ML112640368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML112640368
| number = ML112640368
| issue date = 09/21/2011
| issue date = 09/21/2011
| title = South Texas Project, Units 1 and 2 - Acceptance Review Email, License Amendment Request, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System (TAC Nos. ME6978 and
| title = Acceptance Review Email, License Amendment Request, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System
| author name = Singal B K
| author name = Singal B
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Harrison A
| addressee name = Harrison A
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Singal, Balwant Sent: Wednesday, September 21, 2011 12:51 PM To: 'Harrison, Albon' Cc: 'Taplett, Kenneth'  
{{#Wiki_filter:From:                     Singal, Balwant Sent:                     Wednesday, September 21, 2011 12:51 PM To:                       'Harrison, Albon' Cc:                       'Taplett, Kenneth'


==Subject:==
==Subject:==
Acceptance of Application - License Amendment Request Technical Specification 3.7.7, "Control Room Makeup and Cleanup Filtration System," TAC Nos. ME6978 and ME6979 By letter dated August 23, 2011, STP Nuclear Operating Company submitted an amendment request for approval of the License Amendment Request to revise the application of Risk-Informed Technical Specifications to Technical Specification (TS) 3.7.7, "Control Room Makeup and Cleanup Filtration System.This change will correct a potential misapplication of the Configuration Risk Management Program that is currently allowed by the TSs for South Texas Project, Units 1 and 2.
Acceptance of Application - License Amendment Request Technical Specification 3.7.7, "Control Room Makeup and Cleanup Filtration System,"
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
TAC Nos. ME6978 and ME6979 By letter dated August 23, 2011, STP Nuclear Operating Company submitted an amendment request for approval of the License Amendment Request to revise the application of Risk-Informed Technical Specifications to Technical Specification (TS) 3.7.7, Control Room Makeup and Cleanup Filtration System. This change will correct a potential misapplication of the Configuration Risk Management Program that is currently allowed by the TSs for South Texas Project, Units 1 and 2.
 
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me.  
If you have any questions, please contact me.
 
Balwant K. Singal Senior Project Manager (Comanche Peak and STP)
Balwant K. Singal Senior Project Manager (Comanche Peak and STP)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222}}
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222}}

Latest revision as of 22:09, 20 March 2020

Acceptance Review Email, License Amendment Request, Revise Applicability of Risk-Managed Technical Specifications (TS) to TS 3.7.7, Control Room Makeup and Cleanup Filtration System
ML112640368
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/21/2011
From: Balwant Singal
Plant Licensing Branch IV
To: Harrison A
South Texas
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC ME6978, TAC ME6979
Download: ML112640368 (1)


Text

From: Singal, Balwant Sent: Wednesday, September 21, 2011 12:51 PM To: 'Harrison, Albon' Cc: 'Taplett, Kenneth'

Subject:

Acceptance of Application - License Amendment Request Technical Specification 3.7.7, "Control Room Makeup and Cleanup Filtration System,"

TAC Nos. ME6978 and ME6979 By letter dated August 23, 2011, STP Nuclear Operating Company submitted an amendment request for approval of the License Amendment Request to revise the application of Risk-Informed Technical Specifications to Technical Specification (TS) 3.7.7, Control Room Makeup and Cleanup Filtration System. This change will correct a potential misapplication of the Configuration Risk Management Program that is currently allowed by the TSs for South Texas Project, Units 1 and 2.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Comanche Peak and STP)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222