Line 2: Line 2:
| number = ML090790322
| number = ML090790322
| issue date = 02/06/2009
| issue date = 02/06/2009
| title = Diablo Canyon-2009-02-Draft Outline Comments
| title = 2009-02-Draft Outline Comments
| author name = Larson B T
| author name = Larson B
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Rev 0 Facility:
{{#Wiki_filter:DRAFT OUTLINE COMMENTS Rev 0 Facility:     DC                                   First Exam Date:       02/06/2009 Written Exam Outline (12/9/2008)
DC First Exam Date:
Comment                                     Resolution 1   Put revision number on all forms.         Will do.
02/06/2009 Written Exam Outline (12/9/2008)
Two KA repeat on SRO exam from last 2    None.
Comment Resolution 1 Put revision number on all forms.
2 NRC exams (T2/G1-007)
Will do. 2 Two KA repeat on SRO exam from last 2 NRC exams (T2/G1-007)
Five KA repeats on RO exam from last 2   Only one question is repeated from past 2 3  NRC exams - Note that limit is 4 repeat   NRC exams.
None. 3 Five KA repeats on RO exam from last 2 NRC exams - Note that limit is 4 repeat  
questions.
 
4   List of suppressed KAs?                   Sent via email.
questions. Only one question is repeated from past 2 NRC exams.
If questions are repeated from previous   Done. No issues identified.
4 List of suppressed KAs?
2 NRC exams, review post-exam 5
Sent via email.
analysis to determine quality of questions.
5 If questions are repeated from previous 2 NRC exams, review post-exam analysis to determine quality of  
 
questions. Done. No issues identified.
 
Administrative JPM Outline (12/9/2008)
Administrative JPM Outline (12/9/2008)
Comment Resolution 1 Use "A" designators (A1, A2, etc)
Comment                                     Resolution 1   Use A designators (A1, A2, etc)         Will do.
Will do. 2 Put revision number on all forms.
2   Put revision number on all forms.         Will do.
Will do. 3 Provide ES-301-1 for Audit exam Will do.
3   Provide ES-301-1 for Audit exam           Will do.                                                     OBDI 202 - IOLE Process
Attachment 6 OBDI 202 - IOLE Process Control Room / In-Plant System JPM Outline (12/9/2008)
Comment Resolution 1 Draft exam submittal for Modified JPMs must include a copy of the parent JPM. Will send via email.
2 What are the "LJC-XXX" and "LJP-XXX"
 
designators? LJC - License JPM Control Room LJP - License JPM Plant 3 Provide ES-301-2 for Audit exam Will do. 4 Put revision number on all forms.
Will do. 5 S2 - what is PT-456?
PZR pressure transmitter
 
Simulator Scenario Outline Comments (12/9/2008)
Comment Resolution 1 Was facility-specific or industry-generic
 
operating experience used in development of the scenarios?
Yes. Hi swell, FCV-540 failure.
2 Was PRA used to identify risk-important
 
operator actions?
Yes. 3 2 scenarios are MOL, 1 is BOL, and 1 doesn't identify core life. Does training include differences? Yes. No simulator issues anticipated.
4 Provide ES-D-1's for Audit exam.
Will do. 5 Will identify B/U scenario during validation. Change name of B/U to Scenario 4.
Done. 6 For each scenario, complete Target Quantitative Attributes from ES-301-4 and include on D-1's.
Will do. 7 In Event column of D-1's, identify applicant position (i.e. R-ATC, N-SRO, BOP) Will do. 8 On Scenario Narrative - replace A, B, C with 1, 2, 3.
Will do. 9 Precursors to events don't count as events (Scenario 1, Events 5/6). Each event must have verifiable actions.
Noted. 10 Scenario 2, Event 1 - move this event to Event 4 (in case the applicants are too slow to prevent reactor trip)
Will do.
Attachment 6 OBDI 202 - IOLE Process 11 Scenario 2, Event 3 - actually 2 events (PZR level channel fails - I for SRO and
 
ATC. Restore letdown is N for SRO and BOP). Okay. 12 Scenario 3, Event 2 - D-1 says 900 MW, narrative says 800 MW.
Fixed. 900 MW is correct.
13 Scenario 3, Event 3: D-1 says NI-44 fails
 
high, narrative says Tc RTD fails hi Fixed. D-1 is correct.
14 Scenario 4, Event 5 - initiate steam leak as small, then ramp up slowly.
Will implement a 5 min ramp and test during
 
validation.
15 Scenario 4, Event 3 - is this 2 events?
No. 16 Scenario 4, Event 7 - how is this CT? Do all Train B components align


properly?
Control Room / In-Plant System JPM Outline (12/9/2008)
Not a CT. Fixed.
Comment                                      Resolution Draft exam submittal for Modified JPMs    Will send via email.
17 If Scenarios 2 and 4 are selected for the exam, ensure different applicants restore
1 must include a copy of the parent JPM.
What are the LJC-XXX and LJP-XXX      LJC - License JPM Control Room 2
designators?                               LJP - License JPM Plant 3  Provide ES-301-2 for Audit exam            Will do.
4  Put revision number on all forms.          Will do.
5  S2 - what is PT-456?                      PZR pressure transmitter Simulator Scenario Outline Comments (12/9/2008)
Comment                                      Resolution Was facility-specific or industry-generic  Yes. Hi swell, FCV-540 failure.
1 operating experience used in development of the scenarios?
Was PRA used to identify risk-important    Yes.
2 operator actions?
2 scenarios are MOL, 1 is BOL, and 1      Yes. No simulator issues anticipated.
3 doesnt identify core life. Does training include differences?
4 Provide ES-D-1s for Audit exam.            Will do.
Will identify B/U scenario during          Done.
5 validation. Change name of B/U to Scenario 4.
For each scenario, complete Target        Will do.
6 Quantitative Attributes from ES-301-4 and include on D-1s.
In Event column of D-1s, identify        Will do.
7 applicant position (i.e. R-ATC, N-SRO, BOP)
On Scenario Narrative - replace A, B, C    Will do.
8 with 1, 2, 3.
Precursors to events dont count as        Noted.
9 events (Scenario 1, Events 5/6). Each event must have verifiable actions.
Scenario 2, Event 1 - move this event to  Will do.
10 Event 4 (in case the applicants are too slow to prevent reactor trip)                                                        OBDI 202 - IOLE Process


letdown. Will do once exam scenarios are identified.
Scenario 2, Event 3 - actually 2 events  Okay.
18 When preparing Draft Op Test, identify all Tech Specs and action statement(s) in the D-2 for each TS call.
(PZR level channel fails - I for SRO and 11 ATC. Restore letdown is N for SRO and BOP).
N/A 19 When preparing Draft Op Test, Critical Tasks must be carefully defined, including time limits where applicable.
Scenario 3, Event 2 - D-1 says 900 MW,    Fixed. 900 MW is correct.
N/A 20 When preparing Draft Op Test, identify all procedure transitions in the D-2's.
12 narrative says 800 MW.
N/A}}
Scenario 3, Event 3: D-1 says NI-44 fails Fixed. D-1 is correct.
13 high, narrative says Tc RTD fails hi Scenario 4, Event 5 - initiate steam leak Will implement a 5 min ramp and test during 14 as small, then ramp up slowly.            validation.
15  Scenario 4, Event 3 - is this 2 events?  No.
Scenario 4, Event 7 - how is this CT?    Not a CT. Fixed.
16  Do all Train B components align properly?
If Scenarios 2 and 4 are selected for the Will do once exam scenarios are identified.
17  exam, ensure different applicants restore letdown.
When preparing Draft Op Test, identify   N/A 18  all Tech Specs and action statement(s) in the D-2 for each TS call.
When preparing Draft Op Test, Critical   N/A 19  Tasks must be carefully defined, including time limits where applicable.
When preparing Draft Op Test, identify   N/A 20 all procedure transitions in the D-2s.                                                       OBDI 202 - IOLE Process}}

Latest revision as of 08:55, 14 November 2019

2009-02-Draft Outline Comments
ML090790322
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/06/2009
From: Brian Larson
Operations Branch IV
To:
Pacific Gas & Electric Co
References
50-275/09-301, 50-323/09-301
Download: ML090790322 (3)


Text

DRAFT OUTLINE COMMENTS Rev 0 Facility: DC First Exam Date: 02/06/2009 Written Exam Outline (12/9/2008)

Comment Resolution 1 Put revision number on all forms. Will do.

Two KA repeat on SRO exam from last 2 None.

2 NRC exams (T2/G1-007)

Five KA repeats on RO exam from last 2 Only one question is repeated from past 2 3 NRC exams - Note that limit is 4 repeat NRC exams.

questions.

4 List of suppressed KAs? Sent via email.

If questions are repeated from previous Done. No issues identified.

2 NRC exams, review post-exam 5

analysis to determine quality of questions.

Administrative JPM Outline (12/9/2008)

Comment Resolution 1 Use A designators (A1, A2, etc) Will do.

2 Put revision number on all forms. Will do.

3 Provide ES-301-1 for Audit exam Will do. OBDI 202 - IOLE Process

Control Room / In-Plant System JPM Outline (12/9/2008)

Comment Resolution Draft exam submittal for Modified JPMs Will send via email.

1 must include a copy of the parent JPM.

What are the LJC-XXX and LJP-XXX LJC - License JPM Control Room 2

designators? LJP - License JPM Plant 3 Provide ES-301-2 for Audit exam Will do.

4 Put revision number on all forms. Will do.

5 S2 - what is PT-456? PZR pressure transmitter Simulator Scenario Outline Comments (12/9/2008)

Comment Resolution Was facility-specific or industry-generic Yes. Hi swell, FCV-540 failure.

1 operating experience used in development of the scenarios?

Was PRA used to identify risk-important Yes.

2 operator actions?

2 scenarios are MOL, 1 is BOL, and 1 Yes. No simulator issues anticipated.

3 doesnt identify core life. Does training include differences?

4 Provide ES-D-1s for Audit exam. Will do.

Will identify B/U scenario during Done.

5 validation. Change name of B/U to Scenario 4.

For each scenario, complete Target Will do.

6 Quantitative Attributes from ES-301-4 and include on D-1s.

In Event column of D-1s, identify Will do.

7 applicant position (i.e. R-ATC, N-SRO, BOP)

On Scenario Narrative - replace A, B, C Will do.

8 with 1, 2, 3.

Precursors to events dont count as Noted.

9 events (Scenario 1, Events 5/6). Each event must have verifiable actions.

Scenario 2, Event 1 - move this event to Will do.

10 Event 4 (in case the applicants are too slow to prevent reactor trip) OBDI 202 - IOLE Process

Scenario 2, Event 3 - actually 2 events Okay.

(PZR level channel fails - I for SRO and 11 ATC. Restore letdown is N for SRO and BOP).

Scenario 3, Event 2 - D-1 says 900 MW, Fixed. 900 MW is correct.

12 narrative says 800 MW.

Scenario 3, Event 3: D-1 says NI-44 fails Fixed. D-1 is correct.

13 high, narrative says Tc RTD fails hi Scenario 4, Event 5 - initiate steam leak Will implement a 5 min ramp and test during 14 as small, then ramp up slowly. validation.

15 Scenario 4, Event 3 - is this 2 events? No.

Scenario 4, Event 7 - how is this CT? Not a CT. Fixed.

16 Do all Train B components align properly?

If Scenarios 2 and 4 are selected for the Will do once exam scenarios are identified.

17 exam, ensure different applicants restore letdown.

When preparing Draft Op Test, identify N/A 18 all Tech Specs and action statement(s) in the D-2 for each TS call.

When preparing Draft Op Test, Critical N/A 19 Tasks must be carefully defined, including time limits where applicable.

When preparing Draft Op Test, identify N/A 20 all procedure transitions in the D-2s. OBDI 202 - IOLE Process