ML14240A675: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 1 OF 14         System JPM A Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 2 OF 14  EVALUATION SHEET Task: Respond to an inadvertent dilution while shutdown per AP/1/A/5500/013 (Boron Dilution), Case II (Boron Dilution While Shutdown) Alternate Path: Yes   Facility JPM #: New Safety Function: 1 Title: Chemical and Volume Control System K/A 004 A2.06 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS: and based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent boration/dilution Rating(s): 4.2 / 4.3 CFR: 41.5 / 43/5 / 45/3 / 45/5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
{{#Wiki_filter:Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam System JPM A PAGE 1 OF 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Respond to an inadvertent dilution while shutdown per AP/1/A/5500/013 (Boron Dilution), Case II (Boron Dilution While Shutdown)
Alternate Path:     Yes Facility JPM #:     New Safety Function:     1       Title:       Chemical and Volume Control System K/A         004 A2.06     Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS: and based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent boration/dilution Rating(s):   4.2 / 4.3     CFR:       41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                         Perform             X     Simulate


==References:==
==References:==
AP/1/A/5500/013 (Boron Dilution) rev. 24   Task Standard: Starts the 1A NI (Safety Injection) pump. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #168. 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event LOA-NI004 (RACKOUT NI PMP 1B) RACKOUT    LOA-NV067 (RACKOUT NV PMP 1B) RACKOUT    LOA-NV066 (RACKOUT NV PMP 1A) RACKOUT    2                                     Ensure EVENT 2 = x10i167c (NV-353 pushbutton)
AP/1/A/5500/013 (Boron Dilution) rev. 24 Task Standard:       Starts the 1A NI (Safety Injection) pump.
PAGE 0F 14 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup. INITIATING CUES:   A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown). EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/013 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______   STEP 1:   1. Verify boron dilution event - IN PROGRESS. STANDARD: Applicant determines a boron dilution event is in progress per the initiating cue. COMMENTS:       ___ SAT  ___ UNSAT      STEP 2   Verify Reactor Trip:   All rod bottom lights - LIT All reactor trip and bypass breakers - OPEN. STANDARD:   Applicant verifies the reactor is tripped by verifying all rod bottom lights are lit on the DRPI monitors and that the green OPEN lights are lit for RX TRIP BKR 1A and RX TRIP BKR 1B on 1MC-1. COMMENTS:       ___ SAT    ___UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14  STEP 3   3. Verify core alterations - IN PROGRESS. STANDARD: Applicant verifies that core alterations are NOT because the unit is in MODE 5 and proceeds to the RNO. COMMENTS:       ___ SAT  ___ UNSAT      STEP 4   3. RNO GO TO Step 5. STANDARD: Applicant proceeds to step 5 COMMENTS:       ___ SAT  ___ UNSAT    STEP 5   5. Evacuate personnel from reactor building using the following:   Containment evacuation alarm Plant page. STANDARD: Applicant depresses the red ON pushbutton for the UNIT 1 CONT EVAC ALARM on 1MC-1 and makes a plant page. This step is critical to perform either action to protect the health and safety of the people working inside containment. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14    STEP 6   6. Stop any dilutions in progress as follows: a. Place "NC MAKEUP CONTROL" switch to "STOP". STANDARD: Applicant 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT    STEP 7  6. b. Verify Unit 1 RMWST aligned for VCT makeup. STANDARD: Applicant verifies the Unit 1 RMWST is aligned per the initial conditions. COMMENTS:       ___ SAT  ___ UNSAT    STEP 8   6. c. Place both reactor makeup water pumps to "OFF". STANDARD: Applicant places RX M/U WTR PUMP 1A and RX M/U WTR PUMP 1B on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 9   6. d. Isolate the NV demineralizers as follows: 1) Place 1NV-153A (Letdn Hx Otlt 3-Way Valve) in the "VCT" position. STANDARD: Applicant places 1NV- on 1MC-10. This step is critical to prevent un-saturating the Mixed Bed Demineralizers. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 10   6. d. 2) Ensure the following valves - CLOSED:   1NV-353 & 364 (Mixed Bed Demin 1A Isol) 1NV-368 & 379 (Mixed Bed Demin 1B Isol). STANDARD: Applicant depresses the green CLOSE pushbutton for NV-353 & 364 MIXED BED DEMIN 1A ISOL and verifies the green CLSD light is lit for NV-368 & 379 MIXED BED DEMIN 1A ISOL on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14  NOTE Unit shutdown alignments may have established alternate boration flowpaths. STEP 11   7. Ensure proper BDMS operation as follows: a. Verify at least one of the following alarm(s) - LIT:   1AD-2, E/2 "TRAIN A SHUTDOWN MARGIN ALARM"   OR   1AD-2, F/2 "TRAIN B SHUTDOWN MARGIN ALARM". STANDARD: Applicant verifies at least one of the alarms is lit. COMMENTS:       ___ SAT  ___ UNSAT    STEP 12   7. b. Ensure the following valves - OPEN:   1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). STANDARD: Applicant verifies the red OPEN lights are lit for 1NV-252A and 1NV-253B on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14  STEP 13   7. c. Ensure the following valves - CLOSED:   1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol). STANDARD: Applicant verifies that the green CLSD lights are lit for 1NV-188A and 1NV-189B on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT    STEP 14   7. d. Verify NV pump - ON. STANDARD: Applicant determines that no NV pumps are on and proceeds to the RNO. COMMENTS:       ___ SAT  ___ UNSAT    STEP 15   7. d. RNO d. Perform the following: 1) IF NV pump 1A AND 1B boration flowpath NOT available, THEN GO TO Enclosure 1 (NI or ND Pump Boron Injection Alignment). STANDARD: Applicant proceeds to Enclosure 1. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14  Enclosure 1 STEP 16   1. Align NC system boration flowpath as follows: a. IF establishing NC system boration, THEN GO TO Step 2. STANDARD: Applicant proceeds to step 2. COMMENTS:       ___ SAT  ___ UNSAT    STEP 17   2. Initiate NC system boration flow as required using at least one of the following boration flowpaths. IF NI Pump 1A aligned to provide boron injection flowpath, THEN perform the following to establish NI Pump 1A injection flow: a. Ensure 1NI-118A (NI Pump 1A C-Leg Inj Isol) - OPEN. STANDARD: Applicant verifies that the red OPEN light is lit for 1NI-118A on 1MC-11 COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14  STEP 18             b. START NI Pump 1A. STANDARD: Applicant depresses the red ON pushbutton for NI PMP 1A. This step is critical to initiate NC system boration flow. NOTE TO EXAMINER: No other flow paths will be aligned. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 19   3. WHEN NC system boration no longer required, THEN perform Step 5. STANDARD: Applicant acknowledges step. COMMENTS:       ___ SAT  ___ UNSAT    STEP 20   4. GO TO Case II (Boron Dilution While Shutdown), Step 9. STANDARD: Applicant proceeds to Case II, Step 9. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14  NOTE  A time delay of up to 3-5 minutes can be expected before indication of negative reactivity insertion is obtained on excore instrumentation. STEP 21   9. Verify neutron flux level - STABLE OR DECREASING. STANDARD: Applicant reads the step. Examiner Cue:   COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT    STOP TIME ________
Validation Time: 15 minutes                             Time Critical:         Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM A     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup. INITIATING CUES:   A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).
===========================================================================
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 1 OF 14         JPM B Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 2 OF 14  EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path: Yes   Facility JPM #: NI-088 Safety Function: 2 Title: Emergency Core Cooling System (ECCS) K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves. Rating(s): 4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Applicant:                                                                     Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                           Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                 _____________________________/________
NAME                                       SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #168.
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event RACK LOA-NI004 (RACKOUT NI PMP 1B)
OUT RACK LOA-NV067 (RACKOUT NV PMP 1B)
OUT RACK LOA-NV066 (RACKOUT NV PMP 1A)                                               2 OUT
 
Ensure EVENT 2 = x10i167c (NV-353 & 364 MIXED BED DEMIN 1A ISOL CLOSE
 
pushbutton)
PAGE 3 OF 14
 
PAGE 4 0F 14 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup.
INITIATING CUES:
A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).
EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/013 PAGE 4 OF 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT START TIME: _______
STEP 1: 1. Verify boron dilution event - IN PROGRESS.
___ SAT STANDARD:
___ UNSAT Applicant determines a boron dilution event is in progress per the initiating cue.
COMMENTS:
STEP 2 Verify Reactor Trip:                                                     ___ SAT All rod bottom lights - LIT                                       ___UNSAT All reactor trip and bypass breakers - OPEN.
STANDARD:
Applicant verifies the reactor is tripped by verifying all rod bottom lights are lit on the DRPI monitors and that the green OPEN lights are lit for RX TRIP BKR 1A and RX TRIP BKR 1B on 1MC-1.
COMMENTS:
PAGE 5 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 3 3. Verify core alterations - IN PROGRESS.
___ SAT STANDARD:
___ UNSAT Applicant verifies that core alterations are NOT because the unit is in MODE 5 and proceeds to the RNO.
COMMENTS:
STEP 4 3. RNO GO TO Step 5.                                                 ___ SAT STANDARD:                                                                   ___ UNSAT Applicant proceeds to step 5 COMMENTS:
STEP 5     5. Evacuate personnel from reactor building using the           CRITICAL following:                                                     STEP Containment evacuation alarm                             ___ SAT Plant page.
___ UNSAT STANDARD:
Applicant depresses the red ON pushbutton for the UNIT 1 CONT EVAC ALARM on 1MC-1 and makes a plant page.
This step is critical to perform either action to protect the health and safety of the people working inside containment.
COMMENTS:
PAGE 6 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 6 6. Stop any dilutions in progress as follows:
___ SAT
: a. Place "NC MAKEUP CONTROL" switch to "STOP".
___ UNSAT STANDARD:
Applicant places the NC MAKEUP CONTROL to the STOP position 1MC-10.
COMMENTS:
STEP 7 6. b. Verify Unit 1 RMWST aligned for VCT makeup.
___ SAT STANDARD:
___ UNSAT Applicant verifies the Unit 1 RMWST is aligned per the initial conditions.
COMMENTS:
STEP 8 6. c. Place both reactor makeup water pumps to "OFF".
___ SAT STANDARD:
___ UNSAT Applicant places RX M/U WTR PUMP 1A and RX M/U WTR PUMP 1B to the OFF position on 1MC-10.
COMMENTS:
PAGE 7 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 9 6. d. Isolate the NV demineralizers as follows:                   CRITICAL STEP
: 1) Place 1NV-153A (Letdn Hx Otlt 3-Way Valve) in the "VCT" position.                                     ___ SAT STANDARD:                                                               ___ UNSAT Applicant places 1NV-153A in the VCT position on 1MC-10.
This step is critical to prevent un-saturating the Mixed Bed Demineralizers.
COMMENTS:
STEP 10 6. d. 2) Ensure the following valves - CLOSED:
___ SAT 1NV-353 & 364 (Mixed Bed Demin 1A Isol) 1NV-368 & 379 (Mixed Bed Demin 1B Isol).       ___ UNSAT STANDARD:
Applicant depresses the green CLOSE pushbutton for NV-353 & 364 MIXED BED DEMIN 1A ISOL and verifies the green CLSD light is lit for NV-368 & 379 MIXED BED DEMIN 1A ISOL on 1MC-10.
COMMENTS:
PAGE 8 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT NOTE Unit shutdown alignments may have established alternate boration flowpaths.
___ SAT STEP 11 7. Ensure proper BDMS operation as follows:
___ UNSAT
: a. Verify at least one of the following alarm(s) - LIT:
1AD-2, E/2 "TRAIN A SHUTDOWN MARGIN ALARM" OR 1AD-2, F/2 "TRAIN B SHUTDOWN MARGIN ALARM".
STANDARD:
Applicant verifies at least one of the alarms is lit.
COMMENTS:
STEP 12 7. b. Ensure the following valves - OPEN:
___ SAT 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST).               ___ UNSAT STANDARD:
Applicant verifies the red OPEN lights are lit for 1NV-252A and 1NV-253B on 1MC-10.
COMMENTS:
PAGE 9 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 13 7. c. Ensure the following valves - CLOSED:
___ SAT 1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol).                           ___ UNSAT STANDARD:
Applicant verifies that the green CLSD lights are lit for 1NV-188A and 1NV-189B on 1MC-10.
COMMENTS:
STEP 14 7. d. Verify NV pump - ON.
___ SAT STANDARD:
___ UNSAT Applicant determines that no NV pumps are on and proceeds to the RNO.
COMMENTS:
STEP 15 7. d. RNO d. Perform the following:
___ SAT
: 1) IF NV pump 1A AND 1B boration flowpath NOT available, THEN GO TO Enclosure 1 (NI   ___ UNSAT or ND Pump Boron Injection Alignment).
STANDARD:
Applicant proceeds to Enclosure 1.
COMMENTS:
PAGE 10 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT Enclosure 1 STEP 16 1. Align NC system boration flowpath as follows:                   ___ SAT
: a. IF establishing NC system boration, THEN GO TO Step 2.     ___ UNSAT STANDARD:
Applicant proceeds to step 2.
COMMENTS:
STEP 17 2. Initiate NC system boration flow as required using at least one of the following boration flowpaths.                 ___ SAT IF NI Pump 1A aligned to provide boron injection         ___ UNSAT flowpath, THEN perform the following to establish NI Pump 1A injection flow:
: a. Ensure 1NI-118A (NI Pump 1A C-Leg Inj Isol) - OPEN.
STANDARD:
Applicant verifies that the red OPEN light is lit for 1NI-118A on 1MC-11 COMMENTS:
PAGE 11 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                       SAT/UNSAT STEP 18           b. START NI Pump 1A.                             CRITICAL STEP STANDARD:
___ SAT Applicant depresses the red ON pushbutton for NI PMP 1A.
___ UNSAT This step is critical to initiate NC system boration flow.
NOTE TO EXAMINER: No other flow paths will be aligned.
COMMENTS:
STEP 19 3. WHEN NC system boration no longer required, THEN perform Step 5.                                     ___ SAT STANDARD:                                                         ___ UNSAT Applicant acknowledges step.
COMMENTS:
STEP 20 4. GO TO Case II (Boron Dilution While Shutdown), Step 9.
___ SAT STANDARD:
___ UNSAT Applicant proceeds to Case II, Step 9.
COMMENTS:
PAGE 12 0F 14
 
Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE A time delay of up to 3-5 minutes can be expected before indication of negative reactivity insertion is obtained on excore instrumentation.                                                   ___ SAT STEP 21 9. Verify neutron flux level - STABLE OR DECREASING.             ___ UNSAT STANDARD:
Applicant reads the step.
Examiner Cue: Another operator will complete the procedure.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 13 0F 14
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM A READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup.
INITIATING CUES:
A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam JPM B PAGE 1 OF 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path:     Yes Facility JPM #:     NI-088 Safety Function:     2       Title:       Emergency Core Cooling System (ECCS)
K/A         006 A4.07     Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.
Rating(s):   4.4 / 4.4     CFR:       41.7 / 45.5 to 45.8 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                       Perform             X     Simulate


==References:==
==References:==
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation)   Task Standard: EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed. The FWST is isolated with the NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps aligned and injecting from the 1A ND (Residual Heat Removal System) pump. The 1B ND (Residual Heat Removal System) pump is shutdown. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #169 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B ISOL (STEM) FAIL TO POSITION) 0    MAL-NC013A (NC COLD LEG A LEAK) 27.5 PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   A LOCA has occurred on Unit 1. INITIATING CUES:   1AD--annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6. EXAMINER NOTE:   After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.
EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation)
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______   STEP 1:   6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc as follows: a. Ensure Enclosure 1 (Foldout Page) is monitored. STANDARD: Applicant reads the step. Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:       ___ SAT  ___ UNSAT    NOTE CSF should not be implemented until directed by this procedure. STEP 2         b. Verify at least one of the following annunciators - LIT:   1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft"   OR   1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft". STANDARD:   Applicant determines that one or both annunciators are lit. COMMENTS:       ___ SAT    ___UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14  STEP 3         c. Verify both ND pumps - ON. STANDARD: Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:       ___ SAT  ___ UNSAT      STEP 4  6.c. RNO c. Perform the following: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is open, THEN start ND pump 1A. STANDARD: Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT    STEP 5                       2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. STANDARD: Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14  STEP 6                       3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. STANDARD: Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d. COMMENTS:       ___ SAT  ___ UNSAT    STEP 7  6. d. Ensure the following valves - CLOSED:   1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol). STANDARD: Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11. This step is critical to prevent pump run out should only one ND pump be running. Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 8   6. e. Isolate NI Pump Miniflow as follows: 1) Verify NC pressure - LESS THAN 1620 PSIG. STANDARD: Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig. COMMENTS:       ___ SAT  ___ UNSAT    STEP 9           2) Ensure the following valves - CLOSED:     1NI-115A (NI Pump 1A Miniflow Isol)     1NI-144A (NI Pump 1B Miniflow Isol). STANDARD: Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT    STEP 10         3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE". STANDARD: Applicant - on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14  STEP 11         4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) - CLOSED. STANDARD: Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT    STEP 12   6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:   1NV-203A (NV Pumps A&B Recirc Isol)   OR   1NV-202B (NV Pmps A&B Recirc Isol). STANDARD: Applicant determines that the green CLSD lights are lit for 1NV-203A and 1NV-202B on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT    STEP 13     g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN. STANDARD: Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14    STEP 14      h. OPEN the following valves:   1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND). STANDARD: Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11. This step is critical align the suction flow path for the NI (Safety Injection System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump. Examiner NOTE: Only one of the valves needs to be open to satisfy the critical step because the valves are in parallel. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 15      i. Align ND discharge to suction of NI and NV pumps as follows: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps). STANDARD: Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 This step is critical align the suction flow path for the NV (Chemical Volume and Control System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14  STEP 16         2) OPEN 1NI-136B (ND Supply To NI Pump 1B). STANDARD: Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step. Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:       ___ SAT  ___ UNSAT    STEP 17      j. Verify at least one ND train aligned to provide suction to NV and NI as follows:   A Train:   1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) - OPEN. STANDARD: Applicant determines that the 1A ND pump is running and 1ND-28A is open and proceeds to the next step. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14  STEP 18      k. Isolate FWST from NV and NI pumps as follows: 1) Place "PWR DISCON FOR 1NI-100B" switch in "ENABLE". STANDARD: Applicant --11. This step is critical to allow operation of 1N-100B COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT      STEP 19           2) CLOSE 1NI-100B (NI Pmps Suct From FWST). STANDARD: Applicant depresses the green CLOSE pushbutton for 1NI-100B on 1MC-11. This step is critical to isolate the NI (Safety Injection System) pumps suction from the FWST. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14  STEP 20           3) CLOSE the following valves:   1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). STANDARD: Applicant depresses the green CLOSE pushbuttons for 1NV-252A and 1NV-253B on 1MC-10. This step is critical to isolate the NV (Chemical Volume and Control System) pumps suction from the FWST. COMMENTS:   END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT    STOP TIME ________
Task Standard:       EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed.
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) May 2014 NRC Initial License Exam JPM B     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   A LOCA has occurred on Unit 1. INITIATING CUES:   1AD-- is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
The FWST is isolated with the NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps aligned and injecting from the 1A ND (Residual Heat Removal System) pump. The 1B ND (Residual Heat Removal System) pump is shutdown.
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 1 OF 16         System JPM C Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 2 OF 16  EVALUATION SHEET Task: Perform PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) Alternate Path: No   Facility JPM #: New Safety Function: 3 Title: Pressurizer Pressure Control K/A 010 A4.03 Ability to manually operate and/or monitor in the control room: PORV and block valves Rating(s): 4.0 / 3.8 CFR: 41.5 / 43.5 / 45.3 / 45.13   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Validation Time: 15 minutes                           Time Critical:         Yes         No     X
===========================================================================
Applicant:                                                                   Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #169
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B 0
ISOL (STEM) FAIL TO POSITION)
MAL-NC013A (NC COLD LEG A LEAK)               27.5
 
PAGE 3 OF 14
 
PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1.
INITIATING CUES:
1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.
PAGE 4 OF 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT START TIME: _______
STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc     ___ SAT as follows:
___ UNSAT
: a. Ensure Enclosure 1 (Foldout Page) is monitored.
STANDARD:
Applicant reads the step.
Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:
NOTE CSF should not be implemented until directed by this procedure.
STEP 2     b. Verify at least one of the following annunciators - LIT: ___ SAT 1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft"               ___UNSAT OR 1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft".
STANDARD:
Applicant determines that one or both annunciators are lit.
COMMENTS:
PAGE 5 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                           SAT/UNSAT STEP 3         c. Verify both ND pumps - ON.
___ SAT STANDARD:
___ UNSAT Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:
STEP 4 6.c. RNO c. Perform the following:                               ___ SAT
: 1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is   ___ UNSAT open, THEN start ND pump 1A.
STANDARD:
Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.
COMMENTS:
STEP 5                   2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B.               ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.
COMMENTS:
PAGE 6 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 6                 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d.                   ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.
COMMENTS:
STEP 7 6. d. Ensure the following valves - CLOSED:                       CRITICAL STEP 1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol).             ___ SAT STANDARD:                                                               ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.
This step is critical to prevent pump run out should only one ND pump be running.
Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.
COMMENTS:
PAGE 7 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 8 6. e. Isolate NI Pump Miniflow as follows:
___ SAT
: 1) Verify NC pressure - LESS THAN 1620 PSIG.
___ UNSAT STANDARD:
Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.
COMMENTS:
STEP 9       2) Ensure the following valves - CLOSED:
___ SAT 1NI-115A (NI Pump 1A Miniflow Isol) 1NI-144A (NI Pump 1B Miniflow Isol).             ___ UNSAT STANDARD:
Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.
COMMENTS:
STEP 10       3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE".                                             ___ SAT STANDARD:                                                             ___ UNSAT Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.
COMMENTS:
PAGE 8 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 11       4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -
CLOSED.                                                 ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.
COMMENTS:
STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED:                                           ___ SAT 1NV-203A (NV Pumps A&B Recirc Isol)                   ___ UNSAT OR 1NV-202B (NV Pmps A&B Recirc Isol).
STANDARD:
Applicant determines that the green CLSD lights are lit for 1NV-203A and 1NV-202B on 1MC-10.
COMMENTS:
STEP 13   g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.
___ SAT STANDARD:
___ UNSAT Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.
COMMENTS:
PAGE 9 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 14      h. OPEN the following valves:                                 CRITICAL STEP 1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND).                     ___ SAT STANDARD:                                                                 ___ UNSAT Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.
This step is critical align the suction flow path for the NI (Safety Injection System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump.
Examiner NOTE: Only one of the valves needs to be open to satisfy the critical step because the valves are in parallel.
COMMENTS:
STEP 15      i. Align ND discharge to suction of NI and NV pumps as         CRITICAL follows:                                                     STEP
: 1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps).           ___ SAT STANDARD:                                                                 ___ UNSAT Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 This step is critical align the suction flow path for the NV (Chemical Volume and Control System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump.
COMMENTS:
PAGE 10 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 16       2) OPEN 1NI-136B (ND Supply To NI Pump 1B).
___ SAT STANDARD:
___ UNSAT Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.
Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:
STEP 17    j. Verify at least one ND train aligned to provide suction to NV and NI as follows:                                           ___ SAT A Train:                                                 ___ UNSAT 1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) -
OPEN.
STANDARD:
Applicant determines that the 1A ND pump is running and 1ND-28A is open and proceeds to the next step.
COMMENTS:
PAGE 11 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 18      k. Isolate FWST from NV and NI pumps as follows:           CRITICAL STEP
: 1) Place "PWR DISCON FOR 1NI-100B" switch in "ENABLE".                                           ___ SAT STANDARD:                                                               ___ UNSAT Applicant places the PWR DISCON FOR 1NI-100B switch to ENABLE on 1MC-11.
This step is critical to allow operation of 1N-100B COMMENTS:
STEP 19         2) CLOSE 1NI-100B (NI Pmps Suct From FWST).             CRITICAL STEP STANDARD:
___ SAT Applicant depresses the green CLOSE pushbutton for 1NI-100B on 1MC-11.                                                             ___ UNSAT This step is critical to isolate the NI (Safety Injection System) pumps suction from the FWST.
COMMENTS:
PAGE 12 0F 14
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                           SAT/UNSAT STEP 20         3) CLOSE the following valves:                       CRITICAL STEP 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST).         ___ SAT STANDARD:                                                           ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1NV-252A and 1NV-253B on 1MC-10.
This step is critical to isolate the NV (Chemical Volume and Control System) pumps suction from the FWST.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 13 0F 14
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)
May 2014 NRC Initial License Exam JPM B READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1.
INITIATING CUES:
1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam System JPM C PAGE 1 OF 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Perform PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle)
Alternate Path:     No Facility JPM #:     New Safety Function:     3       Title:     Pressurizer Pressure Control K/A         010 A4.03     Ability to manually operate and/or monitor in the control room: PORV and block valves Rating(s):   4.0 / 3.8     CFR:       41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                         Perform           X     Simulate


==References:==
==References:==
PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) rev. 017   Task Standard: Enclosure 13.4 successfully completed with all valves returned to the as found position. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 3 OF 16  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #170 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 16 Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam PAGE 4 OF 16  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 3. INITIATING CUES:   The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs. EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/A/4200/023B, Enclosure 13.4.
PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) rev. 017 Task Standard:       Enclosure 13.4 successfully completed with all valves returned to the as found position.
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 16  START TIME: _______   STEP 1:   1.1 IF testing 1NC-32B (Pzr PORV), perform the following: 1.1.1 Record the as found position of 1NC-31B (Pzr PORV Isol) below: ______________ STANDARD: Applicant records OPEN as the as found position. COMMENTS:       ___ SAT  ___ UNSAT      STEP 2          1.1.2 Ensure 1NC-31B (Pzr PORV Isol) is closed. STANDARD:   Applicant places the switch for 1NC-31B to the CLOSE or OVERRIDE position. This step is critical to prevent a pressure transient when 1NC-32B is opened. COMMENTS:     CRITICAL STEP    ___ SAT    ___UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 16  STEP 3          1.1.3 Record the as found position of 1NC-32B (Pzr PORV) below: ______________ STANDARD: Applicant records CLOSED as the as found position for 1NC-32B COMMENTS:       ___ SAT  ___ UNSAT      STEP 4         1.1.4 Circle below the as found switch position of 1NC-32B (Pzr PORV). Close      Open     Auto STANDARD: Applicant circles Auto as the as found switch position of 1NC-32B. COMMENTS:       ___ SAT  ___ UNSAT    STEP 5           1.1.5 Ensure 1NC-32B (Pzr PORV) is closed. STANDARD: Applicant determines that 1NC-32B is closed. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 16  STEP 6         1.1.6 Cycle 1NC-32B (Pzr PORV) from closed to open to closed from the control room. STANDARD: Applicant places the switch for 1NC-32B to the OPEN position and then to the AUTO or CLOSE position. This step is critical to cycle 1NC-32B. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 7         1.1.7 Return 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.3 of this enclosure. STANDARD: Applicant determines that 1NC-32B is in the as found position as recorded in step 1.1.3. COMMENTS:       ___ SAT  ___ UNSAT    STEP 8         1.1.8 Return switch for 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.4 of this enclosure. STANDARD: Applicant places the switch for 1NC-32B to the AUTO position. This step is critical to return the switch for 1NC-32B to the as found position. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 16    STEP 9         1.1.9 Return 1NC-31B (Pzr PORV Isol) to the as found position, as recorded in Step 1.1.1 of this enclosure. STANDARD: Applicant places the switch for 1NC-31B to the OPEN position. This step is critical to return 1NC-31B to the as found position and make 1NC-32B available for pressure relief. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 10   1.2 IF testing 1NC-34A (Pzr PORV), perform the following: 1.2.1 Record the as found position of 1NC-33A (Pzr PORV Isol) below: ______________ STANDARD: Applicant records OPEN as the as found position for 1NC-33A COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 16  STEP 11         1.2.2 Ensure 1NC-33A (Pzr PORV Isol) is closed. STANDARD: Applicant places the switch for 1NC-33A to the CLOSE or OVERRIDE position. This step is critical to prevent a pressure transient when 1NC-34A is opened. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 12         1.2.3 Record the as found position of 1NC-34A (Pzr PORV) below: ______________ STANDARD: Applicant records CLOSED for the as found position for 1NC-34A. COMMENTS:       ___ SAT  ___ UNSAT    STEP 13          1.2.4 Circle below the as found switch position of 1NC-34A (Pzr PORV). Close     Open     Auto STANDARD: Applicant circles Auto as the as found switch position of 1NC-34A. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 16  STEP 14         1.2.5 Ensure 1NC-34A (Pzr PORV) is closed. STANDARD: Applicant determines that 1NC-34A is closed. COMMENTS:       ___ SAT  ___ UNSAT    STEP 15         1.2.6 Cycle 1NC-34A (Pzr PORV) from closed to open to closed from the control room. STANDARD: Applicant places the switch for 1NC-34A to the OPEN position and then to the AUTO or CLOSE position. This step is critical to cycle 1NC-34A. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 16         1.2.7 Return 1NC-34A (Pzr PORV) to the as found position, as recorded in Step 1.2.3 of this enclosure. STANDARD: Applicant determines that 1NC-34A is in the as found position as recorded in step 1.2.3. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 16  STEP 17         1.2.8 Return switch for 1NC-34A (Pzr PORV) to the as found position, as recorded in Step 1.2.4 of this enclosure. STANDARD: Applicant places the switch for 1NC-34A to the AUTO position This step is critical to return the switch for 1NC-34A to the as found position. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 18             1.2.9 Return 1NC-33A (Pzr PORV Isol) to the as found position, as recorded in Step 1.2.1 of this enclosure. STANDARD: Applicant places the switch for 1NC-33A to the OPEN position. This step is critical to return 1NC-33A to the as found position and make 1NC-34A available for pressure relief. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 16  STEP 19   1.3 IF testing 1NC-36B (Pzr PORV), perform the following: 1.3.1 Record the as found position of 1NC-35B (Pzr PORV Isol) below: ______________ STANDARD: Applicant records OPEN as the as found position for 1NC-35B. COMMENTS:       ___ SAT  ___ UNSAT    STEP 20         1.3.2 Ensure 1NC-35B (Pzr PORV Isol) is closed. STANDARD: Applicant places the switch for 1NC-35B to the CLOSE position. This step is critical to prevent a pressure transient when 1NC-36B is opened. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 21         1.3.3 Record the as found position of 1NC-36B (Pzr PORV) below: ______________ STANDARD: Applicant records CLOSED as the as found position for 1NC-36B. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 16  STEP 22         1.3.4 Circle below the as found switch position of 1NC-36B (Pzr PORV). Close     Open     Auto STANDARD: Applicant circles AUTO as the as found switch position of 1NC-36B COMMENTS:       ___ SAT  ___ UNSAT      STEP 23         1.3.5 Ensure 1NC-36B (Pzr PORV) is closed. STANDARD: Applicant determines that 1NC-36B is closed. COMMENTS:       ___ SAT  ___ UNSAT      STEP 24         1.3.6 Cycle 1NC-36B (Pzr PORV) from closed to open to closed from the control room. STANDARD: Applicant places the switch for 1NC-36B to the OPEN position and then to the AUTO or CLOSE position. This step is critical to cycle 1NC-36B. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 16  STEP 25         1.3.7 Return 1NC-36B (Pzr PORV) to the as found position, as recorded in Step 1.3.3 of this enclosure. STANDARD: Applicant determines that 1NC-36B is in the as found position as recorded in step 1.3.3. COMMENTS:       ___ SAT  ___ UNSAT      STEP 26   1.3.8 Return switch for 1NC-36B (Pzr PORV) to the as found position, as recorded in Step 1.3.4 of this enclosure. STANDARD: Applicant places the switch for 1NC-36B to the AUTO position. This step is critical to return the switch for 1NC-36B to the as found position. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 16  STEP 27   1.3.9 Return 1NC-35B (Pzr PORV Isol) to the as found position, as recorded in Step 1.3.1 of this enclosure. STANDARD: Applicant places the switch for 1NC-35B to the OPEN position. This step is critical to return 1NC-35B to the as found position and to make 1NC-36B available for pressure relief. COMMENTS:   END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT    STOP TIME ________
Validation Time: 15 minutes                             Time Critical:       Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM C     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is in MODE 3. INITIATING CUES:   The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs.
===========================================================================
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 1 OF 17         System JPM D Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 2 OF 17  EVALUATION SHEET Task: Start Reactor Coolant Pump 1B Alternate Path: Yes   Facility JPM #: NCP081 (modified) Safety Function: 4P Title: Reactor Coolant Pump System K/A 003 A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RCPS control including: RCP vibration. Rating(s): 2.9 / 2.9 CFR: 41.5 / 45.5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Applicant:                                                                   Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                 _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #170
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 16
 
PAGE 4 0F 16 Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 3.
INITIATING CUES:
The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/A/4200/023B, Enclosure 13.4.
PAGE 4 OF 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                           SAT/UNSAT START TIME: _______
STEP 1: 1.1 IF testing 1NC-32B (Pzr PORV), perform the following:
___ SAT 1.1.1 Record the as found position of 1NC-31B (Pzr PORV Isol) below:                                     ___ UNSAT
______________
STANDARD:
Applicant records OPEN as the as found position.
COMMENTS:
CRITICAL STEP 2        1.1.2 Ensure 1NC-31B (Pzr PORV Isol) is closed.           STEP STANDARD:                                                             ___ SAT Applicant places the switch for 1NC-31B to the CLOSE or OVERRIDE   ___UNSAT position.
This step is critical to prevent a pressure transient when 1NC-32B is opened.
COMMENTS:
PAGE 5 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 3      1.1.3 Record the as found position of 1NC-32B (Pzr PORV) below:                                             ___ SAT
______________
___ UNSAT STANDARD:
Applicant records CLOSED as the as found position for 1NC-32B COMMENTS:
STEP 4       1.1.4 Circle below the as found switch position of 1NC-32B ___ SAT (Pzr PORV).
___ UNSAT Close      Open     Auto STANDARD:
Applicant circles Auto as the as found switch position of 1NC-32B.
COMMENTS:
STEP 5       1.1.5 Ensure 1NC-32B (Pzr PORV) is closed.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1NC-32B is closed.
COMMENTS:
PAGE 6 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 6       1.1.6 Cycle 1NC-32B (Pzr PORV) from closed to open to         CRITICAL closed from the control room.                           STEP STANDARD:                                                                   ___ SAT Applicant places the switch for 1NC-32B to the OPEN position and then   ___ UNSAT to the AUTO or CLOSE position.
This step is critical to cycle 1NC-32B.
COMMENTS:
STEP 7       1.1.7 Return 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.3 of this enclosure.           ___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that 1NC-32B is in the as found position as recorded in step 1.1.3.
COMMENTS:
STEP 8       1.1.8 Return switch for 1NC-32B (Pzr PORV) to the as found     CRITICAL position, as recorded in Step 1.1.4 of this enclosure. STEP STANDARD:                                                                   ___ SAT Applicant places the switch for 1NC-32B to the AUTO position.           ___ UNSAT This step is critical to return the switch for 1NC-32B to the as found position.
COMMENTS:
PAGE 7 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 9       1.1.9 Return 1NC-31B (Pzr PORV Isol) to the as found           CRITICAL position, as recorded in Step 1.1.1 of this enclosure. STEP STANDARD:                                                                   ___ SAT Applicant places the switch for 1NC-31B to the OPEN position.           ___ UNSAT This step is critical to return 1NC-31B to the as found position and make 1NC-32B available for pressure relief.
COMMENTS:
STEP 10 1.2 IF testing 1NC-34A (Pzr PORV), perform the following:
___ SAT 1.2.1 Record the as found position of 1NC-33A (Pzr PORV Isol) below:                                         ___ UNSAT
______________
STANDARD:
Applicant records OPEN as the as found position for 1NC-33A COMMENTS:
PAGE 8 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 11         1.2.2 Ensure 1NC-33A (Pzr PORV Isol) is closed.             CRITICAL STEP STANDARD:
___ SAT Applicant places the switch for 1NC-33A to the CLOSE or OVERRIDE position.                                                               ___ UNSAT This step is critical to prevent a pressure transient when 1NC-34A is opened.
COMMENTS:
STEP 12         1.2.3 Record the as found position of 1NC-34A (Pzr PORV) below:                                               ___ SAT
______________
___ UNSAT STANDARD:
Applicant records CLOSED for the as found position for 1NC-34A.
COMMENTS:
STEP 13        1.2.4 Circle below the as found switch position of 1NC-34A (Pzr PORV).                                         ___ SAT Close     Open     Auto                             ___ UNSAT STANDARD:
Applicant circles Auto as the as found switch position of 1NC-34A.
COMMENTS:
PAGE 9 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 14       1.2.5 Ensure 1NC-34A (Pzr PORV) is closed.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1NC-34A is closed.
COMMENTS:
STEP 15       1.2.6 Cycle 1NC-34A (Pzr PORV) from closed to open to     CRITICAL closed from the control room.                       STEP STANDARD:                                                               ___ SAT Applicant places the switch for 1NC-34A to the OPEN position and then ___ UNSAT to the AUTO or CLOSE position.
This step is critical to cycle 1NC-34A.
COMMENTS:
STEP 16       1.2.7 Return 1NC-34A (Pzr PORV) to the as found position, as recorded in Step 1.2.3 of this enclosure.       ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that 1NC-34A is in the as found position as recorded in step 1.2.3.
COMMENTS:
PAGE 10 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 17       1.2.8 Return switch for 1NC-34A (Pzr PORV) to the as     CRITICAL found position, as recorded in Step 1.2.4 of this   STEP enclosure.
___ SAT STANDARD:
___ UNSAT Applicant places the switch for 1NC-34A to the AUTO position This step is critical to return the switch for 1NC-34A to the as found position.
COMMENTS:
STEP 18           1.2.9 Return 1NC-33A (Pzr PORV Isol) to the as found CRITICAL position, as recorded in Step 1.2.1 of this     STEP enclosure.
___ SAT STANDARD:
___ UNSAT Applicant places the switch for 1NC-33A to the OPEN position.
This step is critical to return 1NC-33A to the as found position and make 1NC-34A available for pressure relief.
COMMENTS:
PAGE 11 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 19 1.3 IF testing 1NC-36B (Pzr PORV), perform the following:
___ SAT 1.3.1 Record the as found position of 1NC-35B (Pzr PORV Isol) below:                                     ___ UNSAT
______________
STANDARD:
Applicant records OPEN as the as found position for 1NC-35B.
COMMENTS:
STEP 20       1.3.2 Ensure 1NC-35B (Pzr PORV Isol) is closed.           CRITICAL STEP STANDARD:
___ SAT Applicant places the switch for 1NC-35B to the CLOSE position.
___ UNSAT This step is critical to prevent a pressure transient when 1NC-36B is opened.
COMMENTS:
STEP 21       1.3.3 Record the as found position of 1NC-36B (Pzr PORV) below:                                           ___ SAT
______________
___ UNSAT STANDARD:
Applicant records CLOSED as the as found position for 1NC-36B.
COMMENTS:
PAGE 12 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 22         1.3.4 Circle below the as found switch position of 1NC-36B (Pzr PORV).                                         ___ SAT Close     Open     Auto                             ___ UNSAT STANDARD:
Applicant circles AUTO as the as found switch position of 1NC-36B COMMENTS:
STEP 23         1.3.5 Ensure 1NC-36B (Pzr PORV) is closed.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1NC-36B is closed.
COMMENTS:
STEP 24         1.3.6 Cycle 1NC-36B (Pzr PORV) from closed to open to       CRITICAL closed from the control room.                         STEP STANDARD:
___ SAT Applicant places the switch for 1NC-36B to the OPEN position and then to the AUTO or CLOSE position.                                         ___ UNSAT This step is critical to cycle 1NC-36B.
COMMENTS:
PAGE 13 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 25       1.3.7 Return 1NC-36B (Pzr PORV) to the as found position, as recorded in Step 1.3.3 of this enclosure.       ___ SAT STANDARD:                                                               ___ UNSAT Applicant determines that 1NC-36B is in the as found position as recorded in step 1.3.3.
COMMENTS:
STEP 26 1.3.8 Return switch for 1NC-36B (Pzr PORV) to the as found       CRITICAL position, as recorded in Step 1.3.4 of this enclosure. STEP STANDARD:                                                               ___ SAT Applicant places the switch for 1NC-36B to the AUTO position.         ___ UNSAT This step is critical to return the switch for 1NC-36B to the as found position.
COMMENTS:
PAGE 14 0F 16
 
Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 27 1.3.9 Return 1NC-35B (Pzr PORV Isol) to the as found position,   CRITICAL as recorded in Step 1.3.1 of this enclosure.           STEP STANDARD:                                                               ___ SAT Applicant places the switch for 1NC-35B to the OPEN position.       ___ UNSAT This step is critical to return 1NC-35B to the as found position and to make 1NC-36B available for pressure relief.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 15 0F 16
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM C READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 3.
INITIATING CUES:
The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs.
 
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam System JPM D PAGE 1 OF 17
 
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Start Reactor Coolant Pump 1B Alternate Path:     Yes Facility JPM #:     NCP081 (modified)
Safety Function:     4P       Title:       Reactor Coolant Pump System K/A         003 A1.01     Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RCPS control including: RCP vibration.
Rating(s):   2.9 / 2.9     CFR:       41.5 / 45.5 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                       Perform           X     Simulate


==References:==
==References:==
OP/1/A/6150/002A (Reactor Coolant Pump) rev. 068   Task Standard: 1B Reactor Coolant Pump is tripped when vibration is noted to be greater than NC pump trip criteria. Validation Time: 20 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 3 OF 17 1. Reset to any 100% power IC set. 2. Manually trip the reactor at 1MC-1. 3. Trip all (4) four NCP breakers at 1MC-10. 4. Place CF pump in service for auto S/G level control and secure CA. 5. Insert MAL-NCP005FXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5 6. Insert MAL-NCP005FYB (NCP VIB B MOUNT VERT FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5 7. Insert MAL-NCP005SXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =120 Value=30, EVENT =1, Delay = 5 8. Insert MAL-NCP005SYB (NCP VIB B MOUNT VERT FAILURE) Initial =0Ramp =120 Value=30, EVENT =1, Delay = 5 9. Insert EVENT 1 = x10d185M >400   (NCP B AMPS>400) 10. Freeze simulator and write to a snap. IC SELECTED:       SIMULATOR OPERATOR INSTRUCTIONS: ENSURE BENTLEY NEVADA VIBRATION MONITORS ON BACK BOARD ARE RESET AND THAT ALARMS 1AD-6 A/5 AND B/5 ARE CLEARED BETWEEN STUDENTS.
OP/1/A/6150/002A (Reactor Coolant Pump) rev. 068 Task Standard:       1B Reactor Coolant Pump is tripped when vibration is noted to be greater than NC pump trip criteria.
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 4 OF 17  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #171 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event MAL-NCP005FXB (NCP VIB 1B MOUNT HORZ FAILURE) 10 5 4 MIN 1 MAL-NCP005FYB (NCP VIB 1B MOUNT VERT FAILURE) 10 5 4 MIN 1 MAL-NCP005SXB (NCP VIB 1B SHAFT HORZ FAILURE) 30 5 2 MIN 1 MAL-NCP005SYB (NCP VIB 1B SHAFT VERT FAILURE) 30 5 2 MIN 1                              Ensure EVENT 1 = x10d185m>400 (NCP B AMPS > 400)
Validation Time: 20 minutes                           Time Critical:       Yes         No     X
PAGE 5 0F 17 Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam PAGE 5 OF 17  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored. INITIATING CUES: Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1. The Initial Conditions of Enclosure 4.1 have been satisfied. EXAMINER NOTE:   After reading cue, provide the applicant with a copy of OP/1/A/6150/002A (Reactor Coolant Pump Operation), Enclosure 4.1 (Startup and Operation of the NC Pumps).
===========================================================================
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 17  START TIME: _______ NOTE: In order to start an NC Pump, the underfrequency condition must be cleared by having at least three of four 6900V breakers (1TA, B, C, D-3) racked in and energized. STEP 1:   3.1 IF Unit 1 is in Mode 5, refer to Tech Spec Table 3.4.12-1 (Reactor Coolant Pump Operating Restrictions For Low Temperature Overpressure Protection) for temperature limitations on NC Pump starts. STANDARD: Applicant determines that this step does not apply. COMMENTS:       ___ SAT  ___ UNSAT      STEP 2   3.2 IF the pump to be started will be the fourth NC Pump in service on Unit 1, verify NC temperature is > 130&deg;F. {PIP 96-1290, PIP 02-484} STANDARD:   Applicant determines that this step does not apply. COMMENTS:       ___ SAT    ___UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 17  NOTE: If #1 Seal gauge overranged, can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:   "VCT" position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal   "NCDT" position: NC Press minus VCT Press = #1 Seal   STEP 3   3.3 Verify that No. 1 seal is greater than 200 psig for the pump to be started per the following gauges: (Control Board 1MC5)   1B NCP: 1NVP5220 STANDARD: Applicant VCT position:  NC Press minus Excess Letdn Hx Otlt Press = #1   COMMENTS:       ___ SAT  ___ UNSAT      STEP 4   3.4 Verify that the standpipe level for the pump to be started is normal by its associated annunciator DARK:   "NCP B #2 SEAL S-PIPE HI/LO LVL" 1AD-7 A/2 STANDARD: Applicant verifies annunciator is DARK. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 17  STEP 5   3.5 Verify that VCT pressure is 15 psig. STANDARD: Applicant determines VCT pressure is  15 psig on the OAC or per 1NVP5500 (VCT VENT PRESS) ON 1MC-5. COMMENTS:       ___ SAT  ___ UNSAT    STEP 6   3.6 Verify 7-10 gpm seal injection flow on the pump to be started by the following gauges: (Control Board 1MC5)   1B NCP: 1NVP5320 STANDARD: Applicant verifies seal injection is within range on 1NCP5230. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 17  NOTE: 1. If #1 Seal Leakoff Flow rate is < 1.0 gpm, the # 1 Seal Low Flow indication shall be used. 2. If #1 Seal 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:   "VCT" position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal   "NCDT" position: NC Press minus VCT Press = #1 Seal   STEP 7   3.7 Verify adequate #1 Seal Leakoff Flow on the pump to be started as follows: 3.7.1 Determine required #1 Seal Leakoff Flow from Revised Data Book Figure 26 (NC Pump No. 1 Seal Normal Operating Range). STANDARD: Applicant determines that the minimum required #1 Seal Leakoff Flow is approximately 1 gpm. COMMENTS:       ___ SAT  ___ UNSAT    STEP 8         3.7.2 Add 0.26 gpm to the minimum required #1 Seal Leakoff Flow of Figure 26 to correct for an expected drop in leakoff flow on pump start (0.20 gpm) and instrument inaccuracy (0.06 gpm). STANDARD: Applicant determines that the minimum required is 1 + 0.26 = 1.26   COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 17  STEP 9         3.7.3   Obtain the current #1 Seal Leakoff Flow per one of the following:   DCS graphic 6002 (NC PUMPS) OR Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) OR Appropriate OAC point   C1A1376 (NC Pmp B No. 1 Seal Leakoff Lo Flow) C1A0442 (NC Pmp B No. 1 Seal Leakoff Flow)   STANDARD: Applicant obtains the current #1 Seal Leak Flow. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 17  NOTE: 1. Operating Experience has shown that when NC Pump seal work has been performed during outages higher than desired seal leakoff flow can occur until NC Pump seal is seated. 2. Step 3.7.4.2 only applicable when OP/1/A/6150/001 (Filling and Venting the Reactor Coolant System) in progress. STEP 10       3.7.4 Perform one of the following based on indicated #1 Seal Leakoff Flow: 3.7.4.1 Verify the indicated #1 Seal Leakoff Flow (Step 3.7.3) is within the range of Data Book Figure 26 as adjusted per Step 3.7.2. STANDARD: Applicant determines that the #1 Seal Leakoff Flow is within limits. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 17  STEP 11   3.8 Verify upper and lower oil pot levels normal, for the pump to be started, via one of the following:   Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) OR Visual inspection (local) OR Associated annunciators DARK:   "NCP B UPPER/LOWER OIL RESERVOIR LO LEVEL" 1AD-6 F/2 STANDARD: Applicant verifies oil pot levels are normal per one of the listed indications. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 17  NOTE: KC flow is NOT required to the Thermal Barrier Hx whenever NC System temperature is less than 200&deg;F. STEP 12   3.9 Verify KC flow to the Thermal Barrier Heater Exchanger normal, for the pump to be started, via one of the following:   Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) OR Associated annunciators DARK:   "NCP B THERMAL BARRIER KC OUTLET HI/LO FLOW" 1AD-6 E/2 STANDARD: Applicant determines that KC flow to the Thermal Barrier Exchanger is normal per one of the indications. COMMENTS:       ___ SAT  ___ UNSAT    STEP 13   3.10 Verify KC flow to the Upper Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following:   Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) OR Associated annunciators DARK:   "NCP B MTR UPPER BRG KC OUTLET HI/LO FLOW" 1AD-6 C/2   STANDARD: Applicant determines that KC flow to the Upper Motor Bearing Oil Cooler is normal per one of the indications. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 14 0F 17  STEP 14   3.11 Verify KC flow to the Lower Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following:   Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) OR Associated annunciators DARK:   "NCP B MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/2 STANDARD: Applicant determines that the KC flow to the Lower Motor Bearing Oil Cooler is normal per one of the indications. COMMENTS:       ___ SAT  ___ UNSAT    STEP 15   3.12 Verify annunciator 1AD-11, K-6, "230 KV SWITCHYARD VOLTAGE LO" is dark. STANDARD: Applicant determines that 1AD-11, K/6 is dark. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 15 0F 17  STEP 16   3.13 IF the 6.9kv switchgear supplying the NC Pump to be started is also supplying a 4160v Essential Bus, verify the following: STANDARD: Applicant determines that the step does not apply. COMMENTS:       ___ SAT  ___ UNSAT    STEP 17   3.14 Two minutes prior to starting NC pump, start one oil lift pump for NCP to be started by pressing the "ON" pushbutton for:   "NC PUMP OIL LIFT PUMP B1" "NC PUMP OIL LIFT PUMP B2" STANDARD: Applicant depresses the red ON pushbutton for NC PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting the 1B NC Pump. This step is critical to lift and lubricate the pump so that it can be started. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 16 0F 17  NOTE: 1. If NC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles. 2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear associated with the NC Pump to be started in the following step. The alarm condition is expected to clear within 36 seconds.{PIP 95-0287} STEP 18   3.15 Start desired NC pump by pressing the "ON" pushbutton for: (R.M.)   "NC PUMP 1B" STANDARD: Applicant depresses the red ON pushbutton for NC PMP 1B. Once Hi Hi vibration is verified, the pump should be tripped. This step is critical to start the 1B NC Pump and then trip the pump upon verification of Hi Hi Vibration to protect the pump from further damage. NOTE TO EXAMINER: Approximately 5 seconds after the NCP is started, the Hi Hi Vibration alarm will come in. The shaft vibration will reach 20 mils prior to reaching 5 on the mount. Per the annunciator response, the pump should be tripped at >20 mils in Modes 1 and 2, but not until >30 mils in Mode 3 (current condition). At 5 mils on the mount, the pump is tripped regardless of mode. 5 mils on the mount will occur before 30 mils on the shaft. EXAMINER CUE: AFTER the pump is tripped: AP/1/A/5500/004 (Loss of Reactor Coolant Pump)   COMMENTS:   END OF TASK CRITICAL STEP    ___ SAT  ___ UNSAT  STOP TIME ________
Applicant:                                                                 Time Start: __________
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM D       READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored. INITIATING CUES: Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1. The Initial Conditions of Enclosure 4.1 have been satisfied.
NAME___________________________ Docket #_______________ Time Finish: __________
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 1 OF 11         System JPM E Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 2 OF 11  EVALUATION SHEET Task: Synchronize the Generator to the Grid Alternate Path: Yes   Facility JPM #: NEW Safety Function: 4S Title: Main and Reheat Steam System (MRSS) K/A 045 A4.02 Ability to manually operate and/or monitor in the control room: T/G controls, including breakers Rating(s): 2.7 / 2.6 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 17
 
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam
: 1. Reset to any 100% power IC set.
: 2. Manually trip the reactor at 1MC-1.
: 3. Trip all (4) four NCP breakers at 1MC-10.
: 4. Place CF pump in service for auto S/G level control and secure CA.
: 5. Insert MAL-NCP005FXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5
: 6. Insert MAL-NCP005FYB (NCP VIB B MOUNT VERT FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5
: 7. Insert MAL-NCP005SXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =120 Value=30, EVENT =1, Delay = 5
: 8. Insert MAL-NCP005SYB (NCP VIB B MOUNT VERT FAILURE) Initial =0Ramp =120 Value=30, EVENT =1, Delay = 5
: 9. Insert EVENT 1 = x10d185M >400 (NCP B AMPS>400)
: 10. Freeze simulator and write to a snap.
IC SELECTED:
SIMULATOR OPERATOR INSTRUCTIONS:
ENSURE BENTLEY NEVADA VIBRATION MONITORS ON BACK BOARD ARE RESET AND THAT ALARMS 1AD-6 A/5 AND B/5 ARE CLEARED BETWEEN STUDENTS.
PAGE 3 OF 17
 
Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #171
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event MAL-NCP005FXB (NCP VIB 1B MOUNT                               4 10     5                   1 HORZ FAILURE)                                              MIN MAL-NCP005FYB (NCP VIB 1B MOUNT VERT                           4 10      5                    1 FAILURE)                                                   MIN MAL-NCP005SXB (NCP VIB 1B SHAFT HORZ                           2 30      5                    1 FAILURE)                                                   MIN MAL-NCP005SYB (NCP VIB 1B SHAFT VERT                           2 30      5                    1 FAILURE)                                                   MIN
 
Ensure EVENT 1 = x10d185m>400 (NCP B AMPS > 400)
PAGE 4 OF 17
 
PAGE 5 0F 17 Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored.
INITIATING CUES:
Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1.
The Initial Conditions of Enclosure 4.1 have been satisfied.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6150/002A (Reactor Coolant Pump Operation), Enclosure 4.1 (Startup and Operation of the NC Pumps).
PAGE 5 OF 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT START TIME: _______
NOTE: In order to start an NC Pump, the underfrequency condition must be cleared by having at least three of four 6900V breakers (1TA, B, C, D-3) racked in and energized.                                   ___ SAT STEP 1: 3.1 IF Unit 1 is in Mode 5, refer to Tech Spec Table 3.4.12-1     ___ UNSAT (Reactor Coolant Pump Operating Restrictions For Low Temperature Overpressure Protection) for temperature limitations on NC Pump starts.
STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
STEP 2 3.2 IF the pump to be started will be the fourth NC Pump in         ___ SAT service on Unit 1, verify NC temperature is > 130&deg;F. {PIP 96-1290, PIP 02-484}                                             ___UNSAT STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
PAGE 6 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: If #1 Seal P gauge overranged, P can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows:                             ___ SAT "VCT" position: NC Press minus Excess Letdn Hx Otlt Press   ___ UNSAT
            = #1 Seal P "NCDT" position: NC Press minus VCT Press = #1 Seal P STEP 3 3.3 Verify that No. 1 seal P is greater than 200 psig for the pump to be started per the following gauges: (Control Board 1MC5) 1B NCP: 1NVP5220 STANDARD:
Applicant verifies seal P > than 200 psid using stated gauge OR for VCT position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal P COMMENTS:
STEP 4 3.4 Verify that the standpipe level for the pump to be started is ___ SAT normal by its associated annunciator DARK:
___ UNSAT "NCP B #2 SEAL S-PIPE HI/LO LVL" 1AD-7 A/2 STANDARD:
Applicant verifies annunciator is DARK.
COMMENTS:
PAGE 7 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 5   3.5 Verify that VCT pressure is 15 psig.
___ SAT STANDARD:
___ UNSAT Applicant determines VCT pressure is  15 psig on the OAC or per 1NVP5500 (VCT VENT PRESS) ON 1MC-5.
COMMENTS:
STEP 6 3.6 Verify 7-10 gpm seal injection flow on the pump to be started by the following gauges: (Control Board 1MC5)               ___ SAT 1B NCP: 1NVP5320                                         ___ UNSAT STANDARD:
Applicant verifies seal injection is within range on 1NCP5230.
COMMENTS:
PAGE 8 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: 1. If #1 Seal Leakoff Flow rate is < 1.0 gpm, the # 1 Seal Low Flow indication shall be used.
___ SAT
: 2. If #1 Seal P gauge overranged, P can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch     ___ UNSAT position as follows:
                "VCT" position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal P "NCDT" position: NC Press minus VCT Press = #1 Seal P
STEP 7 3.7 Verify adequate #1 Seal Leakoff Flow on the pump to be started as follows:
3.7.1 Determine required #1 Seal Leakoff Flow from Revised Data Book Figure 26 (NC Pump No. 1 Seal Normal Operating Range).
STANDARD:
Applicant determines that the minimum required #1 Seal Leakoff Flow is approximately 1 gpm.
COMMENTS:
STEP 8       3.7.2 Add 0.26 gpm to the minimum required #1 Seal Leakoff Flow of Figure 26 to correct for an expected ___ SAT drop in leakoff flow on pump start (0.20 gpm) and instrument inaccuracy (0.06 gpm).                     ___ UNSAT STANDARD:
Applicant determines that the minimum required is 1 + 0.26 = 1.26 COMMENTS:
PAGE 9 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 9     3.7.3 Obtain the current #1 Seal Leakoff Flow per one of the following:                                           ___ SAT DCS graphic 6002 (NC PUMPS)                   ___ UNSAT OR Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)
OR Appropriate OAC point C1A1376 (NC Pmp B No. 1 Seal Leakoff Lo Flow)
C1A0442 (NC Pmp B No. 1 Seal Leakoff Flow)
STANDARD:
Applicant obtains the current #1 Seal Leak Flow.
COMMENTS:
PAGE 10 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT NOTE: 1. Operating Experience has shown that when NC Pump seal work has been performed during outages higher than desired seal leakoff flow can occur until NC Pump seal is seated.               ___ SAT
: 2. Step 3.7.4.2 only applicable when OP/1/A/6150/001 (Filling and     ___ UNSAT Venting the Reactor Coolant System) in progress.
STEP 10     3.7.4 Perform one of the following based on indicated #1 Seal Leakoff Flow:
3.7.4.1 Verify the indicated #1 Seal Leakoff Flow (Step 3.7.3) is within the range of Data Book Figure 26 as adjusted per Step 3.7.2.
STANDARD:
Applicant determines that the #1 Seal Leakoff Flow is within limits.
COMMENTS:
PAGE 11 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 11 3.8 Verify upper and lower oil pot levels normal, for the pump to be started, via one of the following:                     ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)       ___ UNSAT OR Visual inspection (local)
OR Associated annunciators DARK:
                        "NCP B UPPER/LOWER OIL RESERVOIR LO LEVEL" 1AD-6 F/2 STANDARD:
Applicant verifies oil pot levels are normal per one of the listed indications.
COMMENTS:
PAGE 12 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT NOTE: KC flow is NOT required to the Thermal Barrier Hx whenever NC System temperature is less than 200&deg;F.
___ SAT STEP 12 3.9 Verify KC flow to the Thermal Barrier Heater Exchanger normal, for the pump to be started, via one of the following: ___ UNSAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)
OR Associated annunciators DARK:
                    "NCP B THERMAL BARRIER KC OUTLET HI/LO FLOW" 1AD-6 E/2 STANDARD:
Applicant determines that KC flow to the Thermal Barrier Exchanger is normal per one of the indications.
COMMENTS:
STEP 13 3.10 Verify KC flow to the Upper Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)             ___ UNSAT OR Associated annunciators DARK:
                      "NCP B MTR UPPER BRG KC OUTLET HI/LO FLOW" 1AD-6 C/2 STANDARD:
Applicant determines that KC flow to the Upper Motor Bearing Oil Cooler is normal per one of the indications.
COMMENTS:
PAGE 13 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 14 3.11 Verify KC flow to the Lower Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)             ___ UNSAT OR Associated annunciators DARK:
                      "NCP B MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/2 STANDARD:
Applicant determines that the KC flow to the Lower Motor Bearing Oil Cooler is normal per one of the indications.
COMMENTS:
STEP 15 3.12 Verify annunciator 1AD-11, K-6, "230 KV SWITCHYARD VOLTAGE LO" is dark.                                         ___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that 1AD-11, K/6 is dark.
COMMENTS:
PAGE 14 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 16 3.13 IF the 6.9kv switchgear supplying the NC Pump to be started is also supplying a 4160v Essential Bus, verify the ___ SAT following:
___ UNSAT STANDARD:
Applicant determines that the step does not apply.
COMMENTS:
STEP 17 3.14 Two minutes prior to starting NC pump, start one oil lift       CRITICAL pump for NCP to be started by pressing the "ON"               STEP pushbutton for:
___ SAT "NC PUMP OIL LIFT PUMP B1" "NC PUMP OIL LIFT PUMP B2"                             ___ UNSAT STANDARD:
Applicant depresses the red ON pushbutton for NC PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting the 1B NC Pump.
This step is critical to lift and lubricate the pump so that it can be started.
COMMENTS:
PAGE 15 0F 17
 
Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: 1. If NC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles.                                   CRITICAL STEP
: 2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear             ___ SAT associated with the NC Pump to be started in the following step.
The alarm condition is expected to clear within 36 seconds.{PIP ___ UNSAT 95-0287}
STEP 18 3.15 Start desired NC pump by pressing the "ON" pushbutton for: (R.M.)
                    "NC PUMP 1B" STANDARD:
Applicant depresses the red ON pushbutton for NC PMP 1B. Once Hi Hi vibration is verified, the pump should be tripped.
This step is critical to start the 1B NC Pump and then trip the pump upon verification of Hi Hi Vibration to protect the pump from further damage.
NOTE TO EXAMINER: Approximately 5 seconds after the NCP is started, the Hi Hi Vibration alarm will come in.
The shaft vibration will reach 20 mils prior to reaching 5 on the mount. Per the annunciator response, the pump should be tripped at >20 mils in Modes 1 and 2, but not until >30 mils in Mode 3 (current condition). At 5 mils on the mount, the pump is tripped regardless of mode. 5 mils on the mount will occur before 30 mils on the shaft.
EXAMINER CUE: AFTER the pump is tripped: The CRS has pulled AP/1/A/5500/004 (Loss of Reactor Coolant Pump) and is ready to proceed.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 16 0F 17
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM D READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored.
INITIATING CUES:
Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1.
The Initial Conditions of Enclosure 4.1 have been satisfied.
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam System JPM E PAGE 1 OF 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Synchronize the Generator to the Grid Alternate Path:     Yes Facility JPM #:     NEW Safety Function:     4S       Title:     Main and Reheat Steam System (MRSS)
K/A         045 A4.02       Ability to manually operate and/or monitor in the control room: T/G controls, including breakers Rating(s):   2.7 / 2.6     CFR:       41.7 / 45.5 to 45.8 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                       Perform             X     Simulate


==References:==
==References:==
OP/1/B/6300/001 (Turbine Generator) rev. 099   Task Standard: Synchronizes the generator to the grid. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #172 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event OVR-EP006B (GEN BKR 1B TRIP ENABLE PB) ON    2 OVR-EP006C (GEN BKR 1B TRIP PB) ON   2 OVR-EP007B (GEN BKR 1A TRIP ENABLE PB) ON    4 OVR-EP007C (GEN BKR 1A TRIP PB) ON   4                               Ensure EVENT 2 = x01i120a & !x01i148e Ensure EVENT 4 = x01i120b & !x01i147e PAGE 4 0F 11 Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is in MODE 1 at 14% power. Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup). INITIATING CUES: The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup).
OP/1/B/6300/001 (Turbine Generator) rev. 099 Task Standard:       Synchronizes the generator to the grid.
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  START TIME: _______   STEP 1:   3.62 Synchronize the Generator to the grid as follows: 3.62.1 Prior to placing the turbine generator on line, ensure Rx power is between 13% and 15% power. STANDARD: Applicant determines Rx power is approximately 14%. COMMENTS:       ___ SAT  ___ UNSAT      STEP 2            3.62.2 Announce the following over the plant page:   "Placing Unit 1 Main Turbine on line, please clear the Transformer Yard". STANDARD:   Applicant makes an announcement using the beige phone on 1MC-1 COMMENTS:       ___ SAT    ___UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11  NOTE: If "MAN/AUTO REG" (1MC1) indicates "MAN", Manual sync of Generator is required. STEP 3             3.62.3 IF Auto sync of the Generator is desired, perform the following: 3.62.3.1 Verify "MAN/AUTO REG" in "AUTO" (1MC1). STANDARD: Applicant determines auto sync of the generator is desired per the initiating cue and determines that the AUTO light for MAN/AUTO REG is LIT COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11  NOTE: 1. When "GEN SYNC SELECT" switch is turned to "AUTO 1A" or "AUTO 1B", the AVR Auto Sync Relay automatically adjusts Terminal voltage and Turbine speed and closes the selected breaker. 2. The following will occur when the Generator Breaker closes:   6-7 MWe is picked up. A Target of 60 MWe is automatically input. A Load Rate of 12 MW/MIN is automatically input. The MW feedback loop is placed in service. The turbine is placed in "HOLD". STEP 4                       3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position. STANDARD: Applicant places the GEN SYNC SELECT switch to either the AUTO 1A or AUTO 1B position. EXAMINER NOTE: The first breaker selected will fail to close. COMMENTS:       ___ SAT  ___ UNSAT    STEP 5                       3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: A. Depress "Auto Sync Enable" on Turbine Control panel. STANDARD: Applicant Control Panel. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11  STEP 6                                     B. IF selected Generator Breaker fails to close within 5 minutes, perform Steps 3.62.3.2 - 3.62.3.3 for opposite breaker. STANDARD: Applicant determines that the generator breaker failed to close and returns to step 3.62.3.2 for the opposite breaker. COMMENTS:       ___ SAT  ___ UNSAT    STEP 7                      3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position. STANDARD: Applicant places the GEN SYNC SELECT switch to the opposite position than was selected the first time. This step is critical to close a generator breaker and synchronize the generator grid. COMMENTS:     CRITICAL STEP   ___ SAT  ___ UNSAT    . STEP 8                      3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: STANDARD: Applicant determines the step does not apply this time. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11  STEP 9                       3.62.3.4 Return "GEN SYNC SELECT" switch to the "MAN" position. STANDARD: Applicant places the GEN SYNC SELECT switch to the MAN position. COMMENTS:       ___ SAT  ___ UNSAT    STEP 10           3.62.4 IF Manual sync of Generator is desired, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS:       ___ SAT  ___ UNSAT    STEP 11           3.62.5 After Generator Breaker 1A (or 1B) has closed, verify the following: 3.62.5.1 A Target of 60 MWe. 3.62.5.2 A Load Rate of 12 MW/Min. STANDARD: Applicant verifies a target of 60 MWe and a Load Rate of 12MW/Min is present on the Turbine Control Panel or the Turbine Graphic. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11  STEP 12           3.62.6 Select "GO" to pick up load. STANDARD: Applicant   This step is critical to pick up load. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 13           3.62.7 WHILE continuing with the power increase, but before 50% power, place other Generator Breaker in service as follows: STANDARD: Applicant reads the step. EXAMINER CUE:   COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT    STOP TIME ________
Validation Time: 15 minutes                           Time Critical:         Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM E     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is in MODE 1 at 14% power. Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup). INITIATING CUES: The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived.
===========================================================================
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 1 OF 11         System JPM F Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 2 OF 11  EVALUATION SHEET Task: Restore Normal Power to 1ETB and Shutdown D/G 1B from the Control Room Alternate Path: Yes   Facility JPM #: DG3-004 (Modified) Safety Function: 6 Title: Emergency Diesel Generator (ED/G) System K/A 064 A4.01 Ability to manually operate and/or monitor in the control room: local and remote operation of the ED/G Rating(s): 4.0 / 4.3 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Applicant:                                                                   Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #172
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event OVR-EP006B (GEN BKR 1B TRIP ENABLE ON                            2 PB)
OVR-EP006C (GEN BKR 1B TRIP PB)               ON                             2 OVR-EP007B (GEN BKR 1A TRIP ENABLE ON                            4 PB)
OVR-EP007C (GEN BKR 1A TRIP PB)               ON                             4
 
Ensure EVENT 2 = x01i120a & !x01i148e Ensure EVENT 4 = x01i120b & !x01i147e
 
PAGE 3 OF 11
 
PAGE 4 0F 11 Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 1 at 14% power.
Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator)
Enclosure 4.1 (Turbine Generator Startup).
INITIATING CUES:
The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup).
PAGE 4 OF 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT START TIME: _______
STEP 1: 3.62 Synchronize the Generator to the grid as follows:
___ SAT 3.62.1 Prior to placing the turbine generator on line, ensure Rx power is between 13% and 15% power. ___ UNSAT STANDARD:
Applicant determines Rx power is approximately 14%.
COMMENTS:
STEP 2        3.62.2 Announce the following over the plant page:         ___ SAT "Placing Unit 1 Main Turbine on line, please clear ___UNSAT the Transformer Yard".
STANDARD:
Applicant makes an announcement using the beige phone on 1MC-1 COMMENTS:
PAGE 5 0F 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: If "MAN/AUTO REG" (1MC1) indicates "MAN", Manual sync of Generator is required.
___ SAT STEP 3         3.62.3 IF Auto sync of the Generator is desired, perform the following:                                   ___ UNSAT 3.62.3.1 Verify "MAN/AUTO REG" in "AUTO" (1MC1).
STANDARD:
Applicant determines auto sync of the generator is desired per the initiating cue and determines that the AUTO light for MAN/AUTO REG is LIT COMMENTS:
PAGE 6 0F 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: 1. When "GEN SYNC SELECT" switch is turned to "AUTO 1A" or "AUTO 1B", the AVR Auto Sync Relay automatically adjusts Terminal voltage and Turbine speed and closes the selected     ___ SAT breaker.
___ UNSAT
: 2. The following will occur when the Generator Breaker closes:
6-7 MWe is picked up.
A Target of 60 MWe is automatically input.
A Load Rate of 12 MW/MIN is automatically input.
The MW feedback loop is placed in service.
The turbine is placed in "HOLD".
STEP 4               3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position.
STANDARD:
Applicant places the GEN SYNC SELECT switch to either the AUTO 1A or AUTO 1B position.
EXAMINER NOTE: The first breaker selected will fail to close.
COMMENTS:
STEP 5               3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following:           ___ SAT A. Depress "Auto Sync Enable" on Turbine ___ UNSAT Control panel.
STANDARD:
Applicant depresses the Auto Sync Enable button on the Turbine Control Panel.
COMMENTS:
PAGE 7 0F 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 6                           B. IF selected Generator Breaker fails to close within 5 minutes, perform Steps     ___ SAT 3.62.3.2 - 3.62.3.3 for opposite breaker.
___ UNSAT STANDARD:
Applicant determines that the generator breaker failed to close and returns to step 3.62.3.2 for the opposite breaker.
COMMENTS:
STEP 7                3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1)           CRITICAL to "AUTO 1A" or "AUTO 1B" position.           STEP
___ SAT STANDARD:
___ UNSAT Applicant places the GEN SYNC SELECT switch to the opposite position than was selected the first time.
This step is critical to close a generator breaker and synchronize the generator grid.
COMMENTS:
.
STEP 8                3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following:               ___ SAT STANDARD:                                                                     ___ UNSAT Applicant determines the step does not apply this time.
COMMENTS:
PAGE 8 0F 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 9               3.62.3.4 Return "GEN SYNC SELECT" switch to the "MAN" position.                       ___ SAT STANDARD:                                                             ___ UNSAT Applicant places the GEN SYNC SELECT switch to the MAN position.
COMMENTS:
STEP 10       3.62.4 IF Manual sync of Generator is desired, perform the following:                                 ___ SAT STANDARD:                                                             ___ UNSAT Applicant determines that this step does not apply.
COMMENTS:
STEP 11       3.62.5 After Generator Breaker 1A (or 1B) has closed, verify the following:                           ___ SAT 3.62.5.1 A Target of 60 MWe.                   ___ UNSAT 3.62.5.2 A Load Rate of 12 MW/Min.
STANDARD:
Applicant verifies a target of 60 MWe and a Load Rate of 12MW/Min is present on the Turbine Control Panel or the Turbine Graphic.
COMMENTS:
PAGE 9 0F 11
 
Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 12         3.62.6 Select "GO" to pick up load.                     CRITICAL STEP STANDARD:
___ SAT Applicant depresses the GO button on the Turbine Control Panel.
___ UNSAT This step is critical to pick up load.
COMMENTS:
STEP 13         3.62.7 WHILE continuing with the power increase, but before 50% power, place other Generator Breaker ___ SAT in service as follows:
___ UNSAT STANDARD:
Applicant reads the step.
EXAMINER CUE: Another operator will place the other breaker in service.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM E READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is in MODE 1 at 14% power.
Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator)
Enclosure 4.1 (Turbine Generator Startup).
INITIATING CUES:
The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived.
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam System JPM F PAGE 1 OF 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Restore Normal Power to 1ETB and Shutdown D/G 1B from the Control Room Alternate Path:     Yes Facility JPM #:     DG3-004 (Modified)
Safety Function:     6       Title:     Emergency Diesel Generator (ED/G) System K/A         064 A4.01     Ability to manually operate and/or monitor in the control room: local and remote operation of the ED/G Rating(s):   4.0 / 4.3     CFR:       41.7 / 45.5 to 45.8 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator       X     In-Plant                       Perform             X     Simulate


==References:==
==References:==
OP/1/A/6350/002 (Diesel Generator Operation) rev. 157 , Enclosure 4.18   Task Standard: 1ETB power being   Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #173 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event IND-DG012 (D/G 1B P/F METER) .500   2 SEC   2 IND-DG013 (D/G 1B KW METER) 0 2 SEC 2                                          Ensure EVENT 2 = x11i343c (1ATD CLOSE pushbutton)
OP/1/A/6350/002 (Diesel Generator Operation) rev. 157 , Enclosure 4.18 Task Standard:       1ETB power being supplied from 1ATD and D/G is OFF Validation Time: 15 minutes                           Time Critical:         Yes         No       X
PAGE 4 0F 11 Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B -reset. INITIATING CUES:  shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/002 Enclosure 4.18 Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  START TIME: _______   STEP 1:   3.2 IF shutting down the diesel from the Control Room, perform the following: 3.2.1 IF both the normal (ETB Norm Fdr Frm ATD) AND alternate (ETB Alt Fdr Frm SATB) incoming feeder breakers are open, perform the following: CAUTION: It is essential for the Operator to read and understand the following steps before attempting to re-synchronize the D/G and bus to the normal or alternate power source. Quick response to any changes in load and power factor when the breaker closes is required to reduce the likelihood of a reverse power D/G Breaker trip. 3.2.1.1 Adjust voltage using "D/G 1B Volt Adjust" to allow "D/G 1B Volts" to be one half to two divisions (50 to 200 volts) higher than "Line Volts". STANDARD: Applicant determines that both feeder breakers are open and adjusts -8  COMMENTS:        ___ SAT  ___ UNSAT      STEP 2          3.2.1.2 Place the "D/G 1B Sync" Switch in the "ON" position. STANDARD:  Applicant 1MC-11  COMMENTS:       ___ SAT    ___UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 6 0F 11  STEP 3          3.2.1.3 Adjust D/G speed using "D/G 1B Gov Ctrl" such that the Synchroscope is moving slowly in the "FAST" direction, (approximately 1 revolution per 30 seconds). STANDARD: Applicant Synchroscope is moving slowly in the fast direction. COMMENTS:       ___ SAT   ___ UNSAT   CAUTION: The following three steps shall be performed prior to signing off either step to reduce the likelihood of a reverse power D/G Breaker trip. STEP 4          3.2.1.4  As the indicator reaches 1.5 min. before the vertical (synchronized) position, close one of the following breakers:   ETB Norm Fdr Frm ATD OR  ETB Alt Fdr Frm SATB  STANDARD:  Applicant closes ETB Norm Fdr Frm ATD per the initiating cue. This step is critical to align 1ETB to its normal power source. COMMENTS:     CRITICAL STEP   ___ SAT  ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 7 0F 11  STEP 5          3.2.1.5  Stabilize the D/G with a positive load and a lagging power factor. STANDARD: Applicant will attempt to stabilize the D/G with a positive load and a -11. EXAMINER NOTE:  Applicant will not be successful performing this step. COMMENTS:       ___ SAT  ___ UNSAT    STEP 6           3.2.1.6  IF the power factor meter indicates severely leading, (pegs high) AND power output decreases to 0 KW (pegs low) then IMMEDIATELY trip D/G 1B Bkr To ETB. STANDARD:  Applicant determines that the step applies and trips the D/G 1B Bkr To ETB. This step is critical to minimize damage to the diesel generator from reverse power. COMMENTS:     CRITICAL STEP   ___ SAT  ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 8 0F 11  STEP 7          3.2.1.7  Place the "D/G 1B Sync" Switch in the "OFF" position. Record time____________  STANDARD: Applicant . COMMENTS:        ___ SAT  ___ UNSAT     STEP 8      3.2.2 Verify one of the following breakers is closed:      ETB Norm Fdr Frm ATD OR    ETB Alt Fdr Frm SATB STANDARD: Applicant verifies the red CLSD light is lit for ETB Norm Fdr Frm ATD  COMMENTS:        ___ SAT   ___ UNSAT     STEP 9       3.2.3 IF D/G 1B Bkr To ETB is open, go to Step 3.2.7. STANDARD: Applicant determines that the green OPEN light is lit on D/G 1B BKR TO ETB and goes to Step 3.2.7  COMMENTS:       ___ SAT   ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 9 0F 11  STEP 10      3.2.7  Allow diesel to idle unloaded for a minimum of 5 minutes or until the following conditions are met:   Jacket water outlet temperature is < 170&deg;F. Lube oil outlet temperature is < 170&deg;F. Turbocharger exhaust temperatures have stabilized. STANDARD: Applicant reads the step. EXAMINER CUE:  temperature is 167&deg;F and the Turbocharger exhaust  COMMENTS:        ___ SAT   ___ UNSAT     STEP 11       3.2.8 Ensure one of the following conditions is met:   The D/G Sequencer is "RESET". OR  Power has been removed from the D/G Sequencer. STANDARD: Applicant determines that the D/G Sequencer has been reset per the initial conditions or the yellow D/G LOAD SEQ RESET light LIT on 1MC-11 COMMENTS:       ___ SAT   ___ UNSAT Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam  STEP/STANDARD SAT/UNSAT  PAGE 10 0F 11  STEP 12      3.2.9 Depress the D/G 1B "OFF" pushbutton to stop the engine. Record time______________  STANDARD:  Applicant depresses the green OFF pushbutton on D/G 1B on 1MC-11 This step is critical to shut down the diesel. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT     STEP 13      3.2.10 WHEN the engine stops, dispatch Operators as necessary to verify the following:   The "L.O. Pump & Heater" light indicates "ON". The "J.W. Pump & Heater" light indicates "ON". 1RN-292B (1B D/G Hx Inlet Isol) (DB-566, AA-38) closes. STANDARD: Applicant reads the step. EXAMINER CUE:   COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT      STOP TIME ________
===========================================================================
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM F     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B -reset. INITIATING CUES: shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM.
Applicant:                                                                   Time Start: __________
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 1 OF 11         System JPM G Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 2 OF 11  EVALUATION SHEET Task: Shift Lower Containment Vent Units Alternate Path: No   Facility JPM #: New Safety Function: 5 Title: Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS Fans Rating(s): 3.6 / 3.6 CFR: 41.7 / 45.5 to 45.8   Preferred Evaluation Location: Preferred Evaluation Method: Simulator Control Room X Perform Simulate X
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                   DATE
===========================================================================
COMMENTS PAGE 2 OF 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #173
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event 2
IND-DG012 (D/G 1B P/F METER)                 .500                           2 SEC 2
IND-DG013 (D/G 1B KW METER)                     0                           2 SEC
 
Ensure EVENT 2 = x11i343c (1ATD CLOSE pushbutton)
PAGE 3 OF 11
 
PAGE 4 0F 11 Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B Mode Select Switch is in the CTRL-RM position. The D/G Load Sequencer has been reset.
INITIATING CUES:
The SRO instructs you to parallel D/G 1B to 1ETBs normal power source (1ATD) and shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/002 Enclosure 4.18 PAGE 4 OF 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT START TIME: _______
STEP 1: 3.2 IF shutting down the diesel from the Control Room, perform the following:
3.2.1 IF both the normal (ETB Norm Fdr Frm ATD) AND           ___ SAT alternate (ETB Alt Fdr Frm SATB) incoming feeder breakers are open, perform the following:               ___ UNSAT CAUTION: It is essential for the Operator to read and understand the following steps before attempting to re-synchronize the D/G and bus to the normal or alternate power source. Quick response to any changes in load and power factor when the breaker closes is required to reduce the likelihood of a reverse power D/G Breaker trip.
3.2.1.1 Adjust voltage using "D/G 1B Volt Adjust" to allow "D/G 1B Volts" to be one half to two divisions (50 to 200 volts) higher than "Line Volts".
STANDARD:
Applicant determines that both feeder breakers are open and adjusts D/G voltage using the D/G 1B Volt Adjust until D/G 1B Volts are one half to two divisions (50 to 200 volts) higher than Line Volts on 1MC-8 COMMENTS:
STEP 2        3.2.1.2 Place the "D/G 1B Sync" Switch in the "ON" position. ___ SAT STANDARD:                                                                     ___UNSAT Applicant places the D/G 1B Sync Switch in the ON position on 1MC-11 COMMENTS:
PAGE 5 0F 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                                  SAT/UNSAT STEP 3        3.2.1.3 Adjust D/G speed using "D/G 1B Gov Ctrl" such that the Synchroscope is moving slowly in the "FAST"      ___ SAT direction, (approximately 1 revolution per 30 seconds).                                            ___ UNSAT STANDARD:
Applicant adjusts D/G speed using the D/G 1B Gov Ctrl until the Synchroscope is moving slowly in the fast direction.
COMMENTS:
CAUTION: The following three steps shall be performed prior to signing off either step to reduce the likelihood of a reverse power D/G      CRITICAL Breaker trip.                                                      STEP STEP 4        3.2.1.4 As the indicator reaches 1.5 min. before the vertical ___ SAT (synchronized) position, close one of the following breakers:                                              ___ UNSAT ETB Norm Fdr Frm ATD OR ETB Alt Fdr Frm SATB STANDARD:
Applicant closes ETB Norm Fdr Frm ATD per the initiating cue.
This step is critical to align 1ETB to its normal power source.
COMMENTS:
PAGE 6 0F 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                                SAT/UNSAT STEP 5        3.2.1.5 Stabilize the D/G with a positive load and a lagging power factor.                                      ___ SAT STANDARD:                                                                  ___ UNSAT Applicant will attempt to stabilize the D/G with a positive load and a lagging power factor utilizing the D/G 1B GOV CTRL and the D/G 1B VOLT ADJUST on 1MC-11.
EXAMINER NOTE: Applicant will not be successful performing this step.
COMMENTS:
STEP 6        3.2.1.6 IF the power factor meter indicates severely          CRITICAL leading, (pegs high) AND power output decreases      STEP to 0 KW (pegs low) then IMMEDIATELY trip D/G 1B Bkr To ETB.                                         ___ SAT STANDARD:                                                                   ___ UNSAT Applicant determines that the step applies and trips the D/G 1B Bkr To ETB.
This step is critical to minimize damage to the diesel generator from reverse power.
COMMENTS:
PAGE 7 0F 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                              SAT/UNSAT STEP 7       3.2.1.7 Place the "D/G 1B Sync" Switch in the "OFF" position. Record time____________                ___ SAT STANDARD:                                                               ___ UNSAT Applicant places the D/G 1B Sync switch in the OFF position.
COMMENTS:
STEP 8    3.2.2 Verify one of the following breakers is closed:
___ SAT ETB Norm Fdr Frm ATD OR                                                    ___ UNSAT ETB Alt Fdr Frm SATB STANDARD:
Applicant verifies the red CLSD light is lit for ETB Norm Fdr Frm ATD COMMENTS:
STEP 9    3.2.3 IF D/G 1B Bkr To ETB is open, go to Step 3.2.7.
___ SAT STANDARD:
___ UNSAT Applicant determines that the green OPEN light is lit on D/G 1B BKR TO ETB and goes to Step 3.2.7 COMMENTS:
PAGE 8 0F 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                            SAT/UNSAT STEP 10       3.2.7 Allow diesel to idle unloaded for a minimum of 5 minutes or until the following conditions are met: ___ SAT Jacket water outlet temperature is < 170&deg;F. ___ UNSAT Lube oil outlet temperature is < 170&deg;F.
Turbocharger exhaust temperatures have stabilized.
STANDARD:
Applicant reads the step.
EXAMINER CUE: Jacket water temperature is 160&deg;F, Lube Oil outlet temperature is 167&deg;F and the Turbocharger exhaust temperatures have stabilized.
COMMENTS:
STEP 11       3.2.8 Ensure one of the following conditions is met:
___ SAT The D/G Sequencer is "RESET".
OR                                                ___ UNSAT Power has been removed from the D/G Sequencer.
STANDARD:
Applicant determines that the D/G Sequencer has been reset per the initial conditions or the yellow D/G LOAD SEQ RESET light LIT on 1MC-11 COMMENTS:
PAGE 9 0F 11
 
Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD                                SAT/UNSAT STEP 12      3.2.9 Depress the D/G 1B "OFF" pushbutton to stop the         CRITICAL engine.                                                STEP Record time______________
___ SAT STANDARD:
___ UNSAT Applicant depresses the green OFF pushbutton on D/G 1B on 1MC-11 This step is critical to shut down the diesel.
COMMENTS:
STEP 13      3.2.10 WHEN the engine stops, dispatch Operators as necessary to verify the following:                  ___ SAT The "L.O. Pump & Heater" light indicates "ON". ___ UNSAT The "J.W. Pump & Heater" light indicates "ON".
1RN-292B (1B D/G Hx Inlet Isol) (DB-566, AA-38) closes.
STANDARD:
Applicant reads the step.
EXAMINER CUE: An operator has been dispatched.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM F READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B Mode Select Switch is in the CTRL-RM position. The D/G Load Sequencer has been reset.
INITIATING CUES:
The SRO instructs you to parallel D/G 1B to 1ETBs normal power source (1ATD) and shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM.
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam System JPM G PAGE 1 OF 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Shift Lower Containment Vent Units Alternate Path:     No Facility JPM #:     New Safety Function:     5       Title:       Containment Cooling System K/A         022 A4.01     Ability to manually operate and/or monitor in the control room: CCS Fans Rating(s):   3.6 / 3.6     CFR:       41.7 / 45.5 to 45.8 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator             Control Room         X         Perform                   Simulate       X


==References:==
==References:==
OP/2/A/6450/001 (Containment Ventilation (VV) Systems rev.033   Task Standard: 2D LCVU running and 2C LCVU off. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 3 OF 11  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC 3. Enter the password. 4. INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 11 Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam PAGE 4 OF 11  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 2 is in MODE 1. INITIATING CUES:   The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU. Steps 3.1 and 3.3 were marked N/A during the pre-job brief. Peer check has been waived. EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/2/A/6450/001 Containment Ventilation (VV) Systems, Enclosure 4.13.
OP/2/A/6450/001 (Containment Ventilation (VV) Systems rev.033 Task Standard:       2D LCVU running and 2C LCVU off.
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 11  START TIME: _______   STEP 1:   3.2 IF three LCVUs are operating AND it is desired, shift the operating units as follows: 3.2.1 IF the LCVUs are operating in "LOW" speed, perform the following: 3.2.1.1 Stop the LCVU to be removed from service by placing its control switch in the "OFF" position:   "VV LCVU 2C" STANDARD: Applicant describes placing the switch for VV LCVU 2C to the OFF position. This step is critical to shut down the desired Lower Containment Vent Unit EXAMINER CUE: IF asked,   EXAMINER CUE: IF asked,   EXAMINER CUE:   COMMENTS:    CRITICAL STEP  ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 11  NOTE: The procedure may continue up to and including Step 3.2.1.8 before completing the following step. STEP 2                   3.2.1.2 Verify the green indicating light illuminates for the LCVU stopped. STANDARD:   Applicant describes verifying the green indicating light is LIT for VV LCVU 2C. EXAMINER CUE:   COMMENTS:       ___ SAT    ___UNSAT    STEP 3                   3.2.1.3 Verify the red "MAX" indicating light extinguishes for the LCVU stopped. STANDARD: Applicant LCVU 2C MAX is DARK. EXAMINER CUE: light is DARK. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 11  STEP 4                   3.2.1.4 Verify the green "CLOSED" indicating light illuminates for the LCVU damper associated with the LCVU stopped. STANDARD: Applicant describes verifying the green 2LCVU-D-3 LWR CONT VENT DAMPER is LIT. EXAMINER CUE:   COMMENTS:       ___ SAT  ___ UNSAT    STEP 5                   3.2.1.5 Start the idle LCVU by placing its control switch in the "LOW" position:   "VV LCVU 2D" STANDARD: Applicant describes placing the switch for VV LCVU 2D in the LOW position. This step is critical to start the desired LCVU. EXAMINER CUE:   COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 11  STEP 6                   3.2.1.6 Verify the red indicating light illuminates for the LCVU placed in service. STANDARD: Applicant describes verifying the red (middle) indicating light for VV LCVU 2D is LIT. EXAMINER CUE:   COMMENTS:       ___ SAT  ___ UNSAT    STEP 7                   3.2.1.7 Verify the red "OPEN" indicating light illuminates for the LCVU damper associated with the LCVU started. STANDARD: Applicant light for 2LCVU-D-4 LWR CONT VENT DAMPER. EXAMINER CUE:   COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 11  STEP 8         3.2.1.8 Verify the red "MAX" indicating light illuminates for the LCVU placed in service. STANDARD: Applicant describes verifying the red light for VV LCVU 2D MAX is LIT EXAMINER CUE:   COMMENTS:       ___ SAT  ___ UNSAT    STEP 9         3.2.2 IF the LCVUs are operating in "HIGH" speed, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS:       ___ SAT  ___ UNSAT    STEP 10   3.4 Indicate below the operating Pipe Tunnel Booster Fan:   "PIPE TUNNEL BSTR FAN 2A" "PIPE TUNNEL BSTR FAN 2B" STANDARD: Applicant marks the box for the operating Pipe Tunnel Booster Fan. EXAMINER CUE: IF ASKED,   COMMENTS:        ___ SAT  ___ UNSAT Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 11  STEP 11   3.5 Indicate below the operating LCVUs:   "VV LCVU 2A" "VV LCVU 2B" "VV LCVU 2C" "VV LCVU 2D STANDARD: Applicant marks the blocks for the 2A, 2B and 2D LCVUs. COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT    STOP TIME ________
Validation Time: 15 minutes                           Time Critical:       Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM G     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS: Unit 2 is in MODE 1. INITIATING CUES:   The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU. Steps 3.1 and 3.3 were marked N/A during the pre-job brief. Peer check has been waived.
===========================================================================
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 1 OF 14         System JPM H Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 2 OF 14  EVALUATION SHEET Task: Place Standby Component Cooling Train in Service Alternate Path: No Facility JPM #: KC-082 (Modified) Safety Function: 8 Title: Component Cooling Water System K/A 008 A4.01 Ability to manually operate and/or monitor in the control room: CCW indications and controls Rating(s): 3.3 / 3.1 CFR: 41.7 / 45.5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator X In-Plant   Perform X Simulate  
Applicant:                                                                 Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 11
 
PAGE 4 0F 11 Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 2 is in MODE 1.
INITIATING CUES:
The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU.
Steps 3.1 and 3.3 were marked N/A during the pre-job brief.
Peer check has been waived.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/2/A/6450/001 Containment Ventilation (VV) Systems, Enclosure 4.13.
PAGE 4 OF 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                                     SAT/UNSAT START TIME: _______
STEP 1: 3.2 IF three LCVUs are operating AND it is desired, shift the           CRITICAL operating units as follows:                                         STEP 3.2.1 IF the LCVUs are operating in "LOW" speed, perform         ___ SAT the following:
___ UNSAT 3.2.1.1 Stop the LCVU to be removed from service by placing its control switch in the "OFF" position:
                                "VV LCVU 2C" STANDARD:
Applicant describes placing the switch for VV LCVU 2C to the OFF position.
This step is critical to shut down the desired Lower Containment Vent Unit EXAMINER CUE: IF asked, Three LCVUs are operating.
EXAMINER CUE: IF asked, The LCVUs are operating in LOW speed.
EXAMINER CUE: The switch for VV LCVU 2C is in the OFF position.
COMMENTS:
PAGE 5 0F 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                                     SAT/UNSAT NOTE: The procedure may continue up to and including Step 3.2.1.8 before completing the following step.
___ SAT STEP 2             3.2.1.2 Verify the green indicating light illuminates for the LCVU stopped.                                 ___UNSAT STANDARD:
Applicant describes verifying the green indicating light is LIT for VV LCVU 2C.
EXAMINER CUE: The green light is LIT.
COMMENTS:
STEP 3             3.2.1.3 Verify the red "MAX" indicating light extinguishes for the LCVU stopped.               ___ SAT STANDARD:
___ UNSAT Applicant describes verifying the red MAX indicating light for VV LCVU 2C MAX is DARK.
EXAMINER CUE: The red MAX light is DARK.
COMMENTS:
PAGE 6 0F 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 4               3.2.1.4 Verify the green "CLOSED" indicating light illuminates for the LCVU damper associated ___ SAT with the LCVU stopped.
___ UNSAT STANDARD:
Applicant describes verifying the green CLOSED indicating light for 2LCVU-D-3 LWR CONT VENT DAMPER is LIT.
EXAMINER CUE: The green light is LIT.
COMMENTS:
STEP 5               3.2.1.5 Start the idle LCVU by placing its control   CRITICAL switch in the "LOW" position:               STEP "VV LCVU 2D"                         ___ SAT STANDARD:                                                               ___ UNSAT Applicant describes placing the switch for VV LCVU 2D in the LOW position.
This step is critical to start the desired LCVU.
EXAMINER CUE: The switch for LCVU 2D is in the LOW position.
COMMENTS:
PAGE 7 0F 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 6             3.2.1.6 Verify the red indicating light illuminates for the LCVU placed in service.                   ___ SAT STANDARD:                                                                 ___ UNSAT Applicant describes verifying the red (middle) indicating light for VV LCVU 2D is LIT.
EXAMINER CUE: The red light is LIT.
COMMENTS:
STEP 7             3.2.1.7 Verify the red "OPEN" indicating light illuminates for the LCVU damper associated     ___ SAT with the LCVU started.
___ UNSAT STANDARD:
Applicant describes verifying the red OPEN indicating light for 2LCVU-D-4 LWR CONT VENT DAMPER.
EXAMINER CUE: The red light is LIT.
COMMENTS:
PAGE 8 0F 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                                     SAT/UNSAT STEP 8     3.2.1.8 Verify the red "MAX" indicating light illuminates for the LCVU placed in service.                                   ___ SAT STANDARD:                                                                     ___ UNSAT Applicant describes verifying the red light for VV LCVU 2D MAX is LIT EXAMINER CUE: The red light is LIT.
COMMENTS:
STEP 9     3.2.2 IF the LCVUs are operating in "HIGH" speed, perform the following:                                             ___ SAT STANDARD:
___ UNSAT Applicant determines that this step does not apply.
COMMENTS:
STEP 10 3.4 Indicate below the operating Pipe Tunnel Booster Fan:
___ SAT "PIPE TUNNEL BSTR FAN 2A" "PIPE TUNNEL BSTR FAN 2B"                                 ___ UNSAT STANDARD:
Applicant marks the box for the operating Pipe Tunnel Booster Fan.
EXAMINER CUE: IF ASKED, Pipe Tunnel Booster Fan 2A is ON.
COMMENTS:
PAGE 9 0F 11
 
Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD                   SAT/UNSAT STEP 11 3.5 Indicate below the operating LCVUs:
___ SAT "VV LCVU 2A" "VV LCVU 2B"                             ___ UNSAT "VV LCVU 2C" "VV LCVU 2D STANDARD:
Applicant marks the blocks for the 2A, 2B and 2D LCVUs.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 10 0F 11
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM G READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 2 is in MODE 1.
INITIATING CUES:
The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU.
Steps 3.1 and 3.3 were marked N/A during the pre-job brief.
Peer check has been waived.
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam System JPM H PAGE 1 OF 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Place Standby Component Cooling Train in Service Alternate Path:     No Facility JPM #:     KC-082 (Modified)
Safety Function:     8       Title:     Component Cooling Water System K/A         008 A4.01     Ability to manually operate and/or monitor in the control room: CCW indications and controls Rating(s):   3.3 / 3.1     CFR:       41.7 / 45.5 Preferred Evaluation Location:                       Preferred Evaluation Method:
Simulator       X     In-Plant                       Perform             X     Simulate


==References:==
==References:==
OP/1/A/6400/005 (Component Cooling System) rev. 116   Task Standard: for miniflow. Validation Time: 20 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 3 OF 14  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #175 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 14 Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam PAGE 4 OF 14  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:     maintenance on the pump and motor. INITIATING CUES:   The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005. Concurrent verification and peer checks have   EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6400/005 (Component Cooling System), Enclosure 4.3 (Shifting Trains).
OP/1/A/6400/005 (Component Cooling System) rev. 116 Task Standard:       1B1 Component Cooling Pump running and B KC HX outlet valve in KC TEMP position. 1A2 KC Pump stopped and A KC HX Outlet Valve aligned for miniflow.
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 14  START TIME: _______   STEP 1:   3.1.2 Ensure 1RN-347B (KC Hx 1B Inlet Isol) is open. STANDARD: Applicant determines that 1RN-347B is open by verifying the red OPEN light is LIT or via the OAC. COMMENTS:       ___ SAT  ___ UNSAT      STEP 2   3.1.3 Ensure "KC HX 1B OTLT MODE" is in "KC TEMP". STANDARD:   Applicant on 1MC-11. This step is critical to ensure that the outlet of the KC Heat exchanger is controlled at the proper temperature. COMMENTS:     CRITICAL STEP    ___ SAT    ___UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 14  STEP 3   3.1.4 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System) perform the following: (R.M.) 3.1.4.1 Verify the Cation Bed Demineralizer is NOT in service per OP/1/A/6200/001 (Chemical and Volume Control System). STANDARD: Applicant determines that letdown is in service and that the Cation Bed Demineralizers are not in service. EXAMINER CUE: IF ASKED,   COMMENTS:       ___ SAT  ___ UNSAT      STEP 4             3.1.4.2 Record position of 1NV-153A (Letdn Hx Otlt 3-Way Vlv). Recorded valve position________________ STANDARD: Applicant determines that the position of 1NV-position. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 14  STEP 5             3.1.4.3 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains. Person notified ____________________________ STANDARD: Applicant determines that letdown flow is through the demineralizers and notifies Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains. EXAMINER CUE:   Chemistry, I understand the demineralizers will be   COMMENTS:       ___ SAT  ___ UNSAT    STEP 6             3.1.4.4 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers will be bypassed while shifting KC Trains. Person notified ____________________________ STANDARD: Applicant notifies Radiation Protection that the demineralizers will be bypassed while shifting KC Trains. EXAMINER CUE: understand that the demineralizers will be bypassed while shifting KC Trains. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 14  STEP 7             3.1.4.5 Place 1NV-153A (Letdn Hx Otlt 3-Way Vlv) in the "VCT" position. STANDARD: Applicant places the switch for 1NV-position. This step is critical to bypass the demineralizer to prevent a change in reactivity due to the changing boron affinity of the demineralizers caused by letdown temperature changes due to component cooling temperature changes when the trains are shifted. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    CAUTION: 5700 gpm discharge header flow per each operating KC pump shall NOT be exceeded. STEP 8   3.1.5 Start either KC Train 1B pump:   "KC PUMP B1" STANDARD: Applicant depresses the red ON pushbutton for KC PUMP 1B on 1MC-11 This step is critical to start the desired pump. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 14  STEP 9   3.1.6 Adjust the following flow controllers on 1MC11 to zero gpm flow:   1KC-149 (KF Hx 1A Cool Wtr Otlt) STANDARD: Applicant adjusts the controller for 1KC-149 to zero gpm. COMMENTS:       ___ SAT  ___ UNSAT    STEP 10   3.1.7 Stop all KC Train 1A pumps:   "KC PUMP A2" STANDARD: Applicant depresses the green OFF pushbutton for KC PUMP A2 on 1MC-11 This step is critical to secured the desired pump. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 11   3.1.8 Place "KC HX 1A OTLT MODE" in "MINIFLOW" position. STANDARD: Applicant places the switch for KC HX 1A OTLT MODE in the -11 COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 10 0F 14  STEP 12   3.1.9 IF AT ANY TIME KC Train flow approaches 5700 gpm while performing the next step, ensure 1KC-C40B (Train B Miniflow Isol) is closed. STANDARD: Applicant ensures that 1KC-40B is closed on 1MC-11. COMMENTS:       ___ SAT  ___ UNSAT    STEP 13   3.1.10 Perform the following for the KF cooling loops that are in service:     Adjust 1KC-149 (KF Hx 1A Cool Wtr Otlt) flow controller on 1MC11 to 3000 gpm or as necessary to maintain Spent Fuel Pool temperature < 125&deg;F. STANDARD: Applicant adjusts 1KC-149 flow controller to less than or < 3000 gpm. EXAMINER NOTE: Since Spent Fuel Pool temperature is only ~ 115&deg;F, the applicant may decide to adjust 1KC-149 at this time. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 11 0F 14  NOTE: One pump running is preferred as long as flow is < 5700 gpm. STEP 14   3.1.11 IF KC flow requirement is > 5700 gpm, perform the following: STANDARD: Applicant determines that this step does not apply. COMMENTS:       ___ SAT  ___ UNSAT    STEP 15   3.1.12 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System), WHEN KC flow and temperature have stabilized perform the following: (R.M.) 3.1.12.1 IF 1NV-153A (Letdn Hx Otlt 3-Way Vlv) position was recorded as "DEMIN" in Step 3.1.4.2 AND no other reason exists for it to remain in the "VCT" position, return it to "AUTO" as follows: A. Place 1NV-153A in the "DEMIN" position. (R.M.) B. Verify 1NV-153A returns to "AUTO". STANDARD: Applicant places the control switch for 1NV-position and returns it to AUTO on 1MC-10. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 12 0F 14  STEP 16              3.1.12.2 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers have been restored to service. Person notified _________________________ STANDARD: Applicant notifies Primary Chemistry that the demineralizers have been restored to service. EXAMINER CUE:   Chemistry, I understand the demineralizers have been restored   COMMENTS:       ___ SAT  ___ UNSAT    STEP 17              3.1.12.3 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers have been restored to service. Person notified _________________________ STANDARD: Applicant notifies Radiation Protection that the demineralizers have been restored to service. EXAMINER CUE: Christina Frey from Radiation Protection, I understand the demineralizers have been restored to     COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 13 0F 14  STEP 18   3.1.13 IF RN miniflow was established per Step 3.1.1.2, secure unneeded flow paths. STANDARD: Applicant determines that this step does not apply. COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT      STOP TIME ________
Validation Time: 20 minutes                           Time Critical:         Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM H     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:     maintenance on the pump and motor. INITIATING CUES:   The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005. Concurrent verification and peer checks have Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 1 OF 8          System JPM I In-Plant Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 2 OF 8 EVALUATION SHEET Task: Break Condenser Vacuum Locally Alternate Path: None Facility JPM #: CA-084 Safety Function: 4S Title: Main Turbine Generator (MT/G) System K/A 045 A1.06 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MT/G system controls including: Expected response of secondary plant parameters following T/G trip Rating(s): 3.3 / 3.7 CFR: 41.5 / 45.5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator   In-Plant     X Perform   Simulate       X
===========================================================================
Applicant:                                                                   Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                   SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #175
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 14
 
PAGE 4 0F 14 Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is operating at 100% with 1A2 KC Pump in operation.
KC Pump 1A2 needs to be removed from service to permit preventive maintenance on the pump and motor.
INITIATING CUES:
The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in service and take KC Pump 1A2 out of service beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005.
Concurrent verification and peer checks have been waived and the B train KC pumps have been checked out satisfactorily by a NLO.
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6400/005 (Component Cooling System), Enclosure 4.3 (Shifting Trains).
PAGE 4 OF 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT START TIME: _______
STEP 1: 3.1.2 Ensure 1RN-347B (KC Hx 1B Inlet Isol) is open.
___ SAT STANDARD:
___ UNSAT Applicant determines that 1RN-347B is open by verifying the red OPEN light is LIT or via the OAC.
COMMENTS:
CRITICAL STEP 2 3.1.3 Ensure "KC HX 1B OTLT MODE" is in "KC TEMP".                   STEP STANDARD:                                                                 ___ SAT Applicant places the switch for KC HX 1B OTLT MODE in the KC        ___UNSAT TEMP position on 1MC-11.
This step is critical to ensure that the outlet of the KC Heat exchanger is controlled at the proper temperature.
COMMENTS:
PAGE 5 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 3 3.1.4 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System) perform the following: (R.M.) ___ SAT 3.1.4.1 Verify the Cation Bed Demineralizer is NOT in   ___ UNSAT service per OP/1/A/6200/001 (Chemical and Volume Control System).
STANDARD:
Applicant determines that letdown is in service and that the Cation Bed Demineralizers are not in service.
EXAMINER CUE: IF ASKED, The Cation Bed Demineralizers are not in service.
COMMENTS:
STEP 4       3.1.4.2 Record position of 1NV-153A (Letdn Hx Otlt 3-Way ___ SAT Vlv).
Recorded valve position________________           ___ UNSAT STANDARD:
Applicant determines that the position of 1NV-153A is in the DEMIN position.
COMMENTS:
PAGE 6 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT STEP 5         3.1.4.3 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers will be     ___ SAT bypassed while shifting KC Trains.
Person notified ____________________________         ___ UNSAT STANDARD:
Applicant determines that letdown flow is through the demineralizers and notifies Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains.
EXAMINER CUE: This is Stephanie Jackson from Primary Chemistry, I understand the demineralizers will be bypassed while shifting KC Trains.
COMMENTS:
STEP 6         3.1.4.4 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers will be ___ SAT bypassed while shifting KC Trains.
Person notified ____________________________         ___ UNSAT STANDARD:
Applicant notifies Radiation Protection that the demineralizers will be bypassed while shifting KC Trains.
EXAMINER CUE: This is Christina Frey from Radiation Protection, I understand that the demineralizers will be bypassed while shifting KC Trains.
COMMENTS:
PAGE 7 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 7           3.1.4.5 Place 1NV-153A (Letdn Hx Otlt 3-Way Vlv) in the CRITICAL "VCT" position.                                   STEP STANDARD:                                                               ___ SAT Applicant places the switch for 1NV-153A to the VCT position.     ___ UNSAT This step is critical to bypass the demineralizer to prevent a change in reactivity due to the changing boron affinity of the demineralizers caused by letdown temperature changes due to component cooling temperature changes when the trains are shifted.
COMMENTS:
CAUTION: 5700 gpm discharge header flow per each operating KC pump shall NOT be exceeded.                                       CRITICAL STEP STEP 8 3.1.5 Start either KC Train 1B pump:
___ SAT "KC PUMP B1"
___ UNSAT STANDARD:
Applicant depresses the red ON pushbutton for KC PUMP 1B on 1MC-11 This step is critical to start the desired pump.
COMMENTS:
PAGE 8 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 9 3.1.6 Adjust the following flow controllers on 1MC11 to zero gpm flow:                                                   ___ SAT 1KC-149 (KF Hx 1A Cool Wtr Otlt)                   ___ UNSAT STANDARD:
Applicant adjusts the controller for 1KC-149 to zero gpm.
COMMENTS:
STEP 10 3.1.7 Stop all KC Train 1A pumps:                               CRITICAL STEP "KC PUMP A2"
___ SAT STANDARD:
___ UNSAT Applicant depresses the green OFF pushbutton for KC PUMP A2 on 1MC-11 This step is critical to secured the desired pump.
COMMENTS:
STEP 11 3.1.8 Place "KC HX 1A OTLT MODE" in "MINIFLOW" position.
___ SAT STANDARD:
___ UNSAT Applicant places the switch for KC HX 1A OTLT MODE in the MINIFLOW position on 1MC-11 COMMENTS:
PAGE 9 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 12 3.1.9 IF AT ANY TIME KC Train flow approaches 5700 gpm while performing the next step, ensure 1KC-C40B (Train     ___ SAT B Miniflow Isol) is closed.
___ UNSAT STANDARD:
Applicant ensures that 1KC-40B is closed on 1MC-11.
COMMENTS:
STEP 13 3.1.10 Perform the following for the KF cooling loops that are in service:                                                 ___ SAT Adjust 1KC-149 (KF Hx 1A Cool Wtr Otlt) flow         ___ UNSAT controller on 1MC11 to 3000 gpm or as necessary to maintain Spent Fuel Pool temperature < 125&deg;F.
STANDARD:
Applicant adjusts 1KC-149 flow controller to less than or < 3000 gpm.
EXAMINER NOTE: Since Spent Fuel Pool temperature is only ~ 115&deg;F, the applicant may decide to adjust 1KC-149 at this time.
COMMENTS:
PAGE 10 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT NOTE: One pump running is preferred as long as flow is < 5700 gpm.
STEP 14 3.1.11 IF KC flow requirement is > 5700 gpm, perform the         ___ SAT following:
___ UNSAT STANDARD:
Applicant determines that this step does not apply.
COMMENTS:
STEP 15 3.1.12 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System), WHEN KC flow and           ___ SAT temperature have stabilized perform the following:
(R.M.)                                                 ___ UNSAT 3.1.12.1 IF 1NV-153A (Letdn Hx Otlt 3-Way Vlv) position was recorded as "DEMIN" in Step 3.1.4.2 AND no other reason exists for it to remain in the "VCT" position, return it to "AUTO" as follows:
A. Place 1NV-153A in the "DEMIN" position.
(R.M.)
B. Verify 1NV-153A returns to "AUTO".
STANDARD:
Applicant places the control switch for 1NV-153A to the DEMIN position and returns it to AUTO on 1MC-10.
COMMENTS:
PAGE 11 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 16          3.1.12.2 IF letdown flow is through the demineralizers, notify Primary Chemistry that the             ___ SAT demineralizers have been restored to service.
Person notified _________________________     ___ UNSAT STANDARD:
Applicant notifies Primary Chemistry that the demineralizers have been restored to service.
EXAMINER CUE: This is Stephanie Jackson from Primary Chemistry, I understand the demineralizers have been restored to service.
COMMENTS:
STEP 17          3.1.12.3 IF letdown flow is through the demineralizers, notify Radiation Protection that the           ___ SAT demineralizers have been restored to service.
Person notified _________________________     ___ UNSAT STANDARD:
Applicant notifies Radiation Protection that the demineralizers have been restored to service.
EXAMINER CUE: This is Christina Frey from Radiation Protection, I understand the demineralizers have been restored to service.
COMMENTS:
PAGE 12 0F 14
 
Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 18 3.1.13 IF RN miniflow was established per Step 3.1.1.2, secure unneeded flow paths.                                   ___ SAT STANDARD:                                                             ___ UNSAT Applicant determines that this step does not apply.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 13 0F 14
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM H READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is operating at 100% with 1A2 KC Pump in operation.
KC Pump 1A2 needs to be removed from service to permit preventive maintenance on the pump and motor.
INITIATING CUES:
The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in service and take KC Pump 1A2 out of service beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005.
Concurrent verification and peer checks have been waived and the B train KC pumps have been checked out satisfactorily by a NLO.
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam System JPM I In-Plant PAGE 1 OF 8
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Break Condenser Vacuum Locally Alternate Path:     None Facility JPM #:     CA-084 Safety Function:     4S       Title:       Main Turbine Generator (MT/G) System K/A       045 A1.06         Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MT/G system controls including: Expected response of secondary plant parameters following T/G trip Rating(s):   3.3 / 3.7     CFR:       41.5 / 45.5 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator             In-Plant           X           Perform                   Simulate       X


==References:==
==References:==
AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3   Task Standard: Enclosure 3 has been completed with the first vacuum breaker opened within 10 minutes. Validation Time: 8 minutes   Time Critical:   Yes   X No =========================================================================== Applicant:   Time Start:   ________ NAME __                   ___ Docket # _________ Time Finish: ________   Performance Rating:   SAT ____ UNSAT ____ Performance Time ___     Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 3 OF 8  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC # 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 8 Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam PAGE 4 OF 8  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 2 is in Mode 3 following a reactor trip. INITIATING CUES:   The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum). This JPM is TIME CRITICAL; time begins when you acknowledge the task. EXAMINER NOTE: Provide applicant with a copy of the procedure.
AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 Task Standard:       Enclosure 3 has been completed with the first vacuum breaker opened within 10 minutes.
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 8  START TIME _______ Examiner NOTE: Critical Time Start: Record Time that applicant acknowledges the task _________. CAUTION High air flow rates will exist when vacuum breakers are first opened. Stay clear of pipe end. STEP 1:   1. Break condenser vacuum by opening the following valves:   2CM-368 (2A Main Cond Shell Vacuum Bkr) (TB2-600,2F-2G, 26) (Ladder needed)   2CM-369 (2B Main Cond Shell Vacuum Bkr) (TB2-600, 2F, 24-25) (Ladder needed)   2CM-370 (2C Main Cond Shell Vacuum Bkr) (TB2-609, 2F-22) (Ladder needed). STANDARD:   Applicant will describe opening the valves: 2CM-368, 2CM-369, 2CM-370 This step is critical in order to open correct valves for breaking vacuum. Examiner Note: The critical end time is when the applicant describes opening the first valve. Due to the height of the valves, no fall protection will be required. Examiner Cue:   When applicant describes engaging lever and rotating handwheel counter clockwise to open the following valve     Critical end time________ COMMENTS:     CRITICAL STEP  ___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 8    STEP 2   2. Secure steam to CSAEs as follows: a. Close the following valves:   2SA-22 (Main Steam To CSAE) (TB2-614, 2M-32)   2SA-27 (Aux Steam To CSAE) (TB-614, 2L-2M, 27). STANDARD:   Applicant will describe closing 2SA-22 and 2SA-27 This step is critical, because if it is not performed, the CSAEs will continue to pull vacuum. Examiner Cue:   As applicant properly describes closing the valves give cue as appropriate, Valve turns until resistance is felt. COMMENTS:   CRITICAL STEP    ___ SAT    ___UNSAT    STEP 3   b. WHEN time and manpower permit, THEN complete the shutdown of the CSAEs. REFER TO OP/2/B/6300/006 (Main Vacuum). STANDARD: Applicant will read the step Examiner Cue:   The Control Room Supervisor has instructed another operator to complete the shutdown of the CSAEs. COMMENTS:         ___ SAT  ___ UNSAT Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 8  STEP 4   3. WHEN requested by Control Room Supervisor, THEN   verify condenser vacuum broken as follows: a. Inspect each vacuum breaker for absence of air flow into condenser. b. Notify Control Room Supervisor of results. STANDARD: Applicant will inspect each vacuum breaker for the absence of air flow into the condenser and will report to the Control Room Supervisor. Examiner Cue: After each inspection,   COMMENTS:         ___ SAT  ___ UNSAT      STOP TIME ________
Validation Time: 8 minutes                             Time Critical:       Yes   X     No
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JKM I   DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 2 is in Mode 3 following a reactor trip. INITIATING CUES:   The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum). This JPM is TIME CRITICAL; time begins when you acknowledge the task.
===========================================================================
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 1 OF 9          System JPM J In-Plant Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 2 OF 9 EVALUATION SHEET Task: Shifting Main Transformer Auxiliaries Alternate Path: No Facility JPM #: EP-016   Safety Function: 6 Title: Electrical K/A 062 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation. Rating(s): 3.4 / 3.9 CFR: 41.5 / 43.5 / 45.3 / 45.13   Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant X Perform Simulate X
Applicant:                                                                   Time Start: ________
NAME __               ___                             Docket # _________ Time Finish: ________
Performance Rating: SAT ____ UNSAT ____                                       Performance Time ___
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 8
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 8
 
PAGE 4 0F 8 Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 2 is in Mode 3 following a reactor trip.
INITIATING CUES:
The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum).
This JPM is TIME CRITICAL; time begins when you acknowledge the task.
EXAMINER NOTE: Provide applicant with a copy of the procedure.
PAGE 4 OF 8
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT START TIME _______
Examiner NOTE:                                                                 CRITICAL STEP Critical Time Start: Record Time that applicant acknowledges the task
_________.                                                                     ___ SAT CAUTION       High air flow rates will exist when vacuum breakers are         ___ UNSAT first opened. Stay clear of pipe end.
STEP 1: 1. Break condenser vacuum by opening the following valves:
2CM-368 (2A Main Cond Shell Vacuum Bkr) (TB2-600,2F-2G, 26) (Ladder needed) 2CM-369 (2B Main Cond Shell Vacuum Bkr) (TB2-600, 2F, 24-25) (Ladder needed) 2CM-370 (2C Main Cond Shell Vacuum Bkr) (TB2-609, 2F-
: 22) (Ladder needed).
STANDARD:
Applicant will describe opening the valves: 2CM-368, 2CM-369, 2CM-370 This step is critical in order to open correct valves for breaking vacuum.
Examiner Note: The critical end time is when the applicant describes opening the first valve. Due to the height of the valves, no fall protection will be required.
Examiner Cue:       When applicant describes engaging lever and rotating handwheel counter clockwise to open the following valve then: A large volume of airflow is heard.
Critical end time________
COMMENTS:
PAGE 5 0F 8
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT STEP 2 2. Secure steam to CSAEs as follows:                             CRITICAL STEP
: a. Close the following valves:
___ SAT 2SA-22 (Main Steam To CSAE) (TB2-614, 2M-32) 2SA-27 (Aux Steam To CSAE) (TB-614, 2L-2M, 27). ___UNSAT STANDARD:
Applicant will describe closing 2SA-22 and 2SA-27 This step is critical, because if it is not performed, the CSAEs will continue to pull vacuum.
Examiner Cue: As applicant properly describes closing the valves give cue as appropriate, Valve turns until resistance is felt.
COMMENTS:
STEP 3       b. WHEN time and manpower permit, THEN complete the shutdown of the CSAEs. REFER TO OP/2/B/6300/006 (Main Vacuum).                                       ___ SAT STANDARD:
___ UNSAT Applicant will read the step Examiner Cue: The Control Room Supervisor has instructed another operator to complete the shutdown of the CSAEs.
COMMENTS:
PAGE 6 0F 8
 
Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 4 3. WHEN requested by Control Room Supervisor, THEN verify condenser vacuum broken as follows:
___ SAT
: a. Inspect each vacuum breaker for absence of air flow into condenser.                                               ___ UNSAT
: b. Notify Control Room Supervisor of results.
STANDARD:
Applicant will inspect each vacuum breaker for the absence of air flow into the condenser and will report to the Control Room Supervisor.
Examiner Cue: After each inspection, No air flow into condenser.
COMMENTS:
STOP TIME ________
PAGE 7 0F 8
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JKM I DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 2 is in Mode 3 following a reactor trip.
INITIATING CUES:
The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum).
This JPM is TIME CRITICAL; time begins when you acknowledge the task.
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam System JPM J In-Plant PAGE 1 OF 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Shifting Main Transformer Auxiliaries Alternate Path:     No Facility JPM #:     EP-016 Safety Function:     6         Title:     Electrical K/A         062 A2.01     Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation.
Rating(s):   3.4 / 3.9     CFR:       41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator             In-Plant           X             Perform                     Simulate     X


==References:==
==References:==
OP/1/A/6350/005 (Alternate AC Power Sources) rev. 076, Enclosure 4.24   Task Standard: The 1A Main Transformer Auxiliaries are transferred to an energized source. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 3 OF 9  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC 3. Enter the password. 4. -up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 9 Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam PAGE 4 OF 9  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is at 100% power. The incoming feeder breaker to 1LXC tripped due to a load center fault. As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized. INITIATING CUES: The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources). EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/005, Enclosure 4.24.
OP/1/A/6350/005 (Alternate AC Power Sources) rev. 076, Enclosure 4.24 Task Standard:       The 1A Main Transformer Auxiliaries are transferred to an energized source.
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 9  START TIME: _______ NOTE:   1. Shifting of power supplies shall be performed without delay. 2. All breakers and alarm lights are located inside the cabinet at the Main Transformer. 3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer. 4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies. Examiner Note: Applicant should state that they would acquire the required PPE. STEP 1:   3.1 IF shifting Bank A power supplies, perform the following: 3.1.1 Verify voltage indicated on 1LXD per one of the following:   Transformer 1TXD Supply Voltage meter with 1LXD-4B closed OR   Transformer 1TXS Supply Voltage meter with 1LXD-8B closed STANDARD:   Applicant verifies voltage indicated on transformer 1TXD with 1LXD-4B closed or 1TXS with 1LXD-8B closed. Examiner Cue: 600 volts is indicated. COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 9    STEP 2   3.1.2 IF this is an unexpected loss of power, verify the following at Transformer 1A:   "NO VOLTAGE BANK A" alarm light illuminated.   "NO VOLTAGE BANK B" alarm light dark. STANDARD: Applicant   Examiner Cue:  NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK. COMMENTS:       ___ SAT    ___UNSAT    STEP 3  3.1.3 Open "NORMAL FEEDER 1LXC" breaker. STANDARD: Applicant describes opening the NORMAL FEEDER 1LXC breaker by placing it in the OFF (down) position. Examiner Cue: NORMAL FEEDER 1LXC is in the OFF position. This step is critical to allow the lockout bar to be slid in the following step. COMMENTS:     CRITICAL STEP  ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 9    STEP 4   3.1.4 Slide lockout bar to the left. STANDARD: Applicant describes sliding the lockout bar to the left. Examiner Cue: Lockout bar is to the left. This step is critical to allow closing of the EMERG FEEDER 1LXD breaker in the following step. COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 5    3.1.5 Close "EMERG FEEDER 1LXD" breaker. STANDARD: Applicant describes closing the EMERG FEEDER 1LXD breaker by placing the breaker to the ON (up) position. Examiner Cue: EMERG FEEDER 1LXD breaker is in the ON position. This step is critical to energize the transformer auxiliaries for the 1A Main Transformer COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 9    STEP 6   3.1.6 Acknowledge any alarms present. STANDARD: Applicant describes acknowledging any alarms. Examiner Cue: Alarms have been acknowledged. COMMENTS:       ___ SAT  ___ UNSAT    STEP 7  3.1.7 Complete and file Enclosure 4.29 (Unit 1 Main Transformers Cooler Groups Status) to record status. STANDARD: Applicant reads the step. Examiner Cue: Another operator will complete and file enclosure 4.29 NOTE: At this point, Bank A is supplied from 1LXD. Subsequent steps are to return Bank A to 1LXC. COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT      STOP TIME ________
Validation Time: 15 minutes                             Time Critical:         Yes         No     X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM J   DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   Unit 1 is at 100% power. The incoming feeder breaker to 1LXC tripped due to a load center fault. As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized. INITIATING CUES: The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).
===========================================================================
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 1 OF 10          System JPM K In-Plant Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 2 OF 10  EVALUATION SHEET Task: Place the 2A Hydrogen Analyzer in Service Alternate Path: No   Facility JPM #: VX-024 Safety Function: 5 Title: Hydrogen Recombiner and Purge Control System (HRPS) K/A 028 A1.01 Ability to predict and/or monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including): Hydrogen concentration Rating(s): 3.4 / 3.8 CFR: 41.5 / 45.5   Preferred Evaluation Location: Preferred Evaluation Method: Simulator In-Plant X Perform Simulate X
Applicant:                                                                     Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                           Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________                 _____________________________/________
NAME                                       SIGNATURE                 DATE
===========================================================================
COMMENTS PAGE 2 OF 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 9
 
PAGE 4 0F 9 Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is at 100% power.
The incoming feeder breaker to 1LXC tripped due to a load center fault.
As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized.
INITIATING CUES:
The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).
EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/005, Enclosure 4.24.
PAGE 4 OF 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT START TIME: _______
NOTE:   1. Shifting of power supplies shall be performed without delay.
: 2. All breakers and alarm lights are located inside the cabinet at   ___ SAT the Main Transformer.
___ UNSAT
: 3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer.
: 4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies.
Examiner Note: Applicant should state that they would acquire the required PPE.
STEP 1: 3.1 IF shifting Bank A power supplies, perform the following:
3.1.1 Verify voltage indicated on 1LXD per one of the following:
Transformer 1TXD Supply Voltage meter with 1LXD-4B closed OR Transformer 1TXS Supply Voltage meter with 1LXD-8B closed STANDARD:
Applicant verifies voltage indicated on transformer 1TXD with 1LXD-4B closed or 1TXS with 1LXD-8B closed.
Examiner Cue: 600 volts is indicated.
COMMENTS:
PAGE 5 0F 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 2 3.1.2 IF this is an unexpected loss of power, verify the following at Transformer 1A:                                         ___ SAT "NO VOLTAGE BANK A" alarm light illuminated.             ___UNSAT "NO VOLTAGE BANK B" alarm light dark.
STANDARD:
Applicant verifies NO VOLTAGE BANK A alarm light is illuminated and the NO VOLTAGE BANK B alarm light is dark.
Examiner Cue: NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK.
COMMENTS:
STEP 3 3.1.3 Open "NORMAL FEEDER 1LXC" breaker.                             CRITICAL STEP STANDARD:
___ SAT Applicant describes opening the NORMAL FEEDER 1LXC breaker by placing it in the OFF (down) position.                               ___ UNSAT Examiner Cue: NORMAL FEEDER 1LXC is in the OFF position.
This step is critical to allow the lockout bar to be slid in the following step.
COMMENTS:
PAGE 6 0F 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 4 3.1.4 Slide lockout bar to the left.                               CRITICAL STEP STANDARD:
___ SAT Applicant describes sliding the lockout bar to the left.
___ UNSAT Examiner Cue: Lockout bar is to the left.
This step is critical to allow closing of the EMERG FEEDER 1LXD breaker in the following step.
COMMENTS:
STEP 5   3.1.5 Close "EMERG FEEDER 1LXD" breaker.                       CRITICAL STEP STANDARD:
___ SAT Applicant describes closing the EMERG FEEDER 1LXD breaker by placing the breaker to the ON (up) position.                         ___ UNSAT Examiner Cue: EMERG FEEDER 1LXD breaker is in the ON position.
This step is critical to energize the transformer auxiliaries for the 1A Main Transformer COMMENTS:
PAGE 7 0F 9
 
Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT STEP 6 3.1.6 Acknowledge any alarms present.
___ SAT STANDARD:
___ UNSAT Applicant describes acknowledging any alarms.
Examiner Cue: Alarms have been acknowledged.
COMMENTS:
STEP 7 3.1.7 Complete and file Enclosure 4.29 (Unit 1 Main Transformers Cooler Groups Status) to record status.     ___ SAT STANDARD:                                                               ___ UNSAT Applicant reads the step.
Examiner Cue: Another operator will complete and file enclosure 4.29 NOTE: At this point, Bank A is supplied from 1LXD. Subsequent steps are to return Bank A to 1LXC.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 8 0F 9
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM J DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 is at 100% power.
The incoming feeder breaker to 1LXC tripped due to a load center fault.
As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized.
INITIATING CUES:
The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam System JPM K In-Plant PAGE 1 OF 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam EVALUATION SHEET Task:               Place the 2A Hydrogen Analyzer in Service Alternate Path:     No Facility JPM #:     VX-024 Safety Function:     5       Title:       Hydrogen Recombiner and Purge Control System (HRPS)
K/A         028 A1.01     Ability to predict and/or monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including): Hydrogen concentration Rating(s):   3.4 / 3.8     CFR:       41.5 / 45.5 Preferred Evaluation Location:                         Preferred Evaluation Method:
Simulator             In-Plant           X           Perform                   Simulate       X


==References:==
==References:==
EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant), rev. 025 OP/2/A/6450/010 (Containment Hydrogen Control Systems Enclosure 4.9), rev. 026   Task Standard: Hydrogen Analyzer Train 2A in Service monitoring upper containment. Validation Time: 15 minutes   Time Critical:   Yes No X =========================================================================== Applicant:   Time Start:   __________ NAME___________________________ Docket #_______________ Time Finish: __________   Performance Rating:     SAT ____ UNSAT ____ Performance Time _____    Examiner: _____________________________ _____________________________/________ NAME SIGNATURE DATE =========================================================================== COMMENTS Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 3 OF 10  SIMULATOR OPERATOR INSTRUCTIONS: 1. ENSURE NRC Examination Security has been established. 2. Reset to IC #168 3. Enter the password. 4. the INITIAL CONDITION RESET pop-up window. 5. Ensure simulator setup per table below. 6. Place simulator in RUN and acknowledge any alarms. 7. 8. Place simulator in FREEZE until Examiner cue is given. Instructor Action Final Delay Ramp Delete In Event PAGE 4 0F 10 Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam PAGE 4 OF 10  READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   A large break LOCA has occurred on Unit 2. The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant). Containment Hydrogen Analyzer 2B is tagged for maintenance. INITIATING CUES:   The Control Room Supervisor directs you to place Containment Hydrogen OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived. EXAMINER NOTE:   After reading cue, provide examinee with a copy of OP/2/6450/010, Enclosure 4.9 with the Initial Conditions signed off.
EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant), rev. 025 OP/2/A/6450/010 (Containment Hydrogen Control Systems Enclosure 4.9), rev. 026 Task Standard:       Hydrogen Analyzer Train 2A in Service monitoring upper containment.
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 5 0F 10  START TIME: _______   STEP 1:   3.1 Place Hydrogen Analyzer Train A OR Train B in service. 3.1.1 IF aligning Hydrogen Analyzer Train A, proceed as follows: 3.1.1.1 Obtain Hydrogen Analyzer Control Panel Train A (2ELCP0251) key (Key #225) from WCC. STANDARD: Applicant determines from the initiating cue that A train needs to be aligned and obtains the key #225 EXAMINER NOTE:   Key not required to be obtained to complete this JPM task. Once key is identified give cue. EXAMINER CUE:     COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 6 0F 10  NOTE: Steps 3.1.1.2 - 3.1.1.5 will be performed at Hydrogen Analyzer Control Panel Train 2A HACP-2A (2ELCP0251) (AB-579, DD-61). STEP 2                   3.1.1.2 Select the desired sample location by positioning the "HYDROGEN ANALYZER SAMPLE VALVES PORTS" switch:   Position "1" (for sampling Upper Containment) Position "2" (for sampling operating level) Position "3" (for sampling Steam Generator 1B cavity) Position "ALL" for sampling ALL 3 locations) STANDARD:   Applicant describes placing the HYDROGEN ANALYZER SAMPLE   EXAMINER CUE:   This step is critical to sample Upper Containment. COMMENTS:     CRITICAL STEP    ___ SAT    ___UNSAT    STEP 3                   3.1.1.3 Verify the "POS 1: H2 ANALYZER POS 2: POST ACCIDENT SAMPLE PANEL" switch is in "POS. 1". STANDARD: Applicant   EXAMINER CUE:   COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 7 0F 10    STEP 4                   3.1.1.4 Insert key in "HYDROGEN ANALYZER CONT ISOLATION VALVES" key switch and turn to "OPEN" position. STANDARD: Applicant position. This step is critical to open the containment isolation valves in order to be able to sample upper containment. EXAMINER CUE:   COMMENTS:    CRITICAL STEP    ___ SAT  ___ UNSAT    STEP 5                   3.1.1.5 Verify the following indicating lights are lit:   "H2 SAMPLE CONT. ISOLATION VALVES OPEN" Sample location(s) selected in Step 3.1.1.2. STANDARD: Applicant describes verifying the red OPEN light LIT for H2 Sample Containment Isolation Valves. EXAMINER CUE: Red OPEN light is lit COMMENTS:       ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 8 0F 10  NOTE: Steps 3.1.1.6 - 3.1.1.7 will be performed inside A Train Hydrogen Analyzer Control Unit (PAMS) 2MIMT5320A (AB-579, DD-61). STEP 6                     3.1.1.6 Verify the "STANDBY/OFF" switch is in the "STANDBY" position. STANDARD: Applicant   EXAMINER CUE:  STANDBY position COMMENTS:       ___ SAT  ___ UNSAT    STEP 7                   3.1.1.7 Place the "ON/OFF" switch in the "ON" position. STANDARD: Applicant . This step is critical to turn the analyzer on. EXAMINER CUE: Switch is in the ON position light is lit COMMENTS:     CRITICAL STEP    ___ SAT  ___ UNSAT Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT PAGE 9 0F 10  STEP 8                   3.1.1.8 Monitor H2 concentration at either of the following locations:   "Hydrogen Analyzer Control Unit "2MIMT5320A" (AB-579, DD-61)   "CONTAINMENT TRN A H2 ANAL" meter (2MIP5320) located on 2MC7. STANDARD: Applicant describes calling the control room to inform them that the hydrogen analyzers are in service and can be read on the local unit or on 2MC-7. EXAMINER CUE: Hydrogen concentration will be monitored on 2MC-7 COMMENTS:   END OF TASK     ___ SAT  ___ UNSAT      STOP TIME ________
Validation Time: 15 minutes                           Time Critical:       Yes         No       X
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM K     READ TO APPLICANT DIRECTION TO APPLICANT:   I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:   A large break LOCA has occurred on Unit 2. The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant). Containment Hydrogen Analyzer 2B is tagged for maintenance. INITIATING CUES:   The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.}}
===========================================================================
Applicant:                                                                 Time Start: __________
NAME___________________________ Docket #_______________ Time Finish: __________
Performance Rating:                                                         Performance Time _____
SAT ____ UNSAT ____
Examiner: _____________________________               _____________________________/________
NAME                                     SIGNATURE                   DATE
===========================================================================
COMMENTS PAGE 2 OF 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:
: 1. ENSURE NRC Examination Security has been established.
: 2. Reset to IC #168
: 3. Enter the password.
: 4. Select Yes on the INITIAL CONDITION RESET pop-up window.
: 5. Ensure simulator setup per table below.
: 6. Place simulator in RUN and acknowledge any alarms.
: 7. ENSURE Extra Operator is present in the simulator.
: 8. Place simulator in FREEZE until Examiner cue is given.
Instructor Action               Final   Delay Ramp Delete In Event
 
PAGE 3 OF 10
 
PAGE 4 0F 10 Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A large break LOCA has occurred on Unit 2.
The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant).
Containment Hydrogen Analyzer 2B is tagged for maintenance.
INITIATING CUES:
The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in service to Position 1 for sampling Upper Containment per OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.
EXAMINER NOTE: After reading cue, provide examinee with a copy of OP/2/6450/010, Enclosure 4.9 with the Initial Conditions signed off.
PAGE 4 OF 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD                               SAT/UNSAT START TIME: _______
STEP 1: 3.1 Place Hydrogen Analyzer Train A OR Train B in service.
___ SAT 3.1.1 IF aligning Hydrogen Analyzer Train A, proceed as follows:                                             ___ UNSAT 3.1.1.1 Obtain Hydrogen Analyzer Control Panel Train A (2ELCP0251) key (Key #225) from WCC.
STANDARD:
Applicant determines from the initiating cue that A train needs to be aligned and obtains the key #225 EXAMINER NOTE: Key not required to be obtained to complete this JPM task. Once key is identified give cue.
EXAMINER CUE: Key 225 has been obtained.
COMMENTS:
PAGE 5 0F 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD                                     SAT/UNSAT NOTE: Steps 3.1.1.2 - 3.1.1.5 will be performed at Hydrogen Analyzer Control Panel Train 2A HACP-2A (2ELCP0251) (AB-579, DD-61).               CRITICAL STEP STEP 2               3.1.1.2 Select the desired sample location by positioning the "HYDROGEN ANALYZER                 ___ SAT SAMPLE VALVES PORTS" switch:
___UNSAT Position "1" (for sampling Upper Containment)
Position "2" (for sampling operating level)
Position "3" (for sampling Steam Generator 1B cavity)
Position "ALL" for sampling ALL 3 locations)
STANDARD:
Applicant describes placing the HYDROGEN ANALYZER SAMPLE VALVES PORTS switch in position 1.
EXAMINER CUE: Switch is in position 1.
This step is critical to sample Upper Containment.
COMMENTS:
STEP 3               3.1.1.3 Verify the "POS 1: H2 ANALYZER POS 2:
POST ACCIDENT SAMPLE PANEL" switch is             ___ SAT in "POS. 1".
STANDARD:                                                                       ___ UNSAT Applicant describes verifying the switch is in POS 1 EXAMINER CUE: Switch is in position 1.
COMMENTS:
PAGE 6 0F 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD                                   SAT/UNSAT CRITICAL STEP 4               3.1.1.4 Insert key in "HYDROGEN ANALYZER CONT             STEP ISOLATION VALVES" key switch and turn to "OPEN" position.                               ___ SAT STANDARD:
___ UNSAT Applicant describes inserting the key and turning the key to the OPEN position.
This step is critical to open the containment isolation valves in order to be able to sample upper containment.
EXAMINER CUE: Key is in the OPEN position.
COMMENTS:
STEP 5               3.1.1.5 Verify the following indicating lights are lit:
___ SAT "H2 SAMPLE CONT. ISOLATION VALVES OPEN"                             ___ UNSAT Sample location(s) selected in Step 3.1.1.2.
STANDARD:
Applicant describes verifying the red OPEN light LIT for H2 Sample Containment Isolation Valves.
EXAMINER CUE: Red OPEN light is lit.
COMMENTS:
PAGE 7 0F 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD                             SAT/UNSAT NOTE: Steps 3.1.1.6 - 3.1.1.7 will be performed inside A Train Hydrogen Analyzer Control Unit (PAMS) 2MIMT5320A (AB-579, DD-61).
___ SAT STEP 6                 3.1.1.6 Verify the "STANDBY/OFF" switch is in the "STANDBY" position.                       ___ UNSAT STANDARD:
Applicant describes verifying the STANDBY/OFF switch is in the STANDBY position.
EXAMINER CUE: Switch is in the STANDBY position.
COMMENTS:
STEP 7               3.1.1.7 Place the "ON/OFF" switch in the "ON"       CRITICAL position.                                   STEP STANDARD:                                                               ___ SAT Applicant describes moving the ON/OFF switch up to the ON position. ___ UNSAT This step is critical to turn the analyzer on.
EXAMINER CUE: Switch is in the ON position and the green ON light is lit.
COMMENTS:
PAGE 8 0F 10
 
Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD                                 SAT/UNSAT STEP 8             3.1.1.8 Monitor H2 concentration at either of the following locations:                         ___ SAT "Hydrogen Analyzer Control Unit       ___ UNSAT "2MIMT5320A" (AB-579, DD-61)
                                "CONTAINMENT TRN A H2 ANAL" meter (2MIP5320) located on 2MC7.
STANDARD:
Applicant describes calling the control room to inform them that the hydrogen analyzers are in service and can be read on the local unit or on 2MC-7.
EXAMINER CUE: Hydrogen concentration will be monitored on 2MC-7.
COMMENTS:
END OF TASK STOP TIME ________
PAGE 9 0F 10
 
APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM K READ TO APPLICANT DIRECTION TO APPLICANT:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
A large break LOCA has occurred on Unit 2.
The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant).
Containment Hydrogen Analyzer 2B is tagged for maintenance.
INITIATING CUES:
The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in service to Position 1 for sampling Upper Containment per OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.}}

Revision as of 01:57, 4 November 2019

301 Draft Simulator in Plant JPMs
ML14240A675
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/27/2014
From:
NRC/RGN-II/DRS/OLB
To:
Duke Energy Corp
Shared Package
ML14290A363 List:
References
50-413/14-301, 50-414/14-301
Download: ML14240A675 (135)


Text

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam System JPM A PAGE 1 OF 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam EVALUATION SHEET Task: Respond to an inadvertent dilution while shutdown per AP/1/A/5500/013 (Boron Dilution), Case II (Boron Dilution While Shutdown)

Alternate Path: Yes Facility JPM #: New Safety Function: 1 Title: Chemical and Volume Control System K/A 004 A2.06 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS: and based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Inadvertent boration/dilution Rating(s): 4.2 / 4.3 CFR: 41.5 / 43/5 / 45/3 / 45/5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

AP/1/A/5500/013 (Boron Dilution) rev. 24 Task Standard: Starts the 1A NI (Safety Injection) pump.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #168.
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event RACK LOA-NI004 (RACKOUT NI PMP 1B)

OUT RACK LOA-NV067 (RACKOUT NV PMP 1B)

OUT RACK LOA-NV066 (RACKOUT NV PMP 1A) 2 OUT

Ensure EVENT 2 = x10i167c (NV-353 & 364 MIXED BED DEMIN 1A ISOL CLOSE

pushbutton)

PAGE 3 OF 14

PAGE 4 0F 14 Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup.

INITIATING CUES:

A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).

EXAMINER NOTE: After reading cue, provide the applicant with a copy of AP/1/A/5500/013 PAGE 4 OF 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 1. Verify boron dilution event - IN PROGRESS.

___ SAT STANDARD:

___ UNSAT Applicant determines a boron dilution event is in progress per the initiating cue.

COMMENTS:

STEP 2 Verify Reactor Trip: ___ SAT All rod bottom lights - LIT ___UNSAT All reactor trip and bypass breakers - OPEN.

STANDARD:

Applicant verifies the reactor is tripped by verifying all rod bottom lights are lit on the DRPI monitors and that the green OPEN lights are lit for RX TRIP BKR 1A and RX TRIP BKR 1B on 1MC-1.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 3. Verify core alterations - IN PROGRESS.

___ SAT STANDARD:

___ UNSAT Applicant verifies that core alterations are NOT because the unit is in MODE 5 and proceeds to the RNO.

COMMENTS:

STEP 4 3. RNO GO TO Step 5. ___ SAT STANDARD: ___ UNSAT Applicant proceeds to step 5 COMMENTS:

STEP 5 5. Evacuate personnel from reactor building using the CRITICAL following: STEP Containment evacuation alarm ___ SAT Plant page.

___ UNSAT STANDARD:

Applicant depresses the red ON pushbutton for the UNIT 1 CONT EVAC ALARM on 1MC-1 and makes a plant page.

This step is critical to perform either action to protect the health and safety of the people working inside containment.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 6. Stop any dilutions in progress as follows:

___ SAT

a. Place "NC MAKEUP CONTROL" switch to "STOP".

___ UNSAT STANDARD:

Applicant places the NC MAKEUP CONTROL to the STOP position 1MC-10.

COMMENTS:

STEP 7 6. b. Verify Unit 1 RMWST aligned for VCT makeup.

___ SAT STANDARD:

___ UNSAT Applicant verifies the Unit 1 RMWST is aligned per the initial conditions.

COMMENTS:

STEP 8 6. c. Place both reactor makeup water pumps to "OFF".

___ SAT STANDARD:

___ UNSAT Applicant places RX M/U WTR PUMP 1A and RX M/U WTR PUMP 1B to the OFF position on 1MC-10.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 9 6. d. Isolate the NV demineralizers as follows: CRITICAL STEP

1) Place 1NV-153A (Letdn Hx Otlt 3-Way Valve) in the "VCT" position. ___ SAT STANDARD: ___ UNSAT Applicant places 1NV-153A in the VCT position on 1MC-10.

This step is critical to prevent un-saturating the Mixed Bed Demineralizers.

COMMENTS:

STEP 10 6. d. 2) Ensure the following valves - CLOSED:

___ SAT 1NV-353 & 364 (Mixed Bed Demin 1A Isol) 1NV-368 & 379 (Mixed Bed Demin 1B Isol). ___ UNSAT STANDARD:

Applicant depresses the green CLOSE pushbutton for NV-353 & 364 MIXED BED DEMIN 1A ISOL and verifies the green CLSD light is lit for NV-368 & 379 MIXED BED DEMIN 1A ISOL on 1MC-10.

COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE Unit shutdown alignments may have established alternate boration flowpaths.

___ SAT STEP 11 7. Ensure proper BDMS operation as follows:

___ UNSAT

a. Verify at least one of the following alarm(s) - LIT:

1AD-2, E/2 "TRAIN A SHUTDOWN MARGIN ALARM" OR 1AD-2, F/2 "TRAIN B SHUTDOWN MARGIN ALARM".

STANDARD:

Applicant verifies at least one of the alarms is lit.

COMMENTS:

STEP 12 7. b. Ensure the following valves - OPEN:

___ SAT 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). ___ UNSAT STANDARD:

Applicant verifies the red OPEN lights are lit for 1NV-252A and 1NV-253B on 1MC-10.

COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 13 7. c. Ensure the following valves - CLOSED:

___ SAT 1NV-188A (VCT Otlt Isol) 1NV-189B (VCT Otlt Isol). ___ UNSAT STANDARD:

Applicant verifies that the green CLSD lights are lit for 1NV-188A and 1NV-189B on 1MC-10.

COMMENTS:

STEP 14 7. d. Verify NV pump - ON.

___ SAT STANDARD:

___ UNSAT Applicant determines that no NV pumps are on and proceeds to the RNO.

COMMENTS:

STEP 15 7. d. RNO d. Perform the following:

___ SAT

1) IF NV pump 1A AND 1B boration flowpath NOT available, THEN GO TO Enclosure 1 (NI ___ UNSAT or ND Pump Boron Injection Alignment).

STANDARD:

Applicant proceeds to Enclosure 1.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT Enclosure 1 STEP 16 1. Align NC system boration flowpath as follows: ___ SAT

a. IF establishing NC system boration, THEN GO TO Step 2. ___ UNSAT STANDARD:

Applicant proceeds to step 2.

COMMENTS:

STEP 17 2. Initiate NC system boration flow as required using at least one of the following boration flowpaths. ___ SAT IF NI Pump 1A aligned to provide boron injection ___ UNSAT flowpath, THEN perform the following to establish NI Pump 1A injection flow:

a. Ensure 1NI-118A (NI Pump 1A C-Leg Inj Isol) - OPEN.

STANDARD:

Applicant verifies that the red OPEN light is lit for 1NI-118A on 1MC-11 COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 18 b. START NI Pump 1A. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the red ON pushbutton for NI PMP 1A.

___ UNSAT This step is critical to initiate NC system boration flow.

NOTE TO EXAMINER: No other flow paths will be aligned.

COMMENTS:

STEP 19 3. WHEN NC system boration no longer required, THEN perform Step 5. ___ SAT STANDARD: ___ UNSAT Applicant acknowledges step.

COMMENTS:

STEP 20 4. GO TO Case II (Boron Dilution While Shutdown), Step 9.

___ SAT STANDARD:

___ UNSAT Applicant proceeds to Case II, Step 9.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM A May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE A time delay of up to 3-5 minutes can be expected before indication of negative reactivity insertion is obtained on excore instrumentation. ___ SAT STEP 21 9. Verify neutron flux level - STABLE OR DECREASING. ___ UNSAT STANDARD:

Applicant reads the step.

Examiner Cue: Another operator will complete the procedure.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM A READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 5 Unit 1 RMWST is aligned for VCT makeup.

INITIATING CUES:

A boron dilution event is in progress, you have been instructed to perform AP/1/A/5500013 (Boron Dilution), Case II (Boron Dilution While Shutdown).

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam JPM B PAGE 1 OF 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam EVALUATION SHEET Task: Transfer the Emergency Core Coolant System to the Cold Leg Recirculation Alternate Path: Yes Facility JPM #: NI-088 Safety Function: 2 Title: Emergency Core Cooling System (ECCS)

K/A 006 A4.07 Ability to manually operate and/or monitor in the control room: ECCS pumps and valves.

Rating(s): 4.4 / 4.4 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation)

Task Standard: EP/1/A/5000/ES-1.3 Transfer to Cold Leg Recirculation) step 6 is performed.

The FWST is isolated with the NV (Chemical Volume and Control System) and NI (Safety Injection System) pumps aligned and injecting from the 1A ND (Residual Heat Removal System) pump. The 1B ND (Residual Heat Removal System) pump is shutdown.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #169
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event VLV-NI037F (NI184B CNMT SUMP LINE 1B 0

ISOL (STEM) FAIL TO POSITION)

MAL-NC013A (NC COLD LEG A LEAK) 27.5

PAGE 3 OF 14

PAGE 4 0F 14 Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A LOCA has occurred on Unit 1.

INITIATING CUES:

1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

EXAMINER NOTE: After reading the cue, provide the applicant with a copy of EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) complete through step 8 with step 6 flagged.

PAGE 4 OF 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 6. WHEN FWST level decreases to 5% (1AD-9, E/8 "FWST LO-LO LEVEL"), THEN align NV and NI Systems for recirc ___ SAT as follows:

___ UNSAT

a. Ensure Enclosure 1 (Foldout Page) is monitored.

STANDARD:

Applicant reads the step.

Examiner Cue: The OATC will monitor Enclosure 1 COMMENTS:

NOTE CSF should not be implemented until directed by this procedure.

STEP 2 b. Verify at least one of the following annunciators - LIT: ___ SAT 1AD-20, B/2 "CONT. SUMP LEVEL >2.5 ft" ___UNSAT OR 1AD-21, B/2 "CONT. SUMP LEVEL >2.5 ft".

STANDARD:

Applicant determines that one or both annunciators are lit.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 c. Verify both ND pumps - ON.

___ SAT STANDARD:

___ UNSAT Applicant determines that only 1 ND pump is running and transitions to the RNO COMMENTS:

STEP 4 6.c. RNO c. Perform the following: ___ SAT

1) IF 1NI-185A (ND Pump 1A Cont Sump Suct) is ___ UNSAT open, THEN start ND pump 1A.

STANDARD:

Applicant determines that ND PUMP 1A is on by verifying the red ON light is lit on 1MC-11.

COMMENTS:

STEP 5 2) IF 1NI-184B (ND Pump 1B Cont Sump Suct) is open, THEN start ND pump 1B. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1NI-184B is not open by verifying the green CLSD light is lit on 1MC-11 and determines that the step is not applicable.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 3) IF any ND pump running with suction aligned to sump, THEN GO TO Step 6.d. ___ SAT STANDARD: ___ UNSAT Applicant determines that ND Pump 1A is running with suction aligned to the sump and proceeds to step 6.d.

COMMENTS:

STEP 7 6. d. Ensure the following valves - CLOSED: CRITICAL STEP 1ND-32A (ND Train 1A Hot Leg Inj Isol) 1ND-65B (ND Train 1B Hot Leg Inj Isol). ___ SAT STANDARD: ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1ND-32A and 1ND-65B on 1MC-11.

This step is critical to prevent pump run out should only one ND pump be running.

Examiner NOTE: Only one of the valves need to be closed to satisfy the critical step since the valves are in series.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 8 6. e. Isolate NI Pump Miniflow as follows:

___ SAT

1) Verify NC pressure - LESS THAN 1620 PSIG.

___ UNSAT STANDARD:

Applicant determines that NC (Reactor Coolant System) pressure is less than 1620 psig.

COMMENTS:

STEP 9 2) Ensure the following valves - CLOSED:

___ SAT 1NI-115A (NI Pump 1A Miniflow Isol) 1NI-144A (NI Pump 1B Miniflow Isol). ___ UNSAT STANDARD:

Applicant determines that the green CLSD lights are lit for 1NI-115A and 1NI-144A on 1MC-11.

COMMENTS:

STEP 10 3) Ensure "PWR DISCON FOR 1NI-147B" switch in "ENABLE". ___ SAT STANDARD: ___ UNSAT Applicant determines that the PWR DISCON FOR 1NI-147B is in ENABLE on 1MC-11.

COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 11 4) Ensure 1NI-147B (NI Miniflow Hdr To FWST Isol) -

CLOSED. ___ SAT STANDARD: ___ UNSAT Applicant determines that the green CLSD light is lit for 1NI-147B on 1MC-11.

COMMENTS:

STEP 12 6. f. Verify at least one of the following NV pumps miniflow valves - CLOSED: ___ SAT 1NV-203A (NV Pumps A&B Recirc Isol) ___ UNSAT OR 1NV-202B (NV Pmps A&B Recirc Isol).

STANDARD:

Applicant determines that the green CLSD lights are lit for 1NV-203A and 1NV-202B on 1MC-10.

COMMENTS:

STEP 13 g. Ensure 1NI-334B (NI Pump Suct X-Over From ND) - OPEN.

___ SAT STANDARD:

___ UNSAT Applicant determines the red OPEN light is lit for 1NI-334B on 1MC-11.

COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 14 h. OPEN the following valves: CRITICAL STEP 1NI-332A (NI Pump Suct X-Over From ND) 1NI-333B (NI Pump Suct From ND). ___ SAT STANDARD: ___ UNSAT Applicant depresses the red OPEN pushbuttons for 1NI-332A and 1NI-333B on 1MC-11.

This step is critical align the suction flow path for the NI (Safety Injection System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump.

Examiner NOTE: Only one of the valves needs to be open to satisfy the critical step because the valves are in parallel.

COMMENTS:

STEP 15 i. Align ND discharge to suction of NI and NV pumps as CRITICAL follows: STEP

1) OPEN 1ND-28A (ND Supply To NV & 1A NI Pmps). ___ SAT STANDARD: ___ UNSAT Applicant depresses the red OPEN pushbutton for 1ND-28A on 1MC-11 This step is critical align the suction flow path for the NV (Chemical Volume and Control System) pumps to the discharge of the 1A ND (Residual Heat Removal System) pump.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 16 2) OPEN 1NI-136B (ND Supply To NI Pump 1B).

___ SAT STANDARD:

___ UNSAT Applicant depresses the red OPEN pushbutton for 1NI-136B on 1MC-11, determines that the valve will not open and proceeds to the next step.

Examiner NOTE: 1NI-136B will not open due to an interlock with 1NI-184B COMMENTS:

STEP 17 j. Verify at least one ND train aligned to provide suction to NV and NI as follows: ___ SAT A Train: ___ UNSAT 1A ND pump running 1ND-28A (ND Supply To NV & 1A NI Pmps) -

OPEN.

STANDARD:

Applicant determines that the 1A ND pump is running and 1ND-28A is open and proceeds to the next step.

COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 18 k. Isolate FWST from NV and NI pumps as follows: CRITICAL STEP

1) Place "PWR DISCON FOR 1NI-100B" switch in "ENABLE". ___ SAT STANDARD: ___ UNSAT Applicant places the PWR DISCON FOR 1NI-100B switch to ENABLE on 1MC-11.

This step is critical to allow operation of 1N-100B COMMENTS:

STEP 19 2) CLOSE 1NI-100B (NI Pmps Suct From FWST). CRITICAL STEP STANDARD:

___ SAT Applicant depresses the green CLOSE pushbutton for 1NI-100B on 1MC-11. ___ UNSAT This step is critical to isolate the NI (Safety Injection System) pumps suction from the FWST.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 20 3) CLOSE the following valves: CRITICAL STEP 1NV-252A (NV Pumps Suct From FWST) 1NV-253B (NV Pumps Suct From FWST). ___ SAT STANDARD: ___ UNSAT Applicant depresses the green CLOSE pushbuttons for 1NV-252A and 1NV-253B on 1MC-10.

This step is critical to isolate the NV (Chemical Volume and Control System) pumps suction from the FWST.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK)

May 2014 NRC Initial License Exam JPM B READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A LOCA has occurred on Unit 1.

INITIATING CUES:

1AD-9, E/8 FWST LO-LO LEVEL annunciator is lit and the Control Room Supervisor instructs you, as the BOP, to transfer to Cold Leg Recirculation using EP/1/A/5000/ES-1.3 (Transfer to Cold Leg Recirculation) step 6.

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam System JPM C PAGE 1 OF 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam EVALUATION SHEET Task: Perform PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle)

Alternate Path: No Facility JPM #: New Safety Function: 3 Title: Pressurizer Pressure Control K/A 010 A4.03 Ability to manually operate and/or monitor in the control room: PORV and block valves Rating(s): 4.0 / 3.8 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

PT/1/A/4200/023B (NC PORV and Air Supply Stroke Test), Enclosure 13.4 (NC PORV Cycle) rev. 017 Task Standard: Enclosure 13.4 successfully completed with all valves returned to the as found position.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #170
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 16

PAGE 4 0F 16 Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 3.

INITIATING CUES:

The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of PT/1/A/4200/023B, Enclosure 13.4.

PAGE 4 OF 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 1.1 IF testing 1NC-32B (Pzr PORV), perform the following:

___ SAT 1.1.1 Record the as found position of 1NC-31B (Pzr PORV Isol) below: ___ UNSAT

______________

STANDARD:

Applicant records OPEN as the as found position.

COMMENTS:

CRITICAL STEP 2 1.1.2 Ensure 1NC-31B (Pzr PORV Isol) is closed. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-31B to the CLOSE or OVERRIDE ___UNSAT position.

This step is critical to prevent a pressure transient when 1NC-32B is opened.

COMMENTS:

PAGE 5 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 1.1.3 Record the as found position of 1NC-32B (Pzr PORV) below: ___ SAT

______________

___ UNSAT STANDARD:

Applicant records CLOSED as the as found position for 1NC-32B COMMENTS:

STEP 4 1.1.4 Circle below the as found switch position of 1NC-32B ___ SAT (Pzr PORV).

___ UNSAT Close Open Auto STANDARD:

Applicant circles Auto as the as found switch position of 1NC-32B.

COMMENTS:

STEP 5 1.1.5 Ensure 1NC-32B (Pzr PORV) is closed.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1NC-32B is closed.

COMMENTS:

PAGE 6 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 1.1.6 Cycle 1NC-32B (Pzr PORV) from closed to open to CRITICAL closed from the control room. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-32B to the OPEN position and then ___ UNSAT to the AUTO or CLOSE position.

This step is critical to cycle 1NC-32B.

COMMENTS:

STEP 7 1.1.7 Return 1NC-32B (Pzr PORV) to the as found position, as recorded in Step 1.1.3 of this enclosure. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1NC-32B is in the as found position as recorded in step 1.1.3.

COMMENTS:

STEP 8 1.1.8 Return switch for 1NC-32B (Pzr PORV) to the as found CRITICAL position, as recorded in Step 1.1.4 of this enclosure. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-32B to the AUTO position. ___ UNSAT This step is critical to return the switch for 1NC-32B to the as found position.

COMMENTS:

PAGE 7 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 9 1.1.9 Return 1NC-31B (Pzr PORV Isol) to the as found CRITICAL position, as recorded in Step 1.1.1 of this enclosure. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-31B to the OPEN position. ___ UNSAT This step is critical to return 1NC-31B to the as found position and make 1NC-32B available for pressure relief.

COMMENTS:

STEP 10 1.2 IF testing 1NC-34A (Pzr PORV), perform the following:

___ SAT 1.2.1 Record the as found position of 1NC-33A (Pzr PORV Isol) below: ___ UNSAT

______________

STANDARD:

Applicant records OPEN as the as found position for 1NC-33A COMMENTS:

PAGE 8 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 11 1.2.2 Ensure 1NC-33A (Pzr PORV Isol) is closed. CRITICAL STEP STANDARD:

___ SAT Applicant places the switch for 1NC-33A to the CLOSE or OVERRIDE position. ___ UNSAT This step is critical to prevent a pressure transient when 1NC-34A is opened.

COMMENTS:

STEP 12 1.2.3 Record the as found position of 1NC-34A (Pzr PORV) below: ___ SAT

______________

___ UNSAT STANDARD:

Applicant records CLOSED for the as found position for 1NC-34A.

COMMENTS:

STEP 13 1.2.4 Circle below the as found switch position of 1NC-34A (Pzr PORV). ___ SAT Close Open Auto ___ UNSAT STANDARD:

Applicant circles Auto as the as found switch position of 1NC-34A.

COMMENTS:

PAGE 9 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 14 1.2.5 Ensure 1NC-34A (Pzr PORV) is closed.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1NC-34A is closed.

COMMENTS:

STEP 15 1.2.6 Cycle 1NC-34A (Pzr PORV) from closed to open to CRITICAL closed from the control room. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-34A to the OPEN position and then ___ UNSAT to the AUTO or CLOSE position.

This step is critical to cycle 1NC-34A.

COMMENTS:

STEP 16 1.2.7 Return 1NC-34A (Pzr PORV) to the as found position, as recorded in Step 1.2.3 of this enclosure. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1NC-34A is in the as found position as recorded in step 1.2.3.

COMMENTS:

PAGE 10 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 17 1.2.8 Return switch for 1NC-34A (Pzr PORV) to the as CRITICAL found position, as recorded in Step 1.2.4 of this STEP enclosure.

___ SAT STANDARD:

___ UNSAT Applicant places the switch for 1NC-34A to the AUTO position This step is critical to return the switch for 1NC-34A to the as found position.

COMMENTS:

STEP 18 1.2.9 Return 1NC-33A (Pzr PORV Isol) to the as found CRITICAL position, as recorded in Step 1.2.1 of this STEP enclosure.

___ SAT STANDARD:

___ UNSAT Applicant places the switch for 1NC-33A to the OPEN position.

This step is critical to return 1NC-33A to the as found position and make 1NC-34A available for pressure relief.

COMMENTS:

PAGE 11 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 19 1.3 IF testing 1NC-36B (Pzr PORV), perform the following:

___ SAT 1.3.1 Record the as found position of 1NC-35B (Pzr PORV Isol) below: ___ UNSAT

______________

STANDARD:

Applicant records OPEN as the as found position for 1NC-35B.

COMMENTS:

STEP 20 1.3.2 Ensure 1NC-35B (Pzr PORV Isol) is closed. CRITICAL STEP STANDARD:

___ SAT Applicant places the switch for 1NC-35B to the CLOSE position.

___ UNSAT This step is critical to prevent a pressure transient when 1NC-36B is opened.

COMMENTS:

STEP 21 1.3.3 Record the as found position of 1NC-36B (Pzr PORV) below: ___ SAT

______________

___ UNSAT STANDARD:

Applicant records CLOSED as the as found position for 1NC-36B.

COMMENTS:

PAGE 12 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 22 1.3.4 Circle below the as found switch position of 1NC-36B (Pzr PORV). ___ SAT Close Open Auto ___ UNSAT STANDARD:

Applicant circles AUTO as the as found switch position of 1NC-36B COMMENTS:

STEP 23 1.3.5 Ensure 1NC-36B (Pzr PORV) is closed.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1NC-36B is closed.

COMMENTS:

STEP 24 1.3.6 Cycle 1NC-36B (Pzr PORV) from closed to open to CRITICAL closed from the control room. STEP STANDARD:

___ SAT Applicant places the switch for 1NC-36B to the OPEN position and then to the AUTO or CLOSE position. ___ UNSAT This step is critical to cycle 1NC-36B.

COMMENTS:

PAGE 13 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 25 1.3.7 Return 1NC-36B (Pzr PORV) to the as found position, as recorded in Step 1.3.3 of this enclosure. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1NC-36B is in the as found position as recorded in step 1.3.3.

COMMENTS:

STEP 26 1.3.8 Return switch for 1NC-36B (Pzr PORV) to the as found CRITICAL position, as recorded in Step 1.3.4 of this enclosure. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-36B to the AUTO position. ___ UNSAT This step is critical to return the switch for 1NC-36B to the as found position.

COMMENTS:

PAGE 14 0F 16

Catawba Nuclear Station JPM C May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 27 1.3.9 Return 1NC-35B (Pzr PORV Isol) to the as found position, CRITICAL as recorded in Step 1.3.1 of this enclosure. STEP STANDARD: ___ SAT Applicant places the switch for 1NC-35B to the OPEN position. ___ UNSAT This step is critical to return 1NC-35B to the as found position and to make 1NC-36B available for pressure relief.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 15 0F 16

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM C READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 3.

INITIATING CUES:

The Control Room Supervisor instructs you to perform PT/1/A/4200/023B, Enclosure 13.4 for all of the Pzr PORVs.

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam System JPM D PAGE 1 OF 17

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam EVALUATION SHEET Task: Start Reactor Coolant Pump 1B Alternate Path: Yes Facility JPM #: NCP081 (modified)

Safety Function: 4P Title: Reactor Coolant Pump System K/A 003 A1.01 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the RCPS control including: RCP vibration.

Rating(s): 2.9 / 2.9 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6150/002A (Reactor Coolant Pump) rev. 068 Task Standard: 1B Reactor Coolant Pump is tripped when vibration is noted to be greater than NC pump trip criteria.

Validation Time: 20 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 17

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam

1. Reset to any 100% power IC set.
2. Manually trip the reactor at 1MC-1.
3. Trip all (4) four NCP breakers at 1MC-10.
4. Place CF pump in service for auto S/G level control and secure CA.
5. Insert MAL-NCP005FXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5
6. Insert MAL-NCP005FYB (NCP VIB B MOUNT VERT FAILURE) Initial =0 Ramp =240 Value=10, EVENT =1, Delay = 5
7. Insert MAL-NCP005SXB (NCP VIB B MOUNT HORIZ FAILURE) Initial =0 Ramp =120 Value=30, EVENT =1, Delay = 5
8. Insert MAL-NCP005SYB (NCP VIB B MOUNT VERT FAILURE) Initial =0Ramp =120 Value=30, EVENT =1, Delay = 5
9. Insert EVENT 1 = x10d185M >400 (NCP B AMPS>400)
10. Freeze simulator and write to a snap.

IC SELECTED:

SIMULATOR OPERATOR INSTRUCTIONS:

ENSURE BENTLEY NEVADA VIBRATION MONITORS ON BACK BOARD ARE RESET AND THAT ALARMS 1AD-6 A/5 AND B/5 ARE CLEARED BETWEEN STUDENTS.

PAGE 3 OF 17

Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #171
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event MAL-NCP005FXB (NCP VIB 1B MOUNT 4 10 5 1 HORZ FAILURE) MIN MAL-NCP005FYB (NCP VIB 1B MOUNT VERT 4 10 5 1 FAILURE) MIN MAL-NCP005SXB (NCP VIB 1B SHAFT HORZ 2 30 5 1 FAILURE) MIN MAL-NCP005SYB (NCP VIB 1B SHAFT VERT 2 30 5 1 FAILURE) MIN

Ensure EVENT 1 = x10d185m>400 (NCP B AMPS > 400)

PAGE 4 OF 17

PAGE 5 0F 17 Catawba Nuclear Station JPM D May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored.

INITIATING CUES:

Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1.

The Initial Conditions of Enclosure 4.1 have been satisfied.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6150/002A (Reactor Coolant Pump Operation), Enclosure 4.1 (Startup and Operation of the NC Pumps).

PAGE 5 OF 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE: In order to start an NC Pump, the underfrequency condition must be cleared by having at least three of four 6900V breakers (1TA, B, C, D-3) racked in and energized. ___ SAT STEP 1: 3.1 IF Unit 1 is in Mode 5, refer to Tech Spec Table 3.4.12-1 ___ UNSAT (Reactor Coolant Pump Operating Restrictions For Low Temperature Overpressure Protection) for temperature limitations on NC Pump starts.

STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

STEP 2 3.2 IF the pump to be started will be the fourth NC Pump in ___ SAT service on Unit 1, verify NC temperature is > 130°F. {PIP 96-1290, PIP 02-484} ___UNSAT STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

PAGE 6 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: If #1 Seal P gauge overranged, P can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch position as follows: ___ SAT "VCT" position: NC Press minus Excess Letdn Hx Otlt Press ___ UNSAT

= #1 Seal P "NCDT" position: NC Press minus VCT Press = #1 Seal P STEP 3 3.3 Verify that No. 1 seal P is greater than 200 psig for the pump to be started per the following gauges: (Control Board 1MC5) 1B NCP: 1NVP5220 STANDARD:

Applicant verifies seal P > than 200 psid using stated gauge OR for VCT position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal P COMMENTS:

STEP 4 3.4 Verify that the standpipe level for the pump to be started is ___ SAT normal by its associated annunciator DARK:

___ UNSAT "NCP B #2 SEAL S-PIPE HI/LO LVL" 1AD-7 A/2 STANDARD:

Applicant verifies annunciator is DARK.

COMMENTS:

PAGE 7 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 5 3.5 Verify that VCT pressure is 15 psig.

___ SAT STANDARD:

___ UNSAT Applicant determines VCT pressure is 15 psig on the OAC or per 1NVP5500 (VCT VENT PRESS) ON 1MC-5.

COMMENTS:

STEP 6 3.6 Verify 7-10 gpm seal injection flow on the pump to be started by the following gauges: (Control Board 1MC5) ___ SAT 1B NCP: 1NVP5320 ___ UNSAT STANDARD:

Applicant verifies seal injection is within range on 1NCP5230.

COMMENTS:

PAGE 8 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: 1. If #1 Seal Leakoff Flow rate is < 1.0 gpm, the # 1 Seal Low Flow indication shall be used.

___ SAT

2. If #1 Seal P gauge overranged, P can be determined using 1NV125B (Excess Letdn Hx Otlt Ctrl) "VCT" or "NCDT" switch ___ UNSAT position as follows:

"VCT" position: NC Press minus Excess Letdn Hx Otlt Press = #1 Seal P "NCDT" position: NC Press minus VCT Press = #1 Seal P

STEP 7 3.7 Verify adequate #1 Seal Leakoff Flow on the pump to be started as follows:

3.7.1 Determine required #1 Seal Leakoff Flow from Revised Data Book Figure 26 (NC Pump No. 1 Seal Normal Operating Range).

STANDARD:

Applicant determines that the minimum required #1 Seal Leakoff Flow is approximately 1 gpm.

COMMENTS:

STEP 8 3.7.2 Add 0.26 gpm to the minimum required #1 Seal Leakoff Flow of Figure 26 to correct for an expected ___ SAT drop in leakoff flow on pump start (0.20 gpm) and instrument inaccuracy (0.06 gpm). ___ UNSAT STANDARD:

Applicant determines that the minimum required is 1 + 0.26 = 1.26 COMMENTS:

PAGE 9 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 9 3.7.3 Obtain the current #1 Seal Leakoff Flow per one of the following: ___ SAT DCS graphic 6002 (NC PUMPS) ___ UNSAT OR Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Appropriate OAC point C1A1376 (NC Pmp B No. 1 Seal Leakoff Lo Flow)

C1A0442 (NC Pmp B No. 1 Seal Leakoff Flow)

STANDARD:

Applicant obtains the current #1 Seal Leak Flow.

COMMENTS:

PAGE 10 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: 1. Operating Experience has shown that when NC Pump seal work has been performed during outages higher than desired seal leakoff flow can occur until NC Pump seal is seated. ___ SAT

2. Step 3.7.4.2 only applicable when OP/1/A/6150/001 (Filling and ___ UNSAT Venting the Reactor Coolant System) in progress.

STEP 10 3.7.4 Perform one of the following based on indicated #1 Seal Leakoff Flow:

3.7.4.1 Verify the indicated #1 Seal Leakoff Flow (Step 3.7.3) is within the range of Data Book Figure 26 as adjusted per Step 3.7.2.

STANDARD:

Applicant determines that the #1 Seal Leakoff Flow is within limits.

COMMENTS:

PAGE 11 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 11 3.8 Verify upper and lower oil pot levels normal, for the pump to be started, via one of the following: ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) ___ UNSAT OR Visual inspection (local)

OR Associated annunciators DARK:

"NCP B UPPER/LOWER OIL RESERVOIR LO LEVEL" 1AD-6 F/2 STANDARD:

Applicant verifies oil pot levels are normal per one of the listed indications.

COMMENTS:

PAGE 12 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: KC flow is NOT required to the Thermal Barrier Hx whenever NC System temperature is less than 200°F.

___ SAT STEP 12 3.9 Verify KC flow to the Thermal Barrier Heater Exchanger normal, for the pump to be started, via one of the following: ___ UNSAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL)

OR Associated annunciators DARK:

"NCP B THERMAL BARRIER KC OUTLET HI/LO FLOW" 1AD-6 E/2 STANDARD:

Applicant determines that KC flow to the Thermal Barrier Exchanger is normal per one of the indications.

COMMENTS:

STEP 13 3.10 Verify KC flow to the Upper Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) ___ UNSAT OR Associated annunciators DARK:

"NCP B MTR UPPER BRG KC OUTLET HI/LO FLOW" 1AD-6 C/2 STANDARD:

Applicant determines that KC flow to the Upper Motor Bearing Oil Cooler is normal per one of the indications.

COMMENTS:

PAGE 13 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 14 3.11 Verify KC flow to the Lower Motor Bearing Oil Cooler normal, for the pump to be started, via one of the following: ___ SAT Unit 1 Reactor Coolant Pumps graphic (NCPMPALL) ___ UNSAT OR Associated annunciators DARK:

"NCP B MTR LOWER BRG KC OUTLET LO FLOW" 1AD-6 D/2 STANDARD:

Applicant determines that the KC flow to the Lower Motor Bearing Oil Cooler is normal per one of the indications.

COMMENTS:

STEP 15 3.12 Verify annunciator 1AD-11, K-6, "230 KV SWITCHYARD VOLTAGE LO" is dark. ___ SAT STANDARD: ___ UNSAT Applicant determines that 1AD-11, K/6 is dark.

COMMENTS:

PAGE 14 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 16 3.13 IF the 6.9kv switchgear supplying the NC Pump to be started is also supplying a 4160v Essential Bus, verify the ___ SAT following:

___ UNSAT STANDARD:

Applicant determines that the step does not apply.

COMMENTS:

STEP 17 3.14 Two minutes prior to starting NC pump, start one oil lift CRITICAL pump for NCP to be started by pressing the "ON" STEP pushbutton for:

___ SAT "NC PUMP OIL LIFT PUMP B1" "NC PUMP OIL LIFT PUMP B2" ___ UNSAT STANDARD:

Applicant depresses the red ON pushbutton for NC PMP OIL LIFT PMP B1 or B2 approximately two minutes prior to starting the 1B NC Pump.

This step is critical to lift and lubricate the pump so that it can be started.

COMMENTS:

PAGE 15 0F 17

Catawba Nuclear Station JPM B May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: 1. If NC pump is NOT started, the oil lift pump shall be secured to minimize stress on oil nozzles. CRITICAL STEP

2. The Degraded Bus Voltage Relays (27N) may actuate on the essential bus being supplied by the 6.9KV Switchgear ___ SAT associated with the NC Pump to be started in the following step.

The alarm condition is expected to clear within 36 seconds.{PIP ___ UNSAT 95-0287}

STEP 18 3.15 Start desired NC pump by pressing the "ON" pushbutton for: (R.M.)

"NC PUMP 1B" STANDARD:

Applicant depresses the red ON pushbutton for NC PMP 1B. Once Hi Hi vibration is verified, the pump should be tripped.

This step is critical to start the 1B NC Pump and then trip the pump upon verification of Hi Hi Vibration to protect the pump from further damage.

NOTE TO EXAMINER: Approximately 5 seconds after the NCP is started, the Hi Hi Vibration alarm will come in.

The shaft vibration will reach 20 mils prior to reaching 5 on the mount. Per the annunciator response, the pump should be tripped at >20 mils in Modes 1 and 2, but not until >30 mils in Mode 3 (current condition). At 5 mils on the mount, the pump is tripped regardless of mode. 5 mils on the mount will occur before 30 mils on the shaft.

EXAMINER CUE: AFTER the pump is tripped: The CRS has pulled AP/1/A/5500/004 (Loss of Reactor Coolant Pump) and is ready to proceed.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 16 0F 17

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM D READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

EP/1/A/5000/ES-0.2, Natural Circulation Cooldown has been implemented following a Reactor Trip caused by a lightning strike in the switchyard. Normal power has been restored.

INITIATING CUES:

Start NC Pump 1B by completing OP/1/A/6150/002A, NC Pump Operation Enclosure 4.1.

The Initial Conditions of Enclosure 4.1 have been satisfied.

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam System JPM E PAGE 1 OF 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam EVALUATION SHEET Task: Synchronize the Generator to the Grid Alternate Path: Yes Facility JPM #: NEW Safety Function: 4S Title: Main and Reheat Steam System (MRSS)

K/A 045 A4.02 Ability to manually operate and/or monitor in the control room: T/G controls, including breakers Rating(s): 2.7 / 2.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/B/6300/001 (Turbine Generator) rev. 099 Task Standard: Synchronizes the generator to the grid.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #172
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event OVR-EP006B (GEN BKR 1B TRIP ENABLE ON 2 PB)

OVR-EP006C (GEN BKR 1B TRIP PB) ON 2 OVR-EP007B (GEN BKR 1A TRIP ENABLE ON 4 PB)

OVR-EP007C (GEN BKR 1A TRIP PB) ON 4

Ensure EVENT 2 = x01i120a & !x01i148e Ensure EVENT 4 = x01i120b & !x01i147e

PAGE 3 OF 11

PAGE 4 0F 11 Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 1 at 14% power.

Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator)

Enclosure 4.1 (Turbine Generator Startup).

INITIATING CUES:

The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/B/6300/001 (Turbine Generator) Enclosure 4.1 (Turbine Generator Startup).

PAGE 4 OF 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.62 Synchronize the Generator to the grid as follows:

___ SAT 3.62.1 Prior to placing the turbine generator on line, ensure Rx power is between 13% and 15% power. ___ UNSAT STANDARD:

Applicant determines Rx power is approximately 14%.

COMMENTS:

STEP 2 3.62.2 Announce the following over the plant page: ___ SAT "Placing Unit 1 Main Turbine on line, please clear ___UNSAT the Transformer Yard".

STANDARD:

Applicant makes an announcement using the beige phone on 1MC-1 COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: If "MAN/AUTO REG" (1MC1) indicates "MAN", Manual sync of Generator is required.

___ SAT STEP 3 3.62.3 IF Auto sync of the Generator is desired, perform the following: ___ UNSAT 3.62.3.1 Verify "MAN/AUTO REG" in "AUTO" (1MC1).

STANDARD:

Applicant determines auto sync of the generator is desired per the initiating cue and determines that the AUTO light for MAN/AUTO REG is LIT COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: 1. When "GEN SYNC SELECT" switch is turned to "AUTO 1A" or "AUTO 1B", the AVR Auto Sync Relay automatically adjusts Terminal voltage and Turbine speed and closes the selected ___ SAT breaker.

___ UNSAT

2. The following will occur when the Generator Breaker closes:

6-7 MWe is picked up.

A Target of 60 MWe is automatically input.

A Load Rate of 12 MW/MIN is automatically input.

The MW feedback loop is placed in service.

The turbine is placed in "HOLD".

STEP 4 3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) to "AUTO 1A" or "AUTO 1B" position.

STANDARD:

Applicant places the GEN SYNC SELECT switch to either the AUTO 1A or AUTO 1B position.

EXAMINER NOTE: The first breaker selected will fail to close.

COMMENTS:

STEP 5 3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: ___ SAT A. Depress "Auto Sync Enable" on Turbine ___ UNSAT Control panel.

STANDARD:

Applicant depresses the Auto Sync Enable button on the Turbine Control Panel.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 B. IF selected Generator Breaker fails to close within 5 minutes, perform Steps ___ SAT 3.62.3.2 - 3.62.3.3 for opposite breaker.

___ UNSAT STANDARD:

Applicant determines that the generator breaker failed to close and returns to step 3.62.3.2 for the opposite breaker.

COMMENTS:

STEP 7 3.62.3.2 Turn "GEN SYNC SELECT" switch (1MC1) CRITICAL to "AUTO 1A" or "AUTO 1B" position. STEP

___ SAT STANDARD:

___ UNSAT Applicant places the GEN SYNC SELECT switch to the opposite position than was selected the first time.

This step is critical to close a generator breaker and synchronize the generator grid.

COMMENTS:

.

STEP 8 3.62.3.3 IF the selected Generator Breaker did NOT close, perform the following: ___ SAT STANDARD: ___ UNSAT Applicant determines the step does not apply this time.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 9 3.62.3.4 Return "GEN SYNC SELECT" switch to the "MAN" position. ___ SAT STANDARD: ___ UNSAT Applicant places the GEN SYNC SELECT switch to the MAN position.

COMMENTS:

STEP 10 3.62.4 IF Manual sync of Generator is desired, perform the following: ___ SAT STANDARD: ___ UNSAT Applicant determines that this step does not apply.

COMMENTS:

STEP 11 3.62.5 After Generator Breaker 1A (or 1B) has closed, verify the following: ___ SAT 3.62.5.1 A Target of 60 MWe. ___ UNSAT 3.62.5.2 A Load Rate of 12 MW/Min.

STANDARD:

Applicant verifies a target of 60 MWe and a Load Rate of 12MW/Min is present on the Turbine Control Panel or the Turbine Graphic.

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM E May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 12 3.62.6 Select "GO" to pick up load. CRITICAL STEP STANDARD:

___ SAT Applicant depresses the GO button on the Turbine Control Panel.

___ UNSAT This step is critical to pick up load.

COMMENTS:

STEP 13 3.62.7 WHILE continuing with the power increase, but before 50% power, place other Generator Breaker ___ SAT in service as follows:

___ UNSAT STANDARD:

Applicant reads the step.

EXAMINER CUE: Another operator will place the other breaker in service.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM E READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is in MODE 1 at 14% power.

Turbine Generator startup is in progress per OP/1/B/6300/001 (Turbine Generator)

Enclosure 4.1 (Turbine Generator Startup).

INITIATING CUES:

The CRS has instructed you synchronize the generator to the grid in auto and pick up load per Step 3.62. Peer Checks have been waived.

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam System JPM F PAGE 1 OF 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam EVALUATION SHEET Task: Restore Normal Power to 1ETB and Shutdown D/G 1B from the Control Room Alternate Path: Yes Facility JPM #: DG3-004 (Modified)

Safety Function: 6 Title: Emergency Diesel Generator (ED/G) System K/A 064 A4.01 Ability to manually operate and/or monitor in the control room: local and remote operation of the ED/G Rating(s): 4.0 / 4.3 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6350/002 (Diesel Generator Operation) rev. 157 , Enclosure 4.18 Task Standard: 1ETB power being supplied from 1ATD and D/G is OFF Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #173
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event 2

IND-DG012 (D/G 1B P/F METER) .500 2 SEC 2

IND-DG013 (D/G 1B KW METER) 0 2 SEC

Ensure EVENT 2 = x11i343c (1ATD CLOSE pushbutton)

PAGE 3 OF 11

PAGE 4 0F 11 Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B Mode Select Switch is in the CTRL-RM position. The D/G Load Sequencer has been reset.

INITIATING CUES:

The SRO instructs you to parallel D/G 1B to 1ETBs normal power source (1ATD) and shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/002 Enclosure 4.18 PAGE 4 OF 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.2 IF shutting down the diesel from the Control Room, perform the following:

3.2.1 IF both the normal (ETB Norm Fdr Frm ATD) AND ___ SAT alternate (ETB Alt Fdr Frm SATB) incoming feeder breakers are open, perform the following: ___ UNSAT CAUTION: It is essential for the Operator to read and understand the following steps before attempting to re-synchronize the D/G and bus to the normal or alternate power source. Quick response to any changes in load and power factor when the breaker closes is required to reduce the likelihood of a reverse power D/G Breaker trip.

3.2.1.1 Adjust voltage using "D/G 1B Volt Adjust" to allow "D/G 1B Volts" to be one half to two divisions (50 to 200 volts) higher than "Line Volts".

STANDARD:

Applicant determines that both feeder breakers are open and adjusts D/G voltage using the D/G 1B Volt Adjust until D/G 1B Volts are one half to two divisions (50 to 200 volts) higher than Line Volts on 1MC-8 COMMENTS:

STEP 2 3.2.1.2 Place the "D/G 1B Sync" Switch in the "ON" position. ___ SAT STANDARD: ___UNSAT Applicant places the D/G 1B Sync Switch in the ON position on 1MC-11 COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 3.2.1.3 Adjust D/G speed using "D/G 1B Gov Ctrl" such that the Synchroscope is moving slowly in the "FAST" ___ SAT direction, (approximately 1 revolution per 30 seconds). ___ UNSAT STANDARD:

Applicant adjusts D/G speed using the D/G 1B Gov Ctrl until the Synchroscope is moving slowly in the fast direction.

COMMENTS:

CAUTION: The following three steps shall be performed prior to signing off either step to reduce the likelihood of a reverse power D/G CRITICAL Breaker trip. STEP STEP 4 3.2.1.4 As the indicator reaches 1.5 min. before the vertical ___ SAT (synchronized) position, close one of the following breakers: ___ UNSAT ETB Norm Fdr Frm ATD OR ETB Alt Fdr Frm SATB STANDARD:

Applicant closes ETB Norm Fdr Frm ATD per the initiating cue.

This step is critical to align 1ETB to its normal power source.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 5 3.2.1.5 Stabilize the D/G with a positive load and a lagging power factor. ___ SAT STANDARD: ___ UNSAT Applicant will attempt to stabilize the D/G with a positive load and a lagging power factor utilizing the D/G 1B GOV CTRL and the D/G 1B VOLT ADJUST on 1MC-11.

EXAMINER NOTE: Applicant will not be successful performing this step.

COMMENTS:

STEP 6 3.2.1.6 IF the power factor meter indicates severely CRITICAL leading, (pegs high) AND power output decreases STEP to 0 KW (pegs low) then IMMEDIATELY trip D/G 1B Bkr To ETB. ___ SAT STANDARD: ___ UNSAT Applicant determines that the step applies and trips the D/G 1B Bkr To ETB.

This step is critical to minimize damage to the diesel generator from reverse power.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 7 3.2.1.7 Place the "D/G 1B Sync" Switch in the "OFF" position. Record time____________ ___ SAT STANDARD: ___ UNSAT Applicant places the D/G 1B Sync switch in the OFF position.

COMMENTS:

STEP 8 3.2.2 Verify one of the following breakers is closed:

___ SAT ETB Norm Fdr Frm ATD OR ___ UNSAT ETB Alt Fdr Frm SATB STANDARD:

Applicant verifies the red CLSD light is lit for ETB Norm Fdr Frm ATD COMMENTS:

STEP 9 3.2.3 IF D/G 1B Bkr To ETB is open, go to Step 3.2.7.

___ SAT STANDARD:

___ UNSAT Applicant determines that the green OPEN light is lit on D/G 1B BKR TO ETB and goes to Step 3.2.7 COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 10 3.2.7 Allow diesel to idle unloaded for a minimum of 5 minutes or until the following conditions are met: ___ SAT Jacket water outlet temperature is < 170°F. ___ UNSAT Lube oil outlet temperature is < 170°F.

Turbocharger exhaust temperatures have stabilized.

STANDARD:

Applicant reads the step.

EXAMINER CUE: Jacket water temperature is 160°F, Lube Oil outlet temperature is 167°F and the Turbocharger exhaust temperatures have stabilized.

COMMENTS:

STEP 11 3.2.8 Ensure one of the following conditions is met:

___ SAT The D/G Sequencer is "RESET".

OR ___ UNSAT Power has been removed from the D/G Sequencer.

STANDARD:

Applicant determines that the D/G Sequencer has been reset per the initial conditions or the yellow D/G LOAD SEQ RESET light LIT on 1MC-11 COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM F May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 12 3.2.9 Depress the D/G 1B "OFF" pushbutton to stop the CRITICAL engine. STEP Record time______________

___ SAT STANDARD:

___ UNSAT Applicant depresses the green OFF pushbutton on D/G 1B on 1MC-11 This step is critical to shut down the diesel.

COMMENTS:

STEP 13 3.2.10 WHEN the engine stops, dispatch Operators as necessary to verify the following: ___ SAT The "L.O. Pump & Heater" light indicates "ON". ___ UNSAT The "J.W. Pump & Heater" light indicates "ON".

1RN-292B (1B D/G Hx Inlet Isol) (DB-566, AA-38) closes.

STANDARD:

Applicant reads the step.

EXAMINER CUE: An operator has been dispatched.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM F READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is recovering from a Unit Blackout per AP/1/A/5500/007 Case I (Loss of Normal Power to an Essential Train). 1ATD is energized and available to supply 1ETB. D/G 1B Mode Select Switch is in the CTRL-RM position. The D/G Load Sequencer has been reset.

INITIATING CUES:

The SRO instructs you to parallel D/G 1B to 1ETBs normal power source (1ATD) and shutdown D/G 1B, per OP/1/A/6350/002 (Diesel Generator Operation), Enclosure 4.18, by completing step 3.2. IV will be waived during the performance of this JPM.

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam System JPM G PAGE 1 OF 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam EVALUATION SHEET Task: Shift Lower Containment Vent Units Alternate Path: No Facility JPM #: New Safety Function: 5 Title: Containment Cooling System K/A 022 A4.01 Ability to manually operate and/or monitor in the control room: CCS Fans Rating(s): 3.6 / 3.6 CFR: 41.7 / 45.5 to 45.8 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator Control Room X Perform Simulate X

References:

OP/2/A/6450/001 (Containment Ventilation (VV) Systems rev.033 Task Standard: 2D LCVU running and 2C LCVU off.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 11

PAGE 4 0F 11 Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is in MODE 1.

INITIATING CUES:

The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU.

Steps 3.1 and 3.3 were marked N/A during the pre-job brief.

Peer check has been waived.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/2/A/6450/001 Containment Ventilation (VV) Systems, Enclosure 4.13.

PAGE 4 OF 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.2 IF three LCVUs are operating AND it is desired, shift the CRITICAL operating units as follows: STEP 3.2.1 IF the LCVUs are operating in "LOW" speed, perform ___ SAT the following:

___ UNSAT 3.2.1.1 Stop the LCVU to be removed from service by placing its control switch in the "OFF" position:

"VV LCVU 2C" STANDARD:

Applicant describes placing the switch for VV LCVU 2C to the OFF position.

This step is critical to shut down the desired Lower Containment Vent Unit EXAMINER CUE: IF asked, Three LCVUs are operating.

EXAMINER CUE: IF asked, The LCVUs are operating in LOW speed.

EXAMINER CUE: The switch for VV LCVU 2C is in the OFF position.

COMMENTS:

PAGE 5 0F 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: The procedure may continue up to and including Step 3.2.1.8 before completing the following step.

___ SAT STEP 2 3.2.1.2 Verify the green indicating light illuminates for the LCVU stopped. ___UNSAT STANDARD:

Applicant describes verifying the green indicating light is LIT for VV LCVU 2C.

EXAMINER CUE: The green light is LIT.

COMMENTS:

STEP 3 3.2.1.3 Verify the red "MAX" indicating light extinguishes for the LCVU stopped. ___ SAT STANDARD:

___ UNSAT Applicant describes verifying the red MAX indicating light for VV LCVU 2C MAX is DARK.

EXAMINER CUE: The red MAX light is DARK.

COMMENTS:

PAGE 6 0F 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 4 3.2.1.4 Verify the green "CLOSED" indicating light illuminates for the LCVU damper associated ___ SAT with the LCVU stopped.

___ UNSAT STANDARD:

Applicant describes verifying the green CLOSED indicating light for 2LCVU-D-3 LWR CONT VENT DAMPER is LIT.

EXAMINER CUE: The green light is LIT.

COMMENTS:

STEP 5 3.2.1.5 Start the idle LCVU by placing its control CRITICAL switch in the "LOW" position: STEP "VV LCVU 2D" ___ SAT STANDARD: ___ UNSAT Applicant describes placing the switch for VV LCVU 2D in the LOW position.

This step is critical to start the desired LCVU.

EXAMINER CUE: The switch for LCVU 2D is in the LOW position.

COMMENTS:

PAGE 7 0F 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 3.2.1.6 Verify the red indicating light illuminates for the LCVU placed in service. ___ SAT STANDARD: ___ UNSAT Applicant describes verifying the red (middle) indicating light for VV LCVU 2D is LIT.

EXAMINER CUE: The red light is LIT.

COMMENTS:

STEP 7 3.2.1.7 Verify the red "OPEN" indicating light illuminates for the LCVU damper associated ___ SAT with the LCVU started.

___ UNSAT STANDARD:

Applicant describes verifying the red OPEN indicating light for 2LCVU-D-4 LWR CONT VENT DAMPER.

EXAMINER CUE: The red light is LIT.

COMMENTS:

PAGE 8 0F 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 8 3.2.1.8 Verify the red "MAX" indicating light illuminates for the LCVU placed in service. ___ SAT STANDARD: ___ UNSAT Applicant describes verifying the red light for VV LCVU 2D MAX is LIT EXAMINER CUE: The red light is LIT.

COMMENTS:

STEP 9 3.2.2 IF the LCVUs are operating in "HIGH" speed, perform the following: ___ SAT STANDARD:

___ UNSAT Applicant determines that this step does not apply.

COMMENTS:

STEP 10 3.4 Indicate below the operating Pipe Tunnel Booster Fan:

___ SAT "PIPE TUNNEL BSTR FAN 2A" "PIPE TUNNEL BSTR FAN 2B" ___ UNSAT STANDARD:

Applicant marks the box for the operating Pipe Tunnel Booster Fan.

EXAMINER CUE: IF ASKED, Pipe Tunnel Booster Fan 2A is ON.

COMMENTS:

PAGE 9 0F 11

Catawba Nuclear Station JPM G May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 11 3.5 Indicate below the operating LCVUs:

___ SAT "VV LCVU 2A" "VV LCVU 2B" ___ UNSAT "VV LCVU 2C" "VV LCVU 2D STANDARD:

Applicant marks the blocks for the 2A, 2B and 2D LCVUs.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 10 0F 11

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM G READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is in MODE 1.

INITIATING CUES:

The Control Room Supervisor has instructed you to shift Lower Containment Vent Units by stopping the 2C LCVU and starting the 2D LCVU.

Steps 3.1 and 3.3 were marked N/A during the pre-job brief.

Peer check has been waived.

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam System JPM H PAGE 1 OF 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam EVALUATION SHEET Task: Place Standby Component Cooling Train in Service Alternate Path: No Facility JPM #: KC-082 (Modified)

Safety Function: 8 Title: Component Cooling Water System K/A 008 A4.01 Ability to manually operate and/or monitor in the control room: CCW indications and controls Rating(s): 3.3 / 3.1 CFR: 41.7 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator X In-Plant Perform X Simulate

References:

OP/1/A/6400/005 (Component Cooling System) rev. 116 Task Standard: 1B1 Component Cooling Pump running and B KC HX outlet valve in KC TEMP position. 1A2 KC Pump stopped and A KC HX Outlet Valve aligned for miniflow.

Validation Time: 20 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #175
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 14

PAGE 4 0F 14 Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is operating at 100% with 1A2 KC Pump in operation.

KC Pump 1A2 needs to be removed from service to permit preventive maintenance on the pump and motor.

INITIATING CUES:

The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in service and take KC Pump 1A2 out of service beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005.

Concurrent verification and peer checks have been waived and the B train KC pumps have been checked out satisfactorily by a NLO.

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6400/005 (Component Cooling System), Enclosure 4.3 (Shifting Trains).

PAGE 4 OF 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.1.2 Ensure 1RN-347B (KC Hx 1B Inlet Isol) is open.

___ SAT STANDARD:

___ UNSAT Applicant determines that 1RN-347B is open by verifying the red OPEN light is LIT or via the OAC.

COMMENTS:

CRITICAL STEP 2 3.1.3 Ensure "KC HX 1B OTLT MODE" is in "KC TEMP". STEP STANDARD: ___ SAT Applicant places the switch for KC HX 1B OTLT MODE in the KC ___UNSAT TEMP position on 1MC-11.

This step is critical to ensure that the outlet of the KC Heat exchanger is controlled at the proper temperature.

COMMENTS:

PAGE 5 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 3 3.1.4 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System) perform the following: (R.M.) ___ SAT 3.1.4.1 Verify the Cation Bed Demineralizer is NOT in ___ UNSAT service per OP/1/A/6200/001 (Chemical and Volume Control System).

STANDARD:

Applicant determines that letdown is in service and that the Cation Bed Demineralizers are not in service.

EXAMINER CUE: IF ASKED, The Cation Bed Demineralizers are not in service.

COMMENTS:

STEP 4 3.1.4.2 Record position of 1NV-153A (Letdn Hx Otlt 3-Way ___ SAT Vlv).

Recorded valve position________________ ___ UNSAT STANDARD:

Applicant determines that the position of 1NV-153A is in the DEMIN position.

COMMENTS:

PAGE 6 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 5 3.1.4.3 IF letdown flow is through the demineralizers, notify Primary Chemistry that the demineralizers will be ___ SAT bypassed while shifting KC Trains.

Person notified ____________________________ ___ UNSAT STANDARD:

Applicant determines that letdown flow is through the demineralizers and notifies Primary Chemistry that the demineralizers will be bypassed while shifting KC Trains.

EXAMINER CUE: This is Stephanie Jackson from Primary Chemistry, I understand the demineralizers will be bypassed while shifting KC Trains.

COMMENTS:

STEP 6 3.1.4.4 IF letdown flow is through the demineralizers, notify Radiation Protection that the demineralizers will be ___ SAT bypassed while shifting KC Trains.

Person notified ____________________________ ___ UNSAT STANDARD:

Applicant notifies Radiation Protection that the demineralizers will be bypassed while shifting KC Trains.

EXAMINER CUE: This is Christina Frey from Radiation Protection, I understand that the demineralizers will be bypassed while shifting KC Trains.

COMMENTS:

PAGE 7 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 7 3.1.4.5 Place 1NV-153A (Letdn Hx Otlt 3-Way Vlv) in the CRITICAL "VCT" position. STEP STANDARD: ___ SAT Applicant places the switch for 1NV-153A to the VCT position. ___ UNSAT This step is critical to bypass the demineralizer to prevent a change in reactivity due to the changing boron affinity of the demineralizers caused by letdown temperature changes due to component cooling temperature changes when the trains are shifted.

COMMENTS:

CAUTION: 5700 gpm discharge header flow per each operating KC pump shall NOT be exceeded. CRITICAL STEP STEP 8 3.1.5 Start either KC Train 1B pump:

___ SAT "KC PUMP B1"

___ UNSAT STANDARD:

Applicant depresses the red ON pushbutton for KC PUMP 1B on 1MC-11 This step is critical to start the desired pump.

COMMENTS:

PAGE 8 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 9 3.1.6 Adjust the following flow controllers on 1MC11 to zero gpm flow: ___ SAT 1KC-149 (KF Hx 1A Cool Wtr Otlt) ___ UNSAT STANDARD:

Applicant adjusts the controller for 1KC-149 to zero gpm.

COMMENTS:

STEP 10 3.1.7 Stop all KC Train 1A pumps: CRITICAL STEP "KC PUMP A2"

___ SAT STANDARD:

___ UNSAT Applicant depresses the green OFF pushbutton for KC PUMP A2 on 1MC-11 This step is critical to secured the desired pump.

COMMENTS:

STEP 11 3.1.8 Place "KC HX 1A OTLT MODE" in "MINIFLOW" position.

___ SAT STANDARD:

___ UNSAT Applicant places the switch for KC HX 1A OTLT MODE in the MINIFLOW position on 1MC-11 COMMENTS:

PAGE 9 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 12 3.1.9 IF AT ANY TIME KC Train flow approaches 5700 gpm while performing the next step, ensure 1KC-C40B (Train ___ SAT B Miniflow Isol) is closed.

___ UNSAT STANDARD:

Applicant ensures that 1KC-40B is closed on 1MC-11.

COMMENTS:

STEP 13 3.1.10 Perform the following for the KF cooling loops that are in service: ___ SAT Adjust 1KC-149 (KF Hx 1A Cool Wtr Otlt) flow ___ UNSAT controller on 1MC11 to 3000 gpm or as necessary to maintain Spent Fuel Pool temperature < 125°F.

STANDARD:

Applicant adjusts 1KC-149 flow controller to less than or < 3000 gpm.

EXAMINER NOTE: Since Spent Fuel Pool temperature is only ~ 115°F, the applicant may decide to adjust 1KC-149 at this time.

COMMENTS:

PAGE 10 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: One pump running is preferred as long as flow is < 5700 gpm.

STEP 14 3.1.11 IF KC flow requirement is > 5700 gpm, perform the ___ SAT following:

___ UNSAT STANDARD:

Applicant determines that this step does not apply.

COMMENTS:

STEP 15 3.1.12 IF letdown is in service per OP/1/A/6200/001 (Chemical and Volume Control System), WHEN KC flow and ___ SAT temperature have stabilized perform the following:

(R.M.) ___ UNSAT 3.1.12.1 IF 1NV-153A (Letdn Hx Otlt 3-Way Vlv) position was recorded as "DEMIN" in Step 3.1.4.2 AND no other reason exists for it to remain in the "VCT" position, return it to "AUTO" as follows:

A. Place 1NV-153A in the "DEMIN" position.

(R.M.)

B. Verify 1NV-153A returns to "AUTO".

STANDARD:

Applicant places the control switch for 1NV-153A to the DEMIN position and returns it to AUTO on 1MC-10.

COMMENTS:

PAGE 11 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 16 3.1.12.2 IF letdown flow is through the demineralizers, notify Primary Chemistry that the ___ SAT demineralizers have been restored to service.

Person notified _________________________ ___ UNSAT STANDARD:

Applicant notifies Primary Chemistry that the demineralizers have been restored to service.

EXAMINER CUE: This is Stephanie Jackson from Primary Chemistry, I understand the demineralizers have been restored to service.

COMMENTS:

STEP 17 3.1.12.3 IF letdown flow is through the demineralizers, notify Radiation Protection that the ___ SAT demineralizers have been restored to service.

Person notified _________________________ ___ UNSAT STANDARD:

Applicant notifies Radiation Protection that the demineralizers have been restored to service.

EXAMINER CUE: This is Christina Frey from Radiation Protection, I understand the demineralizers have been restored to service.

COMMENTS:

PAGE 12 0F 14

Catawba Nuclear Station JPM H May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 18 3.1.13 IF RN miniflow was established per Step 3.1.1.2, secure unneeded flow paths. ___ SAT STANDARD: ___ UNSAT Applicant determines that this step does not apply.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 13 0F 14

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM H READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is operating at 100% with 1A2 KC Pump in operation.

KC Pump 1A2 needs to be removed from service to permit preventive maintenance on the pump and motor.

INITIATING CUES:

The Control Room SRO instructs you to shift trains of KC with 1B1 KC Pump in service and take KC Pump 1A2 out of service beginning at step 3.1.2 in enclosure 4.3 of OP/1/A/6400/005.

Concurrent verification and peer checks have been waived and the B train KC pumps have been checked out satisfactorily by a NLO.

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam System JPM I In-Plant PAGE 1 OF 8

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam EVALUATION SHEET Task: Break Condenser Vacuum Locally Alternate Path: None Facility JPM #: CA-084 Safety Function: 4S Title: Main Turbine Generator (MT/G) System K/A 045 A1.06 Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MT/G system controls including: Expected response of secondary plant parameters following T/G trip Rating(s): 3.3 / 3.7 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 Task Standard: Enclosure 3 has been completed with the first vacuum breaker opened within 10 minutes.

Validation Time: 8 minutes Time Critical: Yes X No

===============================================================

Applicant: Time Start: ________

NAME __ ___ Docket # _________ Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 8

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 8

PAGE 4 0F 8 Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is in Mode 3 following a reactor trip.

INITIATING CUES:

The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum).

This JPM is TIME CRITICAL; time begins when you acknowledge the task.

EXAMINER NOTE: Provide applicant with a copy of the procedure.

PAGE 4 OF 8

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME _______

Examiner NOTE: CRITICAL STEP Critical Time Start: Record Time that applicant acknowledges the task

_________. ___ SAT CAUTION High air flow rates will exist when vacuum breakers are ___ UNSAT first opened. Stay clear of pipe end.

STEP 1: 1. Break condenser vacuum by opening the following valves:

2CM-368 (2A Main Cond Shell Vacuum Bkr) (TB2-600,2F-2G, 26) (Ladder needed) 2CM-369 (2B Main Cond Shell Vacuum Bkr) (TB2-600, 2F, 24-25) (Ladder needed) 2CM-370 (2C Main Cond Shell Vacuum Bkr) (TB2-609, 2F-

22) (Ladder needed).

STANDARD:

Applicant will describe opening the valves: 2CM-368, 2CM-369, 2CM-370 This step is critical in order to open correct valves for breaking vacuum.

Examiner Note: The critical end time is when the applicant describes opening the first valve. Due to the height of the valves, no fall protection will be required.

Examiner Cue: When applicant describes engaging lever and rotating handwheel counter clockwise to open the following valve then: A large volume of airflow is heard.

Critical end time________

COMMENTS:

PAGE 5 0F 8

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 2 2. Secure steam to CSAEs as follows: CRITICAL STEP

a. Close the following valves:

___ SAT 2SA-22 (Main Steam To CSAE) (TB2-614, 2M-32) 2SA-27 (Aux Steam To CSAE) (TB-614, 2L-2M, 27). ___UNSAT STANDARD:

Applicant will describe closing 2SA-22 and 2SA-27 This step is critical, because if it is not performed, the CSAEs will continue to pull vacuum.

Examiner Cue: As applicant properly describes closing the valves give cue as appropriate, Valve turns until resistance is felt.

COMMENTS:

STEP 3 b. WHEN time and manpower permit, THEN complete the shutdown of the CSAEs. REFER TO OP/2/B/6300/006 (Main Vacuum). ___ SAT STANDARD:

___ UNSAT Applicant will read the step Examiner Cue: The Control Room Supervisor has instructed another operator to complete the shutdown of the CSAEs.

COMMENTS:

PAGE 6 0F 8

Catawba Nuclear Station JPM I May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 4 3. WHEN requested by Control Room Supervisor, THEN verify condenser vacuum broken as follows:

___ SAT

a. Inspect each vacuum breaker for absence of air flow into condenser. ___ UNSAT
b. Notify Control Room Supervisor of results.

STANDARD:

Applicant will inspect each vacuum breaker for the absence of air flow into the condenser and will report to the Control Room Supervisor.

Examiner Cue: After each inspection, No air flow into condenser.

COMMENTS:

STOP TIME ________

PAGE 7 0F 8

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JKM I DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is in Mode 3 following a reactor trip.

INITIATING CUES:

The Control Room Supervisor instructs you to perform AP/2/A/5500/006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum).

This JPM is TIME CRITICAL; time begins when you acknowledge the task.

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam System JPM J In-Plant PAGE 1 OF 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam EVALUATION SHEET Task: Shifting Main Transformer Auxiliaries Alternate Path: No Facility JPM #: EP-016 Safety Function: 6 Title: Electrical K/A 062 A2.01 Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Types of loads that, if de-energized, would degrade or hinder plant operation.

Rating(s): 3.4 / 3.9 CFR: 41.5 / 43.5 / 45.3 / 45.13 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

OP/1/A/6350/005 (Alternate AC Power Sources) rev. 076, Enclosure 4.24 Task Standard: The 1A Main Transformer Auxiliaries are transferred to an energized source.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 9

PAGE 4 0F 9 Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% power.

The incoming feeder breaker to 1LXC tripped due to a load center fault.

As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized.

INITIATING CUES:

The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).

EXAMINER NOTE: After reading cue, provide the applicant with a copy of OP/1/A/6350/005, Enclosure 4.24.

PAGE 4 OF 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

NOTE: 1. Shifting of power supplies shall be performed without delay.

2. All breakers and alarm lights are located inside the cabinet at ___ SAT the Main Transformer.

___ UNSAT

3. During normal operation, loss of a power supply (from LXC or LXD) will be indicated by the associated "NO VOLTAGE BANK A (B)" alarm light at the transformer.
4. Electrical PPE (high voltage gloves, FR clothing, face shield) is required for shifting power supplies.

Examiner Note: Applicant should state that they would acquire the required PPE.

STEP 1: 3.1 IF shifting Bank A power supplies, perform the following:

3.1.1 Verify voltage indicated on 1LXD per one of the following:

Transformer 1TXD Supply Voltage meter with 1LXD-4B closed OR Transformer 1TXS Supply Voltage meter with 1LXD-8B closed STANDARD:

Applicant verifies voltage indicated on transformer 1TXD with 1LXD-4B closed or 1TXS with 1LXD-8B closed.

Examiner Cue: 600 volts is indicated.

COMMENTS:

PAGE 5 0F 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 2 3.1.2 IF this is an unexpected loss of power, verify the following at Transformer 1A: ___ SAT "NO VOLTAGE BANK A" alarm light illuminated. ___UNSAT "NO VOLTAGE BANK B" alarm light dark.

STANDARD:

Applicant verifies NO VOLTAGE BANK A alarm light is illuminated and the NO VOLTAGE BANK B alarm light is dark.

Examiner Cue: NO VOLTAGE BANK A is LIT and NO VOLTAGE BANK B is DARK.

COMMENTS:

STEP 3 3.1.3 Open "NORMAL FEEDER 1LXC" breaker. CRITICAL STEP STANDARD:

___ SAT Applicant describes opening the NORMAL FEEDER 1LXC breaker by placing it in the OFF (down) position. ___ UNSAT Examiner Cue: NORMAL FEEDER 1LXC is in the OFF position.

This step is critical to allow the lockout bar to be slid in the following step.

COMMENTS:

PAGE 6 0F 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 4 3.1.4 Slide lockout bar to the left. CRITICAL STEP STANDARD:

___ SAT Applicant describes sliding the lockout bar to the left.

___ UNSAT Examiner Cue: Lockout bar is to the left.

This step is critical to allow closing of the EMERG FEEDER 1LXD breaker in the following step.

COMMENTS:

STEP 5 3.1.5 Close "EMERG FEEDER 1LXD" breaker. CRITICAL STEP STANDARD:

___ SAT Applicant describes closing the EMERG FEEDER 1LXD breaker by placing the breaker to the ON (up) position. ___ UNSAT Examiner Cue: EMERG FEEDER 1LXD breaker is in the ON position.

This step is critical to energize the transformer auxiliaries for the 1A Main Transformer COMMENTS:

PAGE 7 0F 9

Catawba Nuclear Station JPM J May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 6 3.1.6 Acknowledge any alarms present.

___ SAT STANDARD:

___ UNSAT Applicant describes acknowledging any alarms.

Examiner Cue: Alarms have been acknowledged.

COMMENTS:

STEP 7 3.1.7 Complete and file Enclosure 4.29 (Unit 1 Main Transformers Cooler Groups Status) to record status. ___ SAT STANDARD: ___ UNSAT Applicant reads the step.

Examiner Cue: Another operator will complete and file enclosure 4.29 NOTE: At this point, Bank A is supplied from 1LXD. Subsequent steps are to return Bank A to 1LXC.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 8 0F 9

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM J DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% power.

The incoming feeder breaker to 1LXC tripped due to a load center fault.

As a result, one-half of the 1A Main Transformer Auxiliaries have been de-energized.

INITIATING CUES:

The Unit Supervisor directs you to shift the 1A Main Transformer Auxiliaries to the 1LXD Feeder per Enclosures 4.24 (Shifting Main Transformer 1A Auxiliaries) of OP/1/A/6350/005 (Alternate AC Power Sources).

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam System JPM K In-Plant PAGE 1 OF 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam EVALUATION SHEET Task: Place the 2A Hydrogen Analyzer in Service Alternate Path: No Facility JPM #: VX-024 Safety Function: 5 Title: Hydrogen Recombiner and Purge Control System (HRPS)

K/A 028 A1.01 Ability to predict and/or monitor changes in parameter (to prevent exceeding design limits) associated with operating the HRPS controls including): Hydrogen concentration Rating(s): 3.4 / 3.8 CFR: 41.5 / 45.5 Preferred Evaluation Location: Preferred Evaluation Method:

Simulator In-Plant X Perform Simulate X

References:

EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant), rev. 025 OP/2/A/6450/010 (Containment Hydrogen Control Systems Enclosure 4.9), rev. 026 Task Standard: Hydrogen Analyzer Train 2A in Service monitoring upper containment.

Validation Time: 15 minutes Time Critical: Yes No X

===============================================================

Applicant: Time Start: __________

NAME___________________________ Docket #_______________ Time Finish: __________

Performance Rating: Performance Time _____

SAT ____ UNSAT ____

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS PAGE 2 OF 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam SIMULATOR OPERATOR INSTRUCTIONS:

1. ENSURE NRC Examination Security has been established.
2. Reset to IC #168
3. Enter the password.
4. Select Yes on the INITIAL CONDITION RESET pop-up window.
5. Ensure simulator setup per table below.
6. Place simulator in RUN and acknowledge any alarms.
7. ENSURE Extra Operator is present in the simulator.
8. Place simulator in FREEZE until Examiner cue is given.

Instructor Action Final Delay Ramp Delete In Event

PAGE 3 OF 10

PAGE 4 0F 10 Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A large break LOCA has occurred on Unit 2.

The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant).

Containment Hydrogen Analyzer 2B is tagged for maintenance.

INITIATING CUES:

The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in service to Position 1 for sampling Upper Containment per OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.

EXAMINER NOTE: After reading cue, provide examinee with a copy of OP/2/6450/010, Enclosure 4.9 with the Initial Conditions signed off.

PAGE 4 OF 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT START TIME: _______

STEP 1: 3.1 Place Hydrogen Analyzer Train A OR Train B in service.

___ SAT 3.1.1 IF aligning Hydrogen Analyzer Train A, proceed as follows: ___ UNSAT 3.1.1.1 Obtain Hydrogen Analyzer Control Panel Train A (2ELCP0251) key (Key #225) from WCC.

STANDARD:

Applicant determines from the initiating cue that A train needs to be aligned and obtains the key #225 EXAMINER NOTE: Key not required to be obtained to complete this JPM task. Once key is identified give cue.

EXAMINER CUE: Key 225 has been obtained.

COMMENTS:

PAGE 5 0F 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: Steps 3.1.1.2 - 3.1.1.5 will be performed at Hydrogen Analyzer Control Panel Train 2A HACP-2A (2ELCP0251) (AB-579, DD-61). CRITICAL STEP STEP 2 3.1.1.2 Select the desired sample location by positioning the "HYDROGEN ANALYZER ___ SAT SAMPLE VALVES PORTS" switch:

___UNSAT Position "1" (for sampling Upper Containment)

Position "2" (for sampling operating level)

Position "3" (for sampling Steam Generator 1B cavity)

Position "ALL" for sampling ALL 3 locations)

STANDARD:

Applicant describes placing the HYDROGEN ANALYZER SAMPLE VALVES PORTS switch in position 1.

EXAMINER CUE: Switch is in position 1.

This step is critical to sample Upper Containment.

COMMENTS:

STEP 3 3.1.1.3 Verify the "POS 1: H2 ANALYZER POS 2:

POST ACCIDENT SAMPLE PANEL" switch is ___ SAT in "POS. 1".

STANDARD: ___ UNSAT Applicant describes verifying the switch is in POS 1 EXAMINER CUE: Switch is in position 1.

COMMENTS:

PAGE 6 0F 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT CRITICAL STEP 4 3.1.1.4 Insert key in "HYDROGEN ANALYZER CONT STEP ISOLATION VALVES" key switch and turn to "OPEN" position. ___ SAT STANDARD:

___ UNSAT Applicant describes inserting the key and turning the key to the OPEN position.

This step is critical to open the containment isolation valves in order to be able to sample upper containment.

EXAMINER CUE: Key is in the OPEN position.

COMMENTS:

STEP 5 3.1.1.5 Verify the following indicating lights are lit:

___ SAT "H2 SAMPLE CONT. ISOLATION VALVES OPEN" ___ UNSAT Sample location(s) selected in Step 3.1.1.2.

STANDARD:

Applicant describes verifying the red OPEN light LIT for H2 Sample Containment Isolation Valves.

EXAMINER CUE: Red OPEN light is lit.

COMMENTS:

PAGE 7 0F 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT NOTE: Steps 3.1.1.6 - 3.1.1.7 will be performed inside A Train Hydrogen Analyzer Control Unit (PAMS) 2MIMT5320A (AB-579, DD-61).

___ SAT STEP 6 3.1.1.6 Verify the "STANDBY/OFF" switch is in the "STANDBY" position. ___ UNSAT STANDARD:

Applicant describes verifying the STANDBY/OFF switch is in the STANDBY position.

EXAMINER CUE: Switch is in the STANDBY position.

COMMENTS:

STEP 7 3.1.1.7 Place the "ON/OFF" switch in the "ON" CRITICAL position. STEP STANDARD: ___ SAT Applicant describes moving the ON/OFF switch up to the ON position. ___ UNSAT This step is critical to turn the analyzer on.

EXAMINER CUE: Switch is in the ON position and the green ON light is lit.

COMMENTS:

PAGE 8 0F 10

Catawba Nuclear Station JPM K May 2014 NRC Initial License Exam STEP/STANDARD SAT/UNSAT STEP 8 3.1.1.8 Monitor H2 concentration at either of the following locations: ___ SAT "Hydrogen Analyzer Control Unit ___ UNSAT "2MIMT5320A" (AB-579, DD-61)

"CONTAINMENT TRN A H2 ANAL" meter (2MIP5320) located on 2MC7.

STANDARD:

Applicant describes calling the control room to inform them that the hydrogen analyzers are in service and can be read on the local unit or on 2MC-7.

EXAMINER CUE: Hydrogen concentration will be monitored on 2MC-7.

COMMENTS:

END OF TASK STOP TIME ________

PAGE 9 0F 10

APPLICANT CUE SHEET (RETURN TO EXAMINER UPON COMPLETION OF TASK) 2014 NRC Initial License Exam JPM K READ TO APPLICANT DIRECTION TO APPLICANT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A large break LOCA has occurred on Unit 2.

The procedure currently in use is EP/2/A/5000/E-1 (Loss of Reactor or Secondary Coolant).

Containment Hydrogen Analyzer 2B is tagged for maintenance.

INITIATING CUES:

The Control Room Supervisor directs you to place Containment Hydrogen Analyzer 2A in service to Position 1 for sampling Upper Containment per OP/2/A/6450/010 (Containment Hydrogen Control Systems) Enclosure 4.9, step 3.1. All initial conditions are complete. Peer check has been waived.