| issue date = 12/18/2012 | | issue date = 12/18/2012 | ||
| title = Er 05000361-12-301; 05000362-12-301; October 12 - November 13, 2012; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report | | title = Er 05000361-12-301; 05000362-12-301; October 12 - November 13, 2012; San Onofre Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Dietrich P | | addressee name = Dietrich P | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 18, 2012 | ||
==SUBJECT:== | |||
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NRC EXAMINATION REPORT 05000361/2012301; 05000362/2012301 | |||
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NRC EXAMINATION REPORT 05000361/2012301; 05000362/2012301 | |||
==Dear Mr. Dietrich:== | ==Dear Mr. Dietrich:== | ||
Line 34: | Line 30: | ||
No findings were identified during this examination. | No findings were identified during this examination. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ | Sincerely, | ||
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15 | /RA/ | ||
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15 Enclosure: | |||
NRC Examination Report 05000361/2012301; 05000362/2012301 cc: Electronic Distribution for San Onofre Nuclear Generating Station | |||
= | =SUMMARY OF FINDINGS= | ||
ER05000361/2012301; 05000362/2012301; October 12 - November 13, 2012; San Onofre | |||
Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report. | |||
NRC examiners evaluated the competency of eight applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses, and four applicants for upgrade senior reactor operator licenses at San Onofre Nuclear Generating Station, Units 2 and 3. | NRC examiners evaluated the competency of eight applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses, and four applicants for upgrade senior reactor operator licenses at San Onofre Nuclear Generating Station, Units 2 and 3. | ||
Line 54: | Line 48: | ||
The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | ||
=== | ===NRC-Identified and Self-Revealing Findings=== | ||
No findings were identified. | No findings were identified. | ||
=== | ===Licensee-Identified Violations=== | ||
None. | None. | ||
Line 71: | Line 65: | ||
====a. Scope==== | ====a. Scope==== | ||
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject | NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 86: | Line 80: | ||
NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. | NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration. | ||
NRC examiners determined that the written examinations and | NRC examiners determined that the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination. | ||
===.3 Operator Knowledge and Performance=== | ===.3 Operator Knowledge and Performance=== | ||
Line 98: | Line 92: | ||
No findings were identified. | No findings were identified. | ||
All of the applicants passed the written examination and all parts of the operating test. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. | All of the applicants passed the written examination and all parts of the operating test. | ||
The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal. | |||
===.4 Simulation Facility Performance=== | ===.4 Simulation Facility Performance=== | ||
====a. Scope==== | ====a. Scope==== | ||
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 115: | Line 111: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | |||
{{a|4OA6}} | |||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
Line 123: | Line 118: | ||
The licensee did not identify any information or materials used during the examination as proprietary. | The licensee did not identify any information or materials used during the examination as proprietary. | ||
ATTACHMENT: | ATTACHMENT: | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
Line 130: | Line 125: | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: [[contact::J. Rogers]], Operations Instructor | : [[contact::J. Rogers]], Operations Instructor | ||
===NRC Personnel=== | ===NRC Personnel=== | ||
: [[contact::J. Reynoso]], Resident Inspector | : [[contact::J. Reynoso]], Resident Inspector | ||
==ADAMS DOCUMENTS REFERENCED== | ==ADAMS DOCUMENTS REFERENCED== | ||
}} | }} |
Latest revision as of 18:45, 20 December 2019
ML12353A322 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 12/18/2012 |
From: | Vincent Gaddy Operations Branch IV |
To: | Peter Dietrich Southern California Edison Co |
References | |
50-361/12-301, 50-362/12-301 | |
Download: ML12353A322 (8) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 18, 2012
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - NRC EXAMINATION REPORT 05000361/2012301; 05000362/2012301
Dear Mr. Dietrich:
On October 24, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at San Onofre Nuclear Generating Station, Units 2 and 3. The enclosed report documents the examination results and licensing decisions. The preliminary examination results were discussed on October 22, 2012, with Mr. George Pickar, Operations Training Manager, and other members of your staff. A telephonic exit meeting was conducted on November 13, 2012, with Mr. Scott Rua, Operations Training, who was provided the NRC licensing decisions.
The examination included the evaluation of eight applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses and four applicants for upgrade senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent Gaddy, Chief Operations Branch Division of Reactor Safety Dockets: 50-361; 50-362 Licenses: NPF-10; NPF-15 Enclosure:
NRC Examination Report 05000361/2012301; 05000362/2012301 cc: Electronic Distribution for San Onofre Nuclear Generating Station
SUMMARY OF FINDINGS
ER05000361/2012301; 05000362/2012301; October 12 - November 13, 2012; San Onofre
Nuclear Generating Station, Units 2 and 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of eight applicants for reactor operator licenses, nine applicants for instant senior reactor operator licenses, and four applicants for upgrade senior reactor operator licenses at San Onofre Nuclear Generating Station, Units 2 and 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on October 24, 2012. NRC examiners administered the operating tests on October 12-22, 2012.
The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
b. Findings
No findings were identified.
NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
NRC examiners determined that the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
.3 Operator Knowledge and Performance
a. Scope
On October 24, 2012, the licensee proctored the administration of the written examinations to all twenty-one applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on October 31, 2012.
The NRC examination team administered the various portions of the operating tests to all twenty-one applicants on October 12-22, 2012.
b. Findings
No findings were identified.
All of the applicants passed the written examination and all parts of the operating test.
The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the preliminary examination results to Messrs. George Pickar, Operations Training Manager, Richard Davis, Nuclear Training Director, and other members of the staff on October 22, 2012. A telephonic exit was conducted on November 13, 2012, between Ms. Laura Hurley, Licensing Assistant, and Mr. Scott Rua, Operations Training.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Rogers, Operations Instructor
NRC Personnel
- J. Reynoso, Resident Inspector