Correction Letter to Revised Technical Specification 3.7.7, Technical Specification Page 3/4 7-16
ML12241A193
Person / Time
Site: South Texas  
Issue date: 08/30/2012
From: Balwant Singal
Plant Licensing Branch IV
To: Richards K
South Texas
Singal B
References
TAC ME6979
Download: ML12241A193 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 30, 2012 Mr. Kevin D. Richards President and Chief Executive Officerl STP Nuclear Operating Company South Texas Project P.O. Box 289 VVadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - RE: CORRECTION LEITER TO REVISED TECHNICAL SPECIFICATION 3.7.7, TECHNICAL SPECIFICATION PAGE 3/4 7-16 (TAC NOS. ME6978 AND ME6979)

Dear Mr. Richards:

By letter dated August 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 199 to Facility Operating License No. NPF-76 and Amendment No. 187 to Facility Operating License No. NPF-80 for the South Texas Project, Units 1 and 2 respectively.

The amendments contained changes to the Technical Specification (TS) 3.7.7, "Control Room Makeup and Cleanup Filtration System," in response to your application dated August 23,2011.

The scanned copy of the document transmitted via e-mail is missing the revision bars on the revised TS page 3/4 7-16 and the corrected page is being re-transmitted. There is no change to the document transmitted previously, except to show the revision bars on the revised TS page 3/4 7-16.

K. Richards

- 2 If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.singal@nrc.gov.

Sincerely,

~~QA:j ~I~~

~ant K. Singal, Senior Project Manager Plant licensing Branch IV Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/encl: Distribution via listserv

PLANT SYSTEMS 3/4.7.7 CONTROL ROOM MAKEUP AND CLEANUP FILTRATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.7 Three independent Control Room Makeup and Cleanup Filtration Systems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4:

ACTION:

a.

With one Control Room Makeup and Cleanup Filtration System inoperable for reasons other than condition b or condition e, within 7 days restore the inoperable system to OPERABLE status, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With one Control Room Makeup and Cleanup Filtration System inoperable only due to unavailability of cooling, within 7 days restore the inoperable system to OPERABLE status or apply the requirements of the CRMP, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With two Control Room Makeup and Cleanup Filtration Systems inoperable for reasons other than condition e, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> restore at least two systems to OPERABLE status, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With three Control Room Makeup and Cleanup Filtration Systems inoperable for reasons other than condition e, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> restore at least one system to OPERABLE status, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

The Control Room Envelope (CRE) boundary is not a required system, subsystem, train, component, or device that depends on a diesel generator as a source of emergency power. Specification 3.S.1.1.d need not be applied for an inoperable Control Room Makeup and Cleanup Filtration System that is inoperable solely due to an inoperable Control Room Envelope boundary.

e.

One or more Control Room Makeup and Cleanup Filtration Systems inoperable due to inoperable Control Room Envelope (CRE) boundary perform the following:

1) immediately initiate action to implement mitigating actions, and
2) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> verify mitigating actions ensure CRE occupant exposures to radiological, chemical and smoke hazards will not exceed limits, and
3) within 90 days restore CRE boundary to OPERABLE status.

OR be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SOUTH TEXAS UNITS 1 & 2 3/47-16 Unit 1 -Amendment No. fi9, 125, 128, 179, 188,195,199 Unit 2 - Amendment No. 47, 11 d, 117, HiS. 175. Hid. 187

K. Richards

-2 If you have any questions, please contact me at 301-415-3016 or via e-mail at Balwant.singal@nrc.gov.

Docket Nos. 50-498 and 50-499

Enclosure:

As stated cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrDraApla Resource RidsNrrDssScvb Resource ADAMS Accession No Ml12241A193 Sincerely, IRA!

Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMSouth Texas Resource RidsOgcRp Resource RidsRgn4MailCenter Resource HWalker, NRRIDSS/SCVB OFFICE INRR/LPL4/PM NRR/LPL4/LA OGC NRR/LPL4/BC NRR/LPL4/PM NAME BSingal JBurkhardt (BClayton for)

N/A MMarkley BSingal DATE 8/30/12 8/29/12 8/30112 8/30/12 OFFICIAL RECORD COpy