Line 2: |
Line 2: |
| | number = ML14246A151 | | | number = ML14246A151 |
| | issue date = 09/03/2014 | | | issue date = 09/03/2014 |
| | title = Perry Nuclear Power Plant - Revised Non-Cited Violation 05000440/2013007-01 in NRC PI&R Inspection Report 05000440/2013007 | | | title = Revised Non-Cited Violation 05000440/2013007-01 in NRC PI&R Inspection Report 05000440/2013007 |
| | author name = Boland A T | | | author name = Boland A T |
| | author affiliation = NRC/RGN-III/DRP | | | author affiliation = NRC/RGN-III/DRP |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARIR 05000440/20230042024-01-30030 January 2024 Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30
[Table view] |
Inspection Report - Perry - 2013007 |
---|
|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 3, 2014
EA-14-143
Mr. Ernest Harkness Site Vice-President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-290 Perry, OH 44081-0097
SUBJECT: PERRY NUCLEAR POWER PLANT - REVISED NON-CITED VIOLATION 05000440/2013007-01 IN NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000440/2013007
Dear Mr. Harkness:
On January 3, 2014, the U.S. Nuclear Regulatory Commission (NRC) issued the subject inspection report following completion of a baseline problem identification and resolution (PI&R) team inspection. In this report, the NRC inspectors documented a finding of very low safety significance (Green) and associated non-cited violation (NCV) of Technical Specification (TS) 3.4.11, "RCS Pressure and Temperature (P/T) Limits," for the failure to comply with reactor vessel pressure/minimum temperature limits (NCV 05000440/2013007-01). Specifically, from June 2011 through July 2013, reactor operators operated the plant with a vacuum in the reactor vessel during 5 cold startups and 1 cooldown. Vessel pressures at a vacuum, i.e., less than 0 pounds per square inch gauge, are not indicated on the graphs (the pressure/temperature limit curves) associated with TS 3.4.11. The purposes of specifying the minimum temperatures at a bounding range of vessel pressures are to prevent brittle fracture (nonductile) failure of the vessel and to maintain adequate shutdown margin to criticality. As discussed in the inspection report, the NRC concluded, at the time, that the operation of the reactor in those 6 instances represented a violation of the TS. However, after further review, the NRC has concluded that a violation of TS 3.4.11 did not occur. The intent of the curves was to show the minimum temperatures which must be maintained at the pressures shown on the curves. These pressures range from 0 to 1400 pounds per square inch gauge. Because pressures less than 0 pounds per square inch gauge, i.e., a vacuum, are not shown, operation of the reactor in a vacuum on the 6 instances discussed in the inspection report did not represent a violation of the TS. However, those instances did represent operation outside of the parameters used in the analysis by your vendor (General Electric) to generate the pressure/temperature limit curves. This analysis is incorporated into the Facility Operating License No. NPF-58 by Amendment 127 issued by the NRC to Perry on April 29, 2003, and the curves are incorporated into TS 3.4.11. The analysis assumed reactor pressure of 0 pounds per square inch gauge or greater for startups, cooldowns, and power operation. Although we have now concluded that a violation of TS 3.4.11 did not occur during the 5 reactor cold startups and 1 cooldown discussed in the inspection report, we have concluded that the operation of the reactor outside of the parameters of the analysis involved a violation of 10 CFR 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings." Criterion V requires, in part, that activities affecting quality be prescribed by procedures appropriate to the circumstances. Startup and cooldown of the reactor are activities affecting quality and the instructions and procedures used by the operators for these activities, IOI-1, "Cold Startup"; IOI-4, "Shutdown"; and Surveillance Instruction (SVI-)B21-T1176, "RCS Heatup and Cooldown Surveillance," were not appropriate to the circumstances. Specifically, they allowed reactor vessel pressure during the 5 cold startups and 1 cooldown from June 2011 through July 2013 to be less than 0 pounds per square inch gauge, outside of the pressure parameter inputs to the analysis that is the basis for the pressure/temperature limit curves of TS 3.4.11.
As part of the corrective action for the original TS NCV (in your corrective action program as
Condition Report 2013-18689), you submitted a license amendment request, dated June 23, 2014, to revise the pressure/temperature curves to show pressures less than 0 pounds
per square inch gauge and the associated minimum temperatures. The NRC is treating the Criterion V violation as an NCV, consistent with Section 2.3.2.a of the NRC Enforcement Policy. The cross-cutting aspect identified in NRC Inspection Report 05000440/2013007 for the previously documented NCV of TS 3.4.11 is appropriate to the Criterion V violation, as is our previous determination of very low safety significance (Green). In our letter dated August 5, 2014, we notified you that we have accepted your License Amendment Request for review. Further correspondence on this request will be through the established process for licensee amendment requests.
If you contest the violation or significance of this revised NCV, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident
Inspector Office at Perry Nuclear Power Plant.
If you disagree with the cross-cutting aspect assigned to this finding, you should provide a response within 30 days of the date of this letter, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at Perry Nuclear Power Plant.
In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Anne T. Boland, Director Division of Reactor Projects
Docket No. 50-440 License No. NPF-58
cc w/encl: Distribution via LISTSERV Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Anne T. Boland, Director Division of Reactor Projects
Docket No. 50-440 License No. NPF-58
cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl
- John Jandovitz RidsNrrPMPerry Resource
RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson
Darrell Roberts Steven Orth
Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley
Carmen Olteanu ROPassessment.Resource@nrc.gov
DOCUMENT NAME: Perry IR 2013007 Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NRR OE NAME MKunowski:rj SOrth ABoland DDorman 1 PHolahan 2 DATE 08/19/14 08/19/14 08/19/14 08/26/14 08/27/14 OFFICIAL RECORD COPY
______________________
1 NRR concurrene provided via email from L. Casey on August 26, 2014 2 OE concurrence provided via email from K. Hanley on August 27, 2014