CNS-14-056, 301 General Correspondence
| ML14290A337 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/27/2014 |
| From: | Henderson K Duke Energy Carolinas, Duke Energy Corp |
| To: | Bates M Division of Reactor Safety II |
| Shared Package | |
| ML14290A363 | List: |
| References | |
| CNS-14-056 50-413/14-301, 50-414/14-301 | |
| Download: ML14290A337 (9) | |
Text
Kelvin Henderson DUKE Vice President Et1ERGY Catawba Nuclear Station 803701-4251 Duke Energy CNOIVP 4800 Concord Rd.
York, SC 29745 CNS-14-056 May 02, 2014 Mr. Mark A. Bates, Senior Operations Engineer U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257
Subject:
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units I and 2 Docket Nos.: 50-413 and 50-414 Reactor and Senior Reactor Operator Initial Examinations
Reference:
Letter from NRC to Duke Energy Corporation; Reactor and Senior Reactor Operator Initial Examinations, Catawba Nuclear Station, 05000413/2014301 and 05000414/2014301, dated December 11,2013 The examination materials (final submittal) for the Catawba Nuclear Station Initial License Examination scheduled to begin on May 19, 2014, as listed below, are enclosed for your review.
- a. One (1) CD
- Disk for the written exams and operating exams b.
ES 20 1-3 Examination Security Agreement (updated copy) c.
ES 30 1-3 Operating Test Quality Checklist d.
ES-301-4 Simulator Scenario Quality Checklist e.
ES-301-5 Transient and Event Checklist (multiple pages) f.
ES-301-6 Competencies Checklist g.
ES 401-4 Record of Rejected K/As, updated h.
ES 401-4 Written Examination Quality Checklist www.duke-energy.com
U.S. Nuclear Regulatory Commission May 02, 2014 Page 2 The enclosed material contents shall be withheld from public disclosure until after the 2014 Catawba Nuclear Station Initial Examinations are complete.
If you have any questions or need any additional information, please contact Eric Madsen, Nuclear Training Supervisor at 803-701-3143 or Rick Llewellyn, Operations Training Manager at 803-701-3925.
Sincerely Kelvin Henderson Vice President, Catawba Nuclear Station xc:
3 copies without attachments Malcolm T. Widmann, Chief, U. S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc:
without attachments U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-001 G. A. Hutto, Ill, Senior Resident Catawba CNOI NC
U.S. Nuclear Regulatory Commission May 02, 2014 Page 3 xc:
without attachments Bruce Leonard CTO1A Rick Liewellyn CTO1A Steve Tripi CTO1A ELL EC2ZF bxc:
cover letter with correspondence review documentation only CN-940.00 CNO4DM
Kelvin Henderson DUKE Vice President EIiERGY Catawba Nuclear Station Duke Energy CNO1VP 4800 Concord Road York, SC 29745 0: 803.701.4251 f: 803.701.3221 CNS-1 4-070 June 3, 2014 Mr. Mark A. Bates, Senior Operations Engineer U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257
SUBJECT:
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Numbers 413 and 50-414 Post Examination Documentation The post examination materials for the Catawba Nuclear Station initial license examination completed on May 29, 2014 submitted in accordance with NUREG 1021 ES 501 C.1.a, as listed below, are enclosed.
Enclosure A:
Original examination answer sheets, one clean copy and examination cover sheets.
Enclosure B: Master examinations and answer keys Enclosure C: Questions asked by applicants during exam Enclosure D: Substantive comments made by applicants following the written examination Enclosure E: Written examination seating chart Enclosure F:
Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RD and one sheet for SRO Enclosure G: Written Examination Performance Analysis Enclosure H:
Form ES-201-3, Examination Security Agreement (preliminary)
Enclosure I:
Post Exam Comments A follow up submittal of Form ES-201-3, Examination Security Agreement will be provided to include all required signoffs.
www.duke-energy.com
U. S. Nuclear Regulatory Commission June 3, 2014 Page 2 If you have any questions or need additional information, please contact Eric Madsen, Training Supervisor at (803) 701-3143 or Rick Liewellyn, Operations Training Manager at (803) 701-3925.
- ScereIy, Kelvin Henderson Vice President, Catawba Nuclear Station xc:
without attachments Malcolm T. Widmann, Chief U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 G. A. Hutto, Ill Senior NRC Resident
- Catawba CNO1NC
U. S. Nuclear Regulatory Commission June 3,2014 Page 3 bxc:
without attachments D. Hensley CTOIA ELL EC2ZF bxc:
cover letter with correspondence review documentation only CN-940.00 CNO4DM
Kelvin Henderson
(
DUKE Vice President EL%1ERGY, Catawba Nuclear Station Duke Energy York, SC 29745 0: 803.701.4251 803.701.3221 CNS-1 4-029 February 26, 2014 Mr. Mark A. Bates, Senior Operations Engineer U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257
Subject:
Duke Energy Carolinas, LLC Catawba Nuclear Station, Units 1 and 2 Docket Nos.: 50-413 and 50-414 Reactor and Senior Reactor Operator Initial Examination Outlines (Preliminary)
Reference:
Letter from NRC to Duke Energy Corporation; Reactor and Senior Reactor Operator Initial Examinations, Catawba Nuclear Station, 0500041 3/2014301 and 05000414/2014301, dated December11, 2013 The examination materials for the Catawba Nuclear Station initial license examination scheduled to begin on May 12, 2014 as listed below, are enclosed for your review.
- a. ES 201 Examination Outline Quality Checklist (Preliminary)
- b. ES 201 Examination Security Agreement c.
ES 301-1
- Administrative Topics Outline (Reactor Operator)
- d. ES 301-1
- Administrative Topics Outline (Senior Reactor Operator)
- e. ES 301-2
- Control Room/In-Plant Systems Outline (Reactor Operator) f.
ES 301 Control Room/In-Plant Systems Outline (Instant Senior Reactor Operator)
- g. ES 301-2
- Control Room/In-Plant Systems Outline (Upgrade Senior Reactor Operator)
- h. ES 301-5
- Transient and Event Checklist (Preliminary) i.
ES D-1
- Forms for 5 (five) Simulator Scenario Outlines j.
ES-401 -2
- PWR Examination Outline. Please Note: The sample plans for the reactor and senior operator written exams were selected for us by the Nuclear Regulatory Commission office.
k.
ES 401-4
- Record of Rejected K/As www.duke-energy.com
U.S. Nuclear Regulatory Commission February 26, 2014 Page 2 of 3 The enclosed material contents shall be withheld from public disclosure until after the 2014 Catawba Nuclear Station Initial Examinations are complete.
If you have any questions or need any additional information, please contact Eric Madsen, Nuclear Training Supervisor at 803-701-3143 or Rick Llewellyn, Operations Training Manager at 803-701-3925.
Kelvin Henderson Site Vice President xc:
3 copies without attachments Malcolm T. Widmann, Chief, U. S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc:
without attachments U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-001 G. A. Hutto, Ill, Senior Resident Catawba CNO1 NC
U.S. Nuclear Regulatory Commission February 26, 2014 Page 3 of 3 xc:
without attachments R. Liewellyn CTO1A T. Hamilton CNO1VP S. P. Tripi CTO1A ELL EC2ZF bxc:
cover letter with correspondence review documentation only CN-940.00 CNO4DM