ML11182A917: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11182A917
| number = ML11182A917
| issue date = 06/29/2011
| issue date = 06/29/2011
| title = Summer, Part 21 Notification, Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus
| title = Part 21 Notification, Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus
| author name = Thompson B
| author name = Thompson B
| author affiliation = South Carolina Electric & Gas Co
| author affiliation = South Carolina Electric & Gas Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:06129120l11 U.S. Nuclear Regulatory Commission Operations Center Event Report Pa,-e I Power Reactor Event# 46997 Site: SUMMER Notification Date / Time: 06/29/2011 09:49 (EDT)Unit: 1 Region: 2 State: SC Event Date/ Time: 06/27/2011 16:11 (EDT)Reactor Type: [1] W-3-LP Last Modification:
{{#Wiki_filter:06129120l11                   U.S. Nuclear Regulatory Commission OperationsCenter Event Report                           Pa,-e I Power Reactor                                                                                     Event#       46997 Site: SUMMER                                       Notification Date / Time: 06/29/2011       09:49   (EDT)
06/29/2011 Containment Type: DRY AMB NRC Notified by: BRUCE THOMPSON Notifications:
Unit: 1               Region: 2       State: SC           Event Date/ Time: 06/27/2011       16:11   (EDT)
MARK FRANKE R2DO HQ Ops Officer: STEVE SANDIN PART 21 GP (email) NRR Emergency Class: NON EMERGENCY 10 CFR Section: 21.21 UNSPECIFIED PARAGRAPH Unit Scram Code RX Crit Init Power Initial RX Mode Curr Power Current RX Mode N Yes 1 100 Power Operation 100 Power Operation APPENDIX R ANALYSES FAILS TO RECOGNIZE HOT-SHORT FAILURE RESULTING IN THE LOSS OF AN ESSENTIAL ELECTRICAL BUS The following Part 21 report was received via fax: "10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result in a loss of the B-train 7.2KV essential electrical bus (XSW1 DB)."Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980sfailed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown.
Reactor Type: [1] W-3-LP                                         Last Modification: 06/29/2011 Containment Type:     DRY AMB NRC Notified by:   BRUCE THOMPSON                                 Notifications: MARK FRANKE                   R2DO HQ Ops Officer:   STEVE SANDIN                                                     PART 21 GP (email)           NRR Emergency Class:     NON EMERGENCY 10 CFR Section:
This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit in this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear.
21.21               UNSPECIFIED PARAGRAPH Unit Scram Code       RX Crit Init Power   Initial RX Mode                 Curr Power Current RX Mode N           Yes 1 100         Power Operation                 100           Power Operation APPENDIX R ANALYSES FAILS TO RECOGNIZE HOT-SHORT FAILURE RESULTING IN THE LOSS OF AN ESSENTIAL ELECTRICAL BUS The following Part 21 report was received via fax:
Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis."However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSW1 DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario.
"10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result in a loss of the B-train 7.2KV essential electrical bus (XSW1 DB).
The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and is considered to be a defect, or omission.
"Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980sfailed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown. This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit in this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear. Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis.
reportable under 10 CFR 21."This condition was identified during the circuit analysis review for transitioning the Appendix R Fire Protection 06/29/2011 U.S. Nuclear Regulatory Commission Operations Center Event Report Paze2 Power Reactor Event # 46997 Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue." The licensee informed the NRC Resident Inspector.
"However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSW1 DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario. The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and is considered to be a defect, or omission. reportable under 10 CFR 21.
PAGE 1 OF 2 NRC FORM 361 U.S. NUCLEAR REGULATORY COMMISSION (12-2000)
"This condition was identified during the circuit analysis review for transitioning the Appendix R Fire Protection
REACTOR PLANT OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET EN# 7 NRC OPERATION TELEPHONE NUMBER: PRIMARY -301-816-5100 or 800-532-3469", BACKUPS -[1st] 301-951-0550 or 800-449-3694W, (2ndl 301-415-0550 and [3rdl 301-415-0553  
 
*Licensees who maintain their own ETS are pDrovided these teleDhone numbers.NOTIFICATION TIME FACILITY OR ORGANIZATION UNIT NAME OF CALLER CALL BACK #(3 ý I\ V C Summer Nuclear Station 1 Bruce Thompson (803) 931-5042 EVENT TiME & ZONE EVENT DATE POWERIMfviO[
06/29/2011                 U.S. Nuclear Regulatory Commission Operations Center Event Report           Paze2 Power Reactor                                                                             Event # 46997 Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue."
BEFORE POWERJMODE AFTER (,.vt kIG ý2- 100% Model1 100% ModelI EVENT CLASSIFICATIONS 1-Hr. Non-Emergency 10 CFR 50.72(b)(1) (v)(A) Safe SID Capabilty AINA GENERAL EMERGENCY GEI/AAEC TS Deviation ADV (vXB) RHR Cagiity AINB SITE AREA EMERGNCY SrAAEC 4-Hr. Non-Emergency 10 CFR 50.72(b)(2) (vXC) Control of Red Release AD'C ALERT ALE/AAEC (i) TS Required SID ASHU (vXD) Accident Mitigation AJ'D UNUSUAL EVENT UNLVAAEC (iv)(A) ECCS Disdchage to RCS ACCS (xni) Offsita Medical NVED 50.72 NON-EMERGENCY (see next columns) _ (iv)(B) RPS Actuation (scram) ARPS (xa) Loss Ccmm/Asat/Resp A(MX PHYSICAL SECURITY (73.71) (1]]) (Ax) Offsita Notificatlon A 60-Day Optional 10 CFR 50.73(a)(1)
The licensee informed the NRC Resident Inspector.
MATERLUALEXPOSURE B7?? 8-Hr. Non-Emergency 10 CFR 50.72(b)(3)
 
Inval Specied System Actuation FITNESS FOR DUTY HFIT (ii)(A) Degraded Condition ADM Other Unspecified Requirement (Identify)
PAGE 1 OF 2 NRC FORM 361                                                                                                                             U.S. NUCLEAR REGULATORY COMMISSION (12-2000)                                                                           REACTOR PLANT                                                       OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET                                                         EN#                         7 NRC OPERATION TELEPHONE NUMBER: PRIMARY - 301-816-5100 or 800-532-3469", BACKUPS - [1st] 301-951-0550 or 800-449-3694W, (2ndl 301-415-0550 and [3rdl 301-415-0553                                                             *Licensees who maintain their own ETS are pDrovided these teleDhone numbers.
OIER U PECFE RECUT. (see last column) (ii)(B) Unanalyzed Condition AUNA NNR INFORMATION ONLY NWF [iv)(A) Specified System Actuation AESF NI NONR DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continue on back)10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result In a loss of the B-train 7.2KV essential electrical bus (XSW1 DB).Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980s failed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown.
NOTIFICATION TIME           FACILITY OR ORGANIZATION                               UNIT             NAME OF CALLER                                       CALL BACK #
This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit In this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear.
(3 ý I\                     VC Summer Nuclear Station                               1                 Bruce Thompson                                       (803) 931-5042 EVENT TiME &ZONE             EVENT DATE                       POWERIMfviO[     BEFORE                                             POWERJMODE AFTER
Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis.However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSWI DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario.
(,.vt kIG                       ý2-                           100% Model1                                                         100% ModelI EVENT CLASSIFICATIONS                                   1-Hr. Non-Emergency 10 CFR 50.72(b)(1)                             (v)(A)   Safe SID Capabilty                   AINA GENERAL EMERGENCY                           GEI/AAEC                       TS Deviation                               ADV         (vXB)   RHR Cagiity                           AINB SITE AREA EMERGNCY                           SrAAEC           4-Hr. Non-Emergency 10 CFR 50.72(b)(2)                               (vXC)   Control of Red Release                 AD'C ALERT                                       ALE/AAEC           (i)         TS Required SID                           ASHU       (vXD)   Accident Mitigation                   AJ'D UNUSUAL EVENT                               UNLVAAEC             (iv)(A)   ECCS Disdchage to RCS                     ACCS       (xni)   Offsita Medical                       NVED 50.72 NON-EMERGENCY               (see next columns)       _   (iv)(B)   RPS Actuation (scram)                     ARPS       (xa)     Loss Ccmm/Asat/Resp                 A(MX PHYSICAL SECURITY (73.71)                         (1)))        (Ax)       Offsita Notificatlon                       A             60-Day Optional 10 CFR 50.73(a)(1)
The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and Is considered to be a defect, or omission, reportable under 10 CFR 21.This condition was identified during the circuit analysis review for trainsitioning the Appendix R Fire Protection Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue.NOTIFICATIONS YES NO WILL BE ANYTHING UNUSUAL OR NRC RESIDENT L 0 -....... NOT UNDERSTOOD?  
MATERLUALEXPOSURE                                   B7?? 8-Hr. Non-Emergency 10 CFR 50.72(b)(3)                                             Inval Specied System Actuation FITNESS FOR DUTY                                   HFIT         (ii)(A)   Degraded Condition                         ADM       Other Unspecified Requirement (Identify)
[]YES (Explain above) NO STATE(s) _ _ DID ALL SYSTEMS []YES Li NO (Explain above)LOCAL V( FUNCTION AS REQUIRED?OTHER GOV AGENCIES _ _ MODE OF OPERATION ESTIMATED ADDrT1ONAL INFO ON BACK MEDIA/PRESS RELEASE I UNTIL CORRECTED:
OIERU PECFE RECUT.                   (see last column)         (ii)(B)     Unanalyzed Condition                     AUNA                                                       NNR INFORMATION ONLY                                   NWF         [iv)(A)   Specified System Actuation                 AESF                                                       NONR NI DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continueon back) 10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result In a loss of the B-train 7.2KV essential electrical bus (XSW1 DB).
RESTART DATE: [] YES ] NO NRC FORM 361 (12-2000)}}
Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980s failed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown. This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit In this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear. Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis.
However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSWI DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario. The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and Is considered to be a defect, or omission, reportable under 10 CFR 21.
This condition was identified during the circuit analysis review for trainsitioning the Appendix R Fire Protection Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue.
NOTIFICATIONS                         YES       NO         WILL BE         ANYTHING UNUSUAL OR NRC RESIDENT                         L           -0       .......           NOT UNDERSTOOD?                       []YES (Explain above)                     NO STATE(s)                           _     _                                 DID ALL SYSTEMS                       []YES                               Li   NO (Explain above)
LOCAL                                           V(                         FUNCTION AS REQUIRED?
OTHER GOV AGENCIES                 _     _                                 MODE OF OPERATION                     ESTIMATED                           ADDrT1ONAL INFO ON BACK MEDIA/PRESS RELEASE                                                         UNTIL I   CORRECTED:                     RESTART DATE:                       [] YES             ] NO NRC FORM 361 (12-2000)}}

Latest revision as of 00:05, 21 March 2020

Part 21 Notification, Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus
ML11182A917
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/29/2011
From: Thompson B
South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML11182A917 (3)


Text

06129120l11 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Pa,-e I Power Reactor Event# 46997 Site: SUMMER Notification Date / Time: 06/29/2011 09:49 (EDT)

Unit: 1 Region: 2 State: SC Event Date/ Time: 06/27/2011 16:11 (EDT)

Reactor Type: [1] W-3-LP Last Modification: 06/29/2011 Containment Type: DRY AMB NRC Notified by: BRUCE THOMPSON Notifications: MARK FRANKE R2DO HQ Ops Officer: STEVE SANDIN PART 21 GP (email) NRR Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH Unit Scram Code RX Crit Init Power Initial RX Mode Curr Power Current RX Mode N Yes 1 100 Power Operation 100 Power Operation APPENDIX R ANALYSES FAILS TO RECOGNIZE HOT-SHORT FAILURE RESULTING IN THE LOSS OF AN ESSENTIAL ELECTRICAL BUS The following Part 21 report was received via fax:

"10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result in a loss of the B-train 7.2KV essential electrical bus (XSW1 DB).

"Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980sfailed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown. This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit in this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear. Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis.

"However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSW1 DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario. The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and is considered to be a defect, or omission. reportable under 10 CFR 21.

"This condition was identified during the circuit analysis review for transitioning the Appendix R Fire Protection

06/29/2011 U.S. Nuclear Regulatory Commission Operations Center Event Report Paze2 Power Reactor Event # 46997 Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue."

The licensee informed the NRC Resident Inspector.

PAGE 1 OF 2 NRC FORM 361 U.S. NUCLEAR REGULATORY COMMISSION (12-2000) REACTOR PLANT OPERATIONS CENTER EVENT NOTIFICATION WORKSHEET EN# 7 NRC OPERATION TELEPHONE NUMBER: PRIMARY - 301-816-5100 or 800-532-3469", BACKUPS - [1st] 301-951-0550 or 800-449-3694W, (2ndl 301-415-0550 and [3rdl 301-415-0553 *Licensees who maintain their own ETS are pDrovided these teleDhone numbers.

NOTIFICATION TIME FACILITY OR ORGANIZATION UNIT NAME OF CALLER CALL BACK #

(3 ý I\ VC Summer Nuclear Station 1 Bruce Thompson (803) 931-5042 EVENT TiME &ZONE EVENT DATE POWERIMfviO[ BEFORE POWERJMODE AFTER

(,.vt kIG ý2- 100% Model1 100% ModelI EVENT CLASSIFICATIONS 1-Hr. Non-Emergency 10 CFR 50.72(b)(1) (v)(A) Safe SID Capabilty AINA GENERAL EMERGENCY GEI/AAEC TS Deviation ADV (vXB) RHR Cagiity AINB SITE AREA EMERGNCY SrAAEC 4-Hr. Non-Emergency 10 CFR 50.72(b)(2) (vXC) Control of Red Release AD'C ALERT ALE/AAEC (i) TS Required SID ASHU (vXD) Accident Mitigation AJ'D UNUSUAL EVENT UNLVAAEC (iv)(A) ECCS Disdchage to RCS ACCS (xni) Offsita Medical NVED 50.72 NON-EMERGENCY (see next columns) _ (iv)(B) RPS Actuation (scram) ARPS (xa) Loss Ccmm/Asat/Resp A(MX PHYSICAL SECURITY (73.71) (1))) (Ax) Offsita Notificatlon A 60-Day Optional 10 CFR 50.73(a)(1)

MATERLUALEXPOSURE B7?? 8-Hr. Non-Emergency 10 CFR 50.72(b)(3) Inval Specied System Actuation FITNESS FOR DUTY HFIT (ii)(A) Degraded Condition ADM Other Unspecified Requirement (Identify)

OIERU PECFE RECUT. (see last column) (ii)(B) Unanalyzed Condition AUNA NNR INFORMATION ONLY NWF [iv)(A) Specified System Actuation AESF NONR NI DESCRIPTION Include: Systems affected, actuations and their initiating signals, causes, effect of event on plant, actions taken or planned, etc. (Continueon back) 10 CFR 21: Appendix R analyses conducted for Virgil C. Summer Nuclear Station (VCSNS) failed to identify that a fire-induced hot-short failure in an ammeter circuit would result In a loss of the B-train 7.2KV essential electrical bus (XSW1 DB).

Appendix R analyses performed by Gilbert/Commonwealth (now WorleyParsons) in the early 1980s failed to recognize the possibility of a fire-induced hot-short condition in a circuit that was identified as being required for safe shutdown. This circuit connects a set of sensing current transformers (CTs) to an ammeter on the Main Control Board, and provides over-current sensing for an over-current relay. Gilbert/Commonwealth recognized that a fire-induced open circuit In this ammeter circuit would result in damage to, or a fire in, the B-train 7.2kV essential switchgear. Thyrite protectors were added to the circuit to protect the CTs from this open circuit condition as part of the Appendix R analysis.

However, this analysis and resolution failed to consider the hot-short-to-ground failure mode. Current from a hot-short could flow through the ammeters, or neutral conductor, and then through the bus neutral over-current relay to ground. This could actuate the over-current relay, which in turn would actuate a lock-out relay and trip all incoming breakers to bus XSWI DB. This bus provides credited B-train power to safe-shutdown components credited for this scenario. The Appendix R analyses conducted for VCSNS by Gilbert/Commonwealth did not address the hot-short scenario and Is considered to be a defect, or omission, reportable under 10 CFR 21.

This condition was identified during the circuit analysis review for trainsitioning the Appendix R Fire Protection Program to NFPA 805 and was reported to the NRC as an unanalyzed condition on 05/03/2011 (see Event Notification No. 46811). Corrective actions have been taken to address this issue.

NOTIFICATIONS YES NO WILL BE ANYTHING UNUSUAL OR NRC RESIDENT L -0 ....... NOT UNDERSTOOD? []YES (Explain above) NO STATE(s) _ _ DID ALL SYSTEMS []YES Li NO (Explain above)

LOCAL V( FUNCTION AS REQUIRED?

OTHER GOV AGENCIES _ _ MODE OF OPERATION ESTIMATED ADDrT1ONAL INFO ON BACK MEDIA/PRESS RELEASE UNTIL I CORRECTED: RESTART DATE: [] YES ] NO NRC FORM 361 (12-2000)