| issue date = 01/25/2013 | | issue date = 01/25/2013 | ||
| title = Requalification Program Inspection - Crystal River Nuclear Plant | | title = Requalification Program Inspection - Crystal River Nuclear Plant | ||
| author name = Franke M | | author name = Franke M | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Franke J | | addressee name = Franke J | ||
| addressee affiliation = Progress Energy Florida, Inc | | addressee affiliation = Progress Energy Florida, Inc | ||
| docket = 05000302 | | docket = 05000302 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 25, 2013 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 | ||
15760 W. Power Line Street Crystal River, FL 34428-6708 | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT | REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT | ||
==Dear Mr. Franke:== | ==Dear Mr. Franke:== | ||
In a telephone conversation on January 16, 2013, Mr. David Lanyi and Mr. Rick Llewellyn, Superintendent - Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Crystal River Nuclear Plant. The inspection is planned for the week of April 8, 2013 which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-2009, | In a telephone conversation on January 16, 2013, Mr. David Lanyi and Mr. Rick Llewellyn, Superintendent - Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Crystal River Nuclear Plant. The inspection is planned for the week of April 8, 2013 which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-2009, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination. | ||
In accordance with 10 CFR 55.59, the NRC has requested that you submit by March 29, 2013, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Llewellyn has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. | |||
Simulators for Use in Operator Training and Examination. | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013. | ||
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503. | |||
In accordance with 10 CFR 55.59, the NRC has requested that you submit by March 29, 2013, the material as specified in paragraph | |||
inspection program needs. The NRC has further requested that you have all items as specified in paragraph | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | |||
J. Franke 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number. | |||
J. Franke 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number. | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room). | ||
In accordance with 10 CFR 2.390 of the | Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), | ||
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov), or me at (404) 997-4436, (Internet E-mail: mark.franke@nrc.gov.) | or me at (404) 997-4436, (Internet E-mail: mark.franke@nrc.gov.) | ||
Sincerely, | |||
Sincerely, | /RA/ | ||
Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 | |||
Docket No.: | |||
==Enclosure:== | ==Enclosure:== | ||
Materials Request List cc: (See Page 3) | |||
Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution | _________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME LANYI FRANKE DATE 1/ 25 /2013 1/25/2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Franke 3 cc: Cynthia Becker Lara S. Nichols (Acting) Chief Deputy General Counsel Florida Bureau of Radiation Control Duke Energy Corporation Department of Health Electronic Mail Distribution Electronic Mail Distribution M. Christopher Nolan Daniel R. Westcott Director - Regulatory Affairs Supervisor General Office Licensing & Regulatory Programs Duke Energy Corporation Crystal River Nuclear Plant (NA1B) | ||
Electronic Mail Distribution Electronic Mail Distribution Regis T. Repko Joseph W. Donahue Senior Vice President Vice President Duke Energy Corporation Nuclear Oversight Electronic Mail Distribution Progress Energy Electronic Mail Distribution Richard A. Wiemann Superintendent, Nuclear Oversight David T. Conley Crystal River Nuclear Plant Senior Counsel Electronic Mail Distribution Legal Department Progress Energy Brian C. McCabe Electronic Mail Distribution Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Mark Rigsby Progress Energy Manager, Support Services - Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C) | |||
Electronic Mail Distribution Terry Hobbs Plant General Manager Senior Resident Inspector Crystal River Nuclear Plant (NA2C) U.S. Nuclear Regulatory Commission Electronic Mail Distribution Crystal River Nuclear Generating Plant 6745 N Tallahassee Rd Blair P. Wunderly Crystal River, FL 34428 Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Attorney General Electronic Mail Distribution Department of Legal Affairs The Capitol PL-01 R. Alexander Glenn Tallahassee, FL 32399-1050 General Counsel Progress Energy Bryan Koon Electronic Mail Distribution Director Florida Division of Emergency Management Donna B. Alexander Electronic Mail Distribution Manager, Nuclear Regulatory Affairs (interim) | |||
Progress Energy Electronic Mail Distribution (cc contd - See page 4) | |||
J. Franke 4 (cc contd) | |||
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Ms. Phyllis Dixon Training Manager Crystal River Nuclear Plant 8200 West Venable Street Crystal River, FL 34429 | |||
Letter to Jon A. Franke from Mark E. Franke dated January 25, 2013. | |||
Letter to Jon A. Franke from Mark E. Franke dated January 25, 2013. | |||
==SUBJECT:== | ==SUBJECT:== | ||
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT Distribution: | REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT Distribution: | ||
RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource | RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource | ||
A. In-office inspection material: | Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in April, 2013 at Crystal River 3. Items listed under In-office inspection material must be received in the NRC Region II office by March 29, 2013. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on April 8, 2013. | ||
A. In-office inspection material: | |||
: 1. Complete list of all licensed individuals (active and inactive; RO and SRO) including license restrictions. | : 1. Complete list of all licensed individuals (active and inactive; RO and SRO) including license restrictions. | ||
: 2. Copy of an Organizational Chart for the training department including simulator staff. | : 2. Copy of an Organizational Chart for the training department including simulator staff. | ||
: 3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans). | : 3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans). | ||
: 4. Copy of the weekly examination schedules for the weeks that the 2013 annual operating exams will be administered, including a list of personnel scheduled for testing the week of April 8, 2013. | : 4. Copy of the weekly examination schedules for the weeks that the 2013 annual operating exams will be administered, including a list of personnel scheduled for testing the week of April 8, 2013. | ||
: 5. Copies of the written examinations that were administered for the last biennial requalification examination (for all weeks), including all re-take examinations. | : 5. Copies of the written examinations that were administered for the last biennial requalification examination (for all weeks), including all re-take examinations. | ||
: 6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of April 8, 2013, with any remaining JPMs and | : 6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of April 8, 2013, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test. (exam security related item) | ||
: 7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human performance errors, including any examination security issues. | : 7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human performance errors, including any examination security issues. | ||
: 8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security. | : 8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security. | ||
: 9. A copy site procedure(s) governing simulator configuration control, maintenance, and fidelity, including all testing methods used to fulfill ANSI/ANS-3.5-2009 requirements. | : 9. A copy site procedure(s) governing simulator configuration control, maintenance, and fidelity, including all testing methods used to fulfill ANSI/ANS-3.5-2009 requirements. | ||
: 10. Copy of the program evaluation of the previous biennial requalification cycle. | : 10. Copy of the program evaluation of the previous biennial requalification cycle. | ||
B. On-site inspection material: | B. On-site inspection material: | ||
: 1. Requalification training attendance records for the current biennial training cycle. | : 1. Requalification training attendance records for the current biennial training cycle. | ||
: 2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average. | : 2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average. | ||
2 | Enclosure | ||
: 4. All training feedback forms since the last requalification inspection. | |||
: 5. Documentation regarding all remedial training conducted for examination failures since the last requalification inspection. | 2 | ||
: 6. Complete list of all individuals that reactivated their licenses since the last requalification inspection. | : 3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam. (exam security related item) | ||
: 7. Records associated with license reactivation, including: | : 4. All training feedback forms since the last requalification inspection. | ||
: a. Documentation of time on shift under instruction. b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator. | : 5. Documentation regarding all remedial training conducted for examination failures since the last requalification inspection. | ||
: 8. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection. | : 6. Complete list of all individuals that reactivated their licenses since the last requalification inspection. | ||
: 9. Medical records for all licensed (active and inactive) operators. | : 7. Records associated with license reactivation, including: | ||
: 10. Simulator maintenance and testing records, including: | : a. Documentation of time on shift under instruction. | ||
: a. List of all open simulator discrepancies b. List of all simulator discrepancies closed within the past 12 months c. List of simulator performance tests | : b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator. | ||
: d. Simulator performance testing records and associated documentation}} | : 8. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection. | ||
: 9. Medical records for all licensed (active and inactive) operators. | |||
: 10. Simulator maintenance and testing records, including: | |||
: a. List of all open simulator discrepancies | |||
: b. List of all simulator discrepancies closed within the past 12 months | |||
: c. List of simulator performance tests | |||
: d. Simulator performance testing records and associated documentation Enclosure}} |
Latest revision as of 07:41, 6 February 2020
ML13031A401 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 01/25/2013 |
From: | Mark Franke Division of Reactor Safety II |
To: | Franke J Progress Energy Florida |
References | |
Download: ML13031A401 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 25, 2013 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT
Dear Mr. Franke:
In a telephone conversation on January 16, 2013, Mr. David Lanyi and Mr. Rick Llewellyn, Superintendent - Operations Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Crystal River Nuclear Plant. The inspection is planned for the week of April 8, 2013 which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-2009, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit by March 29, 2013, the material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Llewellyn has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
J. Franke 2 The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4436, (Internet E-mail: mark.franke@nrc.gov.)
Sincerely,
/RA/
Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72
Enclosure:
Materials Request List cc: (See Page 3)
_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME LANYI FRANKE DATE 1/ 25 /2013 1/25/2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Franke 3 cc: Cynthia Becker Lara S. Nichols (Acting) Chief Deputy General Counsel Florida Bureau of Radiation Control Duke Energy Corporation Department of Health Electronic Mail Distribution Electronic Mail Distribution M. Christopher Nolan Daniel R. Westcott Director - Regulatory Affairs Supervisor General Office Licensing & Regulatory Programs Duke Energy Corporation Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution Electronic Mail Distribution Regis T. Repko Joseph W. Donahue Senior Vice President Vice President Duke Energy Corporation Nuclear Oversight Electronic Mail Distribution Progress Energy Electronic Mail Distribution Richard A. Wiemann Superintendent, Nuclear Oversight David T. Conley Crystal River Nuclear Plant Senior Counsel Electronic Mail Distribution Legal Department Progress Energy Brian C. McCabe Electronic Mail Distribution Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Mark Rigsby Progress Energy Manager, Support Services - Nuclear Electronic Mail Distribution Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Terry Hobbs Plant General Manager Senior Resident Inspector Crystal River Nuclear Plant (NA2C) U.S. Nuclear Regulatory Commission Electronic Mail Distribution Crystal River Nuclear Generating Plant 6745 N Tallahassee Rd Blair P. Wunderly Crystal River, FL 34428 Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Attorney General Electronic Mail Distribution Department of Legal Affairs The Capitol PL-01 R. Alexander Glenn Tallahassee, FL 32399-1050 General Counsel Progress Energy Bryan Koon Electronic Mail Distribution Director Florida Division of Emergency Management Donna B. Alexander Electronic Mail Distribution Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution (cc contd - See page 4)
J. Franke 4 (cc contd)
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Ms. Phyllis Dixon Training Manager Crystal River Nuclear Plant 8200 West Venable Street Crystal River, FL 34429
Letter to Jon A. Franke from Mark E. Franke dated January 25, 2013.
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - CRYSTAL RIVER NUCLEAR PLANT Distribution:
RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource
Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in April, 2013 at Crystal River 3. Items listed under In-office inspection material must be received in the NRC Region II office by March 29, 2013. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on April 8, 2013.
A. In-office inspection material:
- 1. Complete list of all licensed individuals (active and inactive; RO and SRO) including license restrictions.
- 2. Copy of an Organizational Chart for the training department including simulator staff.
- 3. Spreadsheets and/or test outlines which show the usage of written examination questions, JPMs, and simulator scenarios (i.e. outlines/sample plans).
- 4. Copy of the weekly examination schedules for the weeks that the 2013 annual operating exams will be administered, including a list of personnel scheduled for testing the week of April 8, 2013.
- 5. Copies of the written examinations that were administered for the last biennial requalification examination (for all weeks), including all re-take examinations.
- 6. Ten (10) job performance measures (JPMs), both simulator and in-plant, and six (6) simulator scenarios associated with the current annual operating test. The JPMs and scenarios to be reviewed should include those that will be administered the week of April 8, 2013, with any remaining JPMs and scenarios reviewed selected from other weeks of the annual operating test. (exam security related item)
- 7. Self-assessment reports, corrective action reports, and Licensee Event Reports, written since the last requalification inspection, resulting from or concerning human performance errors, including any examination security issues.
- 8. A copy of site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security.
- 9. A copy site procedure(s) governing simulator configuration control, maintenance, and fidelity, including all testing methods used to fulfill ANSI/ANS-3.5-2009 requirements.
- 10. Copy of the program evaluation of the previous biennial requalification cycle.
B. On-site inspection material:
- 1. Requalification training attendance records for the current biennial training cycle.
- 2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.
Enclosure
2
- 3. Simulator scenarios and JPMs (in-plant and simulator) that have been or will be administered for this requalification exam. (exam security related item)
- 4. All training feedback forms since the last requalification inspection.
- 5. Documentation regarding all remedial training conducted for examination failures since the last requalification inspection.
- 6. Complete list of all individuals that reactivated their licenses since the last requalification inspection.
- 7. Records associated with license reactivation, including:
- a. Documentation of time on shift under instruction.
- b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
- 8. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection.
- 9. Medical records for all licensed (active and inactive) operators.
- 10. Simulator maintenance and testing records, including:
- a. List of all open simulator discrepancies
- b. List of all simulator discrepancies closed within the past 12 months
- c. List of simulator performance tests
- d. Simulator performance testing records and associated documentation Enclosure