 OR
< 93&#xba;F. Examiner Cue:
* RO Logbook.
If asked, "RN essential header temperature is 6 9&#xba;F.COMMENTS:
STANDARD:
___ SAT  ___ UNSAT STEP 30   10. Verify any NS pump  
Applicant verifies that RN is aligned to Lake Wylie and that RN essential header temperature is < 93&#xba;F.
- ON. STANDARD: Applicant verifies that the 1A NS pump is on
Examiner Cue: If asked, RN essential header temperature is 69&#xba;F.
. COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
STEP 30 10. Verify any NS pump - ON.
___ SAT STANDARD:
___ UNSAT Applicant verifies that the 1A NS pump is on.
COMMENTS:
PAGE 16 0F 18


Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 17 0F 18  STEP 31   11. Notify Control Room Supervisor this Enclosure shall remain in effect until current or subsequent procedures provide alternate guidance.
Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 31 11. Notify Control Room Supervisor this Enclosure shall remain in effect until current or subsequent procedures ___ SAT provide alternate guidance.
STANDARD: Applicant states that they would notify the CRS.
___ UNSAT STANDARD:
Examiner Cue:
Applicant states that they would notify the CRS.
The Control Room Supervisor has been notified COMMENTS:       ___ SAT  ___ UNSAT STEP 32   12. IF AT ANY TIME containment pressure is less than 1 PSIG, THEN perform the following:
Examiner Cue: The Control Room Supervisor has been notified COMMENTS:
STANDARD: Applicant acknowledges the step.
STEP 32 12. IF AT ANY TIME containment pressure is less than 1 PSIG, THEN perform the following:                       ___ SAT STANDARD:                                                             ___ UNSAT Applicant acknowledges the step.
Examiner Cue:
Examiner Cue: Another operator will monitor containment pressure.
Another operator will monitor containment pressure.
COMMENTS:
COMMENTS:   END OF TASK
END OF TASK STOP TIME ________
___ SAT  ___ UNSAT   
PAGE 17 0F 18


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1.
* A LOCA has occurred on Unit 1.
EP/1/A/5000/ES
* EP/1/A/5000/ES-1.3, (Transfer to Cold Leg Recirculation) has been implemented.
-1.3, (Transfer to Cold Leg Recirculation) has been implemented.
INITIATING CUES:
INITIATING CUES:
The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES-1.3.
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam JPM H PAGE 1 OF 17
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam EVALUATION SHEET Task:                Perform the Main Turbine Weekly Turbine Trip Test Alternate Path:      Yes Facility JPM #:      New Safety Function:    7        Title:      Instrumentation K/A          012 A2.06      Ability to (a) predict the impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure of RPS signal to trip the reactor Rating(s):  4.4 / 4.7      CFR:      41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator      X      In-Plant                        Perform              X      Simulate


The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES
==References:==
-1.3.
PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 rev. 090 AP/1/A/5500/002 (Turbine Generator Trip) rev.032 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) rev. 041 EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS) rev. 021 Task Standard:      Recognizes reactor trip failure, attempts to trip the reactor and manually inserts control rods.
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam PAGE 1 OF 17  
Validation Time: 5 minutes                              Time Critical:          Yes        No    X
===========================================================================
Applicant:                                                                      Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 17


JPM H    
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1.      ENSURE NRC Examination Security has been established.
: 2.      Reset to IC #176
: 3.      Enter the password.
: 4.      Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5.      Ensure simulator setup per table below.
: 6.      Place simulator in RUN and acknowledge any alarms.
: 7.      ENSURE Extra Operator is present in the simulator.
: 8.      Place simulator in FREEZE until Examiner cue is given.
Instructor Action                        Delay Ra Delete In Event Final mp xt1o051l (ELECT TRIP TEST)
MAL-IPX003A MAL-IPX003B MAL-IRX009                                    AUTO MAL-MT007 (xt1o051l)                                  7 SEC PAGE 3 OF 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam PAGE 2 OF 17 EVALUATION SHEET Task: Perform the Main Turbine Weekly Turbine Trip Test Alternate Path:
REV. 0                                                                   PAGE 4 0F 17 Catawba Nuclear Station JPM H Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
Yes  Facility JPM #:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
New  Safety Function: 7 Title: Instrumentation K/A  012 A2.0 6 Ability to (a) predict the impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Failure of RPS signal to trip the reactor Rating(s):
4.4 / 4.7 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator X In-Plant  Perform X Simulate  References
: PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 rev. 090 AP/1/A/5500/002 (Turbine Generator Trip) rev.032 EP/1/A/5000/E
-0 (Reactor Trip or Safety Injection) rev. 04 1 EP/1/A/5000/FR
-S.1 (Response to Nuclear Power Generation/ATWS) rev. 021  Task Standard:
Recognizes reactor trip failure, attempts to trip the reactor and manually inserts control rods.
Validation Time:
5 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:    SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM H Sep. 2013 NRC Exam PAGE 3 OF 17  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
#176 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ra mp Delete In Event xt1o051l (ELECT TRIP TEST)
MAL-IPX003A      MAL-IPX003B      MAL-IRX009 AUTO    MAL-MT007 (xt1o051l) 7 SEC REV. 0 PAGE 4 0F 17 Catawba Nuclear Station JPM H Sep. 2013 NRC Exam PAGE 4 OF 17  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power. INITIATING CUES:
* Unit 1 is at 100% power.
 
INITIATING CUES:
The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.
The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.
EXAMINER NOTE
EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 PAGE 4 OF 17
:   After reading cue, provide the applicant with a copy of PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 5 0F 17   START TIME: _______
STEP 1:  1.2 IF AT ANY TIME a test must be aborted during either the Mechanical Trip Test or the Electrical Trip Test, depress the respective test pushbutton to abort the test and return the


EHC System to normal.
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                                  SAT/UNSAT START TIME: _______
STANDARD:   Applicant acknowledges th e step. COMMENTS:
STEP 1: 1.2 IF AT ANY TIME a test must be aborted during either the Mechanical Trip Test or the Electrical Trip Test, depress the ___ SAT respective test pushbutton to abort the test and return the EHC System to normal.                                         ___ UNSAT STANDARD:
 
Applicant acknowledges the step.
___ SAT
COMMENTS:
___ UNSAT NOTE: Annunciator 1AD
NOTE: Annunciator 1AD-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.
-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.
___ SAT STEP 2 1.3 Perform the Mechanical Trip Test (Control Room) as follows:
STEP 2   1.3 Perform the Mechanical Trip Test (Control Room) as follows:
___UNSAT
1.3.1 Select Turbine Graphic "MECHANICAL & ELECTRICAL TRIP TEST" for display.
* 1.3.1 Select Turbine Graphic "MECHANICAL & ELECTRICAL TRIP TEST" for display.
STANDARD: Applicant selects the MECHANICAL & ELECTRICAL TRIP TEST display on the Turbine Graphic monitor.
STANDARD:
Applicant selects the MECHANICAL & ELECTRICAL TRIP TEST display on the Turbine Graphic monitor.
COMMENTS:
COMMENTS:
___ SAT
PAGE 5 0F 17
___UNSAT 
 
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 6 0F 17   STEP 3    1.3.2 Depress the "TEST ENABLE" pushbutton and verify the light illuminates.
STANDARD:  Applicant depresses TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 3                                                                    CRITICAL
* 1.3.2 Depress the "TEST ENABLE" pushbutton and verify the        STEP light illuminates.
___ SAT STANDARD:
___ UNSAT Applicant depresses TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.
This step is critical to allow the mechanical trip test to be performed.
This step is critical to allow the mechanical trip test to be performed.
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT  ___ UNSAT STEP 4    1.3.3 Depress the "MECH TRIP TEST" pushbutton and verify the following sequence:
CRITICAL STEP 4                                                                      STEP
1.3.3.1 The "MECH TRIP TEST" light illuminates.
* 1.3.3 Depress the "MECH TRIP TEST" pushbutton and verify the following sequence:                                       ___ SAT
STANDARD: Applicant depresses the MECH TRIP TEST pushbutton on the Turbine Control Panel and verifies the light illuminates.
* 1.3.3.1 The "MECH TRIP TEST" light illuminates.           ___ UNSAT STANDARD:
Applicant depresses the MECH TRIP TEST pushbutton on the Turbine Control Panel and verifies the light illuminates.
This step is critical to initiate the Mechanical Trip Test.
This step is critical to initiate the Mechanical Trip Test.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 6 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 17  STEP 5     1.3.3.2 The following sequence occurs in the "MECHANICAL TRIP TEST" box in the upper left of Turbine Graphic "MECHANICAL & ELECTRICAL TRIP TEST". L/O status goes to "COMPLT".
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 5
LT050 status goes to "COMPLT".
* 1.3.3.2 The following sequence occurs in the   ___ SAT "MECHANICAL TRIP TEST" box in the upper left of Turbine Graphic "MECHANICAL & ELECTRICAL TRIP   ___ UNSAT TEST".
M-TRIP status goes to "COMPLT".
* L/O status goes to "COMPLT".
LT048 status goes to "COMPLT".
* LT050 status goes to "COMPLT".
RESET status goes to "COMPLT".
* M-TRIP status goes to "COMPLT".
LT049 status goes to "COMPLT".
* LT048 status goes to "COMPLT".
O-TRIP status goes to "COMPLT".
* RESET status goes to "COMPLT".
LT048 status goes to "COMPLT".
* LT049 status goes to "COMPLT".
RESET status goes to "COMPLT STANDARD: Applicant verifies that all the listed items go to COMPLT on the MECHANICAL & ELECTRICAL TRIP TEST GRAPHIC on the Turbine Graphic monitor.
* O-TRIP status goes to "COMPLT".
COMMENTS:       ___ SAT  ___ UNSAT 
* LT048 status goes to "COMPLT".
* RESET status goes to "COMPLT STANDARD:
Applicant verifies that all the listed items go to COMPLT on the MECHANICAL & ELECTRICAL TRIP TEST GRAPHIC on the Turbine Graphic monitor.
COMMENTS:
PAGE 7 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 17  STEP 6     1.3.3.3 The "MECH TRIP TEST" light is dark.
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 6
STANDARD: Applicant verifies the MECH TRIP TEST light is dark.
* 1.3.3.3 The "MECH TRIP TEST" light is dark.       ___ SAT STANDARD:                                                             ___ UNSAT Applicant verifies the MECH TRIP TEST light is dark.
COMMENTS:        ___ SAT  ___ UNSAT STEP 7    1.3.4 Depress the "TEST ENABLE" pushbutton and verify the light is dark. STANDARD:  Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light is dark.
COMMENTS:
COMMENTS:
___ SAT   ___ UNSAT STEP 8     1.3.5 Acknowledge alarms on Turbine Monitor Control Panel Alarm summary.
STEP 7
STANDARD: Applicant acknowledges the alarms on the Turbine Graphic monitor COMMENTS:
* 1.3.4 Depress the "TEST ENABLE" pushbutton and verify ___ SAT the light is dark.
___ SAT  ___ UNSAT 
___ UNSAT STANDARD:
Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light is dark.
COMMENTS:
STEP 8
* 1.3.5 Acknowledge alarms on Turbine Monitor Control   ___ SAT Panel Alarm summary.
___ UNSAT STANDARD:
Applicant acknowledges the alarms on the Turbine Graphic monitor COMMENTS:
PAGE 8 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 17  STEP 9     1.3.6 Verify annunciator 1AD
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 9
-1, D/6 "EHC SYSTEM FAULT" is dark.
* 1.3.6 Verify annunciator 1AD-1, D/6 "EHC SYSTEM         ___ SAT FAULT" is dark.
STANDARD: Applicant verifies annunciator 1AD
___ UNSAT STANDARD:
-1, D/6 is dark.
Applicant verifies annunciator 1AD-1, D/6 is dark.
COMMENTS:       ___ SAT  ___ UNSAT NOTE: Annunciator 1AD
COMMENTS:
-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.
NOTE: Annunciator 1AD-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.
STEP 10 1.4 Perform the Electrical Trip Test (Control Room) as follows:
___ SAT STEP 10 1.4 Perform the Electrical Trip Test (Control Room) as follows:
1.4.1 Select Turbine Graphic "MECHANICAL AND ELECTRICAL TRIP TEST" for display.
___ UNSAT
STANDARD: Applicant ensures that the MECHANICAL AND ELECTRICAL TRIP TEST is displayed on the Turbine Graphic monitor.
* 1.4.1 Select Turbine Graphic "MECHANICAL AND ELECTRICAL TRIP TEST" for display.
COMMENTS:
STANDARD:
 
Applicant ensures that the MECHANICAL AND ELECTRICAL TRIP TEST is displayed on the Turbine Graphic monitor.
___ SAT  ___ UNSAT 
COMMENTS:
 
PAGE 9 0F 17
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 17   STEP 11    1.4.2 Depress the "TEST ENABLE" pushbutton and verify the light illuminates.
STANDARD:  Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                              SAT/UNSAT STEP 11                                                                  CRITICAL
* 1.4.2 Depress the "TEST ENABLE" pushbutton and          STEP verify the light illuminates.
___ SAT STANDARD:
___ UNSAT Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.
This step is critical to allow the electrical trip test to be performed.
This step is critical to allow the electrical trip test to be performed.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 10 0F 17
 
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 11 0F 17 NOTE:  Based on the LH fluid temperature and viscosity in the piping to the front standard of the Main Turbine, it is possible to get a Sequence Halt alarm on the turbine panel while performing the Electrical Trip Test. STEP 12    1.4.3 Depress the "ELECT TRIP TEST" pushbutton and verify the following sequence:
1.4.3.1 The "ELECT TRIP TEST" light illuminates.
STANDARD:  Applicant depresses the ELECT TRIP TEST pushbutton and verifies the light illuminates.


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                                  SAT/UNSAT NOTE: Based on the LH fluid temperature and viscosity in the piping to the front standard of the Main Turbine, it is possible to get a Sequence  CRITICAL Halt alarm on the turbine panel while performing the Electrical Trip  STEP Test.
___ SAT STEP 12
* 1.4.3 Depress the "ELECT TRIP TEST" pushbutton and        ___ UNSAT verify the following sequence:
* 1.4.3.1 The "ELECT TRIP TEST" light illuminates.
STANDARD:
Applicant depresses the ELECT TRIP TEST pushbutton and verifies the light illuminates.
This step is critical to initiate the Electrical Trip Test.
This step is critical to initiate the Electrical Trip Test.
EXAMINER NOTE: Seven seconds after the ELECT TRIP TEST pushbutton is depressed, the Main Turbine will trip requiring entry into AP/1/A/5500/002 (Turbine Generator Trip). The applicant will perform the immediate actions of AP/1A/5500/002, EP/1/A5000/E
EXAMINER NOTE: Seven seconds after the ELECT TRIP TEST pushbutton is depressed, the Main Turbine will trip requiring entry into AP/1/A/5500/002 (Turbine Generator Trip). The applicant will perform the immediate actions of AP/1A/5500/002, EP/1/A5000/E-0 (Reactor Trip or Safety Injection) and EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS) from memory to successfully complete the JPM. The following procedure steps are listed for reference.
-0 (Reactor Trip or Safety Injection) and EP/1/A/5000/FR
-S.1 (Response to Nuclear Power Generation/ATWS) from memory to successfully complete the JPM. The following procedure steps are listed for reference.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 11 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 17  AP/1/A/5500/002 (Turbine Generator Trip)
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT AP/1/A/5500/002 (Turbine Generator Trip)
STEP 13   1. Verify reactor power  
STEP 13 1. Verify reactor power - LESS THAN 69%.                         ___ SAT STANDARD:                                                                 ___ UNSAT Applicant determines that reactor power is greater than 69 % and transitions to the RNO.
- LESS THAN 69%.
COMMENTS:
STANDARD: Applicant determines that reactor power is greater than 69 % and transitions to the RNO. COMMENTS:       ___ SAT  ___ UNSAT STEP 14   1. RNO Perform the following:
STEP 14 1. RNO Perform the following:
: a. Ensure reactor  
___ SAT
- TRIPPED. b. GO TO EP/1/A/5000/E
: a. Ensure reactor - TRIPPED.
-0 (Reactor Trip Or Safety Injection).
___ UNSAT
STANDARD: Applicant attempts to manually trip the reactor and transitions to E
: b. GO TO EP/1/A/5000/E-0 (Reactor Trip Or Safety Injection).
-0. COMMENTS:       ___ SAT  ___ UNSAT 
STANDARD:
Applicant attempts to manually trip the reactor and transitions to E-0.
COMMENTS:
PAGE 12 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 17  EP/1/A/5000/E
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)
-0 (Reactor Trip or Safety Injection)
STEP 15 2. Verify Reactor Trip:                                     ___ SAT
STEP 15   2. Verify Reactor Trip:
* All rod bottom lights - LIT                       ___ UNSAT
All rod bottom lights  
* All reactor trip and bypass breakers - OPEN
- LIT   All reactor trip and bypass breakers  
* I/R power - DECREASING.
- OPEN   I/R power  
STANDARD:
- DECREASING.
Applicant determines that the reactor trip breakers are closed and transitions to the RNO.
STANDARD: Applicant determines that the reactor trip breakers are closed and transitions to the RNO.
EXAMINER NOTE: Step 1 is to Monitor Enclosure 1 and is not an immediate action.
EXAMINER NOTE: Step 1 is to Monitor Enclosure 1 and is not an immediate action.
COMMENTS:
COMMENTS:       ___ SAT  ___ UNSAT STEP 16   2. RNO Perform the following:
STEP 16 2. RNO Perform the following:
___ SAT
: a. Trip reactor.
: a. Trip reactor.
STANDARD: Applicant attempts to trip the reactor.
___ UNSAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 17  STEP 17   2. RNO b. IF reactor will not trip, THEN OPEN concurrently:
Applicant attempts to trip the reactor.
Implement EP/1/A/5000/F
COMMENTS:
-0 (Critical Safety Function Status Trees). GO TO EP/1/A/5000/FR
PAGE 13 0F 17
-S.1 (Response To Nuclear Power Generation/ATWS).
 
STANDARD: Applicant transitions to FR
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT STEP 17 2. RNO b. IF reactor will not trip, THEN OPEN concurrently:
-S.1. COMMENTS:       ___ SAT  ___ UNSAT EP/1/A/5000/FR
___ SAT
-S.1 (Response to Nuclear Power Generation/ATWS)
* Implement EP/1/A/5000/F-0 (Critical Safety Function Status Trees).                   ___ UNSAT
STEP 1 8  1. Verify Reactor Trip:
* GO TO EP/1/A/5000/FR-S.1 (Response To Nuclear Power Generation/ATWS).
All rod bottom lights  
STANDARD:
- LIT   All reactor trip and bypass breakers  
Applicant transitions to FR-S.1.
- OPEN   I/R power  
COMMENTS:
- DECREASING.
EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS)
STANDARD: Applicant determines that the reactor trip breakers are closed and transitions to the RNO.
STEP 18 1. Verify Reactor Trip:                                       ___ SAT
* All rod bottom lights - LIT                         ___ UNSAT
* All reactor trip and bypass breakers - OPEN
* I/R power - DECREASING.
STANDARD:
Applicant determines that the reactor trip breakers are closed and transitions to the RNO.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT 
PAGE 14 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 17  STEP 1 9  1. RNO Perform the following:
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 19 1. RNO Perform the following:
___ SAT
: a. Trip reactor.
: a. Trip reactor.
STANDARD: Applicant attempts to trip the reactor.
___ UNSAT STANDARD:
COMMENTS:       ___ SAT  ___ UNSAT STEP 20   1. RNO b. IF reactor will not trip, THEN insert rods.
Applicant attempts to trip the reactor.
STANDARD: Applicant places the CRD BANK SELECT switch in the MAN position and inserts control rods.
COMMENTS:
 
STEP 20 1. RNO b. IF reactor will not trip, THEN insert rods.         CRITICAL STEP STANDARD:
This step is critical to take manual control of the control rods and insert negative reactivity.
___ SAT Applicant places the CRD BANK SELECT switch in the MAN position and inserts control rods.                                       ___ UNSAT This step is critical to take manual control of the control rods and insert negative reactivity.
 
This step is also Time Critical and manual rod insertion must be initiated within 30 seconds of receipt of the first out indication.
This step is also Time Critical and manual rod insertion must be initiated within 30 seconds of receipt of the first out indication.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 15 0F 17


Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 16 0F 17  STEP 20   2. Verify Turbine Trip:
Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 20 2. Verify Turbine Trip:
All turbine stop valves  
___ SAT
- CLOSED STANDARD: Applicant verifies the turbine stop valves are closed.
* All turbine stop valves - CLOSED
EXAMINER CUE: The CRS will continue to read the actions of FR
___ UNSAT STANDARD:
-S.1. COMMENTS:
Applicant verifies the turbine stop valves are closed.
END OF TASK
EXAMINER CUE: The CRS will continue to read the actions of FR-S.1.
___ SAT  ___ UNSAT 
COMMENTS:
END OF TASK STOP TIME ________
PAGE 16 0F 17


STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 1 is at 100% power.
* Unit 1 is at 100% power.
INITIATING CUES:
INITIATING CUES:
The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.


The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam JPM I PAGE 1 OF 8


Catawba Nuclear Station JPM I Sep. 2013 NRC Exam PAGE 1 OF 8       
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam EVALUATION SHEET Task:                Makeup to the Unit 2 Spent Fuel Pool from RN Alternate Path:      No Facility JPM #:      KF-058 (Modified)
Safety Function:    8        Title:      Plant Service Systems K/A          033 A2.03      Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Abnormal spent fuel pool water level or loss of water level.
Rating(s):  3.1 / 3.5      CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant          X            Perform                    Simulate      X


JPM I   
==References:==
OP/2/A/6200/005 Spent Fuel Pool Cooling System rev.078 Task Standard:      Lineup completed to supply RN to the Spent Fuel Pool via 2RN-78 and 2KF-104.
Validation Time: 12 minutes                            Time Critical:          Yes          No      X
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 8


Catawba Nuclear Station JPM I Sep. 2013 NRC Exam PAGE 2 OF 8 EVALUATION SHEET Task: Makeup to the Unit 2 Spent Fuel Pool from RN Alternate Path:
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No  Facility JPM #:
KF-058 (Modified)
Safety Function:
8 Title: Plant Service Systems K/A  033 A2.0 3 Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Abnormal spent fuel pool water level or loss of water level.
Rating(s):
3.1 / 3.5 CFR: 41.5 / 43.5 / 45.3 / 45.
13  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant X  Perform  Simulate X  References
: OP/2/A/6200/005 Spent Fuel Pool Cooling System rev.078  Task Standard:
Lineup completed to supply RN to the Spent Fuel Pool via 2RN
-78 and  2KF-104. Validation Time:
1 2 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM I Sep. 2013 NRC Exam PAGE 3 OF 8  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC
: 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event REV. 0 PAGE 4  0F 8 Catawba Nuclear Station JPM I Sep. 2013 NRC Exam PAGE 4 OF 8   READ TO APPLICANT  DIRECTION TO APPLICANT:  I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event PAGE 3 OF 8


REV. 0                                                                  PAGE 4 0F 8 Catawba Nuclear Station JPM I Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
* A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
Spent Fuel Pool level is 39 feet and slowly decreasing.
* Spent Fuel Pool level is 39 feet and slowly decreasing.
INITIATING CUES:
INITIATING CUES:
The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System) Enclosure 4.10.
* The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System)
All initial conditions have been satisfied for this enclosure.
Enclosure 4.10.
Double verification and peer check of procedure steps have been waived during this JPM.
* All initial conditions have been satisfied for this enclosure.
EXAMINER NOTE
* Double verification and peer check of procedure steps have been waived during this JPM.
: After reading the initiating cue, provide the applicant with a copy of OP/2/A/6200/005 Enclosure 4.10.
EXAMINER NOTE: After reading the initiating cue, provide the applicant with a copy of OP/2/A/6200/005 Enclosure 4.10.
PAGE 4 OF 8


Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 8  START TIME: _______
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD                                 SAT/UNSAT START TIME: _______
STEP 1:   3.1 Document Current Spent Fuel Pool Level ______________ ft STANDARD:   Applicant documents Spent Fuel Pool level as 39 feet per the initiating cue. EXAMINER NOTE
STEP 1: 3.1 Document Current Spent Fuel Pool Level ______________ ft
: The applicant is not required to locate the level indication in the control room.
___ SAT STANDARD:
___ UNSAT Applicant documents Spent Fuel Pool level as 39 feet per the initiating cue.
EXAMINER NOTE: The applicant is not required to locate the level indication in the control room.
EXAMINER CUE: Fuel Pool Level is 39 feet.
EXAMINER CUE: Fuel Pool Level is 39 feet.
COMMENTS:
COMMENTS:
 
STEP 2 3.2 IF desired to makeup from RN System Supply Header 2A, perform the following steps:                                   ___ SAT STANDARD:                                                                 ___UNSAT Applicant determines to makeup from RN Train 2A per the initial conditions COMMENTS:
___ SAT
PAGE 5 0F 8
___ UNSAT STEP 2   3.2 IF desired to makeup from RN System Supply Header 2A, perform the following steps:
STANDARD:   Applicant determines to makeup from RN Train 2A per the initial conditions COMMENTS:
___ SAT
___UNSAT 


Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8  STEP 3   3.2.1 Close 2 KF-172 (FWST Overflow To Spent Fuel Pool Isol) (AB-584, MM-6 2, Rm 400). STANDARD: Applicant describes closing 2KF
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD                         SAT/UNSAT STEP 3 3.2.1 Close 2KF-172 (FWST Overflow To Spent Fuel Pool ___ SAT Isol) (AB-584, MM-62, Rm 400).
-172. EXAMINER CUE: 2KF-172 is closed.
___ UNSAT STANDARD:
Applicant describes closing 2KF-172.
EXAMINER CUE: 2KF-172 is closed.
COMMENTS:
COMMENTS:
___ SAT  ___ UNSAT STEP 4   3.2.2 Open 2 RN-78 (2A RN Supply To Assured KF Makeup) (AB-58 9 , LL-60, Rm 400).
CRITICAL STEP 4                                                               STEP 3.2.2 Open 2RN-78 (2A RN Supply To Assured KF Makeup)
STANDARD: Applicant describes opening 2RN
(AB-589, LL-60, Rm 400).                       ___ SAT STANDARD:                                                         ___ UNSAT Applicant describes opening 2RN-78.
-78. EXAMINER CUE: 2RN-78 is open.
EXAMINER CUE: 2RN-78 is open.
This step is critical to align RN to the Unit 2 Spent Fuel Pool.
This step is critical to align RN to the Unit 2 Spent Fuel Pool.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 6 0F 8


Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8  CAUTION:   Maximum Spent Fuel Pool level shall be 40 feet + 6 inches on 2KFP5120 (Fuel Pool Level) or OAC Point C 2A0061 (U2 Spent Fuel Pool Level).
Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD                           SAT/UNSAT CAUTION: Maximum Spent Fuel Pool level shall be 40 feet + 6 inches on 2KFP5120 (Fuel Pool Level) or OAC Point C2A0061 (U2       CRITICAL Spent Fuel Pool Level). Centerline of the Spent Fuel Pool   STEP light receptacles is 41 feet.
Centerline of the Spent Fuel Pool light receptacles is 41 feet.
___ SAT STEP 5 3.2.3 Open 2KF-104 (2A KF Assured Fuel Pool M/U Isol)   ___ UNSAT (AB-584, MM-62, Rm 400).
STEP 5     3.2.3 Open 2 KF-104 (2A KF Assured Fuel Pool M/U Isol) (AB-58 4, MM-62, Rm 400).
STANDARD:
STANDARD: Applicant describes opening 2KF
Applicant describes opening 2KF-104.
-104. EXAMINER CUE: 2KF
EXAMINER CUE: 2KF-104 is open.
-104 is open. This step is critical to align RN to the Unit 2 Spent Fuel Pool.
This step is critical to align RN to the Unit 2 Spent Fuel Pool.
EXAMINER CUE: If monitoring of spent fuel pool level is mentioned by the applicant, provide the following cue: "Another operator will be monitoring spent fuel pool level."
EXAMINER CUE: If monitoring of spent fuel pool level is mentioned by the applicant, provide the following cue:
COMMENT S:
Another operator will be monitoring spent fuel pool level.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 7 0F 8


END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT 
STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
* A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
Spent Fuel Pool level is 39 feet and slowly decreasing.
* Spent Fuel Pool level is 39 feet and slowly decreasing.
INITIATING CUES:
* The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System)
Enclosure 4.10.
* All initial conditions have been satisfied for this enclosure.
* Double verification and peer check of procedure steps have been waived during this JPM.


INITIATING CUES:
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam JPM J PAGE 1 OF 11
The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System) Enclosure 4.10.
All initial conditions have been satisfied for this enclosure.
Double verification and peer check of procedure steps have been waived during this JPM.


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam PAGE 1 OF 11       
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam EVALUATION SHEET Task:                Establishing NC Pump Seal Injection from the SSF Alternate Path:      No Facility JPM #:      AD-002 (Modified)
Safety Function:    4P      Title:      Reactor Coolant System K/A    015/017 AA1.07      Ability to operate and /or monitor the following as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow): RCP seal water injection subsystem.
Rating(s):  3.5 / 3.4      CFR:      41.7 / 45.5 / 45.6 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant          X              Perform                    Simulate        X


JPM J      
==References:==
EP/2/A/5000/G-1 (Generic Enclosures) Enclosure 19 (Establishing NC Makeup/Seal Injection From The SSF) rev. 7 Task Standard:      Seal Injection flow from Standby Makeup Pump #2 is established to the Unit 2 NC pumps within 10 minutes.
Validation Time: 5 minutes                              Time Critical:        Yes    X     No
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                          Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                    DATE
===========================================================================
COMMENTS PAGE 2 OF 11


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam PAGE 2 OF 11 EVALUATION SHEET Task: Establishing NC Pump Seal Injection from the SSF Alternate Path:
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No  Facility JPM #:
AD-0 02 (Modified)
Safety Function:
4P Title: Reactor Coolant System K/A  015/017 AA1.07 Ability to operate and /or monitor the following as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow):  RCP seal water injection subsystem.
Rating(s):
3.5 / 3.4 CFR: 41.7 / 4 5.5 / 45.6  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant X  Perform  Simulate X  References
: EP/2/A/5000/G
-1 (Generic Enclosures) Enclosure 19 (Establishing NC Makeup/Seal Injection From The SSF) rev. 7  Task Standard:
Seal Injection flow from Standby Makeup Pump #2 is established to the Unit 2 NC pumps within 10 minutes.
Validation Time:
5 minutes  Time Critical:
Yes X No  ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM J Sep. 2013 NRC Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC
: 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop-up window.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event REV. 0 PAGE 4 0F 11 Catawba Nuclear Station JPM J Sep. 2013 NRC Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event PAGE 3 OF 11
 
REV. 0                                                                   PAGE 4 0F 11 Catawba Nuclear Station JPM J Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A total loss of all AC power has occurred on Unit 2
* A total loss of all AC power has occurred on Unit 2.
. EP/2/A/5000/ECA
* EP/2/A/5000/ECA-0.0 (Loss of All AC Power) has been entered.
-0.0 (Loss of All AC Power) has been entered.
INITIATING CUES:
INITIATING CUES:
You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/
* You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/2/A/5000/G-1 (Unit 2 Generic Control Room Enclosures),
2/A/5000/G-1 (Unit 2 Generic Control Room Enclosures), Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.
Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.
Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G
* Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G-1 Enclosure 20.
-1 Enclosure 20.
* This JPM is time critical.
This JPM is time critical.
EXAMINER NOTE:
EXAMINER NOTE
After the applicant locates the local copy of EP/2/A/5000/G-1, hand the applicant a copy of EP/2/A/5000/G-1, Enclosure 19.
: After the applicant locates the local copy of EP/2/A/5000/G
PAGE 4 OF 11
-1, hand the applicant a copy of EP/2/A/5000/G
-1, Enclosure 19.


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  START TIME: _______
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT START TIME: _______
NOTE: Indications of 1SLXG being de
NOTE: Indications of 1SLXG being de-energized are as follows:
-energized are as follows:
* Normal lighting in SSF off with emergency lights on ___ SAT
Normal lighting in SSF off with emergency lights on  "LINE VOLTS" on 0CNSL0001 indicating zero volts Annunciator 0AD
                * "LINE VOLTS" on 0CNSL0001 indicating zero volts
-11, B/6 "LOAD CENTER 1SLXG TROUBLE" - LIT  "LOAD CENTER 1SLXG BUS VOLTAGE" on 1SLXG indicating zero volts.
* Annunciator 0AD-11, B/6 "LOAD CENTER 1SLXG           ___ UNSAT TROUBLE" - LIT
STEP 1   1. IF 1SLXG is de
                * "LOAD CENTER 1SLXG BUS VOLTAGE" on 1SLXG indicating zero volts.
-energized, THEN place SSF diesel in operation as follows: STANDARD:   Applicant uses local indications and determines that 1SLXG is not de-energized, and the SSF diesel will not need to be started.
STEP 1 1. IF 1SLXG is de-energized, THEN place SSF diesel in operation as follows:
Examiner Cue
STANDARD:
: As indications are located:
Applicant uses local indications and determines that 1SLXG is not de-energized, and the SSF diesel will not need to be started.
Normal SSF lighting is ON Voltmeter reads 600v.
Examiner Cue: As indications are located:
Annunciator B
* Normal SSF lighting is ON
-6, "Load Center 1SLXG Trouble" is DARK.   "1SLXG bus volts" reads 600 volts
* Voltmeter reads 600v.
. COMMENTS:
* Annunciator B-6, Load Center 1SLXG Trouble" is DARK.
 
* 1SLXG bus volts reads 600 volts.
___ SAT
COMMENTS:
___ UNSAT 
PAGE 5 0F 11


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11  STEP 2   2. Ensure 2 NV-876 (Stdby M/U To Cont Equip Sump 2A) - CLOSED. STANDARD:   Applicant locates the indication for 2NV-876 and verifies the green CLSD light is lit.
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                             SAT/UNSAT STEP 2 2. Ensure 2NV-876 (Stdby M/U To Cont Equip Sump 2A) -
CLOSED.                                                     ___ SAT STANDARD:                                                             ___UNSAT Applicant locates the indication for 2NV-876 and verifies the green CLSD light is lit.
Examiner Cue: GREEN CLOSED light is LIT.
Examiner Cue: GREEN CLOSED light is LIT.
COMMENTS:       ___ SAT    ___UNSAT STEP 3   3. IF annunciator 0AD
COMMENTS:
-11, D/1 (ESS MCC 2EMXS LOSS OF VOLTAGE) LIT, THEN perform the following:
STEP 3 3. IF annunciator 0AD-11, D/1 (ESS MCC 2EMXS LOSS OF VOLTAGE) LIT, THEN perform the following:                   ___ SAT STANDARD:                                                             ___ UNSAT Applicant checks that 0AD-11, D/1 is DARK and verifies that 2EMXS is energized and that this step does not apply.
STANDARD: Applicant checks that 0AD-11, D/1 is DARK and verifies that 2EMXS is energized and that this step does not apply.
Examiner Cue: Annunciator D/1 is DARK.
Examiner Cue: Annunciator D/1 is DARK.
COMMENTS:
COMMENTS:
 
PAGE 6 0F 11
___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11  STEP 4   4. IF "UNIT 2 SSF CONTROLS ENGAGED" DARK , THEN perform the following:
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 4 4. IF "UNIT 2 SSF CONTROLS ENGAGED" DARK, THEN perform the following:                                       ___ SAT STANDARD:                                                               ___ UNSAT Applicant locates Unit 2 SSF ENGAGED and verifies that the light is LIT and that this step does not apply.
STANDARD: Applicant locates "Unit 2 SSF ENGAGED" and verifies that the light is LIT and that this step does not apply.
Examiner Cue: UNIT 2 SSF CONTROLS ENGAGED light is lit.
Examiner Cue: UNIT 2 SSF CONTROLS ENGAGED light is lit.
COMMENTS:       ___ SAT  ___ UNSAT STEP 5    5. IF "UNIT 2 SSF CONTROLS ENGAGED" LIT, THEN perform the following:
COMMENTS:
: a. Ensure the following valves  
STEP 5    5. IF "UNIT 2 SSF CONTROLS ENGAGED" LIT, THEN                   CRITICAL perform the following:                                       STEP
- OPEN:   2NV-865A (Stdby M/U Pump Suct Frm Xfer Tube)
: a. Ensure the following valves - OPEN:                     ___ SAT
STANDARD: Applicant locates the switch for 2NV
* 2NV-865A (Stdby M/U Pump Suct Frm Xfer Tube)       ___ UNSAT STANDARD:
-865A and determines that 2NV-865A is closed and describes opening 2NV
Applicant locates the switch for 2NV-865A and determines that 2NV-865A is closed and describes opening 2NV-865A by depressing the red OPEN pushbutton.
-865A by depressing the red OPEN pushbutton.
Examiner Cue: Green CLSD light is LIT.
Examiner Cue
Examiner Cue: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV-865A: "Red OPEN light is LIT".
: Green CLSD light is LIT. Examiner Cue
This step is critical to align a suction source for Standby Makeup Pump #2 COMMENTS:
: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV
PAGE 7 0F 11
-865A: "Red OPEN light is LIT".
This step is critical to align a suction source for Standby Makeup Pump #2 COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11  STEP 6   5. a. Ensure the following valves  
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 6 5.                                                                 CRITICAL
- OPEN:   2 NV-872A (Stdby M/U Pmp Filt Otlt).
: a. Ensure the following valves - OPEN:                       STEP
STANDARD: Applicant locates the switch for 2NV
* 2NV-872A (Stdby M/U Pmp Filt Otlt).                 ___ SAT STANDARD:
-872A and determines that 2NV
___ UNSAT Applicant locates the switch for 2NV-872A and determines that 2NV-872A is closed and describes opening 2NV-872A by depressing the red OPEN pushbutton.
-872A is closed and describes opening 2NV
Examiner Cue: Green CLSD light is LIT.
-872A by depressing the red OPEN pushbutton.
Examiner Cue: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV-872A: Red OPEN light is LIT.
Examiner Cue
This step is critical to align a flow path for the Standby Makeup #2.
: Green CLSD light is LIT. Examiner Cue
COMMENTS:
: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV
STEP 7 5. b. CLOSE 2NV-89A (NC Pmps Seal Ret Cont Isol).                 CRITICAL STEP STANDARD:
-8 72 A: Red OPEN light is LIT. This step is critical to align a flow path for the Standby Makeup #2
___ SAT Applicant locates the switch for 2NV-89A and determines that 2NV-89A is open and describes closing 2NV-89A by depressing the green CLSD   ___ UNSAT pushbutton.
. COMMENTS:
Examiner Cue: Red OPEN light is LIT.
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 7   5. b. CLOSE 2 NV-89A (NC Pmps Seal Ret Cont Isol).
Examiner Cue: AFTER Applicant describes depressing the green CLOSE pushbutton for 2NV-89A: Green CLSD light is LIT.
STANDARD: Applicant locates the switch for 2NV
This step is critical to ensure voids are collapsed in the seal-leakoff line before flow from the Stand By Makeup Pump arrives.
-89A and determines that 2NV
COMMENTS:
-89A is open and describes closing 2NV
PAGE 8 0F 11
-89A by depressing the green CLSD pushbutton.
Examiner Cue
: Red OPEN light is LIT. Examiner Cue
: AFTER Applicant describes depressing the green CLOSE pushbutton for 2NV
-8 9 A: Green CLSD light is LIT.
This step is critical to ensure voids are collapsed in the seal
-leakoff line before flow from the Stand By Makeup Pump arrives. COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 9 0F 11   STEP 8  6. Ensure 2 NV-877 (Stdby M/U To NC Pump Seal Inj)
- OPEN. STANDARD:  Applicant locates the switch for 2NV
-877 and determines that 2NV-877 is OPEN. Examiner Cue:  Red OPEN light is LIT. COMMENTS:        ___ SAT  ___ UNSAT STEP 9  7. Start "STDBY M/U PUMP #
2" by depressing "ON" pushbutton on SSF console. STANDARD:  Applicant locates the switch for STDBY M/U PUMP #2 and describes depressing the red ON pushbutton.
Examiner Cue:  After the push button has been depressed, state that the Red ON light is LIT. Examiner Note
:  If the applicant states that they would verify seal flow on 2NVP6150 (UNIT 2 STDBY M/U FLOW) for the NC pumps , give the second part of the CUE below.
Examiner Cue:  Standby Makeup Pump discharge flow is 26 gpm.


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 8 6. Ensure 2NV-877 (Stdby M/U To NC Pump Seal Inj) - OPEN.
___ SAT STANDARD:
___ UNSAT Applicant locates the switch for 2NV-877 and determines that 2NV-877 is OPEN.
Examiner Cue: Red OPEN light is LIT.
COMMENTS:
STEP 9 7. Start "STDBY M/U PUMP #2" by depressing "ON"                      CRITICAL pushbutton on SSF console.                                      STEP STANDARD:                                                                  ___ SAT Applicant locates the switch for STDBY M/U PUMP #2 and describes        ___ UNSAT depressing the red ON pushbutton.
Examiner Cue: After the push button has been depressed, state that the Red ON light is LIT.
Examiner Note: If the applicant states that they would verify seal flow on 2NVP6150 (UNIT 2 STDBY M/U FLOW) for the NC pumps, give the second part of the CUE below.
Examiner Cue: Standby Makeup Pump discharge flow is 26 gpm.
This step is critical to provide seal water flow to the NC pumps.
This step is critical to provide seal water flow to the NC pumps.
CRITICAL END TIME _______
CRITICAL END TIME _______
COMMENTS:
COMMENTS:
CRITICAL STEP   ___ SAT   ___ UNSAT
PAGE 9 0F 11
 
Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD                            SAT/UNSAT STEP 10 8. Notify Control Room Supervisor of status of "STDBY M/U PUMP #2".                                                ___ SAT STANDARD:                                                          ___ UNSAT Applicant locates a phone and describes calling the control room.
Examiner Cue: Repeat back information given by the applicant.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11


Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 10 0F 11  STEP 10  8. Notify Control Room Supervisor of status of "STDBY M/U PUMP #2". STANDARD:  Applicant locates a phone and describes calling the control room.
Examiner Cue
:  Repeat back information given by the applicant.
COMMENTS:  END OF TASK
___ SAT  ___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
* A total loss of all AC power has occurred on Unit 2.
* EP/2/A/5000/ECA-0.0 (Loss of All AC Power) has been entered.
INITIATING CUES:
* You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/2/A/5000/G-1 (Unit 2 Generic Control Room Enclosures),
Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.
* Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G-1 Enclosure 20.
* This JPM is time critical.


INITIAL CONDITIONS:  A total loss of all AC power has occurred on Unit 2
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam JPM K PAGE 1 OF 9
. EP/2/A/5000/ECA
-0.0 (Loss of All AC Power) has been entered.
INITIATING CUES:
You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/2/A/5000/G
-1 (Unit 2 Generic Control Room Enclosures), Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.
Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G
-1 Enclosure 20.
This JPM is time critical.


Catawba Nuclear Station JPM K Sep. 2013 NRC Exam PAGE 1 OF 9  
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam EVALUATION SHEET Task:                Shifting Main Transformer Auxiliaries Alternate Path:      No Facility JPM #:      EP-016 (Modified)
Safety Function:    6        Title:      Electrical K/A          062 A2.01      Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation.
Rating(s):  3.4 / 3.9     CFR:      41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator              In-Plant          X            Perform                    Simulate      X


JPM K      
==References:==
OP/2/A/6350/005 (Alternate AC Power Sources) rev. 056, Enclosure 4.20 Task Standard:      The 2A Main Transformer Auxiliaries are transferred to an energized source.
Validation Time: 15 minutes                            Time Critical:          Yes          No     X
===========================================================================
Applicant:                                                                    Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                            Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                _____________________________/________
NAME                                      SIGNATURE                  DATE
===========================================================================
COMMENTS PAGE 2 OF 9


Catawba Nuclear Station JPM K Sep. 2013 NRC Exam PAGE 2 OF 9 EVALUATION SHEET Task: Shifting Main Transformer Auxiliaries Alternate Path:
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:
No  Facility JPM #:
EP-016 (Modified)
Safety Function: 6 Title: Electrical K/A  062 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:  Types of loads that, if de-energized, would degrade or hinder plant operation.
Rating(s):
3.4 / 3.9 CFR: 41.5 / 43.5 / 45.3 / 45.
13  Preferred Evaluation Location:
Preferred Evaluation  Method:
Simulator  In-Plant X  Perform  Simulate X  References
: OP/2/A/6350/005 (Alternate AC Power Sources) rev. 056
, Enclosure 4.20 Task Standard:
The 2A Main Transformer Auxiliaries are transferred to an energized source.
Validation Time:
15 minutes  Time Critical:
Yes  No X ===========================================================================
Applicant:
Time Start:    ______
____ NAME___________________________
Docket #_______________
Time Finish:  ________
__    Performance Rating:
SAT ____  UNSAT ____
Performance Time ___
__    Examiner: _____________________________
_____________________________/________
NAME  SIGNATURE DATE ===========================================================================
COMMENTS Catawba Nuclear Station JPM K Sep. 2013 NRC Exam PAGE 3 OF 9  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 2. Reset to IC
: 3. Enter the password.
: 3. Enter the password.
: 4. Select "Yes" on the INITIAL CONDITION RESET pop
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
-up window.
: 5. Ensure simulator setup per table below.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE "Extra Operator" is present in the simulator.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given
: 8. Place simulator in FREEZE until Examiner cue is given.
. Instructor Action Final Delay Ramp Delete In Event REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM K Sep. 2013 NRC Exam PAGE 4 OF 9  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
Instructor Action               Final   Delay Ramp Delete In Event PAGE 3 OF 9
 
REV. 0                                                                   PAGE 4 0F 9 Catawba Nuclear Station JPM K Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is at 100% power
* Unit 2 is at 100% power.
. The incoming feeder breaker to 2LXC tripped due to a load center fault.
* The incoming feeder breaker to 2LXC tripped due to a load center fault.
As a result, one
* As a result, one-half of the 2A Main Transformer Auxiliaries have been de-energized.
-half of the 2A Main Transformer Auxiliaries have been de
-energized.
INITIATING CUES:
INITIATING CUES:
The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.20 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/2/A/6350/005, Enclosure 4.20.
PAGE 4 OF 9


The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.2 0 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD                                   SAT/UNSAT START TIME: _______
EXAMINER NOTE
NOTE:   1. Shifting of power supplies shall be performed without delay.
:  After reading cue, provide the applicant with a copy of OP/2/A/6350/005, Enclosure 4.20
: 2. All breakers and alarm lights are located inside the cabinet at   ___ SAT the Main Transformer.
___ UNSAT
 
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9  START TIME: _______
NOTE:   1. Shifting of power supplies shall be performed without delay.
: 2. All breakers and alarm lights are located inside the cabinet at the Main Transformer.
: 3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer.
: 3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer.
: 4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies
: 4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies.
. Examiner Note
Examiner Note: Applicant should state that they would acquire the required PPE.
: Applicant should state that they would acquire the required PPE.
STEP 1: 3.1 IF shifting Bank A power supplies, perform the following:
STEP 1:   3.1 IF shifting Bank A power supplies, perform the following:
3.1.1 Verify voltage indicated on 2LXD per one of the following:
3.1.1 Verify voltage indicated on 2LXD per one of the following:
Transformer 2TXD Supply Voltage meter with 2LXD-4B closed OR   Transformer 2TXS Supply Voltage meter with 2LXD-8B closed STANDARD:   Applicant verifies voltage indicated on transformer 2TXD with 2LXD-4B closed or 2TXS with 2LXD
* Transformer 2TXD Supply Voltage meter with 2LXD-4B closed OR
-8B closed.
* Transformer 2TXS Supply Voltage meter with 2LXD-8B closed STANDARD:
Examiner Cue: 600 volts is indicated.
Applicant verifies voltage indicated on transformer 2TXD with 2LXD-4B closed or 2TXS with 2LXD-8B closed.
COMMENTS:
Examiner Cue: 600 volts is indicated.
COMMENTS:
PAGE 5 0F 9


___ SAT
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD                                SAT/UNSAT STEP 2 3.1.2 IF this is an unexpected loss of power, verify the following  ___ SAT at Transformer 2A:
___ UNSAT
___UNSAT
                *    "NO VOLTAGE BANK A" alarm light illuminated.
                *    "NO VOLTAGE BANK B" alarm light dark.
STANDARD:
Applicant verifies NO VOLTAGE BANK A alarm light is illuminated and the NO VOLTAGE BANK B alarm light is dark.
Examiner Cue: NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK.
COMMENTS:
STEP 3 3.1.3 Open "NORMAL FEEDER 2LXC" breaker.                            CRITICAL STEP STANDARD:
___ SAT Applicant describes opening the NORMAL FEEDER 2LXC breaker by placing it in the OFF (down) position.                              ___ UNSAT Examiner Cue: NORMAL FEEDER 2LXC is in the OFF position.
This step is critical to allow the lockout bar to be slid in the following step.
COMMENTS:
PAGE 6 0F 9


Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9    STEP 2  3.1.2 IF this is an unexpected loss of power, verify the following at Transformer 2 A:  "NO VOLTAGE BANK A" alarm light illuminated.
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT CRITICAL STEP 4 3.1.4 Slide lockout bar to the left.                               STEP STANDARD:                                                               ___ SAT Applicant describes sliding the lockout bar to the left.             ___ UNSAT Examiner Cue: Lockout bar is to the left.
  "NO VOLTAGE BANK B" alarm light dark.
STANDARD:  Applicant verifies "NO VOLTAGE BANK A" alarm light is illuminated and the "NO VOLTAGE BANK B" alarm light is dark.
Examiner Cue:  NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK. COMMENTS:        ___ SAT
___UNSAT STEP 3  3.1.3 Open "NORMAL FEEDER 2LXC" breaker.
STANDARD:  Applicant describes opening the NORMAL FEEDER 2LXC breaker by placing it in the OFF (down) position
. Examiner Cue:  NORMAL FEEDER 2LXC is in the OFF position.
This step is critical to allow the lockout bar to be slid in the following step. COMMENTS:
CRITICAL STEP
___ SAT  ___ UNSAT 
 
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT  PAGE 7 0F 9    STEP 4   3.1.4 Slide lockout bar to the left.
STANDARD: Applicant describes sliding the lockout bar to the left. Examiner Cue: Lockout bar is to the left.
This step is critical to allow closing of the EMERG FEEDER 2LXD breaker in the following step.
This step is critical to allow closing of the EMERG FEEDER 2LXD breaker in the following step.
COMMENTS:
COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT STEP 5    3.1.5 Close "EMERG FEEDER 2LXD" breaker. STANDARD: Applicant describes closing the EMERG FEEDER 2LXD breaker by placing the breaker to the ON (up) position.
STEP 5    3.1.5 Close "EMERG FEEDER 2LXD" breaker.                       CRITICAL STEP STANDARD:
Examiner Cue: EMERG FEEDER 2LXD breaker is in the ON position.
___ SAT Applicant describes closing the EMERG FEEDER 2LXD breaker by placing the breaker to the ON (up) position.                         ___ UNSAT Examiner Cue: EMERG FEEDER 2LXD breaker is in the ON position.
 
This step is critical to energize the transformer auxiliaries for the 2A Main Transformer COMMENTS:
This step is critical to energize the transformer auxiliaries for the 2A Main Transformer COMMENTS:
CRITICAL STEP    ___ SAT  ___ UNSAT 
PAGE 7 0F 9


Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9  STEP 6   3.1.6 Acknowledge any alarms present.
Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD                               SAT/UNSAT STEP 6 3.1.6 Acknowledge any alarms present.
STANDARD: Applicant describes acknowledging any alarms.
___ SAT STANDARD:
Examiner Cue: Alarms have been acknowledged.
___ UNSAT Applicant describes acknowledging any alarms.
COMMENTS:       ___ SAT  ___ UNSAT STEP 7   3.1.7 Complete and file Enclosure 4.2 3 (Unit 2 Main Transformers Cooler Groups Status) to record status.
Examiner Cue: Alarms have been acknowledged.
STANDARD: Applicant reads the step
COMMENTS:
. Examiner Cue: Another operator will complete and file enclosure 4.23
STEP 7 3.1.7 Complete and file Enclosure 4.23 (Unit 2 Main Transformers Cooler Groups Status) to record status.     ___ SAT STANDARD:                                                               ___ UNSAT Applicant reads the step.
Examiner Cue: Another operator will complete and file enclosure 4.23 NOTE: At this point, Bank A is supplied from 2LXD. Subsequent steps are to return Bank A to 2LXC.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 8 0F 9


NOTE:  At this point, Bank A is supplied from 2LXD. Subsequent steps are to return Bank A to 2LXC. COMMENTS: 
END OF TASK
___ SAT  ___ UNSAT 
STOP TIME ________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO APPLICANT:
DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
Unit 2 is at 100% power
* Unit 2 is at 100% power.
. The incoming feeder breaker to 2LXC tripped due to a load center fault.
* The incoming feeder breaker to 2LXC tripped due to a load center fault.
As a result, one
* As a result, one-half of the 2A Main Transformer Auxiliaries have been de-energized.
-half of the 2A Main Transformer Auxiliaries have been de
-energized.
INITIATING CUES:
INITIATING CUES:
 
The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.20 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).}}
The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.2 0 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).}}

Revision as of 11:48, 4 November 2019

301 Draft Sim_IN-Plant JPMs
ML13336A403
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/26/2013
From:
Duke Energy Carolinas
To:
NRC/RGN-II
References
50-413/13-301, 50-414/13-301
Download: ML13336A403 (138)


Text

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam JPM A PAGE 1 OF 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam EVALUATION SHEET Task: Establish NC system Bleed and Feed per EP/1/A/5000/FR-H.1 Alternate Path: Yes -

Facility JPM #: NC-046 Safety Function: 4P Title: Reactor Coolant System K/A 002 A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the RCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of heat sinks Rating(s): 4.3 / 4.6 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) rev. 41 Task Standard: Aligns S/I feed path using NI and NV pumps and opens 1NC-32B and 1NC-34A PZR PORVs to establish NC system bleed path Validation Time: 10 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #169.
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event XMT-NV011 FNV_6080 BORON INJ FLOW 0

TO DCS/MCB/OAC (NVAA6080)

MAL-CA003A CAPT SA2 FAILS TO START Active MAL-CA003B CAPT SA5 FAILS TO START Active MAL-CA004A FAILURE OF CA PUMP A TO Both START MAL-CA004B FAILURE OF CA PUMP B TO Both START MAL-NI001B NI PUMP B FAILURE Auto OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B MAL-ISE002B (AUTO SI TRN B FAILS TO Active ACTUATE)

PAGE 3 OF 14

REV. 0 PAGE 4 0F 14 Catawba Nuclear Station JPM A Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed per steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-H.1 pages 27-35.

PAGE 4 OF 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 19. Perform Steps 20 through 24 quickly to establish NC heat removal by NC bleed and feed. ___ SAT STANDARD: ___ UNSAT Applicant acknowledges this step.

COMMENTS:

STEP 2 20. Ensure all NC pumps - OFF. ___ SAT STANDARD: ___UNSAT Applicant ensures the NC pumps are off.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 21. Initiate S/I. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red train A and B SAFETY INJECTION INITIATE pushbuttons and verifies the red SAFETY INJECTION ___ UNSAT ACTUATED status light is lit on 1SI-13 or ECCS TRN A yellow reset light is dark on 1MC-11.

This step is critical to start the NI pump and align the valves required for initiating an NC system feed path.

COMMENTS:

STEP 4 22. Verify NC System feed path as follows: ___ SAT

a. Verify the following pumps - ON: ___ UNSAT
  • At least one NV pump
  • At least one NI pump.

STANDARD:

Applicant determines that at least one NV pump and one NI pump are running.

EXAMINER NOTE: Applicant may start 1B NI pump and 1B NV pump at this time due to it being a failed auto action. If not, the procedure will direct starting these pumps in the upcoming steps.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 22 b. Verify "NV S/I FLOW" - INDICATING FLOW.

___ SAT STANDARD: ___ UNSAT Applicant determines that 1NVP6080 (NV S/I FLOW) on 1MC-3 indicates 0 GPM and transitions to the RNO.

COMMENTS:

STEP 6 22 b. RNO Perform the following:

___ SAT

1) Ensure the following pumps - ON:

___ UNSAT

  • NV Pumps
  • NI Pumps.

STANDARD:

Applicant ensures that all NV pumps and NI pumps are running by depressing the red ON pushbuttons for any non running pump, and verifying the red ON lights are lit and green OFF lights are dark for all pumps.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 7 22 b. RNO 2) IF at least one NV pump in service, THEN perform the following: ___ SAT a) Ensure the following valves - OPEN: ___ UNSAT

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-252A and 1NV-253B.

COMMENTS:

STEP 8 22 b. RNO 2) b) Ensure the following valves - CLOSED:

___ SAT

___ UNSAT

STANDARD:

Applicant determines that the green CLSD light is lit and red OPEN light is dark on 1NV-188A. Applicant determines that the green CLSD light is dark for 1NV-189B, and depresses the green CLOSE pushbutton and verifies the green CLSD light is lit and the red OPEN light is dark COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9 22 b. RNO 2) c) Ensure the following valves - OPEN:

___ SAT

___ UNSAT

STANDARD:

Applicant determines the red OPEN light is lit and green CLSD light is dark on 1NI-9A. Applicant determines that the red OPEN light is dark for 1NI-10B, and depresses the red OPEN pushbutton and verifies the red OPEN light is lit and the green CLSD light is dark.

COMMENTS:

STEP 10 22 b. RNO 3) IF NI Pump 1A is in service, THEN ensure the following valves - OPEN: ___ SAT

STANDARD:

Applicant determines that the red OPEN lights are lit and green CLSD lights are dark on valves 1NI-103A, 1NI-118A, 1NI-162A, and 1NI-100B.

COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 22 b. RNO 4) IF NI Pump 1B is in service, THEN ensure the following valves - OPEN: ___ SAT

STANDARD:

Applicant verifies that the red OPEN light is lit and green CLSD light is dark on valves 1NI-135B, 1NI-150B, 1NI-162A, and 1NI-100B.

COMMENTS:

STEP 12 22 b. RNO 5) IF no feed path can be aligned, THEN perform the following: ___ SAT STANDARD: ___ UNSAT Applicant determines that a feed path does exist and this step is N/A.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 23. Establish NC System bleed path as follows:

___ SAT

a. Ensure all Pzr PORV isolation valves - OPEN.

___ UNSAT STANDARD:

Applicant determines the RED lights are lit and GREEN lights are dark on valves 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

STEP 14 23 b. Select "OPEN" on the following PZR PORVs: CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant rotates switches for 1NC-34A and 1NC-32B, clockwise to the OPEN position and verifies RED lights are lit and GREEN lights are dark on both valves.

This step is critical because it establishes an NC system Bleed path.

COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 15 23 c. Align N2 to Pzr PORVs by opening the following valves:

___ SAT

___ UNSAT

STANDARD:

Applicant depresses the red OPEN pushbutton and verifies red OPEN light lit and green CLSD light dark on valves 1NI-438A and 1NI-439B.

COMMENTS:

STEP 16 23 d. Verify power to all Pzr PORV isolation valves -

AVAILABLE. ___ SAT STANDARD: ___ UNSAT Applicant verifies indicating lights lit on 1NC-31B, 1NC-35B, and 1NC-33A.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM A Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 24. Verify the following valves - OPEN:

STANDARD:

Applicant verifies lights on 1NC-31B, 1NC-32B, 1NC-33A and 1NC-34A indicate OPEN.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The CA system will not function.
  • Attempts to restart the Main CF pumps have been unsuccessful.
  • EP/1/A/5000/FR-H.1 (Response to Loss of Secondary Heat Sink) has been entered due to a RED PATH for the Heat Sink critical safety function while performing EP/1/A/5000/ES-0.1 (Reactor Trip Response).
  • Bleed and Feed initiation criteria have been met.

INITIATING CUES:

  • The CRS instructs you to initiate NC system bleed and feed per steps 19-24 of EP/1/A/5000/FR-H.1. Inform the CRS when the bleed and feed path has been initiated and verified.

Catawba Nuclear Station 2013 NRC Exam JPM A

Catawba Nuclear Station JPM B Sep. 2013 NRC Exam JPM B PAGE 1 OF 19

Catawba Nuclear Station JPM B Sep. 2013 NRC Exam EVALUATION SHEET Task: Restore Power to 1ETA from Offsite per EP/1/A/5000/ECA 0.0 Enclosure 7.

Alternate Path: Yes Facility JPM #: EP-010 Safety Function: 6 Title: Electrical K/A 062 A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)

Rating(s): 3.3 / 3.1 CFR: 41.7 / 45.5 / to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/ECA-0.0 (Loss OF All AC Power), Encl. 7, rev. 047 Task Standard: Restore normal offsite Power to 1ETA from the switchyard.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 19

Catawba Nuclear Station JPM B Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #170
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-DG001A (DG 1A FAILS TO START) Active MAL-DG001B (DG 1B FAILS TO START) Active MAL-EQB003A (LOSS OF D/G 1A Active SEQUENCER CTRL PWR)

MAL-EQB003B (LOSS OF D/G 1B Acitve SEQUENCER CTRL PWR)

LOA-EP067 (600V LC ELXA BKR ELXA-4B) Closed 10 2 LOA-EP069 (600V LC ELXC BKR ELXC-4B) Closed 20 2 OVR-ISE043 SAFETY INJECTION INITIATE Off PB TRN B Open switchyard PCBs Ensure load shed is complete.

PAGE 3 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit One has experienced a Loss of All AC power.
  • It is desired to restore normal power to 1ETA from offsite through 1ATC.
  • The TCC has verified adequate switchyard voltage and grid reliability.
  • The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.

INITIATING CUES:

You have been directed to align Normal power to 1ETA by completing Enclosure 7 [Aligning Normal Power to 1ETA (1ATC)] of EP/1/A/5000/ECA-0.0, (Loss of All AC Power).

EXAMINER NOTE: After reading initiating cue, provide the applicant with a copy of EP/1/A/5000/ECA-0.0 Enclosure 7, [Aligning Normal Power to 1ETA (1ATC)].

.

PAGE 4 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B START TIME: _______

STEP 1: 1. Verify the following 1ETA lockout relays - RESET:

___ SAT

  • 86N (1ETA 03 Cubicle)

___ UNSAT

  • 86B (1ETA 03 Cubicle)
  • 86S (1ETA 04 Cubicle)
  • 86D (1ETA 19 Cubicle).

STANDARD:

Applicant determines that the lockout relays are reset based on the initiating cue or by asking.

Examiner Cue: If asked, 1ETA lockout relays are reset.

COMMENTS:

STEP 2 2. IF AT ANY TIME it becomes apparent this enclosure will ___ SAT not be successful, THEN perform the following:

___UNSAT

a. Notify Control Room Supervisor of status.
b. RETURN TO Section C. (Operator Actions), Step 18.

STANDARD:

Applicant acknowledges the step COMMENTS:

PAGE 5 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 3 3. IF 1ATC energized, THEN GO TO Step 15.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1ATC is not energized.

COMMENTS:

STEP 4 4. IF 6.9 KV buss 1TA energized, THEN GO TO Step 14. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1TA is not energized.

COMMENTS:

STEP 5 5. IF transformer 1T2A energized, THEN GO TO Step 13.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1T2A is not energized.

COMMENTS:

PAGE 6 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 6 6. Notify Transmission Control Center (TCC), using one of the following methods, to coordinate attempts to restore ___ SAT power:

___ UNSAT

  • Outside line:
  • 704-382-9404
  • 704-382-9411
  • 704-382-4413
  • 704-382-9403
  • 704-399-9744

.

  • Two-way radio.

STANDARD:

Applicant notifies the TCC using any of the listed methods Examiner Cue: Repeat back information provided by applicant.

COMMENTS:

STEP 7 7. Notify TCC to verify adequate switchyard voltage and grid reliability. ___ SAT STANDARD: ___ UNSAT Applicant determines adequate switchyard voltage and grid reliability based on the initiating cue or by contacting the TCC.

Examiner Cue: If asked, The TCC has verified adequate switchyard voltage and grid reliability COMMENTS:

PAGE 7 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 8 8. Ensure both main transformer MODs - CLOSED.

___ SAT STANDARD:

___ UNSAT Applicant determines that both main transformer MODs are closed COMMENTS:

STEP 9 9. Verify both turbine generator breakers - OPEN.

___ SAT STANDARD:

___ UNSAT Applicant determines both generator breakers are open COMMENTS:

PAGE 8 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 10 10. Prepare the 6.9 KV busses for power restoration as follows: ___ SAT

a. Dispatch operator to ensure breakers for all de-energized ___ UNSAT motor loads on following 6.9 KV busses - OPEN:
  • 1TA
  • 1TB
  • 1TC
  • 1TD.

STANDARD:

Applicant dispatches operator to open all de-energized motor loads on all 6.9 KV busses.

Examiner Cue: Operators have been dispatched.

COMMENTS:

STEP 11 10 b. Place switches for the following pumps in the "OFF" CRITICAL position: STEP

  • All de-energized hotwell pumps ___ SAT
  • All de-energized condensate booster pumps. ___ UNSAT STANDARD:

Applicant places the switches for the hotwell and booster pumps to OFF This step is critical to prevent overloading the busses when they are re-energized.

COMMENTS:

PAGE 9 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 12 10 c. Depress the OFF pushbutton for all de-energized KR CRITICAL pumps. STEP STANDARD: ___ SAT Applicant depresses the OFF pushbutton for the de-energized KR ___ UNSAT pumps.

Examiner Cue: If asked, 2SLXC is energized.

Examiner Note: Only the A and C KR pump OFF pushbuttons should be depressed. The B KR pump is powered from unit 2 and should be left running to supply unit 2 loads.

This step is critical to prevent overloading the busses when they are re-energized.

COMMENTS:

STEP 13 11. Do not continue in this procedure until all de-energized 6.9 KV motor load breakers are open. ___ SAT STANDARD: ___ UNSAT Applicant determines from the initiating cue, or by asking, that the procedure may continue.

Examiner Cue: If asked, NEO reports that all de-energized 6.9 KV motor load breakers are open.

COMMENTS:

PAGE 10 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B NOTE Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing the main transformer. ___ SAT STEP 14 12. Energize 6.9 KV busses as follows: ___ UNSAT

a. Announce "Energizing Unit 1 main power. All personnel stand clear."

STANDARD:

Applicant makes announcement using plant page COMMENTS:

STEP 15 12 b. Verify the following unit tie PCBs - CLOSED:

___ SAT

  • PCB 15

___ UNSAT

  • PCB 18.

STANDARD:

Applicant determines that the PCBs are open and proceeds to the RNO.

COMMENTS:

PAGE 11 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 16 12 b. RNO b. Perform the following:

___ SAT

1) IF unit tie PCB(s) disconnects - OPEN, THEN return PCB(s) to operation. REFER TO ___ UNSAT OP/0/A/6350/010 (Operation of Station Breakers and Disconnects).

STANDARD:

Applicant determines that the step does not apply.

Examiner Cue: If asked, PCB disconnects are closed.

COMMENTS:

STEP 17 12 b. RNO b. 2) WHEN unit tie PCB(s) returned to operation, CRITICAL THEN CLOSE the following unit tie PCBs: STEP

  • PCB 18. ___ UNSAT STANDARD:

Applicant closes PCBs 15 and 18 This step is critical to supply power from Offsite.

COMMENTS:

PAGE 12 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 18 12 b. RNO b. 3) IF PCB(s) will not close, THEN notify TCC to close affected PCB(s). ___ SAT STANDARD: ___ UNSAT Applicant determines that the step does not apply.

COMMENTS:

STEP 19 13. Verify 1TA - ENERGIZED.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1TA is not energized and proceeds to the RNO.

COMMENTS:

STEP 20 13 RNO Perform the following:

___ SAT

a. IF not previously performed, THEN dispatch operator to ensure breakers for all motor loads on 6.9 KV buss ___ UNSAT 1TA - OPEN:

STANDARD:

Applicant determines that the step does not apply.

COMMENTS:

PAGE 13 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 21 13 RNO b. Ensure switches for the following pumps in the "OFF" position: ___ SAT

  • "HTWL PUMP 1A" ___ UNSAT
  • "CM BSTR PUMP 1A" STANDARD:

Applicant ensures the switches for the pumps in the OFF position.

COMMENTS:

STEP 22 13 RNO c. Place "7KV BUS 1TA MODE SEL" switch in "MAN A CRITICAL

& TIE". STEP STANDARD: ___ SAT Applicant places the 7KV BUS 1TA MODE SEL switch to MAN A & ___ UNSAT TIE This step is critical to operate the required breakers.

COMMENTS:

STEP 23 13 RNO d. CLOSE "7KV 1TA FDR FRM 1T2A". CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red CLOSE pushbutton for 7KV 1TA FDR FRM 1T2A ___ UNSAT This step is critical to energize 1TA.

COMMENTS:

PAGE 14 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 24 13 RNO e. IF "7KV 1TA FDR FRM 1T2A" fails to close, THEN dispatch operator to close 1TA-05 (Normal A ___ SAT Incoming Feeder From XFMR 1T2A). REFER TO Enclosure 30 (Local Operation of 6900V Bus ___ UNSAT Breakers).

STANDARD:

Applicant determines that the step does not apply.

COMMENTS:

STEP 25 14. Verify 1ATC - ENERGIZED.

___ SAT STANDARD:

___ UNSAT Applicant verifies that 1ATC is energized COMMENTS:

STEP 26 15. Verify 1ETA-03 (Normal Incoming Feeder From Xfmr 1ATC) - RACKED IN. ___ SAT STANDARD: ___ UNSAT Applicant verifies that 1ETA-03 is racked in using status lights, the OPEN light lit on the ETA NORM FDR FRM ATC switch, or the cue.

Examiner Cue: If asked, 1ETA-03 is racked in.

COMMENTS:

PAGE 15 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 27 16. Do not continue in this enclosure until:

___ SAT

  • 4KV XFMR 1ATC - ENERGIZED

___ UNSAT

  • 1ETA-03 (Normal Incoming Feeder From Xfmr 1ATC) -

RACKED IN.

  • Load shed of 1ETA - COMPLETE
  • The following 1ETA lockout relays - RESET:
  • 86N (1ETA 03 Cubicle)
  • 86B (1ETA 03 Cubicle)
  • 86S (1ETA 04 Cubicle)
  • 86D (1ETA 19 Cubicle).

STANDARD:

Applicant determines that all conditions are met and continues.

COMMENTS:

PAGE 16 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 28 17. Energize 1ETA as follows: CRITICAL STEP

a. CLOSE "ETA NORM FDR FRM ATC".

___ SAT STANDARD:

___ UNSAT Applicant depresses the CLOSE pushbutton for ETA NORM FDR FRM ATC.

This step is critical to energize 1ETA.

COMMENTS:

STEP 29 17 b. Verify 1ETA - ENERGIZED.

___ SAT STANDARD:

___ UNSAT Applicant verifies that 1ETA is energized.

COMMENTS:

PAGE 17 OF 19

Catawba Nuclear Station 2013 NRC Exam JPM B STEP 30 18. Notify dispatched operator to close the following load CRITICAL center normal incoming breakers from 1ETA: STEP

  • 1ELXA-4B (Normal Incoming Breaker Fed From Xfmr ___ SAT 1ETXA) (AB-577, AA-47, Rm 496)

___ UNSAT

  • 1ELXC-4B (Normal Incoming Breaker Fed From Xfmr 1ETXC) (AB-577, AA-46, Rm 496)

STANDARD:

Applicant notifies dispatched operator to close 1ELXA-4B and 1ELXC-4B.

Examiner Note: Insert Trigger 2 Examiner Cue: Operator reports that 1ELXA-4B and 1ELXC-4B are closed.

This step is critical to energize the A train Essential Load Centers.

COMMENTS:

STEP 31 19. GO TO Section C. (Operator Actions), Step 38.

___ SAT STANDARD:

___ UNSAT Applicant reads the step.

Examiner Cue: The CRS will go to section C, step 38.

COMMENTS:

END OF TASK STOP TIME _______

PAGE 18 OF 19

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

Catawba Nuclear Station 2013 NRC Exam JPM B DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit One has experienced a Loss of All AC power.
  • It is desired to restore normal power to 1ETA from offsite through 1ATC.
  • The TCC has verified adequate switchyard voltage and grid reliability.
  • The load shed of 1ETA has been completed and all lockout relays on 1ETA have been reset.

INITIATING CUES:

You have been directed to align Normal power to 1ETA by completing [Aligning Normal Power to 1ETA (1ATC)] of EP/1/A/5000/ECA-0.0, (Loss of All AC Power).

PAGE 19 OF 19

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam JPM C PAGE 1 OF 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam EVALUATION SHEET Task: Emergency Borate the Reactor Coolant System Alternate Path: Yes Facility JPM #: NV-017 Safety Function: 1 Title: Reactivity Control K/A 004 A2.14 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency Boration Rating(s): 3.8 / 3.9 CFR: 41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/FR-S.1 (Nuclear Power Generation/ATW) rev. 021 Task Standard: One NV pump running with its suction aligned to the FWST and isolated from the VCT.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #171
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-IPX003A MAL-IPX003B VLV-NV043F 0 MAL-MT-007 Instructor will act as the OATC and be manually inserting control rods when the simulator is placed in RUN.

PAGE 3 OF 9

REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM C Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/FR-S.1 pages 3-5.

PAGE 4 OF 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 4. Initiate emergency boration of NC System as follows:

___ SAT

a. Ensure at least one NV pump - ON.

___ UNSAT STANDARD:

Applicant verifies red ON light lit for NV PMP 1A or 1B (1MC-10).

COMMENTS:

STEP 2 4. b. OPEN 1NV-236B (Boric Acid To NV Pumps Suct).

___ SAT STANDARD:

___UNSAT Applicant depresses the red OPEN pushbutton for 1NV-236B and verifies the red OPEN light remains dark and the green CLSD light remains lit on 1MC-10. 1NV-236B remains closed.

COMMENTS:

STEP 3 4. c. Ensure both boric acid transfer pump switches - IN THE "ON" POSITION. ___ SAT STANDARD: ___ UNSAT Applicant rotates the switches for B/A XFER PMP 1A and B/A XFER PMP 1B to the ON position.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 4. d. Verify emergency boration flow - GREATER THAN OR ___ SAT EQUAL TO 30 GPM.

___ UNSAT STANDARD:

Applicant verifies EMER BORATE FLOW (1NVP5440) indicates 0 gpm (1MC-5) and transitions to the RNO.

COMMENTS:

STEP 5 4. d. RNO d. Align NV pump suction to FWST as follows: CRITICAL STEP

1) OPEN the following valves:

___ SAT

___ UNSAT

STANDARD:

Applicant depresses the red OPEN pushbuttons for 1NV-252A and 1NV-253B This step is critical to align borated water to the suction of the charging pumps as long as one of the valves is opened.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 4. d. RNO d. 2) CLOSE the following valves: CRITICAL STEP

___ SAT

___ UNSAT STANDARD:

Applicant depresses the green CLSD pushbutton for 1NV-188A and 1NV-189B.

This step is critical to prevent borated water from going to the VCT instead of the suction of the charging pumps as long as one of the valves is closed.

COMMENTS:

STEP 7 4. e. Verify the following charging line isolation valves - OPEN:

___ SAT

___ UNSAT

STANDARD:

Applicant verifies the red OPEN lights lit and green CLSD lights dark on 1NV-312A and 1NV-314B.

COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station JPM C Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 4. f. Verify Pzr pressure - LESS THAN 2335 PSIG.

___ SAT STANDARD:

___ UNSAT Applicant verifies PZR pressure instruments (1NCP5161, 1NCP5150, 1NCP5170 and 1NCP5171) indicate less than 2335 psig (1MC-10)

COMMENTS:

END OF TASK STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

Catawba Nuclear Station 2013 NRC Exam JPM C DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • The reactor will NOT trip automatically or manually.
  • A Red Path for Subcriticality is in effect.
  • The OATC is inserting rods manually.

INITIATING CUES:

The Control Room Supervisor instructs you to initiate emergency boration, per EP/1/A/5000/FR-S.1, (Nuclear Power Generation/ATWS), step 4.

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam JPM D PAGE 1 OF 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam EVALUATION SHEET Task: Secure 1A ND Pump per EP/1/A/5000/E-0 step 17.

Alternate Path: Yes Facility JPM #: New Safety Function: 3 Title: Reactor Pressure Control K/A 006 A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the ECCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of flow path.

Rating(s): 3.9 / 4.3 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) rev. 041 Task Standard: Secure the 1A ND Pump Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #172
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-ND004F (ND25A NDPMP A MINFLOW 0

VALVE FAIL TO POSITION)

MAL-NC013B (NC COLD LEG D LEAK) 1.55 PAGE 3 OF 10

REV. 0 PAGE 4 0F 10 Catawba Nuclear Station JPM D Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Unit 1 safety injection has occurred due to a loss of coolant accident.
  • EP/1/A/5000/E-0, (Reactor Trip or Safety Injection) has been entered.

INITIATING CUES:

The CRS has directed you to perform step 17 of E-0.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/E-0 pages 10-12.

PAGE 4 OF 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 17. Verify proper S/I flow as follows:

___ SAT

a. "NV S/I FLOW" - INDICATING FLOW.

___ UNSAT STANDARD:

Applicant verifies flow on 1NVP6080 (NV S/I FLOW) on 1MC-5.

COMMENTS:

STEP 2 17. b. NC pressure - LESS THAN 1620 PSIG. ___ SAT STANDARD: ___UNSAT Applicant verifies NC pressure is less than 1620 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG W/R PRESS) on 1MC-5, or the plasma displays on 1MC-1, or the OAC.

COMMENTS:

STEP 3 17. c. NI pumps - INDICATING FLOW.

___ SAT STANDARD:

___ UNSAT Applicant verifies flow on 1NIP5450 (1A DISCH FLOW) and 1NIP5120 (1B DISCH FLOW) on 1MC-11.

COMMENTS:

PAGE 5 0F 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 17. d. NC pressure - LESS THAN 285 PSIG. CRITICAL STEP STANDARD:

___ SAT Applicant verifies NC pressure is greater than 285 psig on 1NCP5120 (LOOP B HOT LEG W/R PRESS) or 1NCP5140 (LOOP C HOT LEG ___ UNSAT W/R PRESS) on 1MC-5, or the plasma displays on 1MC-1, or the OAC, and transitions to the RNO column.

This step is critical to ensure the correct procedure flowpath (RNO) is recognized and implemented for task completion.

COMMENTS:

STEP 5 17.d. RNO d. Perform the following:

___ SAT

1) Ensure ND pump miniflow valve on operating ND pump(s) - OPEN. ___ UNSAT STANDARD:

Applicant determines that 1ND-25A (ND PUMP 1A MINIFLOW) is not open and attempts to open 1ND-25A by depressing the red OPEN pushbutton.

EXAMINER NOTE: 1ND-25A will not open.

COMMENTS:

PAGE 6 0F 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 17.d. RNO d. 2) IF the ND pump miniflow valve(s) cannot be CRITICAL opened, THEN perform the following for affected STEP train(s):

___ SAT a) Reset ECCS.

___ UNSAT STANDARD:

Applicant depresses the yellow RESET pushbutton for ECCS TRN A on 1MC-11 and verifies the yellow RESET light is lit.

This step is critical to allow the 1A D/G Load Sequencer to be reset.

COMMENTS:

STEP 7 17.d. RNO d. 2) b) Reset D/G load sequencer. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the yellow RESET pushbutton for D/G 1A LOAD SEQ RESET on 1MC-11 and verifies the yellow RESET light is lit. ___ UNSAT This step is critical to gain control of the 1A ND Pump.

COMMENTS:

PAGE 7 0F 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 17.d. RNO d. 2) c) Stop ND pump. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the green OFF pushbutton for ND PUMP 1A on 1MC-11 and verifies ND PUMP 1A is off. ___ UNSAT This step is critical to stop the 1A ND Pump from deadheading and subsequent overheating.

COMMENTS:

STEP 9 17.d. RNO d. 2) d) IF AT ANY TIME a B/O occurs, THEN restart S/I equipment previously on. ___ SAT STANDARD: ___ UNSAT Applicant acknowledges the step.

COMMENTS:

STEP 10 17.d. RNO d. 2) e) IF AT ANY TIME NC pressure decreases to less than 285 PSIG in an uncontrolled ___ SAT manner, THEN restart the ND pump.

___ UNSAT STANDARD:

Applicant acknowledges the step.

COMMENTS:

PAGE 8 0F 10

Catawba Nuclear Station JPM D Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 17. d. RNO d. 3) Observe note prior to Step 18 and GO TO Step

18. ___ SAT STANDARD: ___ UNSAT Applicant acknowledges the step and goes to step 18.

Examiner Cue: The CRS will continue to read the steps of E-0.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 9 0F 10

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

Catawba Nuclear Station 2013 NRC Exam JPM D DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A Unit 1 safety injection has occurred due to a loss of coolant accident.
  • EP/1/A/5000/E-0, (Reactor Trip or Safety Injection) has been entered.

INITIATING CUES:

The CRS has directed you to perform step 17 of E-0.

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam JPM E PAGE 1 OF 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam EVALUATION SHEET Task: Increase Pressure in the 1A Cold Leg Accumulator Alternate Path: No Facility JPM #: CLA-109 Safety Function: 2 Title: Reactor Coolant System Inventory Control K/A 006 A1.03 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the ECCS controls including: Accumulator pressure (level, boron concentration).

Rating(s): 3.5 / 3.7 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6200/009 (Cold Leg Accumulator Operation) Enclosure 4.6 rev.075 OP/1/A/6100/010J, (Annunciator Response for 1AD-9, E/1) rev. 068 Task Standard: Cold Leg Accumulator 1A is pressurized with nitrogen to clear annunciator 1AD-9, E/1.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #173
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event PAGE 3 OF 11

REV. 0 PAGE 4 0F 11 Catawba Nuclear Station JPM E Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

  • The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD-9, E/1.
  • Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
  • Peer Check has been waived.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6200/009 Enclosure 4.6.

PAGE 4 OF 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.1 Open 1NI-47A (C-Leg Accum N2 Sup Cont Isol). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red OPEN pushbutton for 1NI-47A

___ UNSAT This step is critical to align nitrogen to the Cold Leg Accumulators.

COMMENTS:

CRITICAL STEP 2 3.2 Position 1CB-1 (located behind control panel 1MC6, BB-56) STEP to "ON".

___ SAT STANDARD:

___UNSAT Applicant places the breaker for 1CB-1 in the ON position.

This step is critical to align power to the switches for the Cold Leg Accumulator nitrogen supply isolations.

COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT NOTE: If N2 inlet temperature decreases to 65°F, accumulator N2 supply isolation valves will auto close. There is no alarm associated with CRITICAL this condition. When N2 inlet temperature increased above 66°F, STEP this condition will auto clear.

___ SAT CAUTION: Pressurization shall be performed on only one accumulator at a time. ___ UNSAT STEP 3 3.3 Open the corresponding valve to increase pressure in the desired accumulator:

  • 1NI-50 (C-Leg Accum A N2 Supply Isol)
  • 1NI-61 (C-Leg Accum B N2 Supply Isol)
  • 1NI-72 (C-Leg Accum C N2 Supply Isol)
  • 1NI-84 (C-Leg Accum D N2 Supply Isol)

STANDARD:

Applicant depresses the red OPEN pushbutton for 1NI-50 and verifies that 1A Cold Leg Accumulator pressure is increasing (1NIP5040 or 1NIP5050 on 1MC-11, or the using the OAC).

This step is critical to align nitrogen to the 1A Cold Leg Accumulator.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 3.4 IF the accumulator N2 supply isolation valve frequently auto ___ SAT closes, ensure the following:

___ UNSAT

  • The thermostat is set at 75°F.

STANDARD:

If 1NI-50 cycles closed and reopens, applicant dispatches an NEO to check the power supply and thermostat setting.

EXAMINER NOTE: If applicant dispatches an operator to check the power supply and thermostat setting, repeat back only what is said.

EXAMINER NOTE: Cold Leg Accumulator pressure cannot be increased unless steps 1, 2, and 3 are successfully completed.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 3.5 WHEN the accumulator is at the desired pressure, close the CRITICAL appropriate valve as follows: STEP 3.5.1 Depress the "CLS" pushbutton for the appropriate ___ SAT valve:

___ UNSAT

  • 1NI-50 (C-Leg Accum A N2 Supply Isol)
  • 1NI-61 (C-Leg Accum B N2 Supply Isol)
  • 1NI-72 (C-Leg Accum C N2 Supply Isol)
  • 1NI-84 (C-Leg Accum D N2 Supply Isol)

STANDARD:

Applicant determines that Cold Leg Accumulator 1A pressure has been restored to within limits by verifying 1AD-9, E/1 clears and depresses the green CLOSE pushbutton for 1NI-50.

This step is critical to terminate the pressure increase and prevent overpressurizing the 1A Cold Leg Accumulator.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 3.5.2 Verify the appropriate valve is closed:

___ SAT

  • 1NI-50 (C-Leg Accum A N2 Supply Isol)

___ UNSAT

  • 1NI-61 (C-Leg Accum B N2 Supply Isol)
  • 1NI-72 (C-Leg Accum C N2 Supply Isol)
  • 1NI-84 (C-Leg Accum D N2 Supply Isol)

STANDARD:

Applicant verifies that the green CSLD light is lit and the red OPEN light is dark for 1NI-50.

COMMENTS:

STEP 7 3.6 IF necessary, repeat Steps 3.3 through 3.5 to increase pressure in additional accumulators. ___ SAT STANDARD: ___ UNSAT Applicant determines that the step does not apply.

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM E Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 3.7 Position 1CB-1 (located behind control panel 1MC6, BB-56) to "OFF". ___ SAT STANDARD: ___ UNSAT Applicant places the breaker for 1CB-1 in the OFF position.

COMMENTS:

STEP 9 3.8 Close 1NI-47A (C-Leg Accum N2 Sup Cont Isol).

___ SAT STANDARD:

___ UNSAT Applicant depresses the green CLOSE pushbutton for 1NI-47A.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

Catawba Nuclear Station 2013 NRC Exam JPM E DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

  • The Control Room Supervisor instructs you to restore CLA 1A pressure to clear annunciator 1AD-9, E/1.
  • Initial conditions for OP/1/A/6200/009, Encl. 4.6 (Increasing Accumulator Pressure) have been satisfied.
  • Peer Check has been waived.

Catawba Nuclear Station JPM F Sep. 2013 NRC Exam JPM F PAGE 1 OF 12

Catawba Nuclear Station JPM F Sep. 2013 NRC Exam EVALUATION SHEET Task: Shift Operating RC Pumps Alternate Path: Yes Facility JPM #: RC-001 Safety Function: 8 Title: Plant Service Systems K/A 075 A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the circulating water system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps Rating(s): 2.5 /2.7 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/B/6400/001A (Condenser Circulating Water) Enclosure 4.7 rev.071 Task Standard: 1A and 1D RC pumps are in service and 1RC-22 is closed.

Validation Time: 20 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 12

Catawba Nuclear Station JPM F Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #174
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Delay Ramp Delete Event Final In x13i159n (1C RC Pump ON pushbutton) 600 XMT-RC063 235 SEC RACK 360 LOA-RC066 (x13i159n)

OUT SEC 15 VLV-RC011F (x13i159n) 0 SEC Do not go to RUN until the student is ready to proceed.

PAGE 3 OF 12

REV. 0 PAGE 4 0F 12 Catawba Nuclear Station JPM F Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 50% power following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
  • 1C RC Pump is NOT rotating in the reverse direction.
  • The NLO is standing by to check 1C RC pump after it starts.

INITIATING CUES:

  • Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
  • Initial Conditions are complete.

EXAMINER NOTE: After reading Initiating Cue, provide applicant with a copy of OP/1/B/6400/001A Enclosure 4.7 with the initial conditions signed off.

PAGE 4 OF 12

Catawba Nuclear Station 2013 NRC Exam JPM F START TIME: _______

STEP 1: 3.1 Start the desired RC Pump as follows:

___ SAT 3.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction. ___ UNSAT STANDARD:

Applicant verifies that the pump is not rotating in the reverse direction per the initiating cue.

COMMENTS:

STEP 2 3.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM" ___ SAT position.

___UNSAT STANDARD:

Applicant ensures the RCP DISCH VALVE MODE SEL switch is in the NORM position COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 3 3.1.3 IF starting a third RC pump, perform the following:

___ SAT 3.1.3.1 Indicate below which cooling tower inlet isolation is closed: ___ UNSAT 1RC-25 (Cool Twr 1A Inlet Isol) 1RC-27 (Cool Twr 1C Inlet Isol)

STANDARD:

Applicant determines that 1RC-25 is closed.

COMMENTS:

STEP 4 3.1.3.2 Ensure all three cooling tower inlet isolation ___ SAT valves are open:

___ UNSAT 1RC-25 (Cool Twr 1A Inlet Isol) 1RC-26 (Cool Twr 1B Inlet Isol 1RC-27 (Cool Twr 1C Inlet Isol)

STANDARD:

Applicant opens 1RC-25 by depressing the red OPEN pushbutton and verifies the red OPEN light illuminates.

Examiner Note: This is a large valve and takes ~ 3.5 minutes to stroke.

COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 5 3.1.4 Start the desired RC pump

___ SAT STANDARD:

___ UNSAT Applicant starts the 1C RC pump, per the initiating cue, by depressing the red ON pushbutton.

COMMENTS:

STEP 6 3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.) ___ SAT STANDARD: ___ UNSAT Applicant determines that valve 1RC-23 (RC Pump 1C Disch Isol) begins to open and then recloses and the 1C RC pump trips.

Examiner Cue: When notified that the 1C RC pump discharge valve did NOT open, provide the following cue: Start the 1D RC pump and secure the 1B RC pump per OP/1/B/6400/001A, Enclosure 4.7.

Examiner Note: If asked by the applicant to verify that the 1D RC pump is not rotating in the reverse direction, or to checkout the 1D RC pump prior to start, provide the following cue: 1D RC pump is not rotating in the reverse direction and all local parameters are normal.

COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 7 3.1.4 Start the desired RC pump CRITICAL STEP STANDARD:

___ SAT Applicant starts the 1D RC pump by depressing the red ON pushbutton. ___ UNSAT This step is critical in order to start a pump to be able to secure the 1B RC pump.

COMMENTS:

STEP 8 3.1.5 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.) ___ SAT STANDARD: ___ UNSAT Applicant determines that 1RC-24 (RC Pump 1D Disch Isol) fully opens.

COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 9 3.2 Stop the desired RC pump as follows: CRITICAL STEP 3.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the ___ SAT next hour.

___ UNSAT STANDARD:

Applicant dispatches an operator to monitor for cooling tower overflow.

This step is critical to ensure EPA guidelines are not being violated.

Examiner Cue: This is Rob, I will monitor Unit 1 Cooling Tower levels COMMENTS:

STEP 10 3.2.2 Close the discharge valve of the pump to be stopped: CRITICAL STEP 1RC-21 (RC Pump 1A Disch Isol) 1RC-22 (RC Pump 1B Disch Isol) ___ SAT 1RC-23 (RC Pump 1C Disch Isol) 1RC-24 (RC Pump 1D Disch Isol) ___ UNSAT STANDARD:

Applicant depresses the green CLOSE pushbutton for 1RC-22 (RC Pump 1B Disch Isol) and verifies the green CLSD light illuminates.

This step is critical to shut down the 1B RC pump.

Examiner Note: This valve may take 1 minute to close.

Examiner Note: The 1B RC pump may trip before it can be manually secured.

COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 11 3.2.3 Ensure that the pump stops when the valve closes.

___ SAT STANDARD:

___ UNSAT Applicant verifies that the 1B RC pump green OFF light is illuminated.

COMMENTS:

STEP 12 3.3 IF Step 3.1.3.1 indicates a cooling tower inlet isolation was CRITICAL initially closed, close that cooling tower inlet isolation. STEP 1RC-25 (Cool Twr 1A Inlet Isol) ___ SAT 1RC-27 (Cool Twr 1C Inlet Isol)

STANDARD: ___ UNSAT Applicant determines that 1RC-25 was originally closed and depresses the green CLOSE pushbutton and verifies the green CLSD light illuminates.

This step is critical to comply with required cooling tower configurations.

COMMENTS:

Catawba Nuclear Station 2013 NRC Exam JPM F STEP 13 3.4 Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the following ___ SAT cooling tower configuration limits:

___ UNSAT STANDARD:

Applicant determines the cooling towers are aligned properly. (See highlighted line.)

COMMENTS:

END OF TASK STOP TIME ________

Catawba Nuclear Station 2013 NRC Exam JPM F APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 50% power following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
  • 1C RC Pump is NOT rotating in the reverse direction.
  • The NLO is standing by to check 1C RC pump after it starts.

INITIATING CUES:

  • Start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/001A (Condenser Circulating Water).
  • Initial Conditions are complete.

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam JPM G PAGE 1 OF 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam EVALUATION SHEET Task: Align the NS System for Cold Leg Recirculation Alternate Path: No Facility JPM #: NS-101 (Significantly Modified)

Safety Function: 5 Title: Containment Integrity K/A 026 A4.01 Ability to manually operate and/or monitor in the control room: CSS controls Rating(s): 4.5 / 4.3 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) Enclosure 2. Rev.029 Task Standard: Aligns NS to Cold Leg Recirculation with 1A NS Pump running and proper RN flow to the 1A NS Heat Exchanger.

Validation Time: 10 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #175
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event x01o063g (Reactor Trip breaker A OPEN Light)

MAL-SM007A (x01o063g) 4.24e+5 MAL-NC013D 27.5 OVR-VV013C (x01o063g) ON OVR-VV019D (x01o063g) ON OVR-VV022D (x01o063g) ON PAGE 3 OF 18

REV. 0 PAGE 4 0F 18 Catawba Nuclear Station JPM G Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.
  • EP/1/A/5000/ES-1.3, (Transfer to Cold Leg Recirculation) has been implemented.

INITIATING CUES:

The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES-1.3.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 Enclosure 2.

PAGE 4 OF 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 1. Verify both NS pumps - OFF.

___ SAT STANDARD:

___ UNSAT Applicant verifies both NS pumps are off .

COMMENTS:

CRITICAL STEP 2 2. CLOSE the following valves: STEP

  • 1NS-3B (NS Pump 1B Suct From FWST). ___UNSAT STANDARD:

Applicant depresses the green CLOSE pushbuttons for 1NS-20A and 1NS-3B.

This step is critical to satisfy the interlocks to open 1NS-18A and 1NS-1B respectively.

COMMENTS:

PAGE 5 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3. Verify containment pressure - GREATER THAN 3 PSIG

___ SAT STANDARD:

___ UNSAT Applicant verifies containment pressure is greater than 3 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC-11 or on the OAC or on any chart recorder containing containment pressure.

COMMENTS:

STEP 4 4. Verify at least one of the following annunciators - LIT: ___ SAT

STANDARD:

Applicant verifies that at least 1AD-20, B/3 or 1AD-21, B/3 is lit on 1MC-7 COMMENTS:

PAGE 6 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5 5. Align NS Train 1A to containment sump as follows:

___ SAT

a. Verify NS Pump 1A - AVAILABLE TO RUN.

___ UNSAT STANDARD:

Applicant verifies that NS Pump 1A is available to run.

COMMENTS:

STEP 6 5. b. Verify 1NI-185A (ND Pump 1A Cont Sump Suct) - OPEN.

___ SAT STANDARD:

___ UNSAT Applicant verifies that 1NI-185A is open.

COMMENTS:

STEP 7 5. c. Verify NS Pump 1B - OFF

___ SAT STANDARD:

___ UNSAT Applicant verifies that NS Pump 1B is off.

COMMENTS:

PAGE 7 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 5. d. OPEN 1NS-29A (NS Spray Hdr 1A Cont Isol). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red OPEN pushbutton for 1NS-29A on 1MC-

11. ___ UNSAT This step is critical to align Containment Spray to the associated spray nozzles.

COMMENTS:

STEP 9 5. e. OPEN 1NS-32A (NS Spray Hdr 1A Cont Isol). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red OPEN pushbutton for 1NS-32A on 1MC-

11. ___ UNSAT This step is critical to align Containment Spray to the associated spray nozzles.

COMMENTS:

STEP 10 5. f. Verify 1NS-20A (NS Pump 1A Suct From FWST) -

CLOSED. ___ SAT STANDARD: ___ UNSAT Applicant verifies that 1NS-20A is closed.

COMMENTS:

PAGE 8 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 5. g. OPEN 1NS-18A (NS Pmp A Suct From Cont Sump). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red OPEN pushbutton for 1NS-18A on 1MC-

11. ___ UNSAT This step is critical to align a suction source for NS Pump 1A.

COMMENTS:

STEP 12 5. h. Verify the following valves - OPEN:

___ SAT

  • 1NS-29A (NS Spray Hdr 1A Cont Isol)

___ UNSAT

  • 1NS-32A (NS Spray Hdr 1A Cont Isol)

STANDARD:

Applicant verifies that 1NS-29A, 1NS-32A and 1NS-18A are open.

COMMENTS:

PAGE 9 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 13 5. i. Verify containment pressure - GREATER THAN 1 PSIG.

___ SAT STANDARD:

___ UNSAT Applicant verifies containment pressure is greater than 1 psig on 1NSP5040, 1NSP5050, 1NSP5060 or 1NSP5070 on 1MC-11 or on the OAC or on any chart recorder containing containment pressure.

COMMENTS:

STEP 14 5. j. Start NS Pump 1A. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red ON pushbutton for NS PMP 1A

___ UNSAT This step is critical to provide containment spray to the spray nozzles.

COMMENTS:

PAGE 10 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT CAUTION Exceeding 4650 GPM RN flow through an NS Hx will cause damage to the Hx tubes.

___ SAT STEP 15 5. k. Align RN to NS Hx 1A as follows:

___ UNSAT

1) Verify at least one of the following:
  • All Unit 1 and Unit 2 RN pumps - ON.

OR

  • RN System - ALIGNED FOR SINGLE SUPPLY HEADER OPERATION STANDARD:

Applicant verifies that all Unit 1 and Unit 2 RN pumps are on COMMENTS:

STEP 16 5. k. 2) OPEN 1RN-144A (NS Hx 1A Inlet Isol). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red OPEN pushbutton for 1RN-144A on 1MC-

11. ___ UNSAT This step is critical to supply cooling water to the 1A NS heat exchanger.

COMMENTS:

PAGE 11 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 5. k. 3) WHEN 1RN-144A begins to open, THEN OPEN 1RN- CRITICAL 148A (NS Hx 1A Otlt Isol). STEP STANDARD: ___ SAT Applicant depresses the red OPEN pushbutton for 1RN-148A on 1MC- ___ UNSAT 11 when they verify that 1RN-144A is opening.

This step is critical to cool the containment spray water supplied to the spray nozzles.

COMMENTS:

STEP 18 6. Align NS Train 1B to containment sump as follows:

___ SAT

a. Verify 1NI-184B (ND Pump 1B Cont Sump Suct) - OPEN.

___ UNSAT STANDARD:

Applicant verifies that 1NI-184B is open.

COMMENTS:

STEP 19 6. b. Verify NS Pump 1A - OFF

___ SAT STANDARD:

___ UNSAT Applicant verifies that NS Pump 1A is on and transitions to the RNO.

COMMENTS:

PAGE 12 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 20 6. b. RNO b. IF NS Pump 1A is running AND RN established to NS Hx 1A, THEN perform the following: ___ SAT

1) Ensure 1NS-3B (NS Pump 1B Suct From ___ UNSAT FWST) - CLOSED.

STANDARD:

Applicant verifies that 1NS-3B is closed.

Examiner Note: 1NS-3B was closed in a previous step.

COMMENTS:

STEP 21 6. b. RNO b. 2) Ensure 1NS-1B (NS Pmp B Suct From Cont Sump) - OPEN. ___ SAT STANDARD: ___ UNSAT Applicant depresses the red OPEN pushbutton for 1NS-1B on 1MC-11.

COMMENTS:

STEP 22 6. b. RNO b. 3) GO TO Step 7.

___ SAT STANDARD:

___ UNSAT Applicant proceeds to step 7.

COMMENTS:

PAGE 13 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 23 7. Verify proper NS alignment as follows:

___ SAT

a. Verify1NS-18A (NS Pmp A Suct From Cont Sump) -

OPEN: ___ UNSAT STANDARD:

Applicant verifies that 1NS-18A is open.

COMMENTS:

STEP 24 7. b. Verify1NS-1B (NS Pmp B Suct From Cont Sump) - OPEN:

___ SAT STANDARD:

___ UNSAT Applicant verifies that 1NS-1B is open.

COMMENTS:

STEP 25 7. c. Verify NS Pump 1A - ON.

___ SAT STANDARD:

___ UNSAT Applicant verifies that NS Pump 1A is on.

COMMENTS:

PAGE 14 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 26 7. d. Verify NS Pump 1B - ON.

___ SAT STANDARD:

___ UNSAT Applicant verifies that NS Pump 1B is off and transitions to the RNO.

COMMENTS:

STEP 27 7. d. RNO d. Ensure the following valves - CLOSED:

___ SAT

  • 1NS-15B (NS Spray Hdr 1B Cont Isol)

___ UNSAT

  • 1NS-12B (NS Spray Hdr 1B Cont Isol).

STANDARD:

Applicant verifies that 1NS-12B and 1NS-15B are closed.

COMMENTS:

STEP 28 8. IF AT ANY TIME NS flow is lost OR RN flow is lost to operating NS Hx, THEN start other NS pump as follows: ___ SAT STANDARD: ___ UNSAT Applicant acknowledges step and continues.

COMMENTS:

PAGE 15 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 29 9. Verify adequate RN heat sink as follows:

___ SAT

  • RN System - SUCTION ALIGNED TO LAKE WYLIE

___ UNSAT

  • RN essential header temperatures at one of the following locations - LESS THAN OR EQUAL TO 93°F.
  • RO Logbook.

STANDARD:

Applicant verifies that RN is aligned to Lake Wylie and that RN essential header temperature is < 93ºF.

Examiner Cue: If asked, RN essential header temperature is 69ºF.

COMMENTS:

STEP 30 10. Verify any NS pump - ON.

___ SAT STANDARD:

___ UNSAT Applicant verifies that the 1A NS pump is on.

COMMENTS:

PAGE 16 0F 18

Catawba Nuclear Station JPM G Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 31 11. Notify Control Room Supervisor this Enclosure shall remain in effect until current or subsequent procedures ___ SAT provide alternate guidance.

___ UNSAT STANDARD:

Applicant states that they would notify the CRS.

Examiner Cue: The Control Room Supervisor has been notified COMMENTS:

STEP 32 12. IF AT ANY TIME containment pressure is less than 1 PSIG, THEN perform the following: ___ SAT STANDARD: ___ UNSAT Applicant acknowledges the step.

Examiner Cue: Another operator will monitor containment pressure.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 17 0F 18

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A LOCA has occurred on Unit 1.
  • EP/1/A/5000/ES-1.3, (Transfer to Cold Leg Recirculation) has been implemented.

INITIATING CUES:

The CRS instructs you to align NS to Cold Leg Recirculation per Enclosure 2 of EP/ES-1.3.

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam JPM H PAGE 1 OF 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam EVALUATION SHEET Task: Perform the Main Turbine Weekly Turbine Trip Test Alternate Path: Yes Facility JPM #: New Safety Function: 7 Title: Instrumentation K/A 012 A2.06 Ability to (a) predict the impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Failure of RPS signal to trip the reactor Rating(s): 4.4 / 4.7 CFR: 41.5 / 43.5 / 45.3 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 rev. 090 AP/1/A/5500/002 (Turbine Generator Trip) rev.032 EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) rev. 041 EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS) rev. 021 Task Standard: Recognizes reactor trip failure, attempts to trip the reactor and manually inserts control rods.

Validation Time: 5 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #176
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Delay Ra Delete In Event Final mp xt1o051l (ELECT TRIP TEST)

MAL-IPX003A MAL-IPX003B MAL-IRX009 AUTO MAL-MT007 (xt1o051l) 7 SEC PAGE 3 OF 17

REV. 0 PAGE 4 0F 17 Catawba Nuclear Station JPM H Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 PAGE 4 OF 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 1.2 IF AT ANY TIME a test must be aborted during either the Mechanical Trip Test or the Electrical Trip Test, depress the ___ SAT respective test pushbutton to abort the test and return the EHC System to normal. ___ UNSAT STANDARD:

Applicant acknowledges the step.

COMMENTS:

NOTE: Annunciator 1AD-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.

___ SAT STEP 2 1.3 Perform the Mechanical Trip Test (Control Room) as follows:

___UNSAT

  • 1.3.1 Select Turbine Graphic "MECHANICAL & ELECTRICAL TRIP TEST" for display.

STANDARD:

Applicant selects the MECHANICAL & ELECTRICAL TRIP TEST display on the Turbine Graphic monitor.

COMMENTS:

PAGE 5 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 CRITICAL

  • 1.3.2 Depress the "TEST ENABLE" pushbutton and verify the STEP light illuminates.

___ SAT STANDARD:

___ UNSAT Applicant depresses TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.

This step is critical to allow the mechanical trip test to be performed.

COMMENTS:

CRITICAL STEP 4 STEP

  • 1.3.3 Depress the "MECH TRIP TEST" pushbutton and verify the following sequence: ___ SAT
  • 1.3.3.1 The "MECH TRIP TEST" light illuminates. ___ UNSAT STANDARD:

Applicant depresses the MECH TRIP TEST pushbutton on the Turbine Control Panel and verifies the light illuminates.

This step is critical to initiate the Mechanical Trip Test.

COMMENTS:

PAGE 6 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 5

  • 1.3.3.2 The following sequence occurs in the ___ SAT "MECHANICAL TRIP TEST" box in the upper left of Turbine Graphic "MECHANICAL & ELECTRICAL TRIP ___ UNSAT TEST".
  • L/O status goes to "COMPLT".
  • LT050 status goes to "COMPLT".
  • M-TRIP status goes to "COMPLT".
  • LT048 status goes to "COMPLT".
  • RESET status goes to "COMPLT".
  • LT049 status goes to "COMPLT".
  • O-TRIP status goes to "COMPLT".
  • LT048 status goes to "COMPLT".
  • RESET status goes to "COMPLT STANDARD:

Applicant verifies that all the listed items go to COMPLT on the MECHANICAL & ELECTRICAL TRIP TEST GRAPHIC on the Turbine Graphic monitor.

COMMENTS:

PAGE 7 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6

  • 1.3.3.3 The "MECH TRIP TEST" light is dark. ___ SAT STANDARD: ___ UNSAT Applicant verifies the MECH TRIP TEST light is dark.

COMMENTS:

STEP 7

  • 1.3.4 Depress the "TEST ENABLE" pushbutton and verify ___ SAT the light is dark.

___ UNSAT STANDARD:

Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light is dark.

COMMENTS:

STEP 8

  • 1.3.5 Acknowledge alarms on Turbine Monitor Control ___ SAT Panel Alarm summary.

___ UNSAT STANDARD:

Applicant acknowledges the alarms on the Turbine Graphic monitor COMMENTS:

PAGE 8 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 9

___ UNSAT STANDARD:

Applicant verifies annunciator 1AD-1, D/6 is dark.

COMMENTS:

NOTE: Annunciator 1AD-1, D/6 "EHC SYSTEM FAULT" will actuate during the performance of this test.

___ SAT STEP 10 1.4 Perform the Electrical Trip Test (Control Room) as follows:

___ UNSAT

  • 1.4.1 Select Turbine Graphic "MECHANICAL AND ELECTRICAL TRIP TEST" for display.

STANDARD:

Applicant ensures that the MECHANICAL AND ELECTRICAL TRIP TEST is displayed on the Turbine Graphic monitor.

COMMENTS:

PAGE 9 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 11 CRITICAL

  • 1.4.2 Depress the "TEST ENABLE" pushbutton and STEP verify the light illuminates.

___ SAT STANDARD:

___ UNSAT Applicant depresses the TEST ENABLE pushbutton on the Turbine Control Panel and verifies the light illuminates.

This step is critical to allow the electrical trip test to be performed.

COMMENTS:

PAGE 10 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT NOTE: Based on the LH fluid temperature and viscosity in the piping to the front standard of the Main Turbine, it is possible to get a Sequence CRITICAL Halt alarm on the turbine panel while performing the Electrical Trip STEP Test.

___ SAT STEP 12

  • 1.4.3 Depress the "ELECT TRIP TEST" pushbutton and ___ UNSAT verify the following sequence:
  • 1.4.3.1 The "ELECT TRIP TEST" light illuminates.

STANDARD:

Applicant depresses the ELECT TRIP TEST pushbutton and verifies the light illuminates.

This step is critical to initiate the Electrical Trip Test.

EXAMINER NOTE: Seven seconds after the ELECT TRIP TEST pushbutton is depressed, the Main Turbine will trip requiring entry into AP/1/A/5500/002 (Turbine Generator Trip). The applicant will perform the immediate actions of AP/1A/5500/002, EP/1/A5000/E-0 (Reactor Trip or Safety Injection) and EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS) from memory to successfully complete the JPM. The following procedure steps are listed for reference.

COMMENTS:

PAGE 11 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT AP/1/A/5500/002 (Turbine Generator Trip)

STEP 13 1. Verify reactor power - LESS THAN 69%. ___ SAT STANDARD: ___ UNSAT Applicant determines that reactor power is greater than 69 % and transitions to the RNO.

COMMENTS:

STEP 14 1. RNO Perform the following:

___ SAT

a. Ensure reactor - TRIPPED.

___ UNSAT

b. GO TO EP/1/A/5000/E-0 (Reactor Trip Or Safety Injection).

STANDARD:

Applicant attempts to manually trip the reactor and transitions to E-0.

COMMENTS:

PAGE 12 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT EP/1/A/5000/E-0 (Reactor Trip or Safety Injection)

STEP 15 2. Verify Reactor Trip: ___ SAT

  • All rod bottom lights - LIT ___ UNSAT
  • I/R power - DECREASING.

STANDARD:

Applicant determines that the reactor trip breakers are closed and transitions to the RNO.

EXAMINER NOTE: Step 1 is to Monitor Enclosure 1 and is not an immediate action.

COMMENTS:

STEP 16 2. RNO Perform the following:

___ SAT

a. Trip reactor.

___ UNSAT STANDARD:

Applicant attempts to trip the reactor.

COMMENTS:

PAGE 13 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 17 2. RNO b. IF reactor will not trip, THEN OPEN concurrently:

___ SAT

  • Implement EP/1/A/5000/F-0 (Critical Safety Function Status Trees). ___ UNSAT
  • GO TO EP/1/A/5000/FR-S.1 (Response To Nuclear Power Generation/ATWS).

STANDARD:

Applicant transitions to FR-S.1.

COMMENTS:

EP/1/A/5000/FR-S.1 (Response to Nuclear Power Generation/ATWS)

STEP 18 1. Verify Reactor Trip: ___ SAT

  • All rod bottom lights - LIT ___ UNSAT
  • I/R power - DECREASING.

STANDARD:

Applicant determines that the reactor trip breakers are closed and transitions to the RNO.

COMMENTS:

PAGE 14 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 19 1. RNO Perform the following:

___ SAT

a. Trip reactor.

___ UNSAT STANDARD:

Applicant attempts to trip the reactor.

COMMENTS:

STEP 20 1. RNO b. IF reactor will not trip, THEN insert rods. CRITICAL STEP STANDARD:

___ SAT Applicant places the CRD BANK SELECT switch in the MAN position and inserts control rods. ___ UNSAT This step is critical to take manual control of the control rods and insert negative reactivity.

This step is also Time Critical and manual rod insertion must be initiated within 30 seconds of receipt of the first out indication.

COMMENTS:

PAGE 15 0F 17

Catawba Nuclear Station JPM H Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 20 2. Verify Turbine Trip:

___ SAT

  • All turbine stop valves - CLOSED

___ UNSAT STANDARD:

Applicant verifies the turbine stop valves are closed.

EXAMINER CUE: The CRS will continue to read the actions of FR-S.1.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 16 0F 17

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.

INITIATING CUES:

The CRS has directed you to perform PT/1/B/4250/002 A (Main Turbine Weekly Trip Test) Enclosure 13.1 beginning at step 1.2.

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam JPM I PAGE 1 OF 8

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam EVALUATION SHEET Task: Makeup to the Unit 2 Spent Fuel Pool from RN Alternate Path: No Facility JPM #: KF-058 (Modified)

Safety Function: 8 Title: Plant Service Systems K/A 033 A2.03 Ability to (a) predict the impacts of the following malfunctions or operations on the Spent Fuel Pool Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Abnormal spent fuel pool water level or loss of water level.

Rating(s): 3.1 / 3.5 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

OP/2/A/6200/005 Spent Fuel Pool Cooling System rev.078 Task Standard: Lineup completed to supply RN to the Spent Fuel Pool via 2RN-78 and 2KF-104.

Validation Time: 12 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 8

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event PAGE 3 OF 8

REV. 0 PAGE 4 0F 8 Catawba Nuclear Station JPM I Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
  • Spent Fuel Pool level is 39 feet and slowly decreasing.

INITIATING CUES:

  • The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System)

Enclosure 4.10.

  • All initial conditions have been satisfied for this enclosure.
  • Double verification and peer check of procedure steps have been waived during this JPM.

EXAMINER NOTE: After reading the initiating cue, provide the applicant with a copy of OP/2/A/6200/005 Enclosure 4.10.

PAGE 4 OF 8

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.1 Document Current Spent Fuel Pool Level ______________ ft

___ SAT STANDARD:

___ UNSAT Applicant documents Spent Fuel Pool level as 39 feet per the initiating cue.

EXAMINER NOTE: The applicant is not required to locate the level indication in the control room.

EXAMINER CUE: Fuel Pool Level is 39 feet.

COMMENTS:

STEP 2 3.2 IF desired to makeup from RN System Supply Header 2A, perform the following steps: ___ SAT STANDARD: ___UNSAT Applicant determines to makeup from RN Train 2A per the initial conditions COMMENTS:

PAGE 5 0F 8

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 3 3.2.1 Close 2KF-172 (FWST Overflow To Spent Fuel Pool ___ SAT Isol) (AB-584, MM-62, Rm 400).

___ UNSAT STANDARD:

Applicant describes closing 2KF-172.

EXAMINER CUE: 2KF-172 is closed.

COMMENTS:

CRITICAL STEP 4 STEP 3.2.2 Open 2RN-78 (2A RN Supply To Assured KF Makeup)

(AB-589, LL-60, Rm 400). ___ SAT STANDARD: ___ UNSAT Applicant describes opening 2RN-78.

EXAMINER CUE: 2RN-78 is open.

This step is critical to align RN to the Unit 2 Spent Fuel Pool.

COMMENTS:

PAGE 6 0F 8

Catawba Nuclear Station JPM I Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT CAUTION: Maximum Spent Fuel Pool level shall be 40 feet + 6 inches on 2KFP5120 (Fuel Pool Level) or OAC Point C2A0061 (U2 CRITICAL Spent Fuel Pool Level). Centerline of the Spent Fuel Pool STEP light receptacles is 41 feet.

___ SAT STEP 5 3.2.3 Open 2KF-104 (2A KF Assured Fuel Pool M/U Isol) ___ UNSAT (AB-584, MM-62, Rm 400).

STANDARD:

Applicant describes opening 2KF-104.

EXAMINER CUE: 2KF-104 is open.

This step is critical to align RN to the Unit 2 Spent Fuel Pool.

EXAMINER CUE: If monitoring of spent fuel pool level is mentioned by the applicant, provide the following cue:

Another operator will be monitoring spent fuel pool level.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 7 0F 8

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A minor seismic event has cracked the Unit 2 Spent Fuel Pool causing an unisolable leak of Spent Fuel Pool water.
  • Spent Fuel Pool level is 39 feet and slowly decreasing.

INITIATING CUES:

  • The Control Room Supervisor directs you to initiate makeup to the Spent Fuel Pool from RN Train 2A per OP/2/A/6200/005 (Spent Fuel Cooling System)

Enclosure 4.10.

  • All initial conditions have been satisfied for this enclosure.
  • Double verification and peer check of procedure steps have been waived during this JPM.

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam JPM J PAGE 1 OF 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam EVALUATION SHEET Task: Establishing NC Pump Seal Injection from the SSF Alternate Path: No Facility JPM #: AD-002 (Modified)

Safety Function: 4P Title: Reactor Coolant System K/A 015/017 AA1.07 Ability to operate and /or monitor the following as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow): RCP seal water injection subsystem.

Rating(s): 3.5 / 3.4 CFR: 41.7 / 45.5 / 45.6 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

EP/2/A/5000/G-1 (Generic Enclosures) Enclosure 19 (Establishing NC Makeup/Seal Injection From The SSF) rev. 7 Task Standard: Seal Injection flow from Standby Makeup Pump #2 is established to the Unit 2 NC pumps within 10 minutes.

Validation Time: 5 minutes Time Critical: Yes X No

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event PAGE 3 OF 11

REV. 0 PAGE 4 0F 11 Catawba Nuclear Station JPM J Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A total loss of all AC power has occurred on Unit 2.
  • EP/2/A/5000/ECA-0.0 (Loss of All AC Power) has been entered.

INITIATING CUES:

  • You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/2/A/5000/G-1 (Unit 2 Generic Control Room Enclosures),

Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.

  • Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G-1 Enclosure 20.
  • This JPM is time critical.

EXAMINER NOTE:

After the applicant locates the local copy of EP/2/A/5000/G-1, hand the applicant a copy of EP/2/A/5000/G-1, Enclosure 19.

PAGE 4 OF 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE: Indications of 1SLXG being de-energized are as follows:

  • Normal lighting in SSF off with emergency lights on ___ SAT
  • "LINE VOLTS" on 0CNSL0001 indicating zero volts
  • "LOAD CENTER 1SLXG BUS VOLTAGE" on 1SLXG indicating zero volts.

STEP 1 1. IF 1SLXG is de-energized, THEN place SSF diesel in operation as follows:

STANDARD:

Applicant uses local indications and determines that 1SLXG is not de-energized, and the SSF diesel will not need to be started.

Examiner Cue: As indications are located:

  • Normal SSF lighting is ON
  • Voltmeter reads 600v.
  • 1SLXG bus volts reads 600 volts.

COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 2 2. Ensure 2NV-876 (Stdby M/U To Cont Equip Sump 2A) -

CLOSED. ___ SAT STANDARD: ___UNSAT Applicant locates the indication for 2NV-876 and verifies the green CLSD light is lit.

Examiner Cue: GREEN CLOSED light is LIT.

COMMENTS:

STEP 3 3. IF annunciator 0AD-11, D/1 (ESS MCC 2EMXS LOSS OF VOLTAGE) LIT, THEN perform the following: ___ SAT STANDARD: ___ UNSAT Applicant checks that 0AD-11, D/1 is DARK and verifies that 2EMXS is energized and that this step does not apply.

Examiner Cue: Annunciator D/1 is DARK.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 4 4. IF "UNIT 2 SSF CONTROLS ENGAGED" DARK, THEN perform the following: ___ SAT STANDARD: ___ UNSAT Applicant locates Unit 2 SSF ENGAGED and verifies that the light is LIT and that this step does not apply.

Examiner Cue: UNIT 2 SSF CONTROLS ENGAGED light is lit.

COMMENTS:

STEP 5 5. IF "UNIT 2 SSF CONTROLS ENGAGED" LIT, THEN CRITICAL perform the following: STEP

a. Ensure the following valves - OPEN: ___ SAT
  • 2NV-865A (Stdby M/U Pump Suct Frm Xfer Tube) ___ UNSAT STANDARD:

Applicant locates the switch for 2NV-865A and determines that 2NV-865A is closed and describes opening 2NV-865A by depressing the red OPEN pushbutton.

Examiner Cue: Green CLSD light is LIT.

Examiner Cue: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV-865A: "Red OPEN light is LIT".

This step is critical to align a suction source for Standby Makeup Pump #2 COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 5. CRITICAL

a. Ensure the following valves - OPEN: STEP

___ UNSAT Applicant locates the switch for 2NV-872A and determines that 2NV-872A is closed and describes opening 2NV-872A by depressing the red OPEN pushbutton.

Examiner Cue: Green CLSD light is LIT.

Examiner Cue: AFTER Applicant describes depressing the red OPEN pushbutton for 2NV-872A: Red OPEN light is LIT.

This step is critical to align a flow path for the Standby Makeup #2.

COMMENTS:

STEP 7 5. b. CLOSE 2NV-89A (NC Pmps Seal Ret Cont Isol). CRITICAL STEP STANDARD:

___ SAT Applicant locates the switch for 2NV-89A and determines that 2NV-89A is open and describes closing 2NV-89A by depressing the green CLSD ___ UNSAT pushbutton.

Examiner Cue: Red OPEN light is LIT.

Examiner Cue: AFTER Applicant describes depressing the green CLOSE pushbutton for 2NV-89A: Green CLSD light is LIT.

This step is critical to ensure voids are collapsed in the seal-leakoff line before flow from the Stand By Makeup Pump arrives.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 8 6. Ensure 2NV-877 (Stdby M/U To NC Pump Seal Inj) - OPEN.

___ SAT STANDARD:

___ UNSAT Applicant locates the switch for 2NV-877 and determines that 2NV-877 is OPEN.

Examiner Cue: Red OPEN light is LIT.

COMMENTS:

STEP 9 7. Start "STDBY M/U PUMP #2" by depressing "ON" CRITICAL pushbutton on SSF console. STEP STANDARD: ___ SAT Applicant locates the switch for STDBY M/U PUMP #2 and describes ___ UNSAT depressing the red ON pushbutton.

Examiner Cue: After the push button has been depressed, state that the Red ON light is LIT.

Examiner Note: If the applicant states that they would verify seal flow on 2NVP6150 (UNIT 2 STDBY M/U FLOW) for the NC pumps, give the second part of the CUE below.

Examiner Cue: Standby Makeup Pump discharge flow is 26 gpm.

This step is critical to provide seal water flow to the NC pumps.

CRITICAL END TIME _______

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM J Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 10 8. Notify Control Room Supervisor of status of "STDBY M/U PUMP #2". ___ SAT STANDARD: ___ UNSAT Applicant locates a phone and describes calling the control room.

Examiner Cue: Repeat back information given by the applicant.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • A total loss of all AC power has occurred on Unit 2.
  • EP/2/A/5000/ECA-0.0 (Loss of All AC Power) has been entered.

INITIATING CUES:

  • You have been directed to establish seal injection to the Unit 2 NC pumps from the SSF per EP/2/A/5000/G-1 (Unit 2 Generic Control Room Enclosures),

Enclosure 19 (Establishing NC Makeup/Seal Injection from the SSF), steps 1 through 8.

  • Another operator has aligned alternate power to 2EMXS per EP/2/A/5000/G-1 Enclosure 20.
  • This JPM is time critical.

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam JPM K PAGE 1 OF 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam EVALUATION SHEET Task: Shifting Main Transformer Auxiliaries Alternate Path: No Facility JPM #: EP-016 (Modified)

Safety Function: 6 Title: Electrical K/A 062 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation.

Rating(s): 3.4 / 3.9 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

OP/2/A/6350/005 (Alternate AC Power Sources) rev. 056, Enclosure 4.20 Task Standard: The 2A Main Transformer Auxiliaries are transferred to an energized source.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event PAGE 3 OF 9

REV. 0 PAGE 4 0F 9 Catawba Nuclear Station JPM K Sep. 2013 NRC Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 2 is at 100% power.
  • The incoming feeder breaker to 2LXC tripped due to a load center fault.
  • As a result, one-half of the 2A Main Transformer Auxiliaries have been de-energized.

INITIATING CUES:

The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.20 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/2/A/6350/005, Enclosure 4.20.

PAGE 4 OF 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE: 1. Shifting of power supplies shall be performed without delay.

2. All breakers and alarm lights are located inside the cabinet at ___ SAT the Main Transformer.

___ UNSAT

3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer.
4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies.

Examiner Note: Applicant should state that they would acquire the required PPE.

STEP 1: 3.1 IF shifting Bank A power supplies, perform the following:

3.1.1 Verify voltage indicated on 2LXD per one of the following:

  • Transformer 2TXD Supply Voltage meter with 2LXD-4B closed OR
  • Transformer 2TXS Supply Voltage meter with 2LXD-8B closed STANDARD:

Applicant verifies voltage indicated on transformer 2TXD with 2LXD-4B closed or 2TXS with 2LXD-8B closed.

Examiner Cue: 600 volts is indicated.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 2 3.1.2 IF this is an unexpected loss of power, verify the following ___ SAT at Transformer 2A:

___UNSAT

  • "NO VOLTAGE BANK A" alarm light illuminated.
  • "NO VOLTAGE BANK B" alarm light dark.

STANDARD:

Applicant verifies NO VOLTAGE BANK A alarm light is illuminated and the NO VOLTAGE BANK B alarm light is dark.

Examiner Cue: NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK.

COMMENTS:

STEP 3 3.1.3 Open "NORMAL FEEDER 2LXC" breaker. CRITICAL STEP STANDARD:

___ SAT Applicant describes opening the NORMAL FEEDER 2LXC breaker by placing it in the OFF (down) position. ___ UNSAT Examiner Cue: NORMAL FEEDER 2LXC is in the OFF position.

This step is critical to allow the lockout bar to be slid in the following step.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT CRITICAL STEP 4 3.1.4 Slide lockout bar to the left. STEP STANDARD: ___ SAT Applicant describes sliding the lockout bar to the left. ___ UNSAT Examiner Cue: Lockout bar is to the left.

This step is critical to allow closing of the EMERG FEEDER 2LXD breaker in the following step.

COMMENTS:

STEP 5 3.1.5 Close "EMERG FEEDER 2LXD" breaker. CRITICAL STEP STANDARD:

___ SAT Applicant describes closing the EMERG FEEDER 2LXD breaker by placing the breaker to the ON (up) position. ___ UNSAT Examiner Cue: EMERG FEEDER 2LXD breaker is in the ON position.

This step is critical to energize the transformer auxiliaries for the 2A Main Transformer COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station JPM K Sep. 2013 NRC Exam STEP/STANDARD SAT/UNSAT STEP 6 3.1.6 Acknowledge any alarms present.

___ SAT STANDARD:

___ UNSAT Applicant describes acknowledging any alarms.

Examiner Cue: Alarms have been acknowledged.

COMMENTS:

STEP 7 3.1.7 Complete and file Enclosure 4.23 (Unit 2 Main Transformers Cooler Groups Status) to record status. ___ SAT STANDARD: ___ UNSAT Applicant reads the step.

Examiner Cue: Another operator will complete and file enclosure 4.23 NOTE: At this point, Bank A is supplied from 2LXD. Subsequent steps are to return Bank A to 2LXC.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 2 is at 100% power.
  • The incoming feeder breaker to 2LXC tripped due to a load center fault.
  • As a result, one-half of the 2A Main Transformer Auxiliaries have been de-energized.

INITIATING CUES:

The Unit Supervisor directs you to shift the 2A Main Transformer Auxiliaries to the 2LXD Feeder per Enclosures 4.20 (Shifting Main Transformer 2A Auxiliaries) of OP/2/A/6350/005 (Alternate AC Power Sources).