{{#Wiki_filter:Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIVR00001AllRiverkeeper Hearing Exhibit List ("RIV Exhibit List")Dec. 22, 2011RIV000002RK-TC-2Riverkeeper Initial Statement of Position Regarding Contention RK-TC Flow Accelerated Corrosion ("RK-TC-2 SOP")Dec. 22, 2011RIV000003RK-TC-2Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Testimony RK-TC-2")Dec. 22, 2011RIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011RIV000005RK-TC-2Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Report")Dec. 22, 2011RIV000006RK-TC-2NRC Information Notice No 86-106, "Feed Water Line Break," December 16, 1986 ("NRC IN 86-106")Dec. 22, 2011RIV000007RK-TC-2NRC Bulletin 87-01, "Thinning Pipe Walls in Nuclear Plants," July 9, 1987  
{{#Wiki_filter:RIVR40001 Revised: June 29, 2012 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
("NRC Bulletin 87-01")Dec. 22, 2011RIV000008RK-TC-2NRC Information Notice 1991-019, "Steam Generator Feed Water Distribution Piping Damage," March 12, 1991 ("NRC IN 1991-019")Dec. 22, 2011RIV000009RK-TC-2Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")Dec. 22, 2011RIV000010RK-TC-2NRC Information Notice 1997-084, "Rupture of Extraction Steam Piping," December 11, 1997 ("NRC IN 1997-084")Dec. 22, 2011 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000011RK-TC-2NRC Information Notice 2006-008, "Secondary Piping Rupture at Mihama Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")Dec. 22, 2011RIV000012RK-TC-2EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")Dec. 22, 2011RIV000013RK-TC-2Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #     Contentions                                     Exhibit Name                                      Exhibit Addressed by Exhibit                                                                              Submission Date RIVR00001    All                  Riverkeeper Hearing Exhibit List ("RIV Exhibit List")                       Dec. 22, 2011 RIV000002    RK-TC-2              Riverkeeper Initial Statement of Position Regarding Contention RK-TC     Dec. 22, 2011 Flow Accelerated Corrosion ("RK-TC-2 SOP")
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")Dec. 22, 2011RIV000014RK-TC-2Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")Dec. 22, 2011RIV000015RK-TC-2EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, 2010) ("Entergy FAC Program")Dec. 22, 2011RIV00016ARK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 1")Dec. 22, 2011RIV00016BRK-TC-2Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Graphs Part 2")Dec. 22, 2011 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000017RK-TC-2V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")Dec. 22, 2011RIV000018RK-TC-2CHECWORKS TM Steam/Feedwater Application, Guidelines for Plant Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")Dec. 22, 2011RIV000019RK-TC-2Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR
RIV000003    RK-TC-2              Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld     Dec. 22, 2011 Testimony RK-TC-2")
("Hausler VY Testimony")Dec. 22, 2011RIV000020RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:
RIV000004    RK-TC-2; RK-TC-1B;   Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")                         Dec. 22, 2011 RK-TC-5 RIV000005    RK-TC-2              Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2         Dec. 22, 2011 Report")
LCF) ("IP3 CHECWORKS SFA Model Aug 2011")Dec. 22, 2011RIV000021RK-TC-2CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -
RIV000006    RK-TC-2              NRC Information Notice No 86-106, Feed Water Line Break, December 16,     Dec. 22, 2011 1986 ("NRC IN 86-106")
Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")Dec. 22, 2011 4Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000022RK-TC-2Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")Dec. 22, 2011RIV000023RK-TC-2NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")Dec. 22, 2011RIV000024RK-TC-2Entergy Engineering Report, Operating Experience Review Report, IP-RPT LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")Dec. 22, 2011RIV000025RK-TC-2Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Report")Dec. 22, 2011RIV000026RK-TC-2Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Report List 1")Dec. 22, 2011RIV000027RK-TC-2Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Report List 2")Dec. 22, 2011RIV000028RK-TC-2Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR-IP2-2001-10525")Dec. 22, 2011RIV000029RK-TC-2Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR-IP3-2006-02270")Dec. 22, 2011 5Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000030RK-TC-2Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")Dec. 22, 2011RIV000031RK-TC-2Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")Dec. 22, 2011RIV000032RK-TC-2Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")Dec. 22, 2011RIV000033RK-TC-2Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March 17, 2011 ("Dedman Article")Dec. 22, 2011RIV000034RK-TC-1BDr.Hopenfeld Pre-filed Testimony Dec. 22, 2011RIV000035RK-TC-1B; RK-TC-5Dr. Hopenfeld ReportDec. 22, 2011RIV000036RK-TC-1B; RK-TC-5Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785Dec. 22, 2011RIV000037RK-TC-1B; RK-TC-5Official Transcript, ACRS Subcommittee, 12/6/2006Dec. 22, 2011RIV000038RK-TC-1B; RK-TC-5NRC IN 2011-04Dec. 22, 2011RIV000039RK-TC-1B; RK-TC-5Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08Dec. 22, 2011 6Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000040RK-TC-1B; RK-TC-5Taylor, EPRI R & D Status Report, Jan/Feb 1983Dec. 22, 2011RIV000041RK-TC-1B; RK-TC-5Entergy, Table of Environmental Correction Actions for Metal Fatigue, 11/6/07Dec. 22, 2011RIV000042RK-TC-1B; RK-TC-5DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294Dec. 22, 2011RIV000043RK-TC-1B; RK-TC-5Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179Dec. 22, 2011RIV000044RK-TC-1B; RK-TC-5NRC Bulletin 88-08Dec. 22, 2011RIV000045RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 1Dec. 22, 2011RIV000046RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 2Dec. 22, 2011RIV000047RK-TC-1B; RK-TC-5NRC IN 97-46Dec. 22, 2011RIV000048RK-TC-1B; RK-TC-5Final Report of the NESC-Thermal Fatigue Project, EUR22763Dec. 22, 2011RIV000049RK-TC-1B; RK-TC-5Entergy Indian Point U3, FAC, 3RF13 Outage, 2005Dec. 22, 2011RIV000050RK-TC-1B; RK-TC-5Westinghouse, WCAP-14950, IPECPROP00059247Dec. 22, 2011RIV000051RK-TC-1B; RK-TC-5Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008Dec. 22, 2011RIV000052A-DRK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1110Dec. 22, 2011RIV000053RK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1122Dec. 22, 2011RIV000054RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11Dec. 22, 2011RIV000055RK-TC-1B; RK-TC-5Westinghouse CN-PAFM-09-64, IPECPROP00058077Dec. 22, 2011RIV000056RK-TC-1B; RK-TC-5Systems Standard Design Criteria, IPECPROP00059698Dec. 22, 2011 7Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000057RK-TC-1B; RK-TC-5RAI Indian Point U2 and U3 LRA, 2/10/11Dec. 22, 2011RIV000058RK-TC-1B; RK-TC-5Response to RAI, Indian Point U2 and U3, 3/28/11Dec. 22, 2011RIV000059RK-EC-3/CW-EC-1Riverkeeper and Clearwater Initial Statement of Position Regarding Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")Dec. 22, 2011RIV000060RK-EC-3/CW-EC-1Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW-EC Spent Fuel Pool Leaks ("Gundersen Testimony")Dec. 22, 2011RIV000061RK-EC-3/CW-EC-1Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC Spent Fuel Pool Leaks ("Stewart Testimony")Dec. 22, 2011RIV000062RK-EC-3/CW-EC-1Curriculum Vitae of Arnold Gundersen ("Gundersen CV")Dec. 22, 2011RIV000063RK-EC-3/CW-EC-1Curriculum Vitae of Gillian Stewart ("Stewart CV")Dec. 22, 2011RIV000064RK-EC-3/CW-EC-1NUREG-1437, Revision 1, Generic Environmental Impact Statement for License Renewal of Nuclear Plants (July 2009) Draft Report for Comment ("GEIS Update")Dec. 22, 2011RIV000065RK-EC-3/CW-EC-1U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Guide (February 2002)Dec. 22, 2011RIV000066RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Indian Point Energy Center, January 7, 2008, IPEC00195418Dec. 22, 2011 8Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000067RK-EC-3/CW-EC-1Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008Dec. 22, 2011RIV000068RK-EC-3/CW-EC-1Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Center, Buchanan, NY (January 2008)Dec. 22, 2011RIV000069RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. 05000247/2005011, March 16, 2006Dec. 22, 2011RIV000070RK-EC-3/CW-EC-1Indian Point Energy Center Status Report (Sept. 6, 2007)Dec. 22, 2011RIV000071RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.
RIV000007    RK-TC-2              NRC Bulletin 87-01, Thinning Pipe Walls in Nuclear Plants, July 9, 1987   Dec. 22, 2011
Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)Dec. 22, 2011RIV000072RK-EC-3/CW-EC-1E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams -
("NRC Bulletin 87-01")
What's Next? (Nov. 19, 2005), IPEC00065830Dec. 22, 2011RIV000073RK-EC-3/CW-EC-1Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06),
RIV000008    RK-TC-2              NRC Information Notice 1991-019, Steam Generator Feed Water Distribution   Dec. 22, 2011 Piping Damage," March 12, 1991 ("NRC IN 1991-019")
IPEC00063518Dec. 22, 2011RIV000074RK-EC-3/CW-EC-1Entergy, Problem Development Sheet - Groundwater, IPEC00207416Dec. 22, 2011 9Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000075RK-EC-3/CW-EC-1E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351Dec. 22, 2011RIV000076RK-EC-3/CW-EC-1GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),
RIV000009    RK-TC-2              Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through         Dec. 22, 2011 Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")
IPEC00227561Dec. 22, 2011RIV000077RK-EC-3/CW-EC-1Entergy Chart of Leak Locations, I PEC00059360Dec. 22, 2011RIV000078RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217Dec. 22, 2011RIV000079RK-EC-3/CW-EC-1Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW YORK TIMES (March 1, 2009)Dec. 22, 2011RIV000080RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219Dec. 22, 2011RIV000081RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223Dec. 22, 2011RIV000082RK-EC-3/CW-EC-1Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517Dec. 22, 2011 10Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000083RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519Dec. 22, 2011RIV000084RK-EC-3/CW-EC-1IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515Dec. 22, 2011RIV000085RK-EC-3/CW-EC-1Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report 05000286/2011004 (November 7, 2011)Dec. 22, 2011RIV000086RK-EC-3/CW-EC-1Entergy correspondence, e-mails regarding approach to groundwater contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936Dec. 22, 2011RIV000087RK-EC-3/CW-EC-1Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506Dec. 22, 2011RIV000088RK-EC-3/CW-EC-1Supplemental Report of the Public Oversight Panel Regarding the Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010Dec. 22, 2011RIV000089RK-EC-3/CW-EC-1GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June
RIV000010    RK-TC-2              NRC Information Notice 1997-084, Rupture of Extraction Steam Piping,"       Dec. 22, 2011 December 11, 1997 ("NRC IN 1997-084")


2011)Dec. 22, 2011 11Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000090RK-EC-3/CW-EC-1Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100Dec. 22, 2011RIV000091RK-EC-3/CW-EC-1Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. NRC (September 1, 2006)Dec. 22, 2011RIV000092RK-EC-3/CW-EC-1Coastal Fish & Wildlife Habitat Rating Form, Haverstraw BayDec. 22, 2011RIV000093RK-EC-3/CW-EC-1National Research Council, Health Risks from Exposure to Low Levels of Ionizing Radiation: BEIR VII - Phase 2 (2006)Dec. 22, 2011RIV000094RK-EC-3/CW-EC-1Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221Dec. 22, 2011RIV000095RK-EC-3/CW-EC-1Groundwater Investigation '06 Quarter 4 Activities and Results, IPEC00063899Dec. 22, 2011RIV000096RK-EC-3/CW-EC-1Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Report for Dec. 21Dec. 22, 2011RIV000097RK-EC-3/CW-EC-1Entergy Document, "Unit 1 Status for ENC Presentation notes," "Groundwater Status," IPEC00062939Dec. 22, 2011RIV000098RK-EC-3/CW-EC-1Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011)Dec. 22, 2011 12Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000099RK-EC-3/CW-EC-1In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Indian Point 3, LLC, and Entergy Nuclear Operations Inc's Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)Dec. 22, 2011RIV000100RK-EC-3/CW-EC-1E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re:
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Historical Sr Data (Exhibit RIV000100)Dec. 22, 2011RIV000101RK-EC-3/CW-EC-1Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2Dec. 22, 2011RIV000102RK-TC-5Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5June 19, 2012RIV000103RK-TC-5; RK-TC-1BHopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)June 19, 2012RIV000104RK-TC-5; RK-TC-1BMemorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011June 19, 2012 13Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000105RK-TC-5; RK-TC-1BNUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)June 19, 2012RIV000106RK-TC-5; RK-TC-1BAssociated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox News.com, February 3, 2012June 19, 2012RIV000107RK-TC-2Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2 (Flow Accelerated Corrosion)June 29, 2012RIV000108RK-TC-2Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper Contention TC Flow Accelerated CorrosionJune 29, 2012RIV000109RK-TC-2Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt)June 29, 2012RIV000110RK-TC-2Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDF's NPPs Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa)June 29, 2012 14Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000111RK-TC-2Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data June 29, 2012RIV000112RK-TC-2Graphs from CHECWORKS Reports (Excerpts)June 29, 2012RIV000113RK-TC-2In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271 -LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt)June 29, 2012RIV000114RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding  Contention NYS-26B/TC-1B - Metal FatigueJune 29, 2012RIV000115RK-TC-1BNRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification (December 20, 1988) June 29, 2012RIV000116RK-TC-1BAudit of NRC's License Renewal Program, OIG-07-A-15, September 6, 2007June 29, 2012RIV000117RK-TC-1BMakoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering  Vol. 6, No. 2, 2011June 29, 2012 15Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit #Contentions Addressed by ExhibitExhibit NameExhibit Submission DateRIV000118RK-TC-1BG. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-860722-12, TI86 005150June 29, 2012RIV000119RK-TC-1BInternational Atomic Energy Agency, Applicability of the leak before break concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993)June 29, 2012}}
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #     Contentions                                     Exhibit Name                                  Exhibit Addressed by Exhibit                                                                          Submission Date RIV000011    RK-TC-2              NRC Information Notice 2006-008, Secondary Piping Rupture at Mihama      Dec. 22, 2011 Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")
RIV000012    RK-TC-2              EPRI, Recommendations for an Effective Flow-Accelerated Corrosion        Dec. 22, 2011 Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")
RIV000013    RK-TC-2              Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Dec. 22, 2011 Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.
(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")
RIV000014    RK-TC-2              Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP-  Dec. 22, 2011 RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")
RIV000015    RK-TC-2              EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1,       Dec. 22, 2011 2010) ("Entergy FAC Program")
RIV00016A    RK-TC-2              Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear                  Dec. 22, 2011 Graphs Part 1")
RIV00016B    RK-TC-2              Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear                  Dec. 22, 2011 Graphs Part 2")
2
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #     Contentions                                     Exhibit Name                                      Exhibit Addressed by Exhibit                                                                              Submission Date RIV000017    RK-TC-2             V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase          Dec. 22, 2011 Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")
RIV000018    RK-TC-2              CHECWORKSTM Steam/Feedwater Application, Guidelines for Plant                Dec. 22, 2011 Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")
RIV000019    RK-TC-2              Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced            Dec. 22, 2011 Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR
("Hausler VY Testimony")
RIV000020    RK-TC-2              CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model,            Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:
LCF) ("IP3 CHECWORKS SFA Model Aug 2011")
RIV000021    RK-TC-2              CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model,             Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -
Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")
3
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #     Contentions                                       Exhibit Name                                      Exhibit Addressed by Exhibit                                                                              Submission Date RIV000022    RK-TC-2              Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the Dec. 22, 2011 ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")
RIV000023    RK-TC-2              NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty            Dec. 22, 2011 Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")
RIV000024    RK-TC-2              Entergy Engineering Report, Operating Experience Review Report, IP-RPT Dec. 22, 2011 LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")
RIV000025    RK-TC-2             Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER            Dec. 22, 2011 Report")
RIV000026    RK-TC-2              Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition      Dec. 22, 2011 Report List 1")
RIV000027    RK-TC-2              Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Dec. 22, 2011 Report List 2")
RIV000028    RK-TC-2              Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR- Dec. 22, 2011 IP2-2001-10525")
RIV000029    RK-TC-2              Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR- Dec. 22, 2011 IP3-2006-02270")
4
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #     Contentions                                     Exhibit Name                                      Exhibit Addressed by Exhibit                                                                            Submission Date RIV000030    RK-TC-2              Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. Dec. 22, 2011 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")
RIV000031    RK-TC-2              Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber,        Dec. 22, 2011 Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")
RIV000032    RK-TC-2              Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic  Dec. 22, 2011 Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")
RIV000033    RK-TC-2              Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March  Dec. 22, 2011 17, 2011 ("Dedman Article")
RIV000034    RK-TC-1B            Dr.Hopenfeld Pre-filed Testimony                                            Dec. 22, 2011 RIV000035    RK-TC-1B; RK-TC-5    Dr. Hopenfeld Report                                                        Dec. 22, 2011 RIV000036    RK-TC-1B; RK-TC-5    Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785              Dec. 22, 2011 RIV000037    RK-TC-1B; RK-TC-5    Official Transcript, ACRS Subcommittee, 12/6/2006                          Dec. 22, 2011 RIV000038    RK-TC-1B; RK-TC-5    NRC IN 2011-04                                                              Dec. 22, 2011 RIV000039    RK-TC-1B; RK-TC-5    Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08          Dec. 22, 2011 5
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                        Exhibit Name                              Exhibit Addressed by Exhibit                                                                        Submission Date RIV000040    RK-TC-1B; RK-TC-5    Taylor, EPRI R & D Status Report, Jan/Feb 1983                        Dec. 22, 2011 RIV000041    RK-TC-1B; RK-TC-5    Entergy, Table of Environmental Correction Actions for Metal Fatigue,  Dec. 22, 2011 11/6/07 RIV000042    RK-TC-1B; RK-TC-5    DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294      Dec. 22, 2011 RIV000043    RK-TC-1B; RK-TC-5    Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179          Dec. 22, 2011 RIV000044    RK-TC-1B; RK-TC-5    NRC Bulletin 88-08                                                    Dec. 22, 2011 RIV000045    RK-TC-1B; RK-TC-5    NRC Bulletin 88-08 Supp. 1                                            Dec. 22, 2011 RIV000046    RK-TC-1B; RK-TC-5    NRC Bulletin 88-08 Supp. 2                                            Dec. 22, 2011 RIV000047    RK-TC-1B; RK-TC-5    NRC IN 97-46                                                          Dec. 22, 2011 RIV000048    RK-TC-1B; RK-TC-5    Final Report of the NESC-Thermal Fatigue Project, EUR22763            Dec. 22, 2011 RIV000049    RK-TC-1B; RK-TC-5    Entergy Indian Point U3, FAC, 3RF13 Outage, 2005                      Dec. 22, 2011 RIV000050    RK-TC-1B; RK-TC-5    Westinghouse, WCAP-14950, IPECPROP00059247                            Dec. 22, 2011 RIV000051    RK-TC-1B; RK-TC-5    Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008          Dec. 22, 2011 RIV000052A-  RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1110                                Dec. 22, 2011 D
RIV000053    RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1122                                Dec. 22, 2011 RIV000054    RK-TC-1B; RK-TC-5    letter from P. Bessette to D. Brancato, 10/18/11                      Dec. 22, 2011 RIV000055    RK-TC-1B; RK-TC-5    Westinghouse CN-PAFM-09-64, IPECPROP00058077                          Dec. 22, 2011 RIV000056    RK-TC-1B; RK-TC-5    Systems Standard Design Criteria, IPECPROP00059698                    Dec. 22, 2011 6
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                    Exhibit Name                                  Exhibit Addressed by Exhibit                                                                        Submission Date RIV000057    RK-TC-1B; RK-TC-5    RAI Indian Point U2 and U3 LRA, 2/10/11                                Dec. 22, 2011 RIV000058    RK-TC-1B; RK-TC-5    Response to RAI, Indian Point U2 and U3, 3/28/11                        Dec. 22, 2011 RIV000059    RK-EC-3/CW-EC-1      Riverkeeper and Clearwater Initial Statement of Position Regarding      Dec. 22, 2011 Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")
RIV000060    RK-EC-3/CW-EC-1      Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW-    Dec. 22, 2011 EC Spent Fuel Pool Leaks ("Gundersen Testimony")
RIV000061    RK-EC-3/CW-EC-1      Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC-1 Dec. 22, 2011
                                  - Spent Fuel Pool Leaks ("Stewart Testimony")
RIV000062    RK-EC-3/CW-EC-1      Curriculum Vitae of Arnold Gundersen ("Gundersen CV")                  Dec. 22, 2011 RIV000063    RK-EC-3/CW-EC-1      Curriculum Vitae of Gillian Stewart ("Stewart CV")                      Dec. 22, 2011 RIV000064    RK-EC-3/CW-EC-1      NUREG-1437, Revision 1, Generic Environmental Impact Statement for      Dec. 22, 2011 License Renewal of Nuclear Plants (July 2009) Draft Report for Comment
("GEIS Update")
RIV000065    RK-EC-3/CW-EC-1      U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance    Dec. 22, 2011 Guide (February 2002)
RIV000066    RK-EC-3/CW-EC-1      GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report,  Dec. 22, 2011 Indian Point Energy Center, January 7, 2008, IPEC00195418 7
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                    Exhibit Addressed by Exhibit                                                                            Submission Date RIV000067    RK-EC-3/CW-EC-1      Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. Dec. 22, 2011 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008 RIV000068    RK-EC-3/CW-EC-1      Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Dec. 22, 2011 Center, Buchanan, NY (January 2008)
RIV000069    RK-EC-3/CW-EC-1      Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. Dec. 22, 2011 05000247/2005011, March 16, 2006 RIV000070    RK-EC-3/CW-EC-1      Indian Point Energy Center Status Report (Sept. 6, 2007)                    Dec. 22, 2011 RIV000071    RK-EC-3/CW-EC-1      In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear  Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.
Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)
RIV000072    RK-EC-3/CW-EC-1      E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams -  Dec. 22, 2011 What's Next? (Nov. 19, 2005), IPEC00065830 RIV000073    RK-EC-3/CW-EC-1      Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06),    Dec. 22, 2011 IPEC00063518 RIV000074    RK-EC-3/CW-EC-1      Entergy, Problem Development Sheet - Groundwater, IPEC00207416              Dec. 22, 2011 8
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                      Exhibit Addressed by Exhibit                                                                                Submission Date RIV000075    RK-EC-3/CW-EC-1      E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler          Dec. 22, 2011 (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351 RIV000076    RK-EC-3/CW-EC-1      GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater        Dec. 22, 2011 Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),
IPEC00227561 RIV000077    RK-EC-3/CW-EC-1      Entergy Chart of Leak Locations, I PEC00059360                                Dec. 22, 2011 RIV000078    RK-EC-3/CW-EC-1      IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP                Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217 RIV000079    RK-EC-3/CW-EC-1      Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW            Dec. 22, 2011 YORK TIMES (March 1, 2009)
RIV000080    RK-EC-3/CW-EC-1      IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP                Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219 RIV000081    RK-EC-3/CW-EC-1      IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP                Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223 RIV000082    RK-EC-3/CW-EC-1      Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1,        Dec. 22, 2011 Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517 9
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                  Exhibit Addressed by Exhibit                                                                          Submission Date RIV000083    RK-EC-3/CW-EC-1      IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP            Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519 RIV000084    RK-EC-3/CW-EC-1      IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP          Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515 RIV000085    RK-EC-3/CW-EC-1      Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report Dec. 22, 2011 05000286/2011004 (November 7, 2011)
RIV000086    RK-EC-3/CW-EC-1      Entergy correspondence, e-mails regarding approach to groundwater        Dec. 22, 2011 contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936 RIV000087    RK-EC-3/CW-EC-1      Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506    Dec. 22, 2011 RIV000088    RK-EC-3/CW-EC-1      Supplemental Report of the Public Oversight Panel Regarding the          Dec. 22, 2011 Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010 RIV000089    RK-EC-3/CW-EC-1      GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Dec. 22, 2011 Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June 2011) 10
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                    Exhibit Addressed by Exhibit                                                                            Submission Date RIV000090    RK-EC-3/CW-EC-1      Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100                Dec. 22, 2011 RIV000091    RK-EC-3/CW-EC-1      Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. Dec. 22, 2011 NRC (September 1, 2006)
RIV000092    RK-EC-3/CW-EC-1      Coastal Fish & Wildlife Habitat Rating Form, Haverstraw Bay                Dec. 22, 2011 RIV000093    RK-EC-3/CW-EC-1      National Research Council, Health Risks from Exposure to Low Levels of      Dec. 22, 2011 Ionizing Radiation: BEIR VII - Phase 2 (2006)
RIV000094    RK-EC-3/CW-EC-1      Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G.      Dec. 22, 2011 Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221 RIV000095    RK-EC-3/CW-EC-1      Groundwater Investigation 06 Quarter 4 Activities and Results,            Dec. 22, 2011 IPEC00063899 RIV000096    RK-EC-3/CW-EC-1      Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Dec. 22, 2011 Report for Dec. 21 RIV000097    RK-EC-3/CW-EC-1      Entergy Document, Unit 1 Status for ENC Presentation notes, Groundwater  Dec. 22, 2011 Status, IPEC00062939 RIV000098    RK-EC-3/CW-EC-1      Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato        Dec. 22, 2011 (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011) 11
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                      Exhibit Addressed by Exhibit                                                                              Submission Date RIV000099    RK-EC-3/CW-EC-1      In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear    Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)
RIV000100    RK-EC-3/CW-EC-1      E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re:      Dec. 22, 2011 Historical Sr Data (Exhibit RIV000100)
RIV000101    RK-EC-3/CW-EC-1      Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2                    Dec. 22, 2011 RIV000102    RK-TC-5              Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5                  June 19, 2012 RIV000103    RK-TC-5; RK-TC-1B    Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak        June 19, 2012 Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)
RIV000104    RK-TC-5; RK-TC-1B    Memorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam              June 19, 2012 Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011 12
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                    Exhibit Addressed by Exhibit                                                                            Submission Date RIV000105    RK-TC-5; RK-TC-1B    NUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the    June 19, 2012 Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)
RIV000106    RK-TC-5; RK-TC-1B    Associated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox    June 19, 2012 News.com, February 3, 2012 RIV000107    RK-TC-2              Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2    June 29, 2012 (Flow Accelerated Corrosion)
RIV000108    RK-TC-2              Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper  June 29, 2012 Contention TC Flow Accelerated Corrosion RIV000109    RK-TC-2              Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy June 29, 2012 Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt)
RIV000110    RK-TC-2              Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDFs NPPs      June 29, 2012 Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa) 13
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                      Exhibit Name                                    Exhibit Addressed by Exhibit                                                                            Submission Date RIV000111    RK-TC-2              Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data          June 29, 2012 RIV000112    RK-TC-2              Graphs from CHECWORKS Reports (Excerpts)                                  June 29, 2012 RIV000113    RK-TC-2              In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear June 29, 2012 Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271
                                  -LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt)
RIV000114    RK-TC-1B            Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention    June 29, 2012 NYS-26B/TC-1B - Metal Fatigue RIV000115    RK-TC-1B            NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification      June 29, 2012 (December 20, 1988)
RIV000116    RK-TC-1B            Audit of NRCs License Renewal Program, OIG-07-A-15, September 6, 2007 June 29, 2012 RIV000117    RK-TC-1B            Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an        June 29, 2012 Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering Vol. 6, No. 2, 2011 14
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit #    Contentions                                    Exhibit Name                                    Exhibit Addressed by Exhibit                                                                           Submission Date RIV000118    RK-TC-1B            G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K.       June 29, 2012 Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119    RK-TC-1B            International Atomic Energy Agency, Applicability of the leak before break June 29, 2012 concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 15}}

Latest revision as of 01:25, 12 November 2019

Riverkeeper Pre-Filed Evidentiary Hearing Exhibit RIVR40001-Revised Exhibit List (RKTC1B, 2 Rebuttal)
ML12181A372
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/29/2012
From:
Riverkeeper
To:
Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12181A367 List:
References
RAS 22866, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12181A372 (15)


Text

RIVR40001 Revised: June 29, 2012 Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIVR00001 All Riverkeeper Hearing Exhibit List ("RIV Exhibit List") Dec. 22, 2011 RIV000002 RK-TC-2 Riverkeeper Initial Statement of Position Regarding Contention RK-TC Dec. 22, 2011 Flow Accelerated Corrosion ("RK-TC-2 SOP")

RIV000003 RK-TC-2 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld Dec. 22, 2011 Testimony RK-TC-2")

RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 RK-TC-5 RIV000005 RK-TC-2 Report of Joram Hopenfeld in Support of RK-TC-2 ("Hopenfeld RK-TC-2 Dec. 22, 2011 Report")

RIV000006 RK-TC-2 NRC Information Notice No 86-106, Feed Water Line Break, December 16, Dec. 22, 2011 1986 ("NRC IN 86-106")

RIV000007 RK-TC-2 NRC Bulletin 87-01, Thinning Pipe Walls in Nuclear Plants, July 9, 1987 Dec. 22, 2011

("NRC Bulletin 87-01")

RIV000008 RK-TC-2 NRC Information Notice 1991-019, Steam Generator Feed Water Distribution Dec. 22, 2011 Piping Damage," March 12, 1991 ("NRC IN 1991-019")

RIV000009 RK-TC-2 Monitoring Report 5-93-0042, Steam Generator Feedring Nozzle Through Dec. 22, 2011 Wall Erosion, June 15, 1993 ("NRC MR 5-93-0042")

RIV000010 RK-TC-2 NRC Information Notice 1997-084, Rupture of Extraction Steam Piping," Dec. 22, 2011 December 11, 1997 ("NRC IN 1997-084")

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000011 RK-TC-2 NRC Information Notice 2006-008, Secondary Piping Rupture at Mihama Dec. 22, 2011 Power Station in Japan," March 16, 2006 ("NRC IN 2006-008")

RIV000012 RK-TC-2 EPRI, Recommendations for an Effective Flow-Accelerated Corrosion Dec. 22, 2011 Program, NSAC-202L-R3 ("EPRI NSAC-202L-R3")

RIV000013 RK-TC-2 Safety Evaluation by the Office of Nuclear Reactor Regulations Related to Dec. 22, 2011 Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

(Vermont Power Station, Docket No. 50-571), at § 2.8.7.1, p. 190, ADAMS Accession No. ML060050028 ("VY Safety Eval")

RIV000014 RK-TC-2 Aging Management Program Evaluation Report - Non-Class 1 Mechanical, IP- Dec. 22, 2011 RPT-06-LRD07, Revision 5, March 18, 2009 ("AMP Eval Report Rev 5")

RIV000015 RK-TC-2 EN-DC-315, Revision 3, Flow Accelerated Corrosion Program (March 1, Dec. 22, 2011 2010) ("Entergy FAC Program")

RIV00016A RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 1")

RIV00016B RK-TC-2 Graphs excerpted from CHECWORKS Reports ("CHECWORKS Wear Dec. 22, 2011 Graphs Part 2")

2

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000017 RK-TC-2 V.K. Chexal, W.H. Layman, & J.S. Horowitz, Tackling the Single-Phase Dec. 22, 2011 Erosion Corrosion Issue, To Be Presented at the American Power Conference April 18-20, 1988, Chicago Illinois (EPRI) ("Chexal APC")

RIV000018 RK-TC-2 CHECWORKSTM Steam/Feedwater Application, Guidelines for Plant Dec. 22, 2011 Modeling and Evaluation of Component Inspection Data, 1009599, Final Report, September 2004, IPECPROP00000271, at p.6-7 (IPECPROP00000334) ("CHECWORKS Proprietary Report 1009599")

RIV000019 RK-TC-2 Rudolf H. Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Dec. 22, 2011 Localized Corrosion: Comparison and Discussion, at 1, 8 (RHH Rebuttal, June 2, 2008, Vermont Yankee License Renewal Proceeding, 06-849-03-LR

("Hausler VY Testimony")

RIV000020 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, at p.26 (excerpt re:

LCF) ("IP3 CHECWORKS SFA Model Aug 2011")

RIV000021 RK-TC-2 CSI, Technologies, Inc., Indian Point Unit 3 CHECWORKS SFA Model, Dec. 22, 2011 Calculation No. 0705.100-01, Revision 2, August 2, 2011, Appendix K -

Components with Negative Time to Tcrit, IPEC00238096 ("CHECWORKS SFA Model Aug 2011 App K")

3

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000022 RK-TC-2 Statement by Dr. F. Peter Ford, transcript of January 26, 2005 meeting of the Dec. 22, 2011 ACRS Subcommittee on Thermal Hydraulics (January 26, 2005), at 198, ADAMS Accession No. ML050400613 ("2005 ACRS Transcript")

RIV000023 RK-TC-2 NUREG/CR-6936, PNNL 16186,Probabilities of Failure and Uncertainty Dec. 22, 2011 Estimate Information for Passive Components - a Literature Review (May 2007) ("NUREG/CR-6936")

RIV000024 RK-TC-2 Entergy Engineering Report, Operating Experience Review Report, IP-RPT Dec. 22, 2011 LRD05, Rev. 3 (2008), IPEC00186046 ("Entergy Op Ex Rev Report")

RIV000025 RK-TC-2 Daily DER Report, DER-01-01522, April 25, 2001, IPEC00020501 ("DER Dec. 22, 2011 Report")

RIV000026 RK-TC-2 Entergy Operations, Inc, Condition Report List, IPEC00185743 ("Condition Dec. 22, 2011 Report List 1")

RIV000027 RK-TC-2 Entergy Operations, Inc., Condition Report List, IPEC00092551 ("Condition Dec. 22, 2011 Report List 2")

RIV000028 RK-TC-2 Entergy Condition Report CR-IP2-2001-10525, IPEC00092616 ("Entergy CR- Dec. 22, 2011 IP2-2001-10525")

RIV000029 RK-TC-2 Entergy Condition Report CR-IP3-2006-02270, IPEC00025699 ("Entergy CR- Dec. 22, 2011 IP3-2006-02270")

4

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000030 RK-TC-2 Transcript of Meeting of Advisory Committee on Reactor Safeguards (Sept. Dec. 22, 2011 10, 2009), ADAMS Accession No. ML092670114, at 90-96 ("ACRS Mtg Transcript Sept 2009")

RIV000031 RK-TC-2 Lynn R. Sykes, John G. Armbruster, Won-Young Kim, & Leonardo Seeber, Dec. 22, 2011 Observations and Tectonic Setting of Historic and Instrumentally Located Earthquakes in the Greater New York City-Philadelphia Area, Bulletin of the Seismological Society of America, Vol. 98, No. 4, pp. 1696-1719, August 2008 ("Sykes Study")

RIV000032 RK-TC-2 Generic Issue 199 (GI-199), Implications of Updated Probabilistic Seismic Dec. 22, 2011 Hazard Estimates in Central and Eastern United States on Existing Plants Safety/Risk Assessment, August 2010, at Appendix D ("Seismic Sore-Damage Frequencies) ("NRC GI-199")

RIV000033 RK-TC-2 Bill Dedman, What are the odds? US nuke plants ranked by quake risk, March Dec. 22, 2011 17, 2011 ("Dedman Article")

RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785 Dec. 22, 2011 RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08 Dec. 22, 2011 5

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Metal Fatigue, Dec. 22, 2011 11/6/07 RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294 Dec. 22, 2011 RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179 Dec. 22, 2011 RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, EUR22763 Dec. 22, 2011 RIV000049 RK-TC-1B; RK-TC-5 Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008 Dec. 22, 2011 RIV000052A- RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 D

RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 6

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 RIV000058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Dec. 22, 2011 RIV000059 RK-EC-3/CW-EC-1 Riverkeeper and Clearwater Initial Statement of Position Regarding Dec. 22, 2011 Consolidated Contention RK-EC-3/CW-EC-1 (Spent Fuel Pool Leaks) ("RK-EC-3-CW-EC-1 SOP")

RIV000060 RK-EC-3/CW-EC-1 Testimony of Arnold Gundersen on Consolidated Contention RK-EC-3/CW- Dec. 22, 2011 EC Spent Fuel Pool Leaks ("Gundersen Testimony")

RIV000061 RK-EC-3/CW-EC-1 Testimony of Gillian Stewart on Consolidated Contention RK-EC-3/CW-EC-1 Dec. 22, 2011

- Spent Fuel Pool Leaks ("Stewart Testimony")

RIV000062 RK-EC-3/CW-EC-1 Curriculum Vitae of Arnold Gundersen ("Gundersen CV") Dec. 22, 2011 RIV000063 RK-EC-3/CW-EC-1 Curriculum Vitae of Gillian Stewart ("Stewart CV") Dec. 22, 2011 RIV000064 RK-EC-3/CW-EC-1 NUREG-1437, Revision 1, Generic Environmental Impact Statement for Dec. 22, 2011 License Renewal of Nuclear Plants (July 2009) Draft Report for Comment

("GEIS Update")

RIV000065 RK-EC-3/CW-EC-1 U.S. EPA, Radionuclides in Drinking Water: A Small Entity Compliance Dec. 22, 2011 Guide (February 2002)

RIV000066 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc., Hydrogeologic Site Investigation Report, Dec. 22, 2011 Indian Point Energy Center, January 7, 2008, IPEC00195418 7

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000067 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Units 1 & 2 - NRC Inspection Report Nos. Dec. 22, 2011 05000003/2007010 and 05000247/2007010, EA-08-088, May 13, 2008 RIV000068 RK-EC-3/CW-EC-1 Entergy, Groundwater Investigation Executive Summary, Indian Point Energy Dec. 22, 2011 Center, Buchanan, NY (January 2008)

RIV000069 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. Dec. 22, 2011 05000247/2005011, March 16, 2006 RIV000070 RK-EC-3/CW-EC-1 Indian Point Energy Center Status Report (Sept. 6, 2007) Dec. 22, 2011 RIV000071 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Prefiled Testimony of Matthew J.

Barvenik, Issue for Adjudication No. 3 - Radiological Materials (July 22, 2011)

RIV000072 RK-EC-3/CW-EC-1 E-mail from Michael Rutkoske to Steven Verrochi (Entergy), Re: SFP Exams - Dec. 22, 2011 What's Next? (Nov. 19, 2005), IPEC00065830 RIV000073 RK-EC-3/CW-EC-1 Entergy, U2 SFP Leak Monitoring Wells and Underground Piping (3/31/06), Dec. 22, 2011 IPEC00063518 RIV000074 RK-EC-3/CW-EC-1 Entergy, Problem Development Sheet - Groundwater, IPEC00207416 Dec. 22, 2011 8

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000075 RK-EC-3/CW-EC-1 E-mail from Ronald Sachatello to Donald Mayer (Entergy), Joseph Adler Dec. 22, 2011 (TLG), Gary Hinrichs (Entergy), Re: IS THE POOL LEAK OFF COLLECTION BOX EFFECTIVE?, IPEC00063351 RIV000076 RK-EC-3/CW-EC-1 GZA, GeoEnvironmental, Inc. Final IPEC Quarterly Long-Term Groundwater Dec. 22, 2011 Monitoring Report, Quarter Two 2010 (Report No. 10) (February 15, 2011),

IPEC00227561 RIV000077 RK-EC-3/CW-EC-1 Entergy Chart of Leak Locations, I PEC00059360 Dec. 22, 2011 RIV000078 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2009), IPEC00225217 RIV000079 RK-EC-3/CW-EC-1 Annie Correal, Indian Pt. Broken Pipe Spurs Safety Worries, THE NEW Dec. 22, 2011 YORK TIMES (March 1, 2009)

RIV000080 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2010), IPEC00225219 RIV000081 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 1, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 2, 2010), IPEC00225223 RIV000082 RK-EC-3/CW-EC-1 Entergy, Nuclear Management Manual, EN-MA-125, Rev. 4, Attachment 9.1, Dec. 22, 2011 Initial Investigation, Troubleshooting Plan for H-3 Investigation, Storm Drain System A, March/April 2009, IPEC00194517 9

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000083 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 3, 8.6 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 4, 2010), IPEC00233519 RIV000084 RK-EC-3/CW-EC-1 IPEC Site Management Manual, IP-SMM, CY-110, Rev. 4, 10.7 RGWMP Dec. 22, 2011 Quarterly Integrated Review Checklist (Quarter 1, 2011), IPEC00233515 RIV000085 RK-EC-3/CW-EC-1 Indian Point Nuclear Generating Unit 3 - NRC Integrated Inspection Report Dec. 22, 2011 05000286/2011004 (November 7, 2011)

RIV000086 RK-EC-3/CW-EC-1 Entergy correspondence, e-mails regarding approach to groundwater Dec. 22, 2011 contamination, IPEC00067228, IPEC00065510, IPEC00130549, IPEC00062936 RIV000087 RK-EC-3/CW-EC-1 Potential Sources of Tritium at IPEC & Inspection Method, IPEC00065506 Dec. 22, 2011 RIV000088 RK-EC-3/CW-EC-1 Supplemental Report of the Public Oversight Panel Regarding the Dec. 22, 2011 Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant, July 20, 2010 RIV000089 RK-EC-3/CW-EC-1 GAO Report to Congressional Requesters, Nuclear Regulatory Commission, Dec. 22, 2011 Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks, GAO-11-563 (June 2011) 10

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000090 RK-EC-3/CW-EC-1 Entergy Groundwater Well Data, Quarter 2, 2011, IPEC00225100 Dec. 22, 2011 RIV000091 RK-EC-3/CW-EC-1 Liquid Radioactive Release Lessons Learned Task Force Final Report, U.S. Dec. 22, 2011 NRC (September 1, 2006)

RIV000092 RK-EC-3/CW-EC-1 Coastal Fish & Wildlife Habitat Rating Form, Haverstraw Bay Dec. 22, 2011 RIV000093 RK-EC-3/CW-EC-1 National Research Council, Health Risks from Exposure to Low Levels of Dec. 22, 2011 Ionizing Radiation: BEIR VII - Phase 2 (2006)

RIV000094 RK-EC-3/CW-EC-1 Entergy E-mail from David Winslow (GZA) to Donald Mayer (Entergy), G. Dec. 22, 2011 Hinrichs (Entergy), Re: Remedial Report (May 19, 2006), IPEC00064221 RIV000095 RK-EC-3/CW-EC-1 Groundwater Investigation 06 Quarter 4 Activities and Results, Dec. 22, 2011 IPEC00063899 RIV000096 RK-EC-3/CW-EC-1 Entergy E-mail from Kathleen McMullin (Entergy) to various, Re: IPEC Status Dec. 22, 2011 Report for Dec. 21 RIV000097 RK-EC-3/CW-EC-1 Entergy Document, Unit 1 Status for ENC Presentation notes, Groundwater Dec. 22, 2011 Status, IPEC00062939 RIV000098 RK-EC-3/CW-EC-1 Letter from Kathryn Sutton (Counsel for Entergy) to Deborah Brancato Dec. 22, 2011 (Riverkeeper), Re: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Docket Nos. 50-247-LR and 50-286-LR (June 24, 2011) 11

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000099 RK-EC-3/CW-EC-1 In the Matter of Entergy Nuclear Indian Point 2, LLC, and Entergy Nuclear Dec. 22, 2011 Indian Point 3, LLC, and Entergy Nuclear Operations Incs Joint Application for CWA § 401 Water Quality Certification, Combined Prefiled Rebuttal Testimony of Thomas C. Esselman, Ph.D., Matthew J. Barvenik, and Owen Hoffman, Ph.D., Radiological - Issue for Adjudication No. 3 (October 4, 2011)

RIV000100 RK-EC-3/CW-EC-1 E-mail From Dara Gray (Entergy) to J. Noggle (NRC) (Jan. 24, 2007), Re: Dec. 22, 2011 Historical Sr Data (Exhibit RIV000100)

RIV000101 RK-EC-3/CW-EC-1 Haverstraw Water Supply Project DEIS, Draft EIS Chapter 2 Dec. 22, 2011 RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5 June 19, 2012 RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak June 19, 2012 Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)

RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam June 19, 2012 Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011 12

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the June 19, 2012 Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)

RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox June 19, 2012 News.com, February 3, 2012 RIV000107 RK-TC-2 Riverkeeper Revised Statement of Position Regarding Contention RK-TC-2 June 29, 2012 (Flow Accelerated Corrosion)

RIV000108 RK-TC-2 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Riverkeeper June 29, 2012 Contention TC Flow Accelerated Corrosion RIV000109 RK-TC-2 Official Transcript of Proceedings, Nuclear Regulatory Commission, Entergy June 29, 2012 Nuclear Vermont Yankee, 50-271-LR; ASLBP No. 06-849-03-LR, Newfane, Vermont, pages 1451-1741 (July 24, 2008), at 1477 (excerpt)

RIV000110 RK-TC-2 Stéphane Trevin & Marie-Pierre Moutrille, Optimization of EDFs NPPs June 29, 2012 Maintenance due to Flow Accelerated Corrosion and BRT-CICEROTM Improvement by NDT Results Analysis (18th World Conference on Nondestructive Testing, 16-20 April 2012, Durban, South Africa) 13

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000111 RK-TC-2 Hopenfeld, Demonstration of Flawed Presentation of CHECWORKS Data June 29, 2012 RIV000112 RK-TC-2 Graphs from CHECWORKS Reports (Excerpts) June 29, 2012 RIV000113 RK-TC-2 In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear June 29, 2012 Operations, Inc. (Vermont Yankee Nuclear Power Station), Docket No. 50-271

-LR, ASLBP No. 06-849-03-LR, Testimony of Jeffrey S. Horowitz and James C. Fitzpatrick on NEC Contention 4 - Flow-Accelerated Corrosion (May 12, 2008), at 12-13 (excerpt)

RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention June 29, 2012 NYS-26B/TC-1B - Metal Fatigue RIV000115 RK-TC-1B NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification June 29, 2012 (December 20, 1988)

RIV000116 RK-TC-1B Audit of NRCs License Renewal Program, OIG-07-A-15, September 6, 2007 June 29, 2012 RIV000117 RK-TC-1B Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an June 29, 2012 Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering Vol. 6, No. 2, 2011 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit # Contentions Exhibit Name Exhibit Addressed by Exhibit Submission Date RIV000118 RK-TC-1B G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. June 29, 2012 Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B International Atomic Energy Agency, Applicability of the leak before break June 29, 2012 concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 15