| title = Ltr 01/03/13 Prairie Island Request for Information
| title = Request for Information
| author name = Hills D E
| author name = Hills D
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
| addressee name = Lynch J
| addressee name = Lynch J
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 3, 2013 Mr. Jim Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089
 
January 3, 2013  
 
Mr. Jim Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089  


==SUBJECT:==
==SUBJECT:==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION  
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Lynch:==
==Dear Mr. Lynch:==
On February 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) inspection, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," (TI 2515-182) at your Prairie Island Station Units 1 and 2. This on-site inspection is scheduled to be performed February 25 through March 1, 2013.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase II of this inspection. It is important that all


documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. F. Sienczak, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at (630) 829-9744. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
On February 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) inspection, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, (TI 2515-182) at your Prairie Island Station Units 1 and 2. This on-site inspection is scheduled to be performed February 25 through March 1, 2013.
J. Lynch     In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase II of this inspection. It is important that all documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
Sincerely,
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. F. Sienczak, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at (630) 829-9744.
/RA/         David E. Hills, Chief       Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
 
J. Lynch                                               In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                              /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60


==Enclosure:==
==Enclosure:==
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
INSPECTION cc w/encl: Distribution via ListServŽ TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 1 Enclosure Inspection Dates: February 25 - March 1, 2013 Inspection Procedures: Temporary Instruction (TI 2515-182), "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and TanksInspector:
INSPECTION cc w/encl:     Distribution via ListServ'
Tom Bilik (630) 829-9744 tom.bilik@nrc.gov A. Information Requested for the In-Office Preparation Week The following documents listed below are requested (electronic copy CD ROM if possible) by February 19, 2013, to facilitate the preparation for the on-site inspection week. The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week. 1. Organization list of site individuals responsible for the site's underground piping and tanks program. 2. Copy of Site Underground Piping and Tanks Program. 3. Please review the enclosure "Questions" list and provide the response and/or document requests. The questions identified with the word "Prep" (highlighted in bold) are the items to be provided in advance of the inspection to support preparation for on-site week. 4. Schedule for completion of the following NEI 09-14 Revision 1 attributes:
 
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Inspection Dates:             February 25 - March 1, 2013 Inspection Procedures:         Temporary Instruction (TI 2515-182), Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:                     Tom Bilik (630) 829-9744 tom.bilik@nrc.gov A. Information Requested for the In-Office Preparation Week The following documents listed below are requested (electronic copy CD ROM if possible) by February 19, 2013, to facilitate the preparation for the on-site inspection week. The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week.
: 1. Organization list of site individuals responsible for the sites underground piping and tanks program.
: 2. Copy of Site Underground Piping and Tanks Program.
: 3. Please review the enclosure Questions list and provide the response and/or document requests. The questions identified with the word Prep (highlighted in bold) are the items to be provided in advance of the inspection to support preparation for on-site week.
: 4. Schedule for completion of the following NEI 09-14 Revision 1 attributes:
Buried Piping
Buried Piping
* Procedures and Oversight;
* Procedures and Oversight;
Line 42: Line 47:
* Inspection Plan;
* Inspection Plan;
* Plan Implementation; and
* Plan Implementation; and
* Asset Management Plan. Underground Piping and Tanks
* Asset Management Plan.
Underground Piping and Tanks
* Procedures and Oversight;
* Procedures and Oversight;
* Prioritization;
* Prioritization;
* Condition Assessment Plan; TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 2 Enclosure
* Condition Assessment Plan; 1                                      Enclosure
 
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST
* Plan Implementation; and
* Plan Implementation; and
* Asset Management Plan. B. Information to be Provided On-Site to the Inspectors Following the Entrance Meeting 1. Location maps of buried and underground piping and tanks identified by the inspector from the information requested for the preparation week. 2. Copy of EPRI document, "Recommendations for an Effective Program to Control the Degradation of Buried Pipe." 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed). 4. Please review the enclosure "Questions" list and provide response and/or document requests. The questions identified with the word "On-Site" (highlighted in bold) are the items to be provided to the inspector on-site at the entrance meeting. 5. For any of the NEI 09-14 Revision 1 attributes identified below which have been completed prior to the NRC's on-site inspection, provide written records that demonstrate that the program attribute is complete.
* Asset Management Plan.
B. Information to be Provided On-Site to the Inspectors Following the Entrance Meeting
: 1. Location maps of buried and underground piping and tanks identified by the inspector from the information requested for the preparation week.
: 2. Copy of EPRI document, Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
: 3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
: 4. Please review the enclosure Questions list and provide response and/or document requests. The questions identified with the word On-Site (highlighted in bold) are the items to be provided to the inspector on-site at the entrance meeting.
: 5. For any of the NEI 09-14 Revision 1 attributes identified below which have been completed prior to the NRCs on-site inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping
Buried Piping
* Procedures and Oversight;
* Procedures and Oversight;
Line 53: Line 67:
* Inspection Plan;
* Inspection Plan;
* Plan Implementation; and
* Plan Implementation; and
* Asset Management Plan. Underground Piping and Tanks
* Asset Management Plan.
Underground Piping and Tanks
* Procedures and Oversight;
* Procedures and Oversight;
* Prioritization;
* Prioritization;
Line 59: Line 74:
* Plan Implementation; and
* Plan Implementation; and
* Asset Management Plan.
* Asset Management Plan.
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 3  Enclosure Questions Response  Prep week/ On-site week Initiative Consistency Prep Has the licensee taken any deviations to either of the initiatives?
2                                      Enclosure
Yes/No  On-site If so, what deviations have been taken and what is (are) the basis for these deviations? Provide documentation of deviations and any associated corrective action reports. Prep Does the licensee have an on-site buried piping program manager (owner) and, potentially, a staff?
Yes/No  On-site How many buried piping program owners have there been since January 1, 2010?  Provide documentation identifying individuals responsible for the site buried piping program since January 1, 2010. On-site How many other site programs are assigned to the buried piping program
 
owner?  List all site programs that are under the direct responsibility of the site's buried piping program owner. On-site Does the licensee have requirements to capture program performance, such as system health reports and performance indicators?
Yes/No Provide copies of most recent systems health
 
reports if applicable Prep Are these requirements periodic or event driven? Periodic/Event Driven/None On-site Are there examples where these requirements have been successfully used to upgrade piping systems or to
 
avert piping or tank leaks?
Yes/No  Provide documentation related to examples if applicable Prep Does the licensee have a program or procedure to confirm that as-built location of buried and underground piping and tanks at the plant?
Yes/No TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 4  Enclosure Prep Has the licensee used this program? Yes/No Prep/ On-site For a sample of buried pipe and underground piping and tanks (sample size at least 1 high and 1 low risk/priority pipe or tank), did the risk ranking and/or prioritization process utilized by the licensee produce results in accordance
 
with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize
 
the importance of components which have a low likelihood and consequence of failure? Yes/No Sample size examined _____
Prep:  Provide copy of site's risk ranking documents including documents pertaining to the actual risk rankings and methodology
 
used. Prep:  Provide documents/drawings and/or list which identifies the risk ranking for each pipe segment or tank in each system within the
 
scope of these programs. 
 
On-site:  Provide the documents which  record/describe how the risk-methodology was applied to determine the risk of pipe segments or tanks as selected by the inspector during the preparation week.


Prep As part of its risk-ranking process did the licensee estimate/determine the total length of buried/underground piping included in the initiatives?
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Questions                                    Response Prep week/                Initiative Consistency On-site week Prep            Has the licensee taken any deviations to    Yes/No either of the initiatives?
Yes/No Prep As part of its risk-ranking process did the licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
On-site        If so, what deviations have been taken      Provide documentation of deviations and any and what is (are) the basis for these      associated corrective action reports.
Yes/No    Preventive Actions/System Maintenance
deviations?
Prep            Does the licensee have an on-site buried   Yes/No piping program manager (owner) and, potentially, a staff?
On-site        How many buried piping program owners      Provide documentation identifying individuals have there been since January 1, 2010?      responsible for the site buried piping program since January 1, 2010.
On-site        How many other site programs are            List all site programs that are under the direct assigned to the buried piping program      responsibility of the sites buried piping owner?                                     program owner.
On-site        Does the licensee have requirements to      Yes/No capture program performance, such as system health reports and performance      Provide copies of most recent systems health indicators?                                reports if applicable Prep           Are these requirements periodic or event    Periodic/Event Driven/None driven?
On-site        Are there examples where these              Yes/No requirements have been successfully used to upgrade piping systems or to        Provide documentation related to examples if avert piping or tank leaks?                applicable Prep            Does the licensee have a program or        Yes/No procedure to confirm that as-built location of buried and underground piping and tanks at the plant?
3                                                  Enclosure


TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 5  Enclosure Prep For buried steel, copper, or aluminum piping or tanks which are not cathodically protected, has the licensee developed a technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained? Yes/No/Not Applicable (no buried steel, copper, or aluminum piping which is not cathodically protected)
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Prep             Has the licensee used this program?          Yes/No Prep/ On-site    For a sample of buried pipe and              Yes/No Sample size examined _____
underground piping and tanks (sample size at least 1 high and 1 low risk/priority  Prep: Provide copy of sites risk ranking pipe or tank), did the risk ranking and/or    documents including documents pertaining to prioritization process utilized by the        the actual risk rankings and methodology licensee produce results in accordance        used.
with the initiative guidelines, i.e., which emphasize the importance of components        Prep: Provide documents/drawings and/or list which have a high likelihood and              which identifies the risk ranking for each pipe consequence of failure and deemphasize        segment or tank in each system within the the importance of components which            scope of these programs.
have a low likelihood and consequence of failure?                                      On-site: Provide the documents which record/describe how the risk-methodology was applied to determine the risk of pipe segments or tanks as selected by the inspector during the preparation week.
Prep            As part of its risk-ranking process did the  Yes/No licensee estimate/determine the total length of buried/underground piping included in the initiatives?
Prep            As part of its risk-ranking process did the  Yes/No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Preventive Actions/System Maintenance 4                                                Enclosure


On-site Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g.,
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Prep        For buried steel, copper, or aluminum          Yes/No/Not Applicable (no buried steel, copper, or piping or tanks which are not cathodically    aluminum piping which is not cathodically protected, has the licensee developed a        protected) technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained?
On-site     Is the technical basis provided as             Yes/No justification by the licensee consistent with the initiative (including its reference   Provide documented technical basis including documents) or industry standards (e.g.,       referencing documents.
NACE SP0169)
NACE SP0169)
Yes/No  Provide documented technical basis including referencing documents. Prep For uncoated steel piping, has the licensee developed a technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be  
Prep         For uncoated steel piping, has the             Yes/No/Not Applicable (no uncoated buried steel licensee developed a technical basis for       pipe) concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained?
 
On-site     Is the technical basis provided as             Yes/No justification by the licensee consistent with the initiative (including its reference   Provide documented technical basis including documents) or industry standards (e.g.,       referencing documents.
maintained? Yes/No/Not Applicable (no uncoated buried steel pipe)  On-site Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g., NACE SP0169)?
NACE SP0169)?
Yes/No  Provide documented technical basis including referencing documents.
Prep         For licensees with cathodic protection        Yes/No/Not Applicable (no cathodic protection systems, does the licensee have               systems) procedures for the maintenance, monitoring and surveys of this equipment?
Prep For licensees with cathodic protection systems, does the licensee have procedures for the maintenance, monitoring and surveys of this  
On-site     Are the licensee procedures consistent         Yes/No with the initiative (including its reference documents) or industry standards (e.g.,       Provide copy of procedures if applicable.
 
NACE SP0169)?
equipment?   Yes/No/Not Applicable (no cathodic protection systems) 
5                                                  Enclosure
 
On-site Are the licensee procedures consistent with the initiative (including its reference documents) or industry standards (e.g., NACE SP0169)?
Yes/No  Provide copy of procedures if applicable.
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 6  Enclosure On-site Is the cathodic protection system, including the evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities?
Yes/No  Provide documentation of training or qualification records of personnel. On-site Is there a program to ensure chase and vault areas which contain piping or tanks subject to the underground piping and tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks? Yes/No/N/A (No piping in chases or vaults)
Provide copy of program. Inspection Activities/Corrective Actions  Prep Has the licensee prepared an inspection plan for its buried piping and underground piping and tanks?
Yes/No  On-site Does the plan specify dates and locations where inspections are planned?
Yes/No  Provide copy of inspection plan and associated implementation procedures.
Prep Have inspections, for which the planned dates have passed, occurred as scheduled or have a substantial number of inspections been deferred? Occurred as scheduled/Deferred Prep Has the licensee experienced leaks and/or significant degradation in safety-related piping or piping carrying licensed material since January 1, 2009?  Leaks  Yes/No Degradation Yes/No
 
Prep If leakage or significant degradation did occur, did the licensee determine the cause of the leakage or degradation?
Yes/No 
 
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 7  Enclosure On-site Based on a review of a sample of root cause analyses for leaks from buried piping or underground piping and tanks
 
which are safety-related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation? Yes/No/N/A (no leaks)
Provide root cause analyses of identified leaks if applicable.
On-site Did the corrective action include an evaluation of extent of condition of the piping or tanks and possible expansion of scope of inspections?  (Preference should be given to high risk piping and "significant" leaks where more information is likely to be available). Yes/No/N/A (no leaks)
Provide corrective action documents concerning leaks if applicable.
Prep Based on a review of a sample of NDE activities which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
Yes/No  Provide list of scheduled NDE activities scheduled during on-site week and list of NDE activities that have already been conducted. On-site Were these procedures sufficiently described and recorded such that the inspection could be reproduced at a later date?  Yes/No  Provide copies of NDE procedures for the various NDE activities that have occurred or
 
are scheduled to occur.
Prep Were the procedures appropriate to detect the targeted degradation


mechanism?
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site      Is the cathodic protection system,          Yes/No including the evaluation of test data, being operated and maintained by personnel        Provide documentation of training or knowledgeable of, or trained in, such        qualification records of personnel.
Yes/No Prep For quantitative inspections, were the procedures used adequate to collect quantitative information?
activities?
Yes/No TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST 8  Enclosure  
On-site      Is there a program to ensure chase and      Yes/No/N/A (No piping in chases or vaults) vault areas which contain piping or tanks subject to the underground piping and        Provide copy of program.
tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks?
Inspection Activities/Corrective Actions Prep        Has the licensee prepared an inspection      Yes/No plan for its buried piping and underground piping and tanks?
On-site      Does the plan specify dates and locations    Yes/No where inspections are planned?
Provide copy of inspection plan and associated implementation procedures.
Prep         Have inspections, for which the planned      Occurred as scheduled/Deferred dates have passed, occurred as scheduled or have a substantial number of inspections been deferred?
Prep        Has the licensee experienced leaks          Leaks Yes/No Degradation Yes/No and/or significant degradation in safety-related piping or piping carrying licensed material since January 1, 2009?
Prep        If leakage or significant degradation did    Yes/No occur, did the licensee determine the cause of the leakage or degradation?
6                                            Enclosure


On-site Did the licensee disposition direct or indirect NDE results in accordance with their procedural requirements?  
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site     Based on a review of a sample of root        Yes/No/N/A (no leaks) cause analyses for leaks from buried piping or underground piping and tanks      Provide root cause analyses of identified leaks which are safety-related or contain          if applicable.
licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?
On-site      Did the corrective action include an        Yes/No/N/A (no leaks) evaluation of extent of condition of the piping or tanks and possible expansion of    Provide corrective action documents scope of inspections? (Preference should    concerning leaks if applicable.
be given to high risk piping and significant leaks where more information is likely to be available).
Prep        Based on a review of a sample of NDE        Yes/No activities which were either directly observed or for which records were          Provide list of scheduled NDE activities reviewed, were the inspections conducted    scheduled during on-site week and list of NDE using a predetermined set of                activities that have already been conducted.
licensee/contractor procedures?
On-site      Were these procedures sufficiently          Yes/No described and recorded such that the inspection could be reproduced at a later date?                                        Provide copies of NDE procedures for the various NDE activities that have occurred or are scheduled to occur.
Prep        Were the procedures appropriate to          Yes/No detect the targeted degradation mechanism?
Prep        For quantitative inspections, were the      Yes/No procedures used adequate to collect quantitative information?
7                                                Enclosure


Yes/No Provide sample of direct and/or indirect NDE results and the subsequent evaluations of these NDE results.
TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site      Did the licensee disposition direct or    Yes/No indirect NDE results in accordance with their procedural requirements?            Provide sample of direct and/or indirect NDE results and the subsequent evaluations of these NDE results.
8                                              Enclosure


J. Lynch     In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
J. Lynch                                                                                     In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/
Sincerely,
David E. Hills, Chief       Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60  
                                                                                /RA/
David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60


==Enclosure:==
==Enclosure:==
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)
INSPECTION cc w/encl: Distribution via ListServŽ DISTRIBUTION
INSPECTION cc w/encl:                 Distribution via ListServ' DISTRIBUTION:
: Cayetano Santos  
Cayetano Santos RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 12____12 Prairie Island Phase 2 RFI TXB.docx Publicly Available                     Non-Publicly Available               Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII                                               RIII NAME               TBilik:ls                             DHills DATE               1/3/13                                 1/3/13 OFFICIAL RECORD COPY}}
 
RidsNrrPMPrairieIsland Resource  
 
RidsNrrDorlLpl3-1 Resource
 
RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck  
 
Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak  
 
DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress\-Ltr 12____12 Prairie Island Phase 2 RFI TXB.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII     NAME TBilik:ls DHills   DATE 1/3/13 1/3/13   OFFICIAL RECORD COPY}}

Latest revision as of 14:28, 17 November 2019

Request for Information
ML13003A199
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/03/2013
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Jeffery Lynch
Northern States Power Co
Thomas Bilik
References
Download: ML13003A199 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 3, 2013 Mr. Jim Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Lynch:

On February 25, 2013, the U.S. Nuclear Regulatory Commission (NRC) will begin the Temporary Instruction (TI) inspection, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, (TI 2515-182) at your Prairie Island Station Units 1 and 2. This on-site inspection is scheduled to be performed February 25 through March 1, 2013.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, we have enclosed a list of documents pertinent to our inspection. The documents requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase II of this inspection. It is important that all documents are up-to-date, and complete, in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. F. Sienczak, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Mr. T. Bilik at (630) 829-9744.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

J. Lynch In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60

Enclosure:

DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)

INSPECTION cc w/encl: Distribution via ListServ'

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Inspection Dates: February 25 - March 1, 2013 Inspection Procedures: Temporary Instruction (TI 2515-182), Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector: Tom Bilik (630) 829-9744 tom.bilik@nrc.gov A. Information Requested for the In-Office Preparation Week The following documents listed below are requested (electronic copy CD ROM if possible) by February 19, 2013, to facilitate the preparation for the on-site inspection week. The inspector may select specific items from the information requested for the preparation week and request follow-up documents during the on-site inspection week.

1. Organization list of site individuals responsible for the sites underground piping and tanks program.
2. Copy of Site Underground Piping and Tanks Program.
3. Please review the enclosure Questions list and provide the response and/or document requests. The questions identified with the word Prep (highlighted in bold) are the items to be provided in advance of the inspection to support preparation for on-site week.
4. Schedule for completion of the following NEI 09-14 Revision 1 attributes:

Buried Piping

  • Procedures and Oversight;
  • Risk-Ranking;
  • Inspection Plan;
  • Plan Implementation; and
  • Asset Management Plan.

Underground Piping and Tanks

  • Procedures and Oversight;
  • Prioritization;
  • Condition Assessment Plan; 1 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST

  • Plan Implementation; and
  • Asset Management Plan.

B. Information to be Provided On-Site to the Inspectors Following the Entrance Meeting

1. Location maps of buried and underground piping and tanks identified by the inspector from the information requested for the preparation week.
2. Copy of EPRI document, Recommendations for an Effective Program to Control the Degradation of Buried Pipe.
3. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).
4. Please review the enclosure Questions list and provide response and/or document requests. The questions identified with the word On-Site (highlighted in bold) are the items to be provided to the inspector on-site at the entrance meeting.
5. For any of the NEI 09-14 Revision 1 attributes identified below which have been completed prior to the NRCs on-site inspection, provide written records that demonstrate that the program attribute is complete.

Buried Piping

  • Procedures and Oversight;
  • Risk-Ranking;
  • Inspection Plan;
  • Plan Implementation; and
  • Asset Management Plan.

Underground Piping and Tanks

  • Procedures and Oversight;
  • Prioritization;
  • Condition Assessment Plan;
  • Plan Implementation; and
  • Asset Management Plan.

2 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Questions Response Prep week/ Initiative Consistency On-site week Prep Has the licensee taken any deviations to Yes/No either of the initiatives?

On-site If so, what deviations have been taken Provide documentation of deviations and any and what is (are) the basis for these associated corrective action reports.

deviations?

Prep Does the licensee have an on-site buried Yes/No piping program manager (owner) and, potentially, a staff?

On-site How many buried piping program owners Provide documentation identifying individuals have there been since January 1, 2010? responsible for the site buried piping program since January 1, 2010.

On-site How many other site programs are List all site programs that are under the direct assigned to the buried piping program responsibility of the sites buried piping owner? program owner.

On-site Does the licensee have requirements to Yes/No capture program performance, such as system health reports and performance Provide copies of most recent systems health indicators? reports if applicable Prep Are these requirements periodic or event Periodic/Event Driven/None driven?

On-site Are there examples where these Yes/No requirements have been successfully used to upgrade piping systems or to Provide documentation related to examples if avert piping or tank leaks? applicable Prep Does the licensee have a program or Yes/No procedure to confirm that as-built location of buried and underground piping and tanks at the plant?

3 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Prep Has the licensee used this program? Yes/No Prep/ On-site For a sample of buried pipe and Yes/No Sample size examined _____

underground piping and tanks (sample size at least 1 high and 1 low risk/priority Prep: Provide copy of sites risk ranking pipe or tank), did the risk ranking and/or documents including documents pertaining to prioritization process utilized by the the actual risk rankings and methodology licensee produce results in accordance used.

with the initiative guidelines, i.e., which emphasize the importance of components Prep: Provide documents/drawings and/or list which have a high likelihood and which identifies the risk ranking for each pipe consequence of failure and deemphasize segment or tank in each system within the the importance of components which scope of these programs.

have a low likelihood and consequence of failure? On-site: Provide the documents which record/describe how the risk-methodology was applied to determine the risk of pipe segments or tanks as selected by the inspector during the preparation week.

Prep As part of its risk-ranking process did the Yes/No licensee estimate/determine the total length of buried/underground piping included in the initiatives?

Prep As part of its risk-ranking process did the Yes/No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?

Preventive Actions/System Maintenance 4 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST Prep For buried steel, copper, or aluminum Yes/No/Not Applicable (no buried steel, copper, or piping or tanks which are not cathodically aluminum piping which is not cathodically protected, has the licensee developed a protected) technical basis for concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained?

On-site Is the technical basis provided as Yes/No justification by the licensee consistent with the initiative (including its reference Provide documented technical basis including documents) or industry standards (e.g., referencing documents.

NACE SP0169)

Prep For uncoated steel piping, has the Yes/No/Not Applicable (no uncoated buried steel licensee developed a technical basis for pipe) concluding that structural (e.g., ASME Code minimum wall, if applicable) and leak-tight integrity of buried piping can be maintained?

On-site Is the technical basis provided as Yes/No justification by the licensee consistent with the initiative (including its reference Provide documented technical basis including documents) or industry standards (e.g., referencing documents.

NACE SP0169)?

Prep For licensees with cathodic protection Yes/No/Not Applicable (no cathodic protection systems, does the licensee have systems) procedures for the maintenance, monitoring and surveys of this equipment?

On-site Are the licensee procedures consistent Yes/No with the initiative (including its reference documents) or industry standards (e.g., Provide copy of procedures if applicable.

NACE SP0169)?

5 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site Is the cathodic protection system, Yes/No including the evaluation of test data, being operated and maintained by personnel Provide documentation of training or knowledgeable of, or trained in, such qualification records of personnel.

activities?

On-site Is there a program to ensure chase and Yes/No/N/A (No piping in chases or vaults) vault areas which contain piping or tanks subject to the underground piping and Provide copy of program.

tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks?

Inspection Activities/Corrective Actions Prep Has the licensee prepared an inspection Yes/No plan for its buried piping and underground piping and tanks?

On-site Does the plan specify dates and locations Yes/No where inspections are planned?

Provide copy of inspection plan and associated implementation procedures.

Prep Have inspections, for which the planned Occurred as scheduled/Deferred dates have passed, occurred as scheduled or have a substantial number of inspections been deferred?

Prep Has the licensee experienced leaks Leaks Yes/No Degradation Yes/No and/or significant degradation in safety-related piping or piping carrying licensed material since January 1, 2009?

Prep If leakage or significant degradation did Yes/No occur, did the licensee determine the cause of the leakage or degradation?

6 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site Based on a review of a sample of root Yes/No/N/A (no leaks) cause analyses for leaks from buried piping or underground piping and tanks Provide root cause analyses of identified leaks which are safety-related or contain if applicable.

licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?

On-site Did the corrective action include an Yes/No/N/A (no leaks) evaluation of extent of condition of the piping or tanks and possible expansion of Provide corrective action documents scope of inspections? (Preference should concerning leaks if applicable.

be given to high risk piping and significant leaks where more information is likely to be available).

Prep Based on a review of a sample of NDE Yes/No activities which were either directly observed or for which records were Provide list of scheduled NDE activities reviewed, were the inspections conducted scheduled during on-site week and list of NDE using a predetermined set of activities that have already been conducted.

licensee/contractor procedures?

On-site Were these procedures sufficiently Yes/No described and recorded such that the inspection could be reproduced at a later date? Provide copies of NDE procedures for the various NDE activities that have occurred or are scheduled to occur.

Prep Were the procedures appropriate to Yes/No detect the targeted degradation mechanism?

Prep For quantitative inspections, were the Yes/No procedures used adequate to collect quantitative information?

7 Enclosure

TEMPORARY INSTRUCTION 2515-182 PHASE II INSPECTION DOCUMENT REQUEST On-site Did the licensee disposition direct or Yes/No indirect NDE results in accordance with their procedural requirements? Provide sample of direct and/or indirect NDE results and the subsequent evaluations of these NDE results.

8 Enclosure

J. Lynch In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records Systems (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-282; 50-306 License No. NPR-42; NPR-60

Enclosure:

DOCUMENT REQUEST FOR TEMPORARY INSTRUCTION (TI 2515-182)

INSPECTION cc w/encl: Distribution via ListServ' DISTRIBUTION:

Cayetano Santos RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\-Ltr 12____12 Prairie Island Phase 2 RFI TXB.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME TBilik:ls DHills DATE 1/3/13 1/3/13 OFFICIAL RECORD COPY