(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML090790322 | | | number = ML090790322 |
| | issue date = 02/06/2009 | | | issue date = 02/06/2009 |
| | title = Diablo Canyon-2009-02-Draft Outline Comments | | | title = 2009-02-Draft Outline Comments |
| | author name = Larson B T | | | author name = Larson B |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0 Facility: | | {{#Wiki_filter:DRAFT OUTLINE COMMENTS Rev 0 Facility: DC First Exam Date: 02/06/2009 Written Exam Outline (12/9/2008) |
| DC First Exam Date: | | Comment Resolution 1 Put revision number on all forms. Will do. |
| 02/06/2009 Written Exam Outline (12/9/2008) | | Two KA repeat on SRO exam from last 2 None. |
| Comment Resolution 1 Put revision number on all forms. | | 2 NRC exams (T2/G1-007) |
| Will do. 2 Two KA repeat on SRO exam from last 2 NRC exams (T2/G1-007) | | Five KA repeats on RO exam from last 2 Only one question is repeated from past 2 3 NRC exams - Note that limit is 4 repeat NRC exams. |
| None. 3 Five KA repeats on RO exam from last 2 NRC exams - Note that limit is 4 repeat
| | questions. |
| | | 4 List of suppressed KAs? Sent via email. |
| questions. Only one question is repeated from past 2 NRC exams. | | If questions are repeated from previous Done. No issues identified. |
| 4 List of suppressed KAs? | | 2 NRC exams, review post-exam 5 |
| Sent via email. | | analysis to determine quality of questions. |
| 5 If questions are repeated from previous 2 NRC exams, review post-exam analysis to determine quality of
| |
| | |
| questions. Done. No issues identified. | |
| | |
| Administrative JPM Outline (12/9/2008) | | Administrative JPM Outline (12/9/2008) |
| Comment Resolution 1 Use "A" designators (A1, A2, etc) | | Comment Resolution 1 Use A designators (A1, A2, etc) Will do. |
| Will do. 2 Put revision number on all forms. | | 2 Put revision number on all forms. Will do. |
| Will do. 3 Provide ES-301-1 for Audit exam Will do. | | 3 Provide ES-301-1 for Audit exam Will do. OBDI 202 - IOLE Process |
| Attachment 6 OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (12/9/2008)
| |
| Comment Resolution 1 Draft exam submittal for Modified JPMs must include a copy of the parent JPM. Will send via email.
| |
| 2 What are the "LJC-XXX" and "LJP-XXX"
| |
| | |
| designators? LJC - License JPM Control Room LJP - License JPM Plant 3 Provide ES-301-2 for Audit exam Will do. 4 Put revision number on all forms.
| |
| Will do. 5 S2 - what is PT-456?
| |
| PZR pressure transmitter
| |
| | |
| Simulator Scenario Outline Comments (12/9/2008)
| |
| Comment Resolution 1 Was facility-specific or industry-generic
| |
| | |
| operating experience used in development of the scenarios?
| |
| Yes. Hi swell, FCV-540 failure.
| |
| 2 Was PRA used to identify risk-important
| |
| | |
| operator actions?
| |
| Yes. 3 2 scenarios are MOL, 1 is BOL, and 1 doesn't identify core life. Does training include differences? Yes. No simulator issues anticipated.
| |
| 4 Provide ES-D-1's for Audit exam.
| |
| Will do. 5 Will identify B/U scenario during validation. Change name of B/U to Scenario 4.
| |
| Done. 6 For each scenario, complete Target Quantitative Attributes from ES-301-4 and include on D-1's.
| |
| Will do. 7 In Event column of D-1's, identify applicant position (i.e. R-ATC, N-SRO, BOP) Will do. 8 On Scenario Narrative - replace A, B, C with 1, 2, 3. | |
| Will do. 9 Precursors to events don't count as events (Scenario 1, Events 5/6). Each event must have verifiable actions.
| |
| Noted. 10 Scenario 2, Event 1 - move this event to Event 4 (in case the applicants are too slow to prevent reactor trip)
| |
| Will do.
| |
| Attachment 6 OBDI 202 - IOLE Process 11 Scenario 2, Event 3 - actually 2 events (PZR level channel fails - I for SRO and
| |
| | |
| ATC. Restore letdown is N for SRO and BOP). Okay. 12 Scenario 3, Event 2 - D-1 says 900 MW, narrative says 800 MW.
| |
| Fixed. 900 MW is correct.
| |
| 13 Scenario 3, Event 3: D-1 says NI-44 fails
| |
| | |
| high, narrative says Tc RTD fails hi Fixed. D-1 is correct.
| |
| 14 Scenario 4, Event 5 - initiate steam leak as small, then ramp up slowly.
| |
| Will implement a 5 min ramp and test during
| |
| | |
| validation.
| |
| 15 Scenario 4, Event 3 - is this 2 events?
| |
| No. 16 Scenario 4, Event 7 - how is this CT? Do all Train B components align
| |
|
| |
|
| properly?
| | Control Room / In-Plant System JPM Outline (12/9/2008) |
| Not a CT. Fixed.
| | Comment Resolution Draft exam submittal for Modified JPMs Will send via email. |
| 17 If Scenarios 2 and 4 are selected for the exam, ensure different applicants restore
| | 1 must include a copy of the parent JPM. |
| | What are the LJC-XXX and LJP-XXX LJC - License JPM Control Room 2 |
| | designators? LJP - License JPM Plant 3 Provide ES-301-2 for Audit exam Will do. |
| | 4 Put revision number on all forms. Will do. |
| | 5 S2 - what is PT-456? PZR pressure transmitter Simulator Scenario Outline Comments (12/9/2008) |
| | Comment Resolution Was facility-specific or industry-generic Yes. Hi swell, FCV-540 failure. |
| | 1 operating experience used in development of the scenarios? |
| | Was PRA used to identify risk-important Yes. |
| | 2 operator actions? |
| | 2 scenarios are MOL, 1 is BOL, and 1 Yes. No simulator issues anticipated. |
| | 3 doesnt identify core life. Does training include differences? |
| | 4 Provide ES-D-1s for Audit exam. Will do. |
| | Will identify B/U scenario during Done. |
| | 5 validation. Change name of B/U to Scenario 4. |
| | For each scenario, complete Target Will do. |
| | 6 Quantitative Attributes from ES-301-4 and include on D-1s. |
| | In Event column of D-1s, identify Will do. |
| | 7 applicant position (i.e. R-ATC, N-SRO, BOP) |
| | On Scenario Narrative - replace A, B, C Will do. |
| | 8 with 1, 2, 3. |
| | Precursors to events dont count as Noted. |
| | 9 events (Scenario 1, Events 5/6). Each event must have verifiable actions. |
| | Scenario 2, Event 1 - move this event to Will do. |
| | 10 Event 4 (in case the applicants are too slow to prevent reactor trip) OBDI 202 - IOLE Process |
|
| |
|
| letdown. Will do once exam scenarios are identified. | | Scenario 2, Event 3 - actually 2 events Okay. |
| 18 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call.
| | (PZR level channel fails - I for SRO and 11 ATC. Restore letdown is N for SRO and BOP). |
| N/A 19 When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.
| | Scenario 3, Event 2 - D-1 says 900 MW, Fixed. 900 MW is correct. |
| N/A 20 When preparing Draft Op Test, identify all procedure transitions in the D-2's.
| | 12 narrative says 800 MW. |
| N/A}}
| | Scenario 3, Event 3: D-1 says NI-44 fails Fixed. D-1 is correct. |
| | 13 high, narrative says Tc RTD fails hi Scenario 4, Event 5 - initiate steam leak Will implement a 5 min ramp and test during 14 as small, then ramp up slowly. validation. |
| | 15 Scenario 4, Event 3 - is this 2 events? No. |
| | Scenario 4, Event 7 - how is this CT? Not a CT. Fixed. |
| | 16 Do all Train B components align properly? |
| | If Scenarios 2 and 4 are selected for the Will do once exam scenarios are identified. |
| | 17 exam, ensure different applicants restore letdown. |
| | When preparing Draft Op Test, identify N/A 18 all Tech Specs and action statement(s) in the D-2 for each TS call. |
| | When preparing Draft Op Test, Critical N/A 19 Tasks must be carefully defined, including time limits where applicable. |
| | When preparing Draft Op Test, identify N/A 20 all procedure transitions in the D-2s. OBDI 202 - IOLE Process}} |
|
---|
Category:License-Operator
MONTHYEARIR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5712016-10-14014 October 2016 2016-10 Draft Outline Comments 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam ML16336A5712016-10-14014 October 2016 2016-10 Draft Outline Comments ML16278A6092016-10-0404 October 2016 NRC Initial Operator Licensing Examination Approval 05000275/2016302; 05000323/2016302 ML16272A1472016-09-28028 September 2016 Generic Fundamentals Examination Results Sept 2016 2023-08-09
[Table view] |
Text
DRAFT OUTLINE COMMENTS Rev 0 Facility: DC First Exam Date: 02/06/2009 Written Exam Outline (12/9/2008)
Comment Resolution 1 Put revision number on all forms. Will do.
Two KA repeat on SRO exam from last 2 None.
2 NRC exams (T2/G1-007)
Five KA repeats on RO exam from last 2 Only one question is repeated from past 2 3 NRC exams - Note that limit is 4 repeat NRC exams.
questions.
4 List of suppressed KAs? Sent via email.
If questions are repeated from previous Done. No issues identified.
2 NRC exams, review post-exam 5
analysis to determine quality of questions.
Administrative JPM Outline (12/9/2008)
Comment Resolution 1 Use A designators (A1, A2, etc) Will do.
2 Put revision number on all forms. Will do.
3 Provide ES-301-1 for Audit exam Will do. OBDI 202 - IOLE Process
Control Room / In-Plant System JPM Outline (12/9/2008)
Comment Resolution Draft exam submittal for Modified JPMs Will send via email.
1 must include a copy of the parent JPM.
What are the LJC-XXX and LJP-XXX LJC - License JPM Control Room 2
designators? LJP - License JPM Plant 3 Provide ES-301-2 for Audit exam Will do.
4 Put revision number on all forms. Will do.
5 S2 - what is PT-456? PZR pressure transmitter Simulator Scenario Outline Comments (12/9/2008)
Comment Resolution Was facility-specific or industry-generic Yes. Hi swell, FCV-540 failure.
1 operating experience used in development of the scenarios?
Was PRA used to identify risk-important Yes.
2 operator actions?
2 scenarios are MOL, 1 is BOL, and 1 Yes. No simulator issues anticipated.
3 doesnt identify core life. Does training include differences?
4 Provide ES-D-1s for Audit exam. Will do.
Will identify B/U scenario during Done.
5 validation. Change name of B/U to Scenario 4.
For each scenario, complete Target Will do.
6 Quantitative Attributes from ES-301-4 and include on D-1s.
In Event column of D-1s, identify Will do.
7 applicant position (i.e. R-ATC, N-SRO, BOP)
On Scenario Narrative - replace A, B, C Will do.
8 with 1, 2, 3.
Precursors to events dont count as Noted.
9 events (Scenario 1, Events 5/6). Each event must have verifiable actions.
Scenario 2, Event 1 - move this event to Will do.
10 Event 4 (in case the applicants are too slow to prevent reactor trip) OBDI 202 - IOLE Process
Scenario 2, Event 3 - actually 2 events Okay.
(PZR level channel fails - I for SRO and 11 ATC. Restore letdown is N for SRO and BOP).
Scenario 3, Event 2 - D-1 says 900 MW, Fixed. 900 MW is correct.
12 narrative says 800 MW.
Scenario 3, Event 3: D-1 says NI-44 fails Fixed. D-1 is correct.
13 high, narrative says Tc RTD fails hi Scenario 4, Event 5 - initiate steam leak Will implement a 5 min ramp and test during 14 as small, then ramp up slowly. validation.
15 Scenario 4, Event 3 - is this 2 events? No.
Scenario 4, Event 7 - how is this CT? Not a CT. Fixed.
16 Do all Train B components align properly?
If Scenarios 2 and 4 are selected for the Will do once exam scenarios are identified.
17 exam, ensure different applicants restore letdown.
When preparing Draft Op Test, identify N/A 18 all Tech Specs and action statement(s) in the D-2 for each TS call.
When preparing Draft Op Test, Critical N/A 19 Tasks must be carefully defined, including time limits where applicable.
When preparing Draft Op Test, identify N/A 20 all procedure transitions in the D-2s. OBDI 202 - IOLE Process